DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Journal Report
Report Run Date: 04/20/2025        Last Data Refresh: 04/19/2025        Report Generated from DOPPLER
 
Facility ID: 8500281
Facility Name: CHEVRON 011
 
03/11/2024 Enforcement Tracking Activity Dallas, Richard D
Activity Status: Open
01/24/2024 Violation Closed Keim, Michael J
Significance: Minor Status: Closed
Criteria ID: 6062
Rule: 62-761.600(4)
01/24/2024 Editable Letter Activity Keim, Michael J
Activity Title: Return to Compliance Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 01/24/2024
Comment: Sent
Events:
Event Type: Activity has been finished Date: 01/24/2024
Comment: Finished
Attachments:
Attachment Date: 01/24/2024 User: KEIM_MJ_1
Description: RTC Letter
View Attachment
01/24/2024 Electronic Communication Activity Keim, Michael J
Activity Closed Date: 01/24/2024 Activity Status: Closed
Date: 01/24/2024
Recipient: Nirav Patel
Sender: M Keim
Subject: TCI report
Message: Storage tank inspection and compliance letter sent via e-mail to Nirav Patel, niravp8432@yahoo.com
Events:
Event Type: Activity has been finished Date: 01/24/2024
Comment: Finished
01/24/2024 Phone Conversation Activity Keim, Michael J
Call Type: Outgoing Activity Status: Closed
Phone Number: (941) 981-2600 Activity Closed Date: 01/24/2024
Subject: Spoke with Nirav Patel regarding TCI scheduling and records needed.
Events:
Event Type: Activity has been finished Date: 01/24/2024
Comment: Finished
01/24/2024 Editable Letter Activity Keim, Michael J
Activity Title: Return to Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 01/24/2024
Comment: Finished
Events:
Event Type: Document has been sent Date: 01/24/2024
Comment: Sent
Attachments:
Attachment Date: 01/24/2024 User: KEIM_MJ_1
Description: RTC Letter
View Attachment
01/24/2024 Site Inspection Activity Closed Keim, Michael J
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 01/17/2024
Activity Closed Date: 01/24/2024 Activity Closed By: KEIM_MJ_1
Events:
Event Type: Activity has been finished Date: 01/24/2024
Comment: Finished
Comments:
Comment Date: 01/24/2024 User: KEIM_MJ_1
Description: Storage tank inspection and compliance letter sent via e-mail to Nirav Patel, niravp8432@yahoo.com Please maintain annual testing. (Due by 03-05-2024) All testing is current, a Return to Compliance letter will be issued. Compliance assist with Nirav Patel
02/28/2023 Enforcement Referral Activity Keim, Michael J
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 03/11/2024
Events:
Event Type: Activity has been submitted for approval Date: 02/28/2023
Comment: Submitted for approval by: Michael J Keim: Please accept this referral for enforcement. This facility needs to have the annual operability and release detection testing completed (see compliance assist phone outreach) Attached: Referral Memo Sunbiz information
Events:
Event Type: Activity/Document was accepted on this date Date: 03/11/2024
Comment: Accepted by Richard D Dallas: Accepted
Events:
Event Type: Activity has been finished Date: 03/11/2024
Comment: Finished
Events:
Event Type: Activity has been assigned Date: 02/29/2024
Comment: Assigned to Richard D Dallas
Events:
Event Type: Activity/Document was acknowledged on this date Date: 02/29/2024
Comment: Acknowledged and Assigned by Brierra Mack
Comments:
Comment Date: 02/28/2023 User: KEIM_MJ_1
Description: Please accept this referral for enforcement. This facility needs to have the annual operability and release detection testing completed (see compliance assist phone outreach) Attached: Referral Memo Sunbiz information
Comments:
Comment Date: 02/28/2023 User: KEIM_MJ_1
Description: Please accept this referral for enforcement. This facility needs to have the annual operability and release detection testing completed (see compliance assist phone outreach) Attached: Referral Memo Sunbiz information
02/28/2023 Phone Conversation Activity Keim, Michael J
Call Type: Outgoing Activity Status: Closed
Phone Number: (941) 981-2600 Activity Closed Date: 02/28/2023
Subject: Spoke with Neil Patel regarding records and annual operability testing status. Operator mentioned that testing may have been completed but cant locate test forms. Also mentioned testing company is no longer in business and may have to re-test.
Events:
Event Type: Activity has been finished Date: 02/28/2023
Comment: Finished
02/28/2023 Enforcement Referral Activity Keim, Michael J
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 03/11/2024
Events:
Event Type: Activity has been submitted for approval Date: 02/28/2023
Comment: Submitted for approval by: Michael J Keim: Please accept this referral for enforcement. This facility needs to have the annual operability and release detection testing completed (see compliance assist phone outreach) Attached: Referral Memo Sunbiz information
Events:
Event Type: Activity/Document was accepted on this date Date: 03/11/2024
Comment: Accepted by Richard D Dallas: Accepted
Events:
Event Type: Activity has been finished Date: 03/11/2024
Comment: Finished
Events:
Event Type: Activity has been assigned Date: 02/29/2024
Comment: Assigned to Richard D Dallas
Events:
Event Type: Activity/Document was acknowledged on this date Date: 02/29/2024
Comment: Acknowledged and Assigned by Brierra Mack
Comments:
Comment Date: 02/28/2023 User: KEIM_MJ_1
Description: Please accept this referral for enforcement. This facility needs to have the annual operability and release detection testing completed (see compliance assist phone outreach) Attached: Referral Memo Sunbiz information
Comments:
Comment Date: 02/28/2023 User: KEIM_MJ_1
Description: Please accept this referral for enforcement. This facility needs to have the annual operability and release detection testing completed (see compliance assist phone outreach) Attached: Referral Memo Sunbiz information
05/31/2022 Violation Closed Keim, Michael J
Significance: Minor Status: Closed
Criteria ID: 6074
Rule: 62-761.710(1), 62-761.710(2), 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d), 62-761.710(3), 62-761.710(3)(a), 62-761.710(3)(b), 62-761.710(3)(c), 62-761.710(3)(d), 62-761.710(3)(e), 62-761.710(3)(f), 62-761.710(3)(g), 62-761.710(3)(h), 62-761.710(3)(i)
05/31/2022 Electronic Communication Activity Keim, Michael J
Activity Closed Date: 05/31/2022 Activity Status: Closed
Date: 05/31/2022
Recipient: Nirav Patel
Sender: M Keim
Subject: TCI report
Message: Storage tank inspection report and compliance letter sent via e-mail to Nirav Patel, niravp8432@yahoo.com
Events:
Event Type: Activity has been finished Date: 05/31/2022
Comment: Finished
05/31/2022 Editable Letter Activity Keim, Michael J
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Description: INF Investigation Response 10-22-2020
Events:
Event Type: Activity has been finished Date: 05/31/2022
Comment: Finished
Events:
Event Type: Document has been sent Date: 05/31/2022
Comment: Sent
Attachments:
Attachment Date: 05/31/2022 User: KEIM_MJ_1
Description: CAO Letter
View Attachment
05/31/2022 Violation Closed Keim, Michael J
Significance: Minor Status: Closed
Criteria ID: 6062
Rule: 62-761.600(4)
05/16/2022 Site Inspection Activity Closed Keim, Michael J
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 05/16/2022
Activity Closed Date: 05/31/2022 Activity Closed By: KEIM_MJ_1
Events:
Event Type: Activity has been finished Date: 05/31/2022
Comment: Finished
Comments:
Comment Date: 05/31/2022 User: KEIM_MJ_1
Description: Storage tank inspection report and compliance letter sent via e-mail to Nirav Patel, niravp8432@yahoo.com Note: Annual testing was due by May 14 2022. Please take the steps to maintain the testing schedule.
