Facility Name: LEWIS OIL CO INC
 
11/06/2023 Attachment Harrington, Richard D.
09/28/2023 Electronic Communication Activity Ramsey, Timothy H
Activity Closed Date: 09/28/2023 Activity Status: Closed
Date: 09/28/2023
Recipient: Wenda Lewis
Sender: Tim Ramsey
Subject: Inspection Report
Message: Sent Inspection report by email
Events:
Event Type: Activity has been finished Date: 09/28/2023
Comment: Finished
09/20/2023 Site Inspection Activity Closed Ramsey, Timothy H
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 09/20/2023
Activity Closed Date: 09/22/2023 Activity Closed By: RAMSEY_TH_1
Events:
Event Type: Activity has been finished Date: 09/22/2023
Comment: Finished
Comments:
Comment Date: 09/20/2023 User: RAMSEY_TH_1
Description: Routine Compliance Inspection Bulk Product Facility Tank #1 – Single wall steel 17000 gallon aboveground storage tank - New/Lube Oil. Tank #2 – Single wall steel 17000 gallon aboveground storage tank - New/Lube Oil. Tank #3 – Single wall steel 12000 gallon aboveground storage tank - New/Lube Oil. Tank #4 – Single wall steel 17000 gallon aboveground storage tank - New/Lube Oil. Tank #5 – Single wall steel 17000 gallon aboveground storage tank - Fuel Oil - Distribution. Tank #6 – Single wall steel 17000 gallon aboveground storage tank - New/Lube Oil. Tank #10 – Double wall steel 2000 gallon aboveground storage tank - Waste Oil. Tank #11 – Double wall steel 2000 gallon aboveground storage tank - Waste Oil. Tank #12 – Single wall steel 1000 gallon aboveground storage tank - New/Lube Oil. Tank #13 – Single wall steel 2000 gallon aboveground storage tank - New/Lube Oil. Tank #14 – Single wall steel 2000 gallon aboveground storage tank - New/Lube Oil. Tank #15 – Single wall steel 2000 gallon aboveground storage tank - New/Lube Oil. Tanks 1-6 and 12-15 are bulk product S/W-AST installed within a sealed dike concrete containment - all equipped with steel aboveground piping dispensing product from tanks to dispensing rack for loading product delivery trucks. Product levels are manual tank gauge monitored (MTG). The tanks within the containment are all lube oil tanks. The drain valves for the containments were secured and locked at time of inspection. The underground product piping from the tanks supply product into the facility warehouse for decanting product into delivery barrels. The underground piping is equipped with observation ports installed for each of the six product pipe lines - these are visually inspected monthly. A current open violation exists for not providing check or anti-siphon valves on piping exiting containment area. Work to resolve this violation is in progress but not yet complete. Please provide documentation that all valving has been installed as soon as possible. Tanks 10 and 11 are D/W-AST's utilized for PCW and recovered waste fuels. These are equipped with spill buckets installed on the fill ports and interstitial monitoring Krueger liquid sight level indicator gauges. Tanks are in containment so annual operability testing of the release detection and overfill devices is not required for these 2 tanks. PCW recovered from multiple facility containments are transported to this facility for storage and disposal. Waste disposal manifests are maintained by the facility staff. Tanks, product piping, dispensers and secondary containments appear to be in good condition. Two year records file review: Registration Placard, Proof of Financial Responsibility, Monthly visual inspections A copy of the Inspection Report was emailed to Wenda Lewis (wlewis@lewisoilco.com)
08/25/2023 Phone Conversation Activity Ramsey, Timothy H
Call Type: Outgoing Activity Status: Closed
Phone Number: (352) 376-3293 Activity Closed Date: 08/25/2023
Subject: Called facility representative by phone to schedule Routine Compliance Inspection, and discuss the following items: Results of past 2 Routine Inspections; New Rule requirements; have records from past 36 months available for review; mentioned Inspection prep Videos; requirement to have representative present to provide access to storage tank system components.
