![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Duval | Status | OPEN | ||||||||
ID | 9813565 | Latitude | 30° 17' 12.0681 | ||||||||
Name |
MURPHY EXPRESS #8659 11930 BEACH BLVD |
Longitude | 81° 30' 13.7471 | ||||||||
JACKSONVILLE, FL 32246 | LL Method | DPHO | |||||||||
Contact | ANNA W JONES | LL Status | REVIEWED | ||||||||
Phone | (870) 881-6854 | Status Date | 02/06/2024 | ||||||||
Account Owner Information | |||||||||||
Name | MURPHY OIL USA INC 200 PEACH ST El Dorado, AR 71730 |
Effective Date | 02/13/2013 | ||||||||
Contact | KRYSTAL TERRELL /JENNIFER BRIDGES /BRAD WEINISCHKE | ||||||||||
Phone | (870) 677-6116 | ||||||||||
KRYSTAL.TERRELL@MURPHYUSA.COM | |||||||||||
Placard # / Date | 680017 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | MURPHY OIL USA INC 200 PEACH ST El Dorado, AR 71730 |
Effective Date | 12/19/2012 | ||||||||
Contact | KRYSTAL TERRELL /JENNIFER BRIDGES /BRAD WEINISCHKE | ||||||||||
Phone | (870) 677-6116 | ||||||||||
KRYSTAL.TERRELL@MURPHYUSA.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 20000 | Unleaded Gas (B) | 03/01/2013 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (Z) DEP approved piping |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (A) Site Suitability Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (P) Vapor monitoring w/dilution |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 20000 | Unleaded Gas (B) | 03/01/2013 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (Z) DEP approved piping |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (A) Site Suitability Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (P) Vapor monitoring w/dilution |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2024 | 04/30/2025 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2023 | 04/30/2024 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2022 | 04/30/2023 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2021 | 04/30/2022 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2020 | 04/30/2021 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2018 | 04/30/2019 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2017 | 04/30/2018 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2016 | 04/30/2017 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2015 | 05/01/2016 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2014 | 04/30/2015 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2013 | 04/30/2014 | |||||||||
No Legacy Data Found | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 05/06/2025 | Satisfied | STERLING_C | Enforcement | |||||||
Enforcement Tracking | 05/06/2025 | Closed Without Enforcement | STERLING_C | Enforcement | |||||||
Enforcement Tracking | 03/25/2025 | Closed Without Enforcement | STERLING_C | Enforcement | |||||||
Incident | 02/10/2025 | Has not led to Discharge | PAUL_JK | Incident | |||||||
Enforcement Referral | 12/20/2024 | Accepted | AMES_J | Enforcement | |||||||
Electronic Communication | 12/09/2024 | Satisfied | AMES_J | Compliance Assistance | |||||||
Electronic Communication | 11/13/2024 | Satisfied | AMES_J | Compliance Assistance | |||||||
Electronic Communication | 11/06/2024 | Satisfied | AMES_J | Compliance Assistance | |||||||
Electronic Communication | 10/14/2024 | Satisfied | AMES_J | Compliance Assistance | |||||||
Incident | 09/10/2024 | Has not led to Discharge | MCARTOR_H_1 | Incident | |||||||
Site Inspection | 09/10/2024 | Major Out of Compliance | SORIANO_JC_1 | 0/2 | Routine Compliance | ||||||
Letter | 09/10/2024 | Satisfied | SORIANO_JC_1 | Compliance Assistance | |||||||
Electronic Communication | 08/08/2024 | Satisfied | SORIANO_JC_1 | Compliance Assistance | |||||||
Letter | 08/06/2024 | Satisfied | STERLING_C | Enforcement | |||||||
Enforcement Referral | 11/28/2023 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Document Management | 05/05/2023 | Satisfied | MCARTOR_H_1 | Incident | |||||||
Electronic Communication | 05/05/2023 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Incident | 05/05/2023 | Has not led to Discharge | JORDAN_SL_1 | Incident | |||||||
Electronic Communication | 05/04/2023 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Electronic Communication | 03/03/2023 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Electronic Communication | 02/13/2023 | Satisfied | JORDAN_SL_1 | Compliance Assistance | |||||||
Enforcement Tracking | 01/04/2023 | Closed Without Enforcement | MCKINLEY_D | Enforcement | |||||||
Letter | 12/30/2022 | Satisfied | JORDAN_SL_1 | Compliance Assistance | |||||||
Site Inspection | 12/29/2022 | Major Out of Compliance | JORDAN_SL_1 | 0/2 | Routine Compliance | ||||||
Incident | 12/22/2022 | Has not led to Discharge | RICHARDS_JE_1 | Incident | |||||||
Document Management | 12/22/2022 | Satisfied | RICHARDS_JE_1 | Incident | |||||||
Electronic Communication | 12/01/2022 | Satisfied | JORDAN_SL_1 | Routine Compliance | |||||||
Electronic Communication | 05/18/2021 | Satisfied | COLE_K | Enforcement | |||||||
Letter | 05/18/2021 | Satisfied | COLE_K | Enforcement | |||||||
Electronic Communication | 05/04/2021 | Satisfied | COLE_K | Enforcement | |||||||
Enforcement Referral | 03/23/2021 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Electronic Communication | 02/24/2021 | Satisfied | AUSTIN_JH_1 | Compliance Assistance | |||||||
Phone Conversation | 01/21/2021 | Satisfied | AUSTIN_JH_1 | Compliance Assistance | |||||||
Electronic Communication | 01/21/2021 | Satisfied | AUSTIN_JH_1 | Compliance Assistance | |||||||
Electronic Communication | 01/21/2021 | Satisfied | AUSTIN_JH_1 | Compliance Assistance | |||||||
Electronic Communication | 12/22/2020 | Satisfied | AUSTIN_JH_1 | Compliance Assistance | |||||||
Site Inspection | 12/14/2020 | Major Out of Compliance | AUSTIN_JH_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 12/14/2020 | Satisfied | AUSTIN_JH_1 | Routine Compliance | |||||||
Letter | 12/14/2020 | Satisfied | AUSTIN_JH_1 | Compliance Assistance | |||||||
Site Inspection | 09/07/2018 | In Compliance | WESTERMAN_ML_1 | 0/2 | Routine Compliance | ||||||
Letter | 09/07/2018 | Satisfied | WESTERMAN_ML_1 | Routine Compliance | |||||||
Electronic Communication | 08/20/2018 | Satisfied | WESTERMAN_ML_1 | Routine Compliance | |||||||
Site Inspection | 03/04/2016 | In Compliance | GREGORY_HM_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 03/04/2016 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Electronic Communication | 03/04/2016 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Site Inspection | 05/09/2014 | In Compliance | LUNN_RJ_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 05/09/2014 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 08/26/2013 | Satisfied | LUNN_RJ_1 | Installation | |||||||
Site Inspection | 06/28/2013 | In Compliance | KOROUS_E_1 | 0/2 | Installation | ||||||
Electronic Communication | 06/28/2013 | Satisfied | KOROUS_E_1 | Installation | |||||||
No Open AOCs Found | |||||||||||
No Open Violations Found | |||||||||||
No Discharges Found |