Facility ID: | 8500014 | ||||||||||
Facility Name: | LEWIS OIL CO INC | ||||||||||
11/06/2023 | Attachment | Harrington, Richard D. | |||||||||
09/28/2023 | Electronic Communication Activity | Ramsey, Timothy H | |||||||||
Activity Closed Date: | 09/28/2023 | Activity Status: | Closed | ||||||||
Date: | 09/28/2023 | ||||||||||
Recipient: | Wenda Lewis | ||||||||||
Sender: | Tim Ramsey | ||||||||||
Subject: | Inspection Report | ||||||||||
Message: | Sent Inspection report by email | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 09/28/2023 | ||||||||
Comment: | Finished | ||||||||||
09/20/2023 | Site Inspection Activity Closed | Ramsey, Timothy H | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 09/20/2023 | ||||||||||
Activity Closed Date: | 09/22/2023 | Activity Closed By: | RAMSEY_TH_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 09/22/2023 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 09/20/2023 | User: | RAMSEY_TH_1 | ||||||||
Description: | Routine Compliance Inspection Bulk Product Facility Tank #1 – Single wall steel 17000 gallon aboveground storage tank - New/Lube Oil. Tank #2 – Single wall steel 17000 gallon aboveground storage tank - New/Lube Oil. Tank #3 – Single wall steel 12000 gallon aboveground storage tank - New/Lube Oil. Tank #4 – Single wall steel 17000 gallon aboveground storage tank - New/Lube Oil. Tank #5 – Single wall steel 17000 gallon aboveground storage tank - Fuel Oil - Distribution. Tank #6 – Single wall steel 17000 gallon aboveground storage tank - New/Lube Oil. Tank #10 – Double wall steel 2000 gallon aboveground storage tank - Waste Oil. Tank #11 – Double wall steel 2000 gallon aboveground storage tank - Waste Oil. Tank #12 – Single wall steel 1000 gallon aboveground storage tank - New/Lube Oil. Tank #13 – Single wall steel 2000 gallon aboveground storage tank - New/Lube Oil. Tank #14 – Single wall steel 2000 gallon aboveground storage tank - New/Lube Oil. Tank #15 – Single wall steel 2000 gallon aboveground storage tank - New/Lube Oil. Tanks 1-6 and 12-15 are bulk product S/W-AST installed within a sealed dike concrete containment - all equipped with steel aboveground piping dispensing product from tanks to dispensing rack for loading product delivery trucks. Product levels are manual tank gauge monitored (MTG). The tanks within the containment are all lube oil tanks. The drain valves for the containments were secured and locked at time of inspection. The underground product piping from the tanks supply product into the facility warehouse for decanting product into delivery barrels. The underground piping is equipped with observation ports installed for each of the six product pipe lines - these are visually inspected monthly. A current open violation exists for not providing check or anti-siphon valves on piping exiting containment area. Work to resolve this violation is in progress but not yet complete. Please provide documentation that all valving has been installed as soon as possible. Tanks 10 and 11 are D/W-AST's utilized for PCW and recovered waste fuels. These are equipped with spill buckets installed on the fill ports and interstitial monitoring Krueger liquid sight level indicator gauges. Tanks are in containment so annual operability testing of the release detection and overfill devices is not required for these 2 tanks. PCW recovered from multiple facility containments are transported to this facility for storage and disposal. Waste disposal manifests are maintained by the facility staff. Tanks, product piping, dispensers and secondary containments appear to be in good condition. Two year records file review: Registration Placard, Proof of Financial Responsibility, Monthly visual inspections A copy of the Inspection Report was emailed to Wenda Lewis (wlewis@lewisoilco.com) | ||||||||||
08/25/2023 | Phone Conversation Activity | Ramsey, Timothy H | |||||||||
Call Type: | Outgoing | Activity Status: | Closed | ||||||||
Phone Number: | (352) 376-3293 | Activity Closed Date: | 08/25/2023 | ||||||||
Subject: | Called facility representative by phone to schedule Routine Compliance Inspection, and discuss the following items: Results of past 2 Routine Inspections; New Rule requirements; have records from past 36 months available for review; mentioned Inspection prep Videos; requirement to have representative present to provide access to storage tank system components. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/25/2023 | ||||||||
Comment: | Finished | ||||||||||
08/17/2023 | Enforcement Tracking Activity | Mack, Brierra | |||||||||
Activity Status: | Open | ||||||||||
02/27/2023 | Enforcement Referral Activity | Ramsey, Timothy H | |||||||||
Activity Result: | Accepted | Activity Status: | Closed | ||||||||
Activity Closed Date: | 08/17/2023 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 02/27/2023 | ||||||||
Comment: | Submitted for approval by: Timothy H Ramsey: Facility referred since violation has not been resolved | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been assigned | Date: | 08/17/2023 | ||||||||
Comment: | Assigned to Brierra Mack | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was accepted on this date | Date: | 08/17/2023 | ||||||||
Comment: | Accepted by Brierra Mack: accepted | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was acknowledged on this date | Date: | 08/17/2023 | ||||||||
Comment: | Acknowledged and Assigned by Brierra Mack | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/17/2023 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 02/27/2023 | User: | RAMSEY_TH_1 | ||||||||
Description: | Facility referred since violation has not been resolved | ||||||||||
Comments: | |||||||||||
Comment Date: | 02/27/2023 | User: | RAMSEY_TH_1 | ||||||||
Description: | Facility referred since violation has not been resolved | ||||||||||
02/27/2023 | Enforcement Referral Activity | Ramsey, Timothy H | |||||||||
Activity Result: | Accepted | Activity Status: | Closed | ||||||||
Activity Closed Date: | 08/17/2023 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 02/27/2023 | ||||||||
Comment: | Submitted for approval by: Timothy H Ramsey: Facility referred since violation has not been resolved | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been assigned | Date: | 08/17/2023 | ||||||||
Comment: | Assigned to Brierra Mack | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was accepted on this date | Date: | 08/17/2023 | ||||||||
Comment: | Accepted by Brierra Mack: accepted | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was acknowledged on this date | Date: | 08/17/2023 | ||||||||
Comment: | Acknowledged and Assigned by Brierra Mack | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/17/2023 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 02/27/2023 | User: | RAMSEY_TH_1 | ||||||||
Description: | Facility referred since violation has not been resolved | ||||||||||
Comments: | |||||||||||
Comment Date: | 02/27/2023 | User: | RAMSEY_TH_1 | ||||||||
Description: | Facility referred since violation has not been resolved | ||||||||||
06/07/2022 | Site Inspection Activity Closed | Zimmerman, Robert A | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 06/07/2022 | ||||||||||
Activity Closed Date: | 06/07/2022 | Activity Closed By: | ZIMMERMAN_RA_2 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 06/07/2022 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 06/07/2022 | User: | ZIMMERMAN_RA_2 | ||||||||
Description: | Owner/operator requested onsite visit of facility to see if the anti-siphon or solenoid valves needed to be installed on to AST systems; owner concurred the tanks needed anti-siphon or solenoid valves for the facility to be in compliance. Owner conveyed due to supply chain issues that installation of the anti-siphon solenoid valves may require more than 30 days. | ||||||||||
Comments: | |||||||||||
Comment Date: | 06/07/2022 | User: | ZIMMERMAN_RA_2 | ||||||||
Description: | Sent tanks compliance assistance re-inspection report and associated compliance letter email attachments to facility representative; "Wenda Lewis" wlewis@lewisoilco.com | ||||||||||
06/07/2022 | Editable Letter Activity | Zimmerman, Robert A | |||||||||
Activity Title: | Compliance Assistance Offer Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 06/07/2022 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 06/07/2022 | ||||||||
Comment: | Sent | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 06/07/2022 | User: | ZIMMERMAN_RA_2 | ||||||||
Description: | 2nd CAO 8500014, LEWIS OIL CO INC re-insp 2022. | ||||||||||
View Attachment | |||||||||||