Events:
Event Type: Activity has been finished Date: 08/25/2023
Comment: Finished
08/17/2023 Enforcement Tracking Activity Mack, Brierra
Activity Status: Open
02/27/2023 Enforcement Referral Activity Ramsey, Timothy H
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 08/17/2023
Events:
Event Type: Activity has been submitted for approval Date: 02/27/2023
Comment: Submitted for approval by: Timothy H Ramsey: Facility referred since violation has not been resolved
Events:
Event Type: Activity has been assigned Date: 08/17/2023
Comment: Assigned to Brierra Mack
Events:
Event Type: Activity/Document was accepted on this date Date: 08/17/2023
Comment: Accepted by Brierra Mack: accepted
Events:
Event Type: Activity/Document was acknowledged on this date Date: 08/17/2023
Comment: Acknowledged and Assigned by Brierra Mack
Events:
Event Type: Activity has been finished Date: 08/17/2023
Comment: Finished
Comments:
Comment Date: 02/27/2023 User: RAMSEY_TH_1
Description: Facility referred since violation has not been resolved
Comments:
Comment Date: 02/27/2023 User: RAMSEY_TH_1
Description: Facility referred since violation has not been resolved
02/27/2023 Enforcement Referral Activity Ramsey, Timothy H
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 08/17/2023
Events:
Event Type: Activity has been submitted for approval Date: 02/27/2023
Comment: Submitted for approval by: Timothy H Ramsey: Facility referred since violation has not been resolved
Events:
Event Type: Activity has been assigned Date: 08/17/2023
Comment: Assigned to Brierra Mack
Events:
Event Type: Activity/Document was accepted on this date Date: 08/17/2023
Comment: Accepted by Brierra Mack: accepted
Events:
Event Type: Activity/Document was acknowledged on this date Date: 08/17/2023
Comment: Acknowledged and Assigned by Brierra Mack
Events:
Event Type: Activity has been finished Date: 08/17/2023
Comment: Finished
Comments:
Comment Date: 02/27/2023 User: RAMSEY_TH_1
Description: Facility referred since violation has not been resolved
Comments:
Comment Date: 02/27/2023 User: RAMSEY_TH_1
Description: Facility referred since violation has not been resolved
06/07/2022 Site Inspection Activity Closed Zimmerman, Robert A
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 06/07/2022
Activity Closed Date: 06/07/2022 Activity Closed By: ZIMMERMAN_RA_2
Events:
Event Type: Activity has been finished Date: 06/07/2022
Comment: Finished
Comments:
Comment Date: 06/07/2022 User: ZIMMERMAN_RA_2
Description: Owner/operator requested onsite visit of facility to see if the anti-siphon or solenoid valves needed to be installed on to AST systems; owner concurred the tanks needed anti-siphon or solenoid valves for the facility to be in compliance. Owner conveyed due to supply chain issues that installation of the anti-siphon solenoid valves may require more than 30 days.
Comments:
Comment Date: 06/07/2022 User: ZIMMERMAN_RA_2
Description: Sent tanks compliance assistance re-inspection report and associated compliance letter email attachments to facility representative; "Wenda Lewis" wlewis@lewisoilco.com
06/07/2022 Editable Letter Activity Zimmerman, Robert A
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 06/07/2022
Comment: Finished
Events:
Event Type: Document has been sent Date: 06/07/2022
Comment: Sent
Attachments:
Attachment Date: 06/07/2022 User: ZIMMERMAN_RA_2
Description: 2nd CAO 8500014, LEWIS OIL CO INC re-insp 2022.
View Attachment
06/07/2022 Electronic Communication Activity Zimmerman, Robert A
Activity Closed Date: 06/07/2022 Activity Status: Closed
Date: 06/07/2022
Recipient: Wenda Lewis
Sender: Robert Zimmerman
Subject: Sent tanks compliance assistance re-inspection report and associated compliance letter to facility representative
Message: Sent tanks compliance assistance re-inspection report and associated compliance letter email attachments to facility representative; "Wenda Lewis" wlewis@lewisoilco.com
Events:
Event Type: Activity has been finished Date: 06/07/2022
Comment: Finished
06/07/2022 Site Inspection Activity Closed Zimmerman, Robert A
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 06/07/2022
Activity Closed Date: 06/07/2022 Activity Closed By: ZIMMERMAN_RA_2
Events:
Event Type: Activity has been finished Date: 06/07/2022
Comment: Finished
Comments:
Comment Date: 06/07/2022 User: ZIMMERMAN_RA_2
Description: Owner/operator requested onsite visit of facility to see if the anti-siphon or solenoid valves needed to be installed on to AST systems; owner concurred the tanks needed anti-siphon or solenoid valves for the facility to be in compliance. Owner conveyed due to supply chain issues that installation of the anti-siphon solenoid valves may require more than 30 days.
