![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Clay | Status | OPEN | ||||||||
ID | 9814982 | Latitude | 30° 8' 53.6796 | ||||||||
Name |
G8 STOP 686 BLANDING BLVD |
Longitude | 81° 45' 25.7804 | ||||||||
ORANGE PARK, FL 32065 | LL Method | DPHO | |||||||||
Contact | SWATI PATEL | LL Status | REVIEWED | ||||||||
Phone | (904) 579-4004 | Status Date | 10/09/2023 | ||||||||
Account Owner Information | |||||||||||
Name | G8 CAPITAL LLC 686 BLANDING BLVD ORANGE PARK, FL 32065 |
Effective Date | 06/26/2023 | ||||||||
Contact | SWATI PATEL | ||||||||||
Phone | (678) 983-4671 | ||||||||||
RCPATEL.LLC@GMAIL.COM | |||||||||||
Placard # / Date | 683765 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | G8 CAPITAL LLC 686 BLANDING BLVD ORANGE PARK, FL 32065 |
Effective Date | 06/26/2023 | ||||||||
Contact | SWATI PATEL | ||||||||||
Phone | (678) 983-4671 | ||||||||||
RCPATEL.LLC@GMAIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 30000 | Unleaded Gas (B) | 02/01/2016 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 15000 | Unleaded Gas (B) | 02/01/2016 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 15000 | Vehicular Diesel (D) | 02/01/2016 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Gasohol (C) | 02/01/2016 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 5000 | Unleaded Gas (B) | 02/01/2016 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 07/01/2020 | 10/28/2021 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 07/01/2018 | 02/25/2021 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2017 | 12/31/2017 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 02/01/2016 | 12/31/2016 | |||||||||
No Legacy Data Found | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Site Inspection | 03/21/2024 | Major Out of Compliance | HARRINGTON_RD_1 | 0/5 | Routine Compliance | ||||||
Enforcement Referral | 03/21/2024 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Electronic Communication | 03/21/2024 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Letter | 01/01/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 11/22/2022 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Letter | 11/22/2022 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
TCAR | 11/22/2022 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Incident | 11/11/2022 | Has not led to Discharge | RAMSEY_TH_1 | Incident | |||||||
Record Document | 09/23/2022 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Document Management | 09/16/2022 | Satisfied | RAMSEY_TH_1 | Incident | |||||||
Record Document | 03/13/2022 | Satisfied | HARRINGTON_RD_1 | Installation | |||||||
Electronic Communication | 02/14/2022 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
TCAR | 02/14/2022 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Letter | 02/14/2022 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Letter | 11/01/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 11/01/2021 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/5 | Routine Compliance | ||||||
Record Document | 03/22/2020 | Satisfied | HARRINGTON_RD_1 | Installation | |||||||
Electronic Communication | 11/20/2019 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
TCAR | 11/20/2019 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Letter | 11/20/2019 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Electronic Communication | 10/27/2019 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 10/27/2019 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/5 | Routine Compliance | ||||||
Letter | 10/27/2019 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Incident | 10/27/2019 | Has not led to Discharge | HARRINGTON_RD_1 | Incident | |||||||
Electronic Communication | 10/27/2019 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Document Management | 09/22/2019 | Satisfied | HARRINGTON_RD_1 | Incident | |||||||
Record Document | 04/30/2017 | Satisfied | HARRINGTON_RD_1 | Installation | |||||||
Site Inspection | 02/22/2017 | In Compliance | HARRINGTON_RD_1 | 0/5 | Routine Compliance | ||||||
Electronic Communication | 02/22/2017 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Record Document | 02/09/2017 | Satisfied | HARRINGTON_RD_1 | Installation | |||||||
Electronic Communication | 10/27/2016 | Satisfied | HARRINGTON_RD_1 | Installation | |||||||
Site Inspection | 10/27/2016 | In Compliance | HARRINGTON_RD_1 | 0/5 | Installation | ||||||
Record Document | 08/26/2016 | Satisfied | HARRINGTON_RD_1 | Installation | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
03/21/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Please provide current spill bucket Integrity Test result documentation. (due every 36 months). | |||||||
03/21/2024 | 7095 | Minor | 1.14 Records requiring 3 year documentation period not kept by facility. | Provide current monthly inspection documentation. Maintain the records for 3 years as required by the UST rules. | |||||||
03/21/2024 | 6012 | SNC-A | 2.9 No financial responsibility instrument or expired instrument for > 180 days. | Provide verification of current Storage Tank Financial Responsibility and facility-completed CFR Form. The CFR Form will be emailed to the facility for completion. | |||||||
No Discharges Found |