06/07/2022 | Electronic Communication Activity | Zimmerman, Robert A | |||||||||
Activity Closed Date: | 06/07/2022 | Activity Status: | Closed | ||||||||
Date: | 06/07/2022 | ||||||||||
Recipient: | Wenda Lewis | ||||||||||
Sender: | Robert Zimmerman | ||||||||||
Subject: | Sent tanks compliance assistance re-inspection report and associated compliance letter to facility representative | ||||||||||
Message: | Sent tanks compliance assistance re-inspection report and associated compliance letter email attachments to facility representative; "Wenda Lewis" wlewis@lewisoilco.com | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 06/07/2022 | ||||||||
Comment: | Finished | ||||||||||
06/07/2022 | Site Inspection Activity Closed | Zimmerman, Robert A | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 06/07/2022 | ||||||||||
Activity Closed Date: | 06/07/2022 | Activity Closed By: | ZIMMERMAN_RA_2 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 06/07/2022 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 06/07/2022 | User: | ZIMMERMAN_RA_2 | ||||||||
Description: | Owner/operator requested onsite visit of facility to see if the anti-siphon or solenoid valves needed to be installed on to AST systems; owner concurred the tanks needed anti-siphon or solenoid valves for the facility to be in compliance. Owner conveyed due to supply chain issues that installation of the anti-siphon solenoid valves may require more than 30 days. | ||||||||||
Comments: | |||||||||||
Comment Date: | 06/07/2022 | User: | ZIMMERMAN_RA_2 | ||||||||
Description: | Sent tanks compliance assistance re-inspection report and associated compliance letter email attachments to facility representative; "Wenda Lewis" wlewis@lewisoilco.com | ||||||||||
06/02/2022 | Comment | Zimmerman, Robert A | |||||||||
Description: | Wenda Lewis cell (352) 339.4048 | ||||||||||
06/02/2022 | Electronic Communication Activity | Zimmerman, Robert A | |||||||||
Activity Closed Date: | 06/02/2022 | Activity Status: | Closed | ||||||||
Date: | 06/02/2022 | ||||||||||
Recipient: | Wenda Lewis | ||||||||||
Sender: | Robert Zimmerman | ||||||||||
Subject: | Violation resolution status - compliance assistance out reach | ||||||||||
Message: | Sent email communication regarding violation resolution status with TCI report and CAO attachments to facility representative; "Wenda Lewis" wlewis@lewisoilco.com | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 06/02/2022 | ||||||||
Comment: | Finished | ||||||||||
08/25/2020 | Violation Open | Zimmerman, Robert A | |||||||||
Significance: | SNC-B | Status: | Open | ||||||||
Criteria ID: | 4042 | ||||||||||
Rule: | 62-761.500(3)(g) | ||||||||||
08/25/2020 | Electronic Communication Activity | Zimmerman, Robert A | |||||||||
Activity Closed Date: | 08/25/2020 | Activity Status: | Closed | ||||||||
Date: | 08/25/2020 | ||||||||||
Recipient: | Joey Long | ||||||||||
Sender: | Robert Zimmerman | ||||||||||
Subject: | TCI report | ||||||||||
Message: | Sent TCI report and CAO email attachments to facility representative; Joey Long jlong@petroleumaids.com cc Jesse Wilkinson jwilkinson@petroleumaids.com | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/25/2020 | ||||||||
Comment: | Finished | ||||||||||
08/25/2020 | Editable Letter Activity | Zimmerman, Robert A | |||||||||
Activity Title: | Compliance Assistance Offer Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 08/25/2020 | ||||||||
Comment: | Sent | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/25/2020 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 08/25/2020 | User: | ZIMMERMAN_RA_2 | ||||||||
Description: | CAO 8500014, LEWIS OIL CO INC. | ||||||||||
View Attachment | |||||||||||
08/10/2020 | Site Inspection Activity Closed | Zimmerman, Robert A | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 08/10/2020 | ||||||||||
Activity Closed Date: | 08/25/2020 | Activity Closed By: | ZIMMERMAN_RA_2 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/25/2020 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 08/25/2020 | User: | ZIMMERMAN_RA_2 | ||||||||
Description: | Sent TCI report and CAO to facility representative; Joey Long jlong@petroleumaids.com cc Jesse Wilkinson jwilkinson@petroleumaids.com | ||||||||||
08/03/2020 | Electronic Communication Activity | Zimmerman, Robert A | |||||||||
Activity Closed Date: | 08/03/2020 | Activity Status: | Closed | ||||||||
Date: | 08/03/2020 | ||||||||||
Recipient: | Joe Long | ||||||||||
Sender: | Robert Zimmerman | ||||||||||
Subject: | Compliance outreach TCI notification-scheduling | ||||||||||
Message: | Contact facility representative "Joey Long" jlong@petroleumaids.com for notification and schedule upcoming TCI and to give a reminder that the three-year record review requirement is: Registration Placard, Proof of Financial Responsibility, STFM, monthly visual inspections, annual overfill protection device and operability test certifications. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/03/2020 | ||||||||
Comment: | Finished | ||||||||||
05/22/2019 | Site Inspection Activity Open | Keim, Michael J | |||||||||
Activity Status: | Open | ||||||||||
On-Site Start Date: | 05/22/2019 | ||||||||||
04/13/2018 | Electronic Communication Activity | Zimmerman, Robert A | |||||||||
Activity Closed Date: | 04/13/2018 | Activity Status: | Closed | ||||||||
Date: | 04/13/2018 | ||||||||||
Recipient: | Joe Long | ||||||||||
Sender: | Robert Zimmerman | ||||||||||
Subject: | TCI report | ||||||||||
Message: | Sent TCI report and ICL email attachments to facility representative. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 04/13/2018 | ||||||||
Comment: | Finished | ||||||||||
04/13/2018 | Editable Letter Activity | Zimmerman, Robert A | |||||||||
Activity Title: | In Compliance Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 04/13/2018 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 04/13/2018 | User: | ZIMMERMAN_RA_2 | ||||||||
Description: | ICL 8500014, LEWIS OIL CO INC. | ||||||||||
View Attachment | |||||||||||
03/30/2018 | Site Inspection Activity Closed | Zimmerman, Robert A | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 03/30/2018 | ||||||||||
Activity Closed Date: | 04/13/2018 | Activity Closed By: | ZIMMERMAN_RA_2 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 04/13/2018 | ||||||||
Comment: | Finished | ||||||||||
03/02/2018 | Phone Conversation Activity | Zimmerman, Robert A | |||||||||
Call Type: | Outgoing | Activity Status: | Closed | ||||||||
Phone Number: | (352) 339-4839 | Activity Closed Date: | 03/02/2018 | ||||||||
Subject: | Contact facility representative for notification and schedule upcoming TCI and to give a reminder that the two year record review requirement is: Registration Placard, Proof of Financial Responsibility, CFR, Monthly visual inspections, containment integrity (if required), annual overfill protection, operability test and Line leak detector (if required) certifications. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 03/02/2018 | ||||||||
Comment: | Finished | ||||||||||
01/09/2015 | Electronic Communication Activity | Harrington, Richard D. | |||||||||
Activity Closed Date: | 01/09/2015 | Activity Status: | Closed | ||||||||
Date: | 01/09/2015 | ||||||||||
Recipient: | wenda lewis | ||||||||||
Sender: | rh | ||||||||||
Subject: | sent report | ||||||||||
Message: | - | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 01/09/2015 | ||||||||
Comment: | Finished | ||||||||||
12/12/2014 | Site Inspection Activity Closed | Harrington, Richard D. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 12/10/2014 | ||||||||||
Activity Closed Date: | 01/09/2015 | Activity Closed By: | HARRINGTON_RD_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 01/09/2015 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 01/08/2015 | User: | HARRINGTON_RD_1 | ||||||||
Description: | Tank 15 was installed in 2007 and was found during file review to not be on the insurance policy. Lewis Oil has added to the policy renewal for 1/31/2015 and will forward the policy when issued. | ||||||||||
Comments: | |||||||||||
Comment Date: | 01/08/2015 | User: | HARRINGTON_RD_1 | ||||||||
Description: | E-mailed report to Wenda Lewis 1/9/2015. | ||||||||||
Comments: | |||||||||||
Comment Date: | 01/09/2015 | User: | HARRINGTON_RD_1 | ||||||||
Description: | Per facility rep Tank 15 has been added to the insurance, will be retroactive to now, and will appear on the new policy issued 1/31/2015. | ||||||||||
12/12/2014 | Site Inspection Activity Closed | Harrington, Richard D. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 12/10/2014 | ||||||||||
Activity Closed Date: | 01/09/2015 | Activity Closed By: | HARRINGTON_RD_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 01/09/2015 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 01/08/2015 | User: | HARRINGTON_RD_1 | ||||||||
Description: | Tank 15 was installed in 2007 and was found during file review to not be on the insurance policy. Lewis Oil has added to the policy renewal for 1/31/2015 and will forward the policy when issued. | ||||||||||
Comments: | |||||||||||
Comment Date: | 01/08/2015 | User: | HARRINGTON_RD_1 | ||||||||
Description: | E-mailed report to Wenda Lewis 1/9/2015. | ||||||||||
Comments: | |||||||||||
Comment Date: | 01/09/2015 | User: | HARRINGTON_RD_1 | ||||||||
Description: | Per facility rep Tank 15 has been added to the insurance, will be retroactive to now, and will appear on the new policy issued 1/31/2015. | ||||||||||
12/12/2014 | Site Inspection Activity Closed | Harrington, Richard D. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 12/10/2014 | ||||||||||
Activity Closed Date: | 01/09/2015 | Activity Closed By: | HARRINGTON_RD_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 01/09/2015 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 01/08/2015 | User: | HARRINGTON_RD_1 | ||||||||
Description: | Tank 15 was installed in 2007 and was found during file review to not be on the insurance policy. Lewis Oil has added to the policy renewal for 1/31/2015 and will forward the policy when issued. | ||||||||||
Comments: | |||||||||||
Comment Date: | 01/08/2015 | User: | HARRINGTON_RD_1 | ||||||||
Description: | E-mailed report to Wenda Lewis 1/9/2015. | ||||||||||
Comments: | |||||||||||
Comment Date: | 01/09/2015 | User: | HARRINGTON_RD_1 | ||||||||
Description: | Per facility rep Tank 15 has been added to the insurance, will be retroactive to now, and will appear on the new policy issued 1/31/2015. | ||||||||||
12/18/2012 | Attachment | Harrington, Richard D. | |||||||||
12/18/2012 | Attachment | Harrington, Richard D. | |||||||||
12/18/2012 | Attachment | Harrington, Richard D. | |||||||||
11/30/2012 | Site Inspection Activity Closed | Harrington, Richard D. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 11/30/2012 | ||||||||||
Activity Closed Date: | 11/30/2012 | Activity Closed By: | HARRINGTON_RD_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 11/30/2012 | ||||||||
Comment: | Finished | ||||||||||
11/30/2012 | Electronic Communication Activity | Harrington, Richard D. | |||||||||
Activity Closed Date: | 11/30/2012 | Activity Status: | Closed | ||||||||
Date: | 11/30/2012 | ||||||||||
Recipient: | wenda lewis | ||||||||||
Sender: | rh | ||||||||||
Subject: | sent report | ||||||||||
Message: | - | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 11/30/2012 | ||||||||
Comment: | Finished | ||||||||||
06/03/2011 | Emergency Preparedness Information Activity | Owens, Joe S. | |||||||||
Activity Result: | Satisfied | Activity Status: | Closed | ||||||||
Activity Closed Date: | 06/03/2011 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 06/03/2011 | ||||||||
Comment: | Finished | ||||||||||
05/17/2011 | Site Inspection Activity Closed | Owens, Joe S. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 05/17/2011 | ||||||||||
Activity Closed Date: | 05/17/2011 | Activity Closed By: | OWENS_JS_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/17/2011 | ||||||||
Comment: | Finished | ||||||||||
05/17/2011 | Emergency Preparedness Information Activity | Owens, Joe S. | |||||||||
Activity Result: | Satisfied | Activity Status: | Closed | ||||||||
Activity Closed Date: | 05/17/2011 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/17/2011 | ||||||||
Comment: | Finished | ||||||||||
05/17/2010 | Site Inspection Activity Closed | Owens, Joe S. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 05/17/2010 | ||||||||||
Activity Closed Date: | 05/17/2010 | Activity Closed By: | OWENS_JS_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/17/2010 | ||||||||
Comment: | Finished | ||||||||||
05/17/2010 | Emergency Preparedness Information Activity | Owens, Joe S. | |||||||||
Activity Result: | Satisfied | Activity Status: | Closed | ||||||||
Activity Closed Date: | 05/17/2010 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/17/2010 | ||||||||
Comment: | Finished | ||||||||||
04/30/2009 | Emergency Preparedness Information Activity | Owens, Joe S. | |||||||||
Activity Result: | Satisfied | Activity Status: | Closed | ||||||||
Activity Closed Date: | 04/30/2009 | ||||||||||
04/28/2009 | Site Inspection Activity Closed | Owens, Joe S. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 04/28/2009 | ||||||||||
Activity Closed Date: | 04/28/2009 | Activity Closed By: | OWENS_JS_1 | ||||||||
05/28/2008 | Site Inspection Activity Closed | Owens, Joe S. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 05/28/2008 | ||||||||||
Activity Closed Date: | 05/28/2008 | Activity Closed By: | OWENS_JS_1 | ||||||||
Comments: | |||||||||||
Comment Date: | 05/28/2008 | User: | OWENS_JS_1 | ||||||||
Description: | CONTACT PRESENTED DOCUMENTS FOR REVIEW FOR FAC: 8500014 Placard current & displayed: OK CFR form complete - FR records are updated - OK RDRL - present and applicable for facility: TANKS; Daily visual monitoring of tanks within containment / PIPING; Visual monitoring of piping interstice @ inspection ports - all other piping A/G. All components visual inspection. Site Diagram for accuracy, attached to ATTACHMENT Facility information. No changes from last inspection. Facility registration information including tank system attributes appear to be accurate. Monthly release detection records - Accepted - daily status inspection forms reviewed. Date range for Inspection records: 4/2007 to present FUTURE DUE DATES OF FOLLOWING: Tank Insurance Renewal Due: 1/2009 Placard Registration renewal due: 6/2008 Visual inspection revealed: Containment is dry and clean, Visual inspection ports for piping from containment into warehouse - dry with no visible trace of liquids. Monthly inspections should document any maint. which is performed or recommended as needed to prevent any release. The entry boots for the piping transition from U/G pipe to A/G piping appears sound and flexible ¿ no cracks observed. Facility has a documented release and is currently scored a 10 - below current clean-up work status. The compliance inspection folder is complete and incorporated into the FAC#8500267 - RDRL is posted and is applicable for facility - Facility inspection records well maintained. | ||||||||||
01/28/2008 | Site Inspection Activity Closed | Owens, Joe S. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 01/28/2008 | ||||||||||
Activity Closed Date: | 01/28/2008 | Activity Closed By: | OWENS_JS_1 | ||||||||
Comments: | |||||||||||
Comment Date: | 01/28/2008 | User: | OWENS_JS_1 | ||||||||
Description: | Tank installed by Petroleum Aids Inc. PCC 056878 installed the AST within the existing containment. Tank has overfill audible alarm and visual gauge for overfill prevention. Insurance has been updated - binder policy reviewed with owner - CFR not yet signed will be signed upon effect date of policy. All piping associated with the tank is within the containment - from the loading rack to the tank top area and from the bottom of the tank back to the distribution rack - contents are heavy lube oil. Tank has been secured and piping has been protected. Due to weight of oil - no anti-siphon valve is required. Tank has been included into existing RDRL and monthly inspection log. Specialty Tank Co. - EQ# 354 | ||||||||||
12/03/2007 | Attachment | Owens, Joe S. | |||||||||
03/28/2007 | Attachment | Owens, Joe S. | |||||||||
03/28/2007 | Attachment | Owens, Joe S. | |||||||||
03/27/2007 | Site Inspection Activity Closed | Owens, Joe S. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 03/27/2007 | ||||||||||
Activity Closed Date: | 03/27/2007 | Activity Closed By: | OWENS_JS_1 | ||||||||
Comments: | |||||||||||
Comment Date: | 03/27/2007 | User: | OWENS_JS_1 | ||||||||
Description: | DOCUMENTS REVIEWED: Placard current & displayed: OK CFR form complete - FR records are updated - RDRL - present and applicable for facility: TANKS;Visual monitoring of tanks within containment / PIPING; Visual monitoring of piping within containment and transfer pump bermed area. All secondary piping for u/g piping from bermed transfer to warehouse (bulk filling of lube oil drums) are visual inspection at inspection ports outside of warehouse. Site Diagram for accuracy, attached to ATTACHMENT Facility information. Facility registration information including tank system attributes appear to be accurate. Monthly release detection records - Accepted. Date range for Inspection records: 5/2006 to present No Monthly incidents documented on insp. form - all systems tight and free of leaks. FUTURE DUE DATES OF FOLLOWING: Tank Insurance Renewal Due: 1/2008 Placard Registration renewal due: 6/2007 Visual inspection revealed: Containment is dry and clean, some peeling of containment sealant is starting to occur around the tank supports and needs addressing to prevent further degradation. Monthly inspections should document any maint. which is performed or recommended as needed to prevent any release. The bermed transfer pump area is slightly stained from seal leakage and a routine cleaning of the area should continue to prevent further degradation of the paving and surrounding area and prevent a possible release. The drain valve for the containment is secured and no visible staining indicating a possible release was evident. Facility has a documented release and is currently scored a 10 - below current state work status. The compliance inspection records are concise and indicate weekly inspections are occuring. RDRL is posted within the office with the placard and is applicable for facility. | ||||||||||
02/09/2007 | Emergency Preparedness Information Activity | Owens, Joe S. | |||||||||
Activity Result: | Satisfied | Activity Status: | Closed | ||||||||
Activity Closed Date: | 02/09/2007 | ||||||||||
05/24/2006 | Site Inspection Activity Closed | Owens, Joe S. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 05/24/2006 | ||||||||||
Activity Closed Date: | 05/25/2006 | Activity Closed By: | OWENS_JS_1 | ||||||||
Comments: | |||||||||||
Comment Date: | 05/24/2006 | User: | OWENS_JS_1 | ||||||||
Description: | Visual inspection of all tanks within containment. Tanks # 12 - 13 - & 14: have antisiphon valves installed. All except tanks #10 & 11 contain lubricant liquids which are not required to have such valves. Tanks # 10 & 11 have interstice gauges and these tanks are stand-alone tanks for containing PCW & Waste product. Containment is dry and clean - appears that sealant used on concrete is in good condition. U/G piping from loading rack into warehouse for transfering of lubricants into other containers is visually monitored by view ports in the secondary, just outside the entrance to the warehouse - this piping all appeared dry and liquid free. Visual inspection records were reviewed, as was the CFR & RDRL for the facility. No signs of any release associated with any of the tanks, however it appears that a delivery truck may have a habitual leak as evident from the parking lot stain outside the warehouse. | ||||||||||
05/24/2005 | Legacy Activity | Ramsey, Timothy H | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
04/07/2004 | Legacy Activity | Ramsey, Timothy H | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
03/16/2004 | Legacy Activity | Ramsey, Timothy H | |||||||||
Activity Name: | TANK INSTALLATION - FINAL INSPECTION | Activity Status: | Closed | ||||||||
Completion Notes: | 2 -2,000 GALLON AST'S ADDED TO CONTAINMENT AREA | ||||||||||
04/11/2003 | Legacy Activity | Ramsey, Timothy H | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
12/18/2001 | Legacy Activity | Ramsey, Timothy H | |||||||||
Activity Name: | TANK INSTALLATION - FINAL INSPECTION | Activity Status: | Closed | ||||||||
Completion Notes: | INSTALLATION INSPECTION, ADDED 1 - 1000 GALLON DOUBLEWALL AST | ||||||||||
12/18/2001 | Legacy Activity | Ramsey, Timothy H | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
Completion Notes: | COMPLIANCE INSPECTION | ||||||||||
12/28/2000 | Legacy Activity | Ramsey, Timothy H | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
Completion Notes: | COMPLIANCE INSPECTION | ||||||||||
03/03/2000 | Legacy Activity | Ramsey, Timothy H | |||||||||
Activity Name: | TANK CLOSURE INSPECTION | Activity Status: | Closed | ||||||||
Completion Notes: | CLOSURE INSPECTION - 280 GAL HEATING OIL TANK #7 | ||||||||||
12/21/1999 | Legacy Activity | Buono, Mike | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
Completion Notes: | COMPLIANCE INSPECTION | ||||||||||
04/22/1999 | Legacy Activity | Buono, Mike | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||