![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Central | Type | Fuel user/Non-retail | ||||||||
County | Volusia | Status | OPEN | ||||||||
ID | 9818595 | Latitude | 29° 2' 7.6675 | ||||||||
Name |
STETSON UNIVERSITY - SAGE HALL 136 E MINNESOTA AVE |
Longitude | 81° 18' 2.5874 | ||||||||
DELAND, FL 32723 | LL Method | DPHO | |||||||||
Contact | FACILITIES MGMNT | LL Status | REVIEWED | ||||||||
Phone | (386) 822-8808 | Status Date | 07/26/2021 | ||||||||
Account Owner Information | |||||||||||
Name | STETSON UNIVERSITY 421 N WOODLAND BLVD, UN#8420 DELAND, FL 32720-3702 |
Effective Date | 06/28/2021 | ||||||||
Contact | BONITA DUKES / MICHELE CLIFTON (AP) | ||||||||||
Phone | (386) 822-8800 | ||||||||||
BDUKES@STETSON.EDU | |||||||||||
Placard # / Date | 694194 - 06/25/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | STETSON UNIVERSITY 421 N WOODLAND BLVD, UN#8420 DELAND, FL 32720-3702 |
Effective Date | 06/28/2021 | ||||||||
Contact | BONITA DUKES / MICHELE CLIFTON (AP) | ||||||||||
Phone | (386) 822-8800 | ||||||||||
BDUKES@STETSON.EDU | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
49138 | 1761 | Emerg Generator Diesel (G) | 07/01/2021 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs (R) Monitor tank bottom space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 06/01/2023 | 06/01/2024 | CRUM & FORSTER SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 06/01/2022 | 06/01/2023 | CRUM & FORSTER SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 08/09/2021 | 06/01/2022 | CRUM & FORSTER INDEMNITY | ||||||||
No Legacy Data Found | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 07/30/2024 | Accepted | BECKER_GT_1 | Enforcement | |||||||
Electronic Communication | 04/10/2024 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 03/20/2024 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 02/23/2024 | Satisfied | GREGORY_JW_1 | Compliance Assistance | |||||||
Phone Conversation | 02/23/2024 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Issue Document | 02/15/2024 | Satisfied | BECKER_GT_1 | Compliance Assistance | |||||||
Electronic Communication | 01/16/2024 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 10/19/2023 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Site Inspection | 10/18/2023 | Major Out of Compliance | BECKER_GT_1 | 1/0 | Installation | ||||||
Letter | 10/18/2023 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 08/11/2022 | Satisfied | BECKER_GT_1 | Installation | |||||||
Electronic Communication | 08/12/2021 | Satisfied | BECKER_GT_1 | Installation | |||||||
Electronic Communication | 08/12/2021 | Satisfied | BECKER_GT_1 | Installation | |||||||
Electronic Communication | 08/12/2021 | Satisfied | BECKER_GT_1 | Installation | |||||||
Electronic Communication | 08/11/2021 | Satisfied | BECKER_GT_1 | Installation | |||||||
Electronic Communication | 08/05/2021 | Satisfied | BECKER_GT_1 | Installation | |||||||
Electronic Communication | 08/05/2021 | Satisfied | BECKER_GT_1 | Installation | |||||||
Electronic Communication | 08/03/2021 | Satisfied | BECKER_GT_1 | Installation | |||||||
Electronic Communication | 07/29/2021 | Satisfied | BECKER_GT_1 | Installation | |||||||
Electronic Communication | 06/30/2021 | Satisfied | BECKER_GT_1 | Installation | |||||||
Electronic Communication | 06/28/2021 | Satisfied | BECKER_GT_1 | Installation | |||||||
Electronic Communication | 06/28/2021 | Satisfied | BECKER_GT_1 | Installation | |||||||
Electronic Communication | 06/28/2021 | Satisfied | BECKER_GT_1 | Installation | |||||||
Electronic Communication | 06/28/2021 | Satisfied | BECKER_GT_1 | Installation | |||||||
Electronic Communication | 06/28/2021 | Satisfied | BECKER_GT_1 | Installation | |||||||
Electronic Communication | 06/28/2021 | Satisfied | BECKER_GT_1 | Installation | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
10/18/2023 | 7031 | SNC-B | 3.1 Any component(s) of storage tank system not installed according to manufacturer's instructions. | An onsite breach of integrity test is required after the tank is set in place. Please have the breach of integrity testing completed, or supply testing records from the time of installation. All integrity tests should be conducted in accordance with manufacturer's specifications. This can be provided by: 1) The tank holding vacuum for at least one hour following being set in place 2) An onsite pressure testing showing the tank secondary holds for at least one hour | |||||||
No Discharges Found |