![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Fuel user/Non-retail | ||||||||
County | Pinellas | Status | OPEN | ||||||||
ID | 9815092 | Latitude | 27° 52' 24.0952 | ||||||||
Name |
BP LAND HOLDINGS LLLP 8333 BRYAN DAIRY RD |
Longitude | 82° 45' 23.3778 | ||||||||
LARGO, FL 33777-1230 | LL Method | DPHO | |||||||||
Contact | IDIS CLAXTON | LL Status | REVIEWED | ||||||||
Phone | (813) 229-1500 | Status Date | 06/01/2016 | ||||||||
Account Owner Information | |||||||||||
Name | BP LAND HOLDINGS LLLP 5550 W EXECUTIVE DR #550 TAMPA, FL 33609 |
Effective Date | 09/08/2023 | ||||||||
Contact | IDIS CLAXTON | ||||||||||
Phone | (813) 229-1500 | ||||||||||
ICLAXTON@HARRODPROPERTIES.COM | |||||||||||
Placard # / Date | 669709 - 09/08/2023 | ||||||||||
Property Owner Information | |||||||||||
Name | BP LAND HOLDINGS LLLP 5550 W EXECUTIVE DR #550 TAMPA, FL 33609 |
Effective Date | 09/08/2023 | ||||||||
Contact | IDIS CLAXTON | ||||||||||
Phone | (813) 229-1500 | ||||||||||
ICLAXTON@HARRODPROPERTIES.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
567 | 3526 | Emerg Generator Diesel (G) | 06/01/2016 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (I) Suction piping system (Z) DEP approved piping |
(6) External piping monitoring (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | |||||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/01/2023 | 03/31/2024 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/01/2020 | 03/31/2021 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/01/2019 | 03/31/2020 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/01/2018 | 03/31/2019 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 06/01/2017 | 05/31/2018 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 06/01/2016 | 05/31/2017 | |||||||||
No Legacy Data Found | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 04/02/2024 | Accepted | JUARISTIC_GK_1 | Enforcement | |||||||
Enforcement Referral | 04/02/2024 | Accepted | JUARISTIC_GK_1 | Enforcement | |||||||
Electronic Communication | 01/04/2024 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Site Inspection | 10/09/2023 | Minor Out of Compliance | SHOCK_E_1 | 1/0 | Routine Compliance | ||||||
Letter | 10/09/2023 | Satisfied | SHOCK_E_1 | Compliance Assistance | |||||||
Electronic Communication | 09/11/2023 | Satisfied | SHOCK_E_1 | Routine Compliance | |||||||
Record Document | 10/20/2020 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Letter | 10/20/2020 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 09/30/2020 | Major Out of Compliance | COLSON_NJ_1 | 1/0 | Routine Compliance | ||||||
Letter | 09/30/2020 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 07/09/2020 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Letter | 05/29/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Record Document | 05/29/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 05/17/2018 | Major Out of Compliance | COLSON_NJ_1 | 1/0 | Routine Compliance | ||||||
Letter | 05/17/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 05/02/2018 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Site Inspection | 06/29/2016 | In Compliance | STRAUSS_RH_1 | 1/0 | Installation | ||||||
Issue Document | 06/29/2016 | Satisfied | COLSON_NJ_1 | Installation | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
10/07/2023 | 7041 | Minor | 1.10 Failure to designate, register, or annually test primary overfill protection device, | Confirm either the overfill shut-off valve, the high level alarm, or the Rochester tank gauge as the primary overfill protection device and provide current testing results for the device. | |||||||
10/07/2023 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | Provide current testing results for the rupture basin sensor that alarms to the generator panel and the remote panel at the security desk. | |||||||
No Discharges Found |