Comments:
Comment Date: 06/07/2022 User: ZIMMERMAN_RA_2
Description: Sent tanks compliance assistance re-inspection report and associated compliance letter email attachments to facility representative; "Wenda Lewis" wlewis@lewisoilco.com
06/02/2022 Comment Zimmerman, Robert A
Description: Wenda Lewis cell (352) 339.4048
06/02/2022 Electronic Communication Activity Zimmerman, Robert A
Activity Closed Date: 06/02/2022 Activity Status: Closed
Date: 06/02/2022
Recipient: Wenda Lewis
Sender: Robert Zimmerman
Subject: Violation resolution status - compliance assistance out reach
Message: Sent email communication regarding violation resolution status with TCI report and CAO attachments to facility representative; "Wenda Lewis" wlewis@lewisoilco.com
Events:
Event Type: Activity has been finished Date: 06/02/2022
Comment: Finished
08/25/2020 Violation Open Zimmerman, Robert A
Significance: SNC-B Status: Open
Criteria ID: 4042
Rule: 62-761.500(3)(g)
08/25/2020 Electronic Communication Activity Zimmerman, Robert A
Activity Closed Date: 08/25/2020 Activity Status: Closed
Date: 08/25/2020
Recipient: Joey Long
Sender: Robert Zimmerman
Subject: TCI report
Message: Sent TCI report and CAO email attachments to facility representative; Joey Long jlong@petroleumaids.com cc Jesse Wilkinson jwilkinson@petroleumaids.com
Events:
Event Type: Activity has been finished Date: 08/25/2020
Comment: Finished
08/25/2020 Editable Letter Activity Zimmerman, Robert A
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 08/25/2020
Comment: Sent
Events:
Event Type: Activity has been finished Date: 08/25/2020
Comment: Finished
Attachments:
Attachment Date: 08/25/2020 User: ZIMMERMAN_RA_2
Description: CAO 8500014, LEWIS OIL CO INC.
View Attachment
08/10/2020 Site Inspection Activity Closed Zimmerman, Robert A
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 08/10/2020
Activity Closed Date: 08/25/2020 Activity Closed By: ZIMMERMAN_RA_2
Events:
Event Type: Activity has been finished Date: 08/25/2020
Comment: Finished
Comments:
Comment Date: 08/25/2020 User: ZIMMERMAN_RA_2
Description: Sent TCI report and CAO to facility representative; Joey Long jlong@petroleumaids.com cc Jesse Wilkinson jwilkinson@petroleumaids.com
08/03/2020 Electronic Communication Activity Zimmerman, Robert A
Activity Closed Date: 08/03/2020 Activity Status: Closed
Date: 08/03/2020
Recipient: Joe Long
Sender: Robert Zimmerman
Subject: Compliance outreach TCI notification-scheduling
Message: Contact facility representative "Joey Long" jlong@petroleumaids.com for notification and schedule upcoming TCI and to give a reminder that the three-year record review requirement is: Registration Placard, Proof of Financial Responsibility, STFM, monthly visual inspections, annual overfill protection device and operability test certifications.
Events:
Event Type: Activity has been finished Date: 08/03/2020
Comment: Finished
05/22/2019 Site Inspection Activity Open Keim, Michael J
Activity Status: Open
On-Site Start Date: 05/22/2019
04/13/2018 Electronic Communication Activity Zimmerman, Robert A
Activity Closed Date: 04/13/2018 Activity Status: Closed
Date: 04/13/2018
Recipient: Joe Long
Sender: Robert Zimmerman
Subject: TCI report
Message: Sent TCI report and ICL email attachments to facility representative.