07/11/2020 Editable Letter Activity Zimmerman, Robert A
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Description: CAO for inspection conducted on 02/24/2020
Events:
Event Type: Activity has been finished Date: 07/11/2020
Comment: Finished
Events:
Event Type: Document has been sent Date: 07/09/2020
Comment: Sent
Attachments:
Attachment Date: 07/11/2020 User: ZIMMERMAN_RA_2
Description: CAO 8500281, CHEVRON 011 2020.
View Attachment
07/11/2020 Electronic Communication Activity Zimmerman, Robert A
Activity Closed Date: 07/11/2020 Activity Status: Closed
Date: 07/11/2020
Recipient: Nirav Patel
Sender: Robert Zimmerman
Subject: TCI report
Message: Sent TCI report and CAO email attachments to facility representative; NIRAVP8432@YAHOO.COM
Events:
Event Type: Activity has been finished Date: 07/11/2020
Comment: Finished
07/10/2020 Violation Closed Zimmerman, Robert A
Significance: Minor Status: Closed
Criteria ID: 4081
Rule: 62-761.710(4)
07/10/2020 Site Inspection Activity Closed Zimmerman, Robert A
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 07/08/2020
Activity Closed Date: 07/11/2020 Activity Closed By: ZIMMERMAN_RA_2
Events:
Event Type: Activity has been finished Date: 07/11/2020
Comment: Finished
Comments:
Comment Date: 07/11/2020 User: ZIMMERMAN_RA_2
Description: Sent TCI report and CAO to facility representative; NIRAVP8432@YAHOO.COM
07/10/2020 Violation Closed Zimmerman, Robert A
Significance: Minor Status: Closed
Criteria ID: 4076
Rule: 62-761.700(3), 62-761.700(3)(a), 62-761.700(3)(a)1., 62-761.700(3)(a)1.a., 62-761.700(3)(a)1.b., 62-761.700(3)(a)1.c., 62-761.700(3)(a)1.d., 62-761.700(3)(a)1.e., 62-761.700(3)(a)1.f., 62-761.700(3)(a)2.
07/10/2020 Violation Closed Zimmerman, Robert A
Significance: Minor Status: Closed
Criteria ID: 4067
Rule: 62-761.600(4)
07/01/2020 Phone Conversation Activity Zimmerman, Robert A
Call Type: Outgoing Activity Status: Closed
Phone Number: (941) 981-2600 Activity Closed Date: 07/01/2020
Subject: Contacted facility representative NIRAV PATEL for notification and scheduling of upcoming TCI and to give a reminder that they will need for the three year record review requirement: Registration Placards, Proof of Financial Responsibility, STFM, monthly visual inspections and electronic release detection records, A/B/C level UST operator certifications, annual operability testing, line leak detector testing, containment integrity testing and overfill protection device testing certifications.
Events:
Event Type: Activity has been finished Date: 07/01/2020
Comment: Finished
07/10/2018 Editable Letter Activity Oliva, Linda
Activity Title: Return to Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 07/10/2018
Comment: Finished
Attachments:
Attachment Date: 07/10/2018 User: OLIVA_L
Description: RTC Letter
View Attachment
06/20/2018 Enforcement Tracking Activity Oliva, Linda
Activity Status: Closed
Activity Result: Closed Without Enforcement Activity Closed Date: 07/10/2018
Events:
Event Type: Activity has been finished Date: 07/10/2018
Comment: Finished
06/19/2018 Enforcement Referral Activity Zimmerman, Robert A
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 06/20/2018
Events:
Event Type: Activity/Document was acknowledged on this date Date: 06/19/2018
Comment: Acknowledged and Assigned by Matthew J Harris
Events:
Event Type: Activity has been assigned Date: 06/19/2018
Comment: Assigned to Linda Oliva
Events:
Event Type: Activity has been submitted for approval Date: 06/19/2018
Comment: Submitted for approval by: Robert A Zimmerman: Have not received any violation resolution action response.
Events:
Event Type: Activity has been finished Date: 06/20/2018
Comment: Finished
Events:
Event Type: Activity/Document was accepted on this date Date: 06/20/2018
Comment: Accepted by Linda Oliva: .
Comments:
Comment Date: 06/19/2018 User: ZIMMERMAN_RA_2
Description: Have not received violation resolution action response from facility representative. Due to be referred 05/02/2018.
Comments:
Comment Date: 06/19/2018 User: ZIMMERMAN_RA_2
Description: Have not received any violation resolution action response.
06/19/2018 Enforcement Referral Activity Zimmerman, Robert A
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 06/20/2018
Events:
Event Type: Activity/Document was acknowledged on this date Date: 06/19/2018
Comment: Acknowledged and Assigned by Matthew J Harris
Events:
Event Type: Activity has been assigned Date: 06/19/2018
Comment: Assigned to Linda Oliva
Events:
Event Type: Activity has been submitted for approval Date: 06/19/2018
Comment: Submitted for approval by: Robert A Zimmerman: Have not received any violation resolution action response.
Events:
Event Type: Activity has been finished Date: 06/20/2018
Comment: Finished
Events:
Event Type: Activity/Document was accepted on this date Date: 06/20/2018
Comment: Accepted by Linda Oliva: .
Comments:
Comment Date: 06/19/2018 User: ZIMMERMAN_RA_2
Description: Have not received violation resolution action response from facility representative. Due to be referred 05/02/2018.
Comments:
Comment Date: 06/19/2018 User: ZIMMERMAN_RA_2
Description: Have not received any violation resolution action response.
03/29/2018 Electronic Communication Activity Zimmerman, Robert A
Activity Closed Date: 03/29/2018 Activity Status: Closed
Date: 03/29/2018
Recipient: NIRAV PATEL
Sender: Robert Zimmerman
Subject: Violation resolution action status
Message: Sent email inquiry regarding violation resolution status, including attached TCI report and CAO letter.
Events:
Event Type: Activity has been finished Date: 03/29/2018
Comment: Finished
02/01/2018 Electronic Communication Activity Zimmerman, Robert A
Activity Closed Date: 02/01/2018 Activity Status: Closed
Date: 02/01/2018
Recipient: Nirav Patel
Sender: Robert Zimmerman
Subject: TCI report
Message: Sent TCI report and CAO email attachments to facility representative.
Events:
Event Type: Activity has been finished Date: 02/01/2018
Comment: Finished
02/01/2018 Editable Letter Activity Zimmerman, Robert A
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 02/01/2018
Comment: Finished
Events:
Event Type: Document has been sent Date: 02/01/2018
Comment: Sent
Attachments:
Attachment Date: 02/01/2018 User: ZIMMERMAN_RA_2
Description: CAO 8500281, CHEVRON 011.
View Attachment
01/30/2018 Violation Closed Zimmerman, Robert A
Significance: Minor Status: Closed
Criteria ID: 4057
Rule: 62-761.500(7)(e)
01/30/2018 Site Inspection Activity Closed Zimmerman, Robert A
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 01/30/2018
Activity Closed Date: 02/01/2018 Activity Closed By: ZIMMERMAN_RA_2
Events:
Event Type: Activity has been finished Date: 02/01/2018
Comment: Finished
Comments:
Comment Date: 01/30/2018 User: ZIMMERMAN_RA_2
Description: Due Dates Per New Rule 07/11/17 - Field erected ASTs fueled by tanker truck must have spill containment unless fill is in secondary containment for dike field or in tank truck containment area. 01/18/18 - USTs & ASTs must conduct initial overfill protection device testing by 01/18/18, and every 12 months thereafter. 01/18/18 - UST single wall spill containment devices must have initial containment integrity test performed and then every 12 months thereafter. 01/18/18 - AST below grade spill containment systems and hydrant sumps must have initial containment integrity test performed and then every 3 years thereafter. 01/18/18 - ASTs with gravity head on small diameter piping must have anti-siphon valves installed in-place as well as isolation block valves on tank systems (no date listed). 01/18/18 - Existing ASTs with pressurized small diameter piping in contact with the soil must have line leak detectors installed, and must be tested every 12 months thereafter. ASTs installed after 01/11/17, must be equipped with line leak detectors at AST installation. 10/13/18 - UST systems with gravity head on small diameter piping must have anti-siphon valves installed in-place as well as isolation block valves on tank systems (no date listed). 10/13/18 - Existing UST generator tanks must have/conduct release detection. UST generator tanks installed after 01/11/17 must have/conduct release detection from time of installation. 10/13/18 - UST & AST piping dispenser sumps and double wall containment devices below grade must have initial containment integrity test performed and then every 3 years thereafter. 10/13/18 - All UST facilities must have Class A, B and C operator's certifications.
Comments:
Comment Date: 01/30/2018 User: ZIMMERMAN_RA_2
Description: Discussed facilities compliance history and modification to the UST rule and presented the UST outreach tool to the facility representative. Upcoming 2018 deadlines for obtaining UST operator certifications, overfill protection operability testing and containment integrity testing as per the new tank rule. Release detection and overfill protection device testing and certification - by January 11, 2018 and, every 12 months thereafter. Periodic test for storage tank system components shall occur according to the following schedule; A. Single wall spill buckets - by January 11, 2018 and, every 12 months thereafter; B. Piping and dispenser sumps - by October 13, 2018 and, every 3 years thereafter; C. Double wall spill buckets - by October 13, 2018 and, every 3 years thereafter; UST operator-s certification; Each UST facility must have a Class A, Class B and Class C operator that is trained and certified in accordance with the rule by October 13, 2018. A Class A, B or C operator must be present at all times of operation unless the facility is unmanned.
01/30/2018 Site Inspection Activity Closed Zimmerman, Robert A
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 01/30/2018
Activity Closed Date: 02/01/2018 Activity Closed By: ZIMMERMAN_RA_2
Events:
Event Type: Activity has been finished Date: 02/01/2018
Comment: Finished
Comments:
Comment Date: 01/30/2018 User: ZIMMERMAN_RA_2
Description: Due Dates Per New Rule 07/11/17 - Field erected ASTs fueled by tanker truck must have spill containment unless fill is in secondary containment for dike field or in tank truck containment area. 01/18/18 - USTs & ASTs must conduct initial overfill protection device testing by 01/18/18, and every 12 months thereafter. 01/18/18 - UST single wall spill containment devices must have initial containment integrity test performed and then every 12 months thereafter. 01/18/18 - AST below grade spill containment systems and hydrant sumps must have initial containment integrity test performed and then every 3 years thereafter. 01/18/18 - ASTs with gravity head on small diameter piping must have anti-siphon valves installed in-place as well as isolation block valves on tank systems (no date listed). 01/18/18 - Existing ASTs with pressurized small diameter piping in contact with the soil must have line leak detectors installed, and must be tested every 12 months thereafter. ASTs installed after 01/11/17, must be equipped with line leak detectors at AST installation. 10/13/18 - UST systems with gravity head on small diameter piping must have anti-siphon valves installed in-place as well as isolation block valves on tank systems (no date listed). 10/13/18 - Existing UST generator tanks must have/conduct release detection. UST generator tanks installed after 01/11/17 must have/conduct release detection from time of installation. 10/13/18 - UST & AST piping dispenser sumps and double wall containment devices below grade must have initial containment integrity test performed and then every 3 years thereafter. 10/13/18 - All UST facilities must have Class A, B and C operator's certifications.
Comments:
Comment Date: 01/30/2018 User: ZIMMERMAN_RA_2
Description: Discussed facilities compliance history and modification to the UST rule and presented the UST outreach tool to the facility representative. Upcoming 2018 deadlines for obtaining UST operator certifications, overfill protection operability testing and containment integrity testing as per the new tank rule. Release detection and overfill protection device testing and certification - by January 11, 2018 and, every 12 months thereafter. Periodic test for storage tank system components shall occur according to the following schedule; A. Single wall spill buckets - by January 11, 2018 and, every 12 months thereafter; B. Piping and dispenser sumps - by October 13, 2018 and, every 3 years thereafter; C. Double wall spill buckets - by October 13, 2018 and, every 3 years thereafter; UST operator-s certification; Each UST facility must have a Class A, Class B and Class C operator that is trained and certified in accordance with the rule by October 13, 2018. A Class A, B or C operator must be present at all times of operation unless the facility is unmanned.
01/26/2018 Phone Conversation Activity Zimmerman, Robert A
Call Type: Outgoing Activity Status: Closed
Phone Number: (941) 981-2600 Activity Closed Date: 01/26/2018
Subject: Contact facility representative for notification and schedule upcoming TCI and to give a reminder that the two year record review requirement is: Registration Placard, Proof of Financial Responsibility, CFR, Monthly visual inspections and Electronic release detection records, containment integrity, annual overfill protection, Line leak detector, Operability test and A/B/C UST operator certifications
Events:
Event Type: Activity has been finished Date: 01/26/2018
Comment: Finished
01/09/2017 Comment Hill, Katrina
Description: New Tenant is Nirav Patel: 941-981-2600, niravp8432@yahoo.com.
12/21/2016 Editable Letter Activity Hill, Katrina
Activity Title: District Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Compliance Assistance Offer Written Date: 12/21/2016
Comment: Compliance Assistance Offer Written
Events:
Event Type: Activity has been finished Date: 01/25/2017
Comment: Finished
Attachments:
Attachment Date: 12/21/2016 User: HILL_K
Description: 01 8500281 CAO Letter
View Attachment
12/16/2016 Enforcement Tracking Activity Hill, Katrina
Activity Status: Closed
Activity Result: Closed Without Enforcement Activity Closed Date: 01/26/2017
Events:
Event Type: Activity has been finished Date: 01/26/2017
Comment: Finished
12/13/2016 Enforcement Referral Activity Harrington, Richard D.
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 12/16/2016
Events:
Event Type: Activity/Document was acknowledged on this date Date: 12/13/2016
Comment: Acknowledged and Assigned by Tim Dohaney
Events:
Event Type: Activity has been assigned Date: 12/13/2016
Comment: Assigned to Katrina Hill
Events:
Event Type: Activity has been finished Date: 12/16/2016
Comment: Finished
Events:
Event Type: Activity/Document was accepted on this date Date: 12/16/2016
Comment: Accepted by Katrina Hill: KH accepted referral, 12/16/2016.
Events:
Event Type: Activity has been submitted for approval Date: 12/13/2016
Comment: Submitted for approval by: Richard D. Harrington: Only the violation related to the 93 sump boots is still open. See 2nd ncl letter and tci report for more details.
Comments:
Comment Date: 12/13/2016 User: HARRINGTON_RD_1
Description: Only the violation related to the 93 sump boots is still open. See 2nd ncl letter and tci report for more details.
11/04/2016 Editable Letter Activity Harrington, Richard D.
Activity Title: County Subsequent Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 11/04/2016
Comment: Sent
Events:
Event Type: Activity has been finished Date: 11/04/2016
Comment: Finished
Attachments:
Attachment Date: 11/04/2016 User: HARRINGTON_RD_1
Description: 2ncl
View Attachment
07/12/2016 Record Document Activity Harrington, Richard D.
Activity Status: Closed
Contact Name: nirav patel Activity Closed Date: 07/12/2016
Events:
Event Type: Activity has been finished Date: 07/12/2016
Comment: Finished
06/14/2016 Violation Closed Harrington, Richard D.
Significance: Minor Status: Closed
Criteria ID: 1123
Rule: 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d), 62-761.710(2)(e), 62-761.710(2)(f), 62-761.710(2)(g), 62-761.710(2)(h)
Comments: If the problem involves failure to perform according to the standards in each of the following areas, then note these items in addition to the paperwork for this rule: a. and g. Inventory - rules 62-761.640(3)(b)1-2, 62-761.640(3)(c) & 62-761.700(1)(c)5 b. Repair, operation, and maintenance - rules 62-761.700(1)(a)1, 62-761.700(1)(a)5, 62-761.700(1)(a)6 & 62-761.700(1)(c)3 c. Release detection - rules 62-761.600(1)(e), 62-761.610(3)(b), 62-761.640(2)(c)4, 62-761.640(2)(e), 62-761.640(3)(d), 62-761.640(3)(e)1-5 & 62-761.640(3)(e)9 d. Release detection response level descriptions - rules 62-761.600(1)(b) & 62-761.640(1)(c) e. Tightness, pressure, and breach of integrity tests - rules 62-761.610(3)(a)1, 62-761.640(1)(a) & 62-761.640(4)(a) f. Financial responsibility - rule 62-761.400(3) g. Repairs and replacements - rule 62-761.700(1)(a)6 The following are not this rule's issues: Rules 62-761.450(1)(a)1, 62-761.450(1)(a)2, 62-761.450(1)(a)3 & 62-761.450(1)(a)4 are verbal notices of activities that may also be written Rule 62-761.450(1)(b) is a registration issue Rules 62-761.450(2), 62-761.450(3)(a) & 62-761.450(3)(b) are INF/DRF reporting issues Rules 62-761.600(1)(a)3 & 62-761.600(1)(f) are covered by rule 62-761.710(3) Anything with cathodic protection is covered by rule 62-761.710(3)
06/14/2016 Editable Letter Activity Harrington, Richard D.
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Description: ICL
Events:
Event Type: Activity has been finished Date: 06/14/2016
Comment: Finished
Attachments:
Attachment Date: 06/14/2016 User: HARRINGTON_RD_1
Description: ncl
View Attachment
06/14/2016 Electronic Communication Activity Harrington, Richard D.
Activity Closed Date: 06/14/2016 Activity Status: Closed
Date: 06/14/2016
Recipient: pradip patel, nirav, AET
Sender: rh
Subject: sent tci report, ncl, CFR Form and DEP tank video link.
Message: -
Events:
Event Type: Activity has been finished Date: 06/14/2016
Comment: Finished
06/14/2016 Site Inspection Activity Closed Harrington, Richard D.
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 06/08/2016
Activity Closed Date: 06/14/2016 Activity Closed By: HARRINGTON_RD_1
Events:
Event Type: Activity has been finished Date: 06/14/2016
Comment: Finished
Comments:
Comment Date: 06/14/2016 User: HARRINGTON_RD_1
Description: Report, ncl and CFR form emailed to Pradip Patel and new account owner on 6/14/2016. AET to be copied on email. DEP tank inspection prep video link also to be emailed.
06/14/2016 Violation Closed Harrington, Richard D.
Significance: Minor Status: Closed
Criteria ID: 1105
Rule: 62-761.700(1)(a)1.a., 62-761.700(1)(a)1.b., 62-761.700(1)(a)1.c., 62-761.700(1)(a)1.d.
Comments: Mark this as out of compliance if you observe a needed repair that hasn't been completed, and the potential for a release exists. Examples of components that would need repair include (but are not limited to) leaking dispensers, cracked spill containment, improperly anchored shear valves, or any compromised containment component. Upon the detection of one of the above conditions, has the facility initiated and completed repairs?
06/14/2016 Violation Closed Harrington, Richard D.
Significance: Minor Status: Closed
Criteria ID: 1105
Rule: 62-761.700(1)(a)1.a., 62-761.700(1)(a)1.b., 62-761.700(1)(a)1.c., 62-761.700(1)(a)1.d.
Comments: Mark this as out of compliance if you observe a needed repair that hasn't been completed, and the potential for a release exists. Examples of components that would need repair include (but are not limited to) leaking dispensers, cracked spill containment, improperly anchored shear valves, or any compromised containment component. Upon the detection of one of the above conditions, has the facility initiated and completed repairs?
05/12/2016 Comment Harrington, Richard D.
Description: pmccord@aetllc.com -- (to schedule inspections. AET does monthly inspections).
03/31/2015 Record Document Activity Harrington, Richard D.
Activity Status: Closed
Contact Name: Pradip Patel Activity Closed Date: 03/31/2015
Events:
Event Type: Activity has been finished Date: 03/31/2015
Comment: Finished
03/20/2015 Record Document Activity Harrington, Richard D.
Activity Status: Closed
Contact Name: ramon inciong Activity Closed Date: 03/20/2015
Events:
Event Type: Activity has been finished Date: 03/20/2015
Comment: Finished
11/10/2014 Editable Letter Activity Harrington, Richard D.
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 11/10/2014
Comment: Finished
Attachments:
Attachment Date: 11/10/2014 User: HARRINGTON_RD_1
Description: ncl
View Attachment
11/10/2014 Electronic Communication Activity Harrington, Richard D.
Activity Closed Date: 11/10/2014 Activity Status: Closed
Date: 11/10/2014
Recipient: pradip patel
Sender: rh
Subject: attached
Message: -
Events:
Event Type: Activity has been finished Date: 11/10/2014
Comment: Finished
10/29/2014 Violation Closed Harrington, Richard D.
Significance: Minor Status: Closed
Criteria ID: 1117
Rule: 62-761.700(1)(c)3.
Comments: Facility must prove that all release detection devices, such as in line leak detectors, sump and liner sensors, ATGs, etc. function properly. Sensing devices may be optical, vapor, float activated, discriminating, non-discriminating, or tied into electrical circuits. ATG probes inside of tanks require calibration testing, if used for release detection as well as inventory measurements.
10/29/2014 Site Inspection Activity Closed Harrington, Richard D.
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 10/14/2014
Activity Closed Date: 11/10/2014 Activity Closed By: HARRINGTON_RD_1
Events:
Event Type: Activity has been finished Date: 11/10/2014
Comment: Finished
Comments:
Comment Date: 11/10/2014 User: HARRINGTON_RD_1
Description: E-mailed report, ncl and Tank Operator Certification information to Pradip Patel 11/10/2014.
09/17/2014 Editable Letter Activity Harrington, Richard D.
Activity Title: County Subsequent Non-Compliance Letter Activity Status: Closed
Description: email
Events:
Event Type: Activity has been finished Date: 09/17/2014
Comment: Finished
Attachments:
Attachment Date: 09/17/2014 User: HARRINGTON_RD_1
Description: 2ncl
View Attachment
09/17/2014 Electronic Communication Activity Harrington, Richard D.
Activity Closed Date: 09/17/2014 Activity Status: Closed
Date: 09/17/2014
Recipient: pradip patel
Sender: sent 2nd ncl
Subject: attached
Message: -
Events:
Event Type: Activity has been finished Date: 09/17/2014
Comment: Finished
08/29/2014 Electronic Communication Activity Harrington, Richard D.
Activity Closed Date: 08/29/2014 Activity Status: Closed
Date: 08/29/2014
Recipient: pradip patel
Sender: rh
Subject: sent 2nd NCL and report
Message: -see attached
Events:
Event Type: Activity has been finished Date: 08/29/2014
Comment: Finished
03/14/2014 Comment Harrington, Richard D.
Description: New owner is Pradip Patel- Pradip30@att.net
03/14/2014 Emergency Preparedness Information Activity Harrington, Richard D.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 03/14/2014
Events:
Event Type: Activity has been finished Date: 03/14/2014
Comment: Finished
03/14/2014 Electronic Communication Activity Harrington, Richard D.
Activity Closed Date: 03/14/2014 Activity Status: Closed
Date: 03/14/2014
Recipient: pradip patel
Sender: rh
Subject: sent report and ncl
Message: -
Events:
Event Type: Activity has been finished Date: 03/14/2014
Comment: Finished
03/14/2014 Editable Letter Activity Harrington, Richard D.
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 03/14/2014
Comment: Finished
Attachments:
Attachment Date: 03/14/2014 User: HARRINGTON_RD_1
Description: ncl
View Attachment
03/14/2014 Site Inspection Activity Closed Harrington, Richard D.
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 03/06/2014
Activity Closed Date: 03/14/2014 Activity Closed By: HARRINGTON_RD_1
Events:
Event Type: Activity has been finished Date: 03/14/2014
Comment: Finished
Comments:
Comment Date: 03/14/2014 User: HARRINGTON_RD_1
Description: E-mailed report to Pradip Patel (owner) 3/14/2014.
03/14/2014 Violation Closed Harrington, Richard D.
Significance: Minor Status: Closed
Criteria ID: 1105
Rule: 62-761.700(1)(a)1.a., 62-761.700(1)(a)1.b., 62-761.700(1)(a)1.c., 62-761.700(1)(a)1.d.
Comments: Mark this as out of compliance if you observe a needed repair that hasn't been completed, and the potential for a release exists. Examples of components that would need repair include (but are not limited to) leaking dispensers, cracked spill containment, improperly anchored shear valves, or any compromised containment component. Upon the detection of one of the above conditions, has the facility initiated and completed repairs?
03/14/2014 Attachment Harrington, Richard D.
10/29/2012 Record Document Activity Harrington, Richard D.
Activity Status: Closed
Contact Name: Raj Shah Activity Closed Date: 10/29/2012
Events:
Event Type: Activity has been finished Date: 10/29/2012
Comment: Finished
09/18/2012 Editable Letter Activity Ramsey, Timothy H
Activity Title: County Subsequent Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 09/18/2012
Comment: Sent on Tue Sep 18 00:00:00 EDT 2012
Events:
Event Type: Activity has been finished Date: 09/18/2012
Comment: Finished
Attachments:
Attachment Date: 09/18/2012 User: RAMSEY_TH_1
Description: 2nd Non-Compliance Letter
View Attachment
05/29/2012 Emergency Preparedness Information Activity Owens, Joe S.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 05/29/2012
Events:
Event Type: Activity has been finished Date: 05/29/2012
Comment: Finished
05/24/2012 Editable Letter Activity Owens, Joe S.
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 05/30/2012
Comment: Sent on Wed May 30 00:00:00 EDT 2012
Events:
Event Type: Activity has been finished Date: 05/30/2012
Comment: Finished
Attachments:
Attachment Date: 05/30/2012 User: RAMSEY_TH_1
Description: 1st Non-Compliance Letter
View Attachment
05/22/2012 Violation Closed Owens, Joe S.
Significance: Minor Status: Closed
Criteria ID: 1020
Rule: 62-761.500(1)(d)5.
Comments: The breach of integrity test is intended for closed interstices only. A closed interstice has no unsecured or unsealed opening to the outside. Double-walled piping without a boot connector, or if the boot has a bleed valve (for tightness testing), is considered an open interstice. The breach of integrity test may be performed by using at least one of the following methods: a. A continuous hydrostatic system b. A continuous vacuum system c. Testing of the interstice for liquid tightness in accordance with manufacturer's installation instructions; or d. Another method in accordance with subsection 62-761.850(2). How the breach of integrity test is performed or to what degree can depend on the depth to groundwater at each facility. When the tank and or piping are fully submerged, the lack of water intrusion into the secondary containment may be considered a verification of its integrity. However, when total submersion is not the case, one of the rule stipulated options must be used. The breach of integrity test should not be confused with a precision tightness test, which tests the primary tank or piping only. The breach of integrity test will test the secondary and primary shells, but is not a precision test.
05/22/2012 Site Inspection Activity Closed Owens, Joe S.
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 05/22/2012
Activity Closed Date: 05/24/2012 Activity Closed By: OWENS_JS_1
Events:
Event Type: Activity has been finished Date: 05/24/2012
Comment: Finished
Comments:
Comment Date: 05/23/2012 User: OWENS_JS_1
Description: BOI due 9/2011
05/31/2011 Emergency Preparedness Information Activity Owens, Joe S.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 05/31/2011
Events:
Event Type: Activity has been finished Date: 05/31/2011
Comment: Finished
04/28/2011 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 04/28/2011
Activity Closed Date: 05/31/2011 Activity Closed By: OWENS_JS_1
Events:
Event Type: Activity has been finished Date: 05/31/2011
Comment: Finished
01/13/2011 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 01/13/2011
Activity Closed Date: 01/13/2011 Activity Closed By: OWENS_JS_1
Events:
Event Type: Activity has been finished Date: 01/13/2011
Comment: Finished
10/29/2010 Emergency Preparedness Information Activity Owens, Joe S.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 10/29/2010
Events:
Event Type: Activity has been finished Date: 10/29/2010
Comment: Finished
10/27/2010 Electronic Communication Activity Owens, Joe S.
Activity Closed Date: 10/27/2010 Activity Status: Closed
Date: 10/27/2010
Recipient: ACEPD
Sender: Jim Ferullo - Sunrise Food Marts
Subject: Received FR documents and copy of CFR
Message: Received FR documents and copy of CFR
Events:
Event Type: Activity has been finished Date: 10/27/2010
Comment: Finished
10/13/2010 Editable Letter Activity Owens, Joe S.
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 10/15/2010
Comment: Finished
Events:
Event Type: Document has been sent Date: 10/15/2010
Comment: Sent on Fri Oct 15 00:00:00 EDT 2010
Attachments:
Attachment Date: 10/15/2010 User: RAMSEY_TH_1
Description: 1st Non-Compliance Letter
View Attachment
10/05/2010 Violation Closed Owens, Joe S.
Significance: Minor Status: Closed
Criteria ID: 1003
Rule: 62-761.400(2)(f)
Comments: All federal facilities with USTs will have a placard. Per FS 376.3077, "It is unlawful for any owner, operator, or supplier to pump or otherwise deposit any motor fuel into a tank required to be registered under section 376.303 FS, unless proof of valid registration is displayed on such tank itself or the dispensing or measuring device connected thereto or, where appropriate, in the office or kiosk of the facility where the tank is located." Penalties can be assessed to the facility owner for failure to properly register tank systems. Note that penalties can be assessed to the supplier that delivers motor fuel to an unregistered facility. Check the details on the placard. Do they agree with the location you are inspecting? Owners of multiple facilities may switch placards by mistake. Placards are not always issued or received in a timely manner at the change of year period (June and July). Provide the DEP Tallahassee phone number to the facility so they may resolve problems (850) 245-8850; (850) 245-8840. Check STCM in the registration/placard section for the date that the payment was made and the date that the placard was issued. The location of the placard in plain view can be subjective in interpretation: a. For vehicular fuel facilities, plain view is meant to allow the transport delivery driver to view the placard prior to delivering fuel. b. A legal definition is an exception to the general requirement of a valid search warrant to legitimize a search or seizure; a search implies prying into hidden places, and it is not a search to observe what is open to view.
10/05/2010 Site Inspection Activity Closed Owens, Joe S.
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 10/05/2010
Activity Closed Date: 10/13/2010 Activity Closed By: OWENS_JS_1
Events:
Event Type: Activity has been finished Date: 10/13/2010
Comment: Finished
10/05/2010 Violation Closed Owens, Joe S.
Significance: Minor Status: Closed
Criteria ID: 1105
Rule: 62-761.700(1)(a)1.a., 62-761.700(1)(a)1.b., 62-761.700(1)(a)1.c., 62-761.700(1)(a)1.d.
Comments: Mark this as out of compliance if you observe a needed repair that hasn't been completed, and the potential for a release exists. Examples of components that would need repair include (but are not limited to) leaking dispensers, cracked spill containment, improperly anchored shear valves, or any compromised containment component. Upon the detection of one of the above conditions, has the facility initiated and completed repairs?
10/05/2010 Violation Closed Owens, Joe S.
Significance: SNC-B Status: Closed
Criteria ID: 1004
Rule: 62-761.400(3)(a)1.
Comments: There are various financial responsibility mechanisms available: Risk Retention Group (RRG) Endorsements Certificate of Insurance Guarantee Letter of Credit Fully Funded Trust Fund Self-Insurance with letter from CFO Stand-by Trust Fund Bond Rating Test (Local Governments) Local Government Financial Test Local Government Guarantee Local Government Fund For detailed information, refer to the DEP's Financial Responsibility Handbook pages 2-1, 2-2. Verify which mechanism(s) are used by the facility. State and federal facilities are exempt from financial responsibility, being considered a type of self insurance. They are always in compliance for this category. Document state or federal as appropriate. Financial responsibility must be maintained on out-of-service tanks. Note: Mark the absence of/or the lack of complete info in the certification of financial responsibility under Rule 62-761.710(2).
10/09/2009 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 10/09/2009
Activity Closed Date: 10/09/2009 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 10/09/2009 User: OWENS_JS_1
Description: A site visit for compliance was performed following a communication from the contractor indicating that the sumps and spill buckets had been cleaned and the PSSC contractor was onsite to test the repaired boots and seals. Hydrostatic test of the electrical boot was performed and PASSED. Testing of the spill bucket secondary by vacuum was performed and passed.
08/27/2009 Emergency Preparedness Information Activity Owens, Joe S.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 08/27/2009
08/21/2009 Violation Closed Owens, Joe S.
Significance: Minor Status: Closed
Criteria ID: 1115
Rule: 62-761.700(1)(c)1.
Comments: Facility equipment shall be maintained to a degree to allow you access. Water in spill containment units, especially above the fill cap shall be removed. Water in any sumps and dispenser liners above the piping opening/penetration (invert) shall be removed. All regulated substance shall be removed from any of the specified system components. Regulated substances: sheen, free product, mixed product water. Petroleum contact water shall be disposed of in accordance with the Department Hazardous Waste Section's Ch. 62-740 F.A.C., "Petroleum Contact Water".
08/21/2009 Editable Letter Activity Owens, Joe S.
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
08/21/2009 Site Inspection Activity Closed Owens, Joe S.
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 08/21/2009
Activity Closed Date: 08/21/2009 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 08/21/2009 User: OWENS_JS_1
Description: An issue that was not noted in the inspection report was the torn electrical entry boot in the Diesel Sump - this needs to be repaired.
Comments:
Comment Date: 08/21/2009 User: OWENS_JS_1
Description: Brad Wentworth - compliance contractor - onsite for inspection assistance.
08/21/2009 Site Inspection Activity Closed Owens, Joe S.
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 08/21/2009
Activity Closed Date: 08/21/2009 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 08/21/2009 User: OWENS_JS_1
Description: An issue that was not noted in the inspection report was the torn electrical entry boot in the Diesel Sump - this needs to be repaired.
Comments:
Comment Date: 08/21/2009 User: OWENS_JS_1
Description: Brad Wentworth - compliance contractor - onsite for inspection assistance.
08/21/2009 Violation Closed Owens, Joe S.
Significance: Minor Status: Closed
Criteria ID: 1105
Rule: 62-761.700(1)(a)1.a., 62-761.700(1)(a)1.b., 62-761.700(1)(a)1.c., 62-761.700(1)(a)1.d.
Comments: Mark this as out of compliance if you observe a needed repair that hasn't been completed, and the potential for a release exists. Examples of components that would need repair include (but are not limited to) leaking dispensers, cracked spill containment, improperly anchored shear valves, or any compromised containment component. Upon the detection of one of the above conditions, has the facility initiated and completed repairs?
09/02/2008 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 09/02/2008
Activity Closed Date: 09/02/2008 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 09/02/2008 User: OWENS_JS_1
Description: REQUESTED UPDATED MLLD AND ATG OPERABILITY TESTING BE SENT TO ACEPD FOLLOWING TESTING.
Comments:
Comment Date: 09/02/2008 User: OWENS_JS_1
Description: Visual inspection performed w/ compliance rep. Brad Wentworth - form completed offsite and E-mailed to AET Inc.; Dana Spence.
09/02/2008 Emergency Preparedness Information Activity Owens, Joe S.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 09/02/2008
09/02/2008 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 09/02/2008
Activity Closed Date: 09/02/2008 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 09/02/2008 User: OWENS_JS_1
Description: REQUESTED UPDATED MLLD AND ATG OPERABILITY TESTING BE SENT TO ACEPD FOLLOWING TESTING.
Comments:
Comment Date: 09/02/2008 User: OWENS_JS_1
Description: Visual inspection performed w/ compliance rep. Brad Wentworth - form completed offsite and E-mailed to AET Inc.; Dana Spence.
08/30/2007 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 08/30/2007
Activity Closed Date: 08/30/2007 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 08/30/2007 User: OWENS_JS_1
Description: Form completed offsite following inspection and results E-mailed to compliance contractor rep: Beth Fleming w/ AET Inc. Brad Wentworth - compliance inspector onsite for inspection.
Comments:
Comment Date: 08/30/2007 User: OWENS_JS_1
Description: REVIEWED DOCUMENTS FOR FAC #: 8500281 Placard current & displayed: OK CFR form complete - FR records are updated - OK RDRL - present and applicable for facility: TANKS; Count. elect. monitoring of tank interstice / PIPING; Count. electric monitoring of piping interstice within STP sumps. MLLD. All disp. liners, spill buckets visual inspection. Site Diagram for accuracy, attached to ATTACHMENT Facility information. No changes frm. TIN inspection. Facility registration information including tank system attributes appear to be accurate. Monthly release detection records - Accepted. Date range for Inspection records: 10/2006 to present No Monthly ATG alarm status documented on insp. form - all systems normal w/ printout to verify - OK. A review of the Alarm Report for the ATG confirms the Operability test for the facility was performed. FUTURE DUE DATES OF FOLLOWING: Tank Insurance Renewal Due: 6/2008 MLLD - 10/2007 Leak Sensor operability test due - 10/2007 Placard Registration renewal due: 6/2008 BOI ( 5yr. integrity test of secondary system) - 2011 Visual inspection revealed: (3) STP sumps are dry and clean, Spill buckets contain a slight trace of fuel which was evident of recent delivery and removed by contact during inspection, but otherwise appear maintained - secondary portion checked for liquid w/ none found. Dispenser liners (2) are dry with no trace of any release, no issues addressed during monthly visual inspections. Monthly inspections should document any maint. which is performed or recommended as needed to prevent any release. The Diesel dispenser area is stained and a routine cleaning of the area should continue to prevent further degradation of the paving and surrounding area. The entry boots within the sumps appear sound and sealed ¿ no cracks observed and no leakage from any groundwater. Facility has no documented release and is currently not scored for state clean-up work status. The compliance inspection folder is complete and concise - RDRL is posted above ATG and is applicable for facility - Facility inspection records well maintained.
08/30/2007 Emergency Preparedness Information Activity Owens, Joe S.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 08/30/2007
08/30/2007 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 08/30/2007
Activity Closed Date: 08/30/2007 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 08/30/2007 User: OWENS_JS_1
Description: Form completed offsite following inspection and results E-mailed to compliance contractor rep: Beth Fleming w/ AET Inc. Brad Wentworth - compliance inspector onsite for inspection.
Comments:
Comment Date: 08/30/2007 User: OWENS_JS_1
Description: REVIEWED DOCUMENTS FOR FAC #: 8500281 Placard current & displayed: OK CFR form complete - FR records are updated - OK RDRL - present and applicable for facility: TANKS; Count. elect. monitoring of tank interstice / PIPING; Count. electric monitoring of piping interstice within STP sumps. MLLD. All disp. liners, spill buckets visual inspection. Site Diagram for accuracy, attached to ATTACHMENT Facility information. No changes frm. TIN inspection. Facility registration information including tank system attributes appear to be accurate. Monthly release detection records - Accepted. Date range for Inspection records: 10/2006 to present No Monthly ATG alarm status documented on insp. form - all systems normal w/ printout to verify - OK. A review of the Alarm Report for the ATG confirms the Operability test for the facility was performed. FUTURE DUE DATES OF FOLLOWING: Tank Insurance Renewal Due: 6/2008 MLLD - 10/2007 Leak Sensor operability test due - 10/2007 Placard Registration renewal due: 6/2008 BOI ( 5yr. integrity test of secondary system) - 2011 Visual inspection revealed: (3) STP sumps are dry and clean, Spill buckets contain a slight trace of fuel which was evident of recent delivery and removed by contact during inspection, but otherwise appear maintained - secondary portion checked for liquid w/ none found. Dispenser liners (2) are dry with no trace of any release, no issues addressed during monthly visual inspections. Monthly inspections should document any maint. which is performed or recommended as needed to prevent any release. The Diesel dispenser area is stained and a routine cleaning of the area should continue to prevent further degradation of the paving and surrounding area. The entry boots within the sumps appear sound and sealed ¿ no cracks observed and no leakage from any groundwater. Facility has no documented release and is currently not scored for state clean-up work status. The compliance inspection folder is complete and concise - RDRL is posted above ATG and is applicable for facility - Facility inspection records well maintained.
02/06/2007 Emergency Preparedness Information Activity Owens, Joe S.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 02/06/2007
12/12/2006 Attachment Owens, Joe S.
12/11/2006 Attachment Owens, Joe S.
11/09/2006 TCAR Activity Ramsey, Timothy H
Activity Result: Complete Activity Status: Closed
Activity Closed Date: 11/09/2006
11/09/2006 Editable Letter Activity Ramsey, Timothy H
Activity Title: Closure Review Letter Activity Status: Closed
11/07/2006 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 11/07/2006
Activity Closed Date: 11/09/2006 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 11/07/2006 User: OWENS_JS_1
Description: Onsite: 9/12/2006: Tanks in-process of being cleaned and levels of vapors present reduced to <2ppm for removal. 9/15/2006: concrete and canopy removed from over tanks. 9/19/2006 tanks removed and ECT onsite taking samples and screening for any any possible contamination - verbal indication from technician: none found. Tank Installation to begin on 9/21. All (3) tanks removed with components and to be recycled by contractor. No previous reported or documented contamination w/ FDEP. Full Tank closure required.
Comments:
Comment Date: 12/08/2006 User: OWENS_JS_1
Description: Construction performed by: Petroleum Technicians Inc. - PCC056694 - Deland, Florida
Comments:
Comment Date: 12/08/2006 User: OWENS_JS_1
Description: The Tanks / STP sumps / Pumps / fill ports and spill buckets / dispenser liners were all removed and re-cycled by the contractor. The piping was removed during the new trenching with other construction debris. ECT Inc. onsite conducting screening w/ OVA in and around excavation during entire removal operations which commenced on 9/18 to 9/20/2006. Verbal indication was that no contamination was detected and area was clean. The tanks were photographed following removal and appeared sound and in good condition w/ no visible signs of deep corrosion which would lend to a leakage point. These photos are archived, currently in the ACEPD database until transfer to OCULUS at a later date.
11/07/2006 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 11/07/2006
Activity Closed Date: 11/09/2006 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 11/07/2006 User: OWENS_JS_1
Description: Onsite: 9/12/2006: Tanks in-process of being cleaned and levels of vapors present reduced to <2ppm for removal. 9/15/2006: concrete and canopy removed from over tanks. 9/19/2006 tanks removed and ECT onsite taking samples and screening for any any possible contamination - verbal indication from technician: none found. Tank Installation to begin on 9/21. All (3) tanks removed with components and to be recycled by contractor. No previous reported or documented contamination w/ FDEP. Full Tank closure required.
Comments:
Comment Date: 12/08/2006 User: OWENS_JS_1
Description: Construction performed by: Petroleum Technicians Inc. - PCC056694 - Deland, Florida
Comments:
Comment Date: 12/08/2006 User: OWENS_JS_1
Description: The Tanks / STP sumps / Pumps / fill ports and spill buckets / dispenser liners were all removed and re-cycled by the contractor. The piping was removed during the new trenching with other construction debris. ECT Inc. onsite conducting screening w/ OVA in and around excavation during entire removal operations which commenced on 9/18 to 9/20/2006. Verbal indication was that no contamination was detected and area was clean. The tanks were photographed following removal and appeared sound and in good condition w/ no visible signs of deep corrosion which would lend to a leakage point. These photos are archived, currently in the ACEPD database until transfer to OCULUS at a later date.
11/07/2006 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 11/07/2006
Activity Closed Date: 11/09/2006 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 11/07/2006 User: OWENS_JS_1
Description: Onsite: 9/12/2006: Tanks in-process of being cleaned and levels of vapors present reduced to <2ppm for removal. 9/15/2006: concrete and canopy removed from over tanks. 9/19/2006 tanks removed and ECT onsite taking samples and screening for any any possible contamination - verbal indication from technician: none found. Tank Installation to begin on 9/21. All (3) tanks removed with components and to be recycled by contractor. No previous reported or documented contamination w/ FDEP. Full Tank closure required.
Comments:
Comment Date: 12/08/2006 User: OWENS_JS_1
Description: Construction performed by: Petroleum Technicians Inc. - PCC056694 - Deland, Florida
Comments:
Comment Date: 12/08/2006 User: OWENS_JS_1
Description: The Tanks / STP sumps / Pumps / fill ports and spill buckets / dispenser liners were all removed and re-cycled by the contractor. The piping was removed during the new trenching with other construction debris. ECT Inc. onsite conducting screening w/ OVA in and around excavation during entire removal operations which commenced on 9/18 to 9/20/2006. Verbal indication was that no contamination was detected and area was clean. The tanks were photographed following removal and appeared sound and in good condition w/ no visible signs of deep corrosion which would lend to a leakage point. These photos are archived, currently in the ACEPD database until transfer to OCULUS at a later date.
09/28/2006 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 09/28/2006
Activity Closed Date: 11/06/2006 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: E-mail copy of installation inspection sent to Beth Fleming - AET Inc. compliance contractor - by E-mail. Copy of inspection sent to Tristar Investo Inc. - attn Raj Shau - by USPS.
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: MLLD test results received 11/06/06 - from Petroleum Technicians Inc. - (3) products passed. FXIDV - Redjacket MLLD for Diesel & FXIV - for gasoline products (2) - EQ# #373
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: RDRL presented with inspection package and posted in store near ATG. CSLD w/ tank tite test every 3 years. Visual of sumps and liners - MLLD. SUPERCEEDED RDRL: by compiance contractor; elect. monitor of sumps & interstice, Visual inspection of spill buckets, disp. liners. - MLLD
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: Notification from Petroleum Technician Inc. - of impending tank change-out - commencing on 9/14/2006 - And tanks installed on 9/22/2006.
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: Visual inspection include CSLD printout from ATG - no failures or incidents with inspections.- 9/06/2006
Comments:
Comment Date: 12/08/2006 User: OWENS_JS_1
Description: Construction performed by: Petroleum Technicians Inc - PCC056694 out of Deland Florida.
Comments:
Comment Date: 09/28/2006 User: OWENS_JS_1
Description: Tank installed 9/21/06 - deadmen set and tank strapped and secured. Primary piping inspection: (3) product lines installed - tested to 50psi and visual soap test of all joints-10/03/06 -PASS. Hydrostatic test of all Spill buckets - 10/03/2006 - passed Vacuum test of EMCO Wheaton D/W spill bucket secondary - 10/03/06 - passed Secondary Piping tested Final inspection w/ operability test conducted 10/19/06 - all sensors passed (3 -piping interstice and sump sensors / (2) tank interstice. - all functioned properly when inverted to simulate a leak. Shear valves - (5) all secure and anchored (1 Diesel and 4 Gasoline) - Dispenser liners clean and dry (2) Spill buckets and VR buckets dry and clean - Straight drop tubes installed to function w/ installed ball check vent valve for overfill protection. ATG printout indicated "Normal Functions" when all sensors re-set.
Comments:
Comment Date: 10/04/2006 User: OWENS_JS_1
Description: EQUIPMENT NUMBERS FOR COMPONENTS: TANKS; METAL PRODUCTS - EQ# 333 PIPING: AMERON/LCX - EQ# 291 SUMPS; OPW PISCES - EQ# 368 DISPENSER LINERS: OPW - EQ# 368 SPILL BUCKETS: PRIMARY - EMCO/WHEATON #A1000 - EQ# 524 VAPOR RECOVERY - OPW - eq# 145 MLLD: REDJACKET - EQ# 373 ATG: VEEDEROOT - EQ# 033 BALL CHECK VEBT VALVE: OPW - EQ 223
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: DUE DATES: Annual operability Test of ATG sensors: 10/2007 MLLD test - 10/2007 Insurance Renewal due -6/2007 Breech of Integrity test for Cat. "C" tanks - 09/2011
09/28/2006 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 09/28/2006
Activity Closed Date: 11/06/2006 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: E-mail copy of installation inspection sent to Beth Fleming - AET Inc. compliance contractor - by E-mail. Copy of inspection sent to Tristar Investo Inc. - attn Raj Shau - by USPS.
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: MLLD test results received 11/06/06 - from Petroleum Technicians Inc. - (3) products passed. FXIDV - Redjacket MLLD for Diesel & FXIV - for gasoline products (2) - EQ# #373
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: RDRL presented with inspection package and posted in store near ATG. CSLD w/ tank tite test every 3 years. Visual of sumps and liners - MLLD. SUPERCEEDED RDRL: by compