![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Fuel user/Non-retail | ||||||||
County | Columbia | Status | OPEN | ||||||||
ID | 9816893 | Latitude | 30° 10' 20.8596 | ||||||||
Name |
Lake Montgomery Health and Rehabilitation Center 1270 SW MAIN BLVD |
Longitude | 82° 38' 26.5632 | ||||||||
LAKE CITY, FL 32025 | LL Method | DPHO | |||||||||
Contact | BRIAN C POLLETT | LL Status | REVIEWED | ||||||||
Phone | (386) 752-7900 | Status Date | 03/18/2019 | ||||||||
Account Owner Information | |||||||||||
Name | LAKE CITY FL OPCO LLC 1270 SW MAIN BLVD LAKE CITY, FL 32055-6684 |
Effective Date | 01/31/2024 | ||||||||
Contact | BRIAN C POLLETT | ||||||||||
Phone | (386) 752-7900 | ||||||||||
BPOLLETT@LAKEMONTGOMERYHRC.COM | |||||||||||
Placard # / Date | 693545 - 06/24/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | LAKE CITY FL OPCO LLC 1270 SW MAIN BLVD LAKE CITY, FL 32055-6684 |
Effective Date | 01/31/2024 | ||||||||
Contact | BRIAN C POLLETT | ||||||||||
Phone | (386) 752-7900 | ||||||||||
BPOLLETT@LAKEMONTGOMERYHRC.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
39744 | 2000 | Emerg Generator Diesel (G) | 04/01/2019 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms (R) Double wall - tank jacket (W) Built on supports |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs (R) Monitor tank bottom space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
95010 | 1000 | Emerg Generator Diesel (G) | 04/01/2019 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (N) Approved synthetic material |
(1) Continuous electronic sensing (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 08/09/2024 | 08/09/2025 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 08/09/2023 | 08/09/2024 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 08/09/2020 | 08/09/2021 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 08/09/2019 | 08/09/2020 | ACE AMERICAN INSURANCE COMPANY | ||||||||
No Legacy Data Found | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Tracking | 05/01/2025 | Closed Without Enforcement | PAUL_JK | Enforcement | |||||||
Letter | 05/01/2025 | Satisfied | PAUL_JK | Enforcement | |||||||
Electronic Communication | 04/22/2025 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Site Inspection | 04/22/2025 | In Compliance | ZIMMERMAN_RA_2 | 2/0 | Routine Compliance | ||||||
Phone Conversation | 03/28/2025 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Enforcement Referral | 05/03/2024 | Accepted | ZIMMERMAN_RA_2 | Enforcement | |||||||
Electronic Communication | 01/19/2023 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 03/24/2021 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 03/24/2021 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Site Inspection | 03/24/2021 | Major Out of Compliance | ZIMMERMAN_RA_2 | 2/0 | Routine Compliance | ||||||
Phone Conversation | 03/01/2021 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Record Document | 09/13/2019 | Satisfied | ZIMMERMAN_RA_2 | Installation | |||||||
Site Inspection | 09/13/2019 | In Compliance | ZIMMERMAN_RA_2 | 2/0 | Installation | ||||||
Electronic Communication | 09/13/2019 | Satisfied | ZIMMERMAN_RA_2 | Installation | |||||||
Phone Conversation | 06/20/2019 | Satisfied | ZIMMERMAN_RA_2 | Installation | |||||||
Electronic Communication | 04/29/2019 | Satisfied | ZIMMERMAN_RA_2 | Installation | |||||||
No Open AOCs Found | |||||||||||
No Open Violations Found | |||||||||||
No Discharges Found |