Events:
Event Type: Activity has been finished Date: 04/13/2018
Comment: Finished
04/13/2018 Editable Letter Activity Zimmerman, Robert A
Activity Title: In Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 04/13/2018
Comment: Finished
Attachments:
Attachment Date: 04/13/2018 User: ZIMMERMAN_RA_2
Description: ICL 8500014, LEWIS OIL CO INC.
View Attachment
03/30/2018 Site Inspection Activity Closed Zimmerman, Robert A
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 03/30/2018
Activity Closed Date: 04/13/2018 Activity Closed By: ZIMMERMAN_RA_2
Events:
Event Type: Activity has been finished Date: 04/13/2018
Comment: Finished
03/02/2018 Phone Conversation Activity Zimmerman, Robert A
Call Type: Outgoing Activity Status: Closed
Phone Number: (352) 339-4839 Activity Closed Date: 03/02/2018
Subject: Contact facility representative for notification and schedule upcoming TCI and to give a reminder that the two year record review requirement is: Registration Placard, Proof of Financial Responsibility, CFR, Monthly visual inspections, containment integrity (if required), annual overfill protection, operability test and Line leak detector (if required) certifications.
Events:
Event Type: Activity has been finished Date: 03/02/2018
Comment: Finished
01/09/2015 Electronic Communication Activity Harrington, Richard D.
Activity Closed Date: 01/09/2015 Activity Status: Closed
Date: 01/09/2015
Recipient: wenda lewis
Sender: rh
Subject: sent report
Message: -
Events:
Event Type: Activity has been finished Date: 01/09/2015
Comment: Finished
12/12/2014 Site Inspection Activity Closed Harrington, Richard D.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 12/10/2014
Activity Closed Date: 01/09/2015 Activity Closed By: HARRINGTON_RD_1
Events:
Event Type: Activity has been finished Date: 01/09/2015
Comment: Finished
Comments:
Comment Date: 01/08/2015 User: HARRINGTON_RD_1
Description: Tank 15 was installed in 2007 and was found during file review to not be on the insurance policy. Lewis Oil has added to the policy renewal for 1/31/2015 and will forward the policy when issued.
Comments:
Comment Date: 01/08/2015 User: HARRINGTON_RD_1
Description: E-mailed report to Wenda Lewis 1/9/2015.
Comments:
Comment Date: 01/09/2015 User: HARRINGTON_RD_1
Description: Per facility rep Tank 15 has been added to the insurance, will be retroactive to now, and will appear on the new policy issued 1/31/2015.
12/12/2014 Site Inspection Activity Closed Harrington, Richard D.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 12/10/2014
Activity Closed Date: 01/09/2015 Activity Closed By: HARRINGTON_RD_1
Events:
Event Type: Activity has been finished Date: 01/09/2015
Comment: Finished
Comments:
Comment Date: 01/08/2015 User: HARRINGTON_RD_1
Description: Tank 15 was installed in 2007 and was found during file review to not be on the insurance policy. Lewis Oil has added to the policy renewal for 1/31/2015 and will forward the policy when issued.
Comments:
Comment Date: 01/08/2015 User: HARRINGTON_RD_1
Description: E-mailed report to Wenda Lewis 1/9/2015.
Comments:
Comment Date: 01/09/2015 User: HARRINGTON_RD_1
Description: Per facility rep Tank 15 has been added to the insurance, will be retroactive to now, and will appear on the new policy issued 1/31/2015.
12/12/2014 Site Inspection Activity Closed Harrington, Richard D.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 12/10/2014
Activity Closed Date: 01/09/2015 Activity Closed By: HARRINGTON_RD_1
Events:
Event Type: Activity has been finished Date: 01/09/2015
Comment: Finished
Comments:
Comment Date: 01/08/2015 User: HARRINGTON_RD_1
Description: Tank 15 was installed in 2007 and was found during file review to not be on the insurance policy. Lewis Oil has added to the policy renewal for 1/31/2015 and will forward the policy when issued.
Comments:
Comment Date: 01/08/2015 User: HARRINGTON_RD_1
Description: E-mailed report to Wenda Lewis 1/9/2015.
Comments:
Comment Date: 01/09/2015 User: HARRINGTON_RD_1
Description: Per facility rep Tank 15 has been added to the insurance, will be retroactive to now, and will appear on the new policy issued 1/31/2015.
12/18/2012 Attachment Harrington, Richard D.
12/18/2012 Attachment Harrington, Richard D.
12/18/2012 Attachment Harrington, Richard D.
11/30/2012 Site Inspection Activity Closed Harrington, Richard D.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 11/30/2012
Activity Closed Date: 11/30/2012 Activity Closed By: HARRINGTON_RD_1
Events:
Event Type: Activity has been finished Date: 11/30/2012
Comment: Finished
11/30/2012 Electronic Communication Activity Harrington, Richard D.
Activity Closed Date: 11/30/2012 Activity Status: Closed
Date: 11/30/2012
Recipient: wenda lewis
Sender: rh
Subject: sent report
Message: -
Events:
Event Type: Activity has been finished Date: 11/30/2012
Comment: Finished
06/03/2011 Emergency Preparedness Information Activity Owens, Joe S.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 06/03/2011
Events:
Event Type: Activity has been finished Date: 06/03/2011
Comment: Finished
05/17/2011 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 05/17/2011
Activity Closed Date: 05/17/2011 Activity Closed By: OWENS_JS_1
Events:
Event Type: Activity has been finished Date: 05/17/2011
Comment: Finished
05/17/2011 Emergency Preparedness Information Activity Owens, Joe S.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 05/17/2011
Events:
Event Type: Activity has been finished Date: 05/17/2011
Comment: Finished
05/17/2010 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 05/17/2010
Activity Closed Date: 05/17/2010 Activity Closed By: OWENS_JS_1
Events:
Event Type: Activity has been finished Date: 05/17/2010
Comment: Finished
05/17/2010 Emergency Preparedness Information Activity Owens, Joe S.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 05/17/2010
Events:
Event Type: Activity has been finished Date: 05/17/2010
Comment: Finished
04/30/2009 Emergency Preparedness Information Activity Owens, Joe S.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 04/30/2009
04/28/2009 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 04/28/2009
Activity Closed Date: 04/28/2009 Activity Closed By: OWENS_JS_1
05/28/2008 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 05/28/2008
Activity Closed Date: 05/28/2008 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 05/28/2008 User: OWENS_JS_1
Description: CONTACT PRESENTED DOCUMENTS FOR REVIEW FOR FAC: 8500014 Placard current & displayed: OK CFR form complete - FR records are updated - OK RDRL - present and applicable for facility: TANKS; Daily visual monitoring of tanks within containment / PIPING; Visual monitoring of piping interstice @ inspection ports - all other piping A/G. All components visual inspection. Site Diagram for accuracy, attached to ATTACHMENT Facility information. No changes from last inspection. Facility registration information including tank system attributes appear to be accurate. Monthly release detection records - Accepted - daily status inspection forms reviewed. Date range for Inspection records: 4/2007 to present FUTURE DUE DATES OF FOLLOWING: Tank Insurance Renewal Due: 1/2009 Placard Registration renewal due: 6/2008 Visual inspection revealed: Containment is dry and clean, Visual inspection ports for piping from containment into warehouse - dry with no visible trace of liquids. Monthly inspections should document any maint. which is performed or recommended as needed to prevent any release. The entry boots for the piping transition from U/G pipe to A/G piping appears sound and flexible ¿ no cracks observed. Facility has a documented release and is currently scored a 10 - below current clean-up work status. The compliance inspection folder is complete and incorporated into the FAC#8500267 - RDRL is posted and is applicable for facility - Facility inspection records well maintained.
01/28/2008 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 01/28/2008
Activity Closed Date: 01/28/2008 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 01/28/2008 User: OWENS_JS_1
Description: Tank installed by Petroleum Aids Inc. PCC 056878 installed the AST within the existing containment. Tank has overfill audible alarm and visual gauge for overfill prevention. Insurance has been updated - binder policy reviewed with owner - CFR not yet signed will be signed upon effect date of policy. All piping associated with the tank is within the containment - from the loading rack to the tank top area and from the bottom of the tank back to the distribution rack - contents are heavy lube oil. Tank has been secured and piping has been protected. Due to weight of oil - no anti-siphon valve is required. Tank has been included into existing RDRL and monthly inspection log. Specialty Tank Co. - EQ# 354
12/03/2007 Attachment Owens, Joe S.
03/28/2007 Attachment Owens, Joe S.
03/28/2007 Attachment Owens, Joe S.
03/27/2007 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 03/27/2007
Activity Closed Date: 03/27/2007 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 03/27/2007 User: OWENS_JS_1
Description: DOCUMENTS REVIEWED: Placard current & displayed: OK CFR form complete - FR records are updated - RDRL - present and applicable for facility: TANKS;Visual monitoring of tanks within containment / PIPING; Visual monitoring of piping within containment and transfer pump bermed area. All secondary piping for u/g piping from bermed transfer to warehouse (bulk filling of lube oil drums) are visual inspection at inspection ports outside of warehouse. Site Diagram for accuracy, attached to ATTACHMENT Facility information. Facility registration information including tank system attributes appear to be accurate. Monthly release detection records - Accepted. Date range for Inspection records: 5/2006 to present No Monthly incidents documented on insp. form - all systems tight and free of leaks. FUTURE DUE DATES OF FOLLOWING: Tank Insurance Renewal Due: 1/2008 Placard Registration renewal due: 6/2007 Visual inspection revealed: Containment is dry and clean, some peeling of containment sealant is starting to occur around the tank supports and needs addressing to prevent further degradation. Monthly inspections should document any maint. which is performed or recommended as needed to prevent any release. The bermed transfer pump area is slightly stained from seal leakage and a routine cleaning of the area should continue to prevent further degradation of the paving and surrounding area and prevent a possible release. The drain valve for the containment is secured and no visible staining indicating a possible release was evident. Facility has a documented release and is currently scored a 10 - below current state work status. The compliance inspection records are concise and indicate weekly inspections are occuring. RDRL is posted within the office with the placard and is applicable for facility.
02/09/2007 Emergency Preparedness Information Activity Owens, Joe S.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 02/09/2007
05/24/2006 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 05/24/2006
Activity Closed Date: 05/25/2006 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 05/24/2006 User: OWENS_JS_1
Description: Visual inspection of all tanks within containment. Tanks # 12 - 13 - & 14: have antisiphon valves installed. All except tanks #10 & 11 contain lubricant liquids which are not required to have such valves. Tanks # 10 & 11 have interstice gauges and these tanks are stand-alone tanks for containing PCW & Waste product. Containment is dry and clean - appears that sealant used on concrete is in good condition. U/G piping from loading rack into warehouse for transfering of lubricants into other containers is visually monitored by view ports in the secondary, just outside the entrance to the warehouse - this piping all appeared dry and liquid free. Visual inspection records were reviewed, as was the CFR & RDRL for the facility. No signs of any release associated with any of the tanks, however it appears that a delivery truck may have a habitual leak as evident from the parking lot stain outside the warehouse.
05/24/2005 Legacy Activity Ramsey, Timothy H
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
04/07/2004 Legacy Activity Ramsey, Timothy H
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
03/16/2004 Legacy Activity Ramsey, Timothy H
Activity Name: TANK INSTALLATION - FINAL INSPECTION Activity Status: Closed
Completion Notes: 2 -2,000 GALLON AST'S ADDED TO CONTAINMENT AREA
04/11/2003 Legacy Activity Ramsey, Timothy H
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
12/18/2001 Legacy Activity Ramsey, Timothy H
Activity Name: TANK INSTALLATION - FINAL INSPECTION Activity Status: Closed
Completion Notes: INSTALLATION INSPECTION, ADDED 1 - 1000 GALLON DOUBLEWALL AST
12/18/2001 Legacy Activity Ramsey, Timothy H
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
Completion Notes: COMPLIANCE INSPECTION
12/28/2000 Legacy Activity Ramsey, Timothy H
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
Completion Notes: COMPLIANCE INSPECTION
03/03/2000 Legacy Activity Ramsey, Timothy H
Activity Name: TANK CLOSURE INSPECTION Activity Status: Closed
Completion Notes: CLOSURE INSPECTION - 280 GAL HEATING OIL TANK #7
12/21/1999 Legacy Activity Buono, Mike
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
Completion Notes: COMPLIANCE INSPECTION
04/22/1999 Legacy Activity Buono, Mike
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed