![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Clay | Status | OPEN | ||||||||
ID | 9814267 | Latitude | 30° 8' 21.2915 | ||||||||
Name |
MURPHY USA #7564 909 BLANDING BLVD |
Longitude | 81° 46' 15.7753 | ||||||||
ORANGE PARK, FL 32065 | LL Method | DPHO | |||||||||
Contact | BRAD WEINISCHKE | LL Status | REVIEWED | ||||||||
Phone | (870) 875-7610 | Status Date | 02/06/2024 | ||||||||
Account Owner Information | |||||||||||
Name | MURPHY OIL USA INC 200 PEACH ST El Dorado, AR 71730 |
Effective Date | 07/30/2014 | ||||||||
Contact | KRYSTAL TERRELL /JENNIFER BRIDGES /BRAD WEINISCHKE | ||||||||||
Phone | (870) 677-6116 | ||||||||||
KRYSTAL.TERRELL@MURPHYUSA.COM | |||||||||||
Placard # / Date | 680024 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | MURPHY OIL USA INC 200 PEACH ST El Dorado, AR 71730 |
Effective Date | 07/30/2014 | ||||||||
Contact | KRYSTAL TERRELL /JENNIFER BRIDGES /BRAD WEINISCHKE | ||||||||||
Phone | (870) 677-6116 | ||||||||||
KRYSTAL.TERRELL@MURPHYUSA.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 20000 | Unleaded Gas (B) | 08/01/2014 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 20000 | Vehicular Diesel (D) | 08/01/2014 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (L) Compartmented (M) Spill containment bucket (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2023 | 04/30/2025 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2021 | 04/30/2023 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2018 | 04/30/2021 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2016 | 04/30/2018 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2015 | 04/30/2016 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2014 | 04/30/2015 | |||||||||
No Legacy Data Found | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 03/25/2025 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Electronic Communication | 03/16/2025 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Record Document | 01/02/2025 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 11/25/2024 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 11/25/2024 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Letter | 11/25/2024 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 04/23/2023 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 04/23/2023 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 04/23/2023 | In Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Letter | 01/31/2021 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 01/31/2021 | In Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 01/31/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 11/06/2020 | Satisfied | RAMSEY_TH_1 | Discharge | |||||||
Discharge Reporting | 11/06/2020 | Satisfied | HARRINGTON_RD_1 | Discharge | |||||||
Document Management | 11/05/2018 | Satisfied | HARRINGTON_RD_1 | Incident | |||||||
Document Management | 11/05/2018 | Satisfied | HARRINGTON_RD_1 | Discharge | |||||||
Incident | 11/05/2018 | Led to Discharge (Incident promoted) | HARRINGTON_RD_1 | Incident | |||||||
Letter | 10/26/2018 | Satisfied | LIBBY_KK_1 | Compliance Assistance | |||||||
Record Document | 10/07/2018 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 09/28/2018 | Satisfied | GOODMAN_TA_1 | Closure | |||||||
Letter | 09/28/2018 | Satisfied | GOODMAN_TA_1 | Closure | |||||||
TCAR | 09/28/2018 | Satisfied | GOODMAN_TA_1 | Closure | |||||||
Electronic Communication | 09/28/2018 | Satisfied | GOODMAN_TA_1 | Closure | |||||||
Electronic Communication | 09/28/2018 | Satisfied | LIBBY_KK_1 | Compliance Assistance | |||||||
Discharge Reporting | 07/30/2018 | Satisfied | HARRINGTON_RD_1 | Discharge | |||||||
Document Management | 07/29/2018 | Satisfied | HARRINGTON_RD_1 | Discharge | |||||||
Electronic Communication | 04/29/2018 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Letter | 04/29/2018 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 04/22/2018 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 03/14/2016 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Phone Conversation | 03/14/2016 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 03/14/2016 | In Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 10/31/2014 | In Compliance | HARRINGTON_RD_1 | 0/2 | Installation | ||||||
Emergency Preparedness Information | 10/31/2014 | Satisfied | HARRINGTON_RD_1 | Installation | |||||||
Electronic Communication | 10/31/2014 | Satisfied | HARRINGTON_RD_1 | Installation | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
11/25/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Provide current Integrity Test results of the double wall spill buckets. | |||||||
11/25/2024 | 6074 | Minor | 2.8 Improper maintenance of records. Records requiring to be maintained for 3 years or for the life of the system not kept by facility. Records not provided within 5 business days. | Provide 6-month visual inspection documentation. | |||||||
11/25/2024 | 6002 | Minor | 2.1 Operator Training records not available. | Provide verification of C Operator Certificates for the facility. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
07/13/2018 | INACTIVE | MCKEEHEN_D | |||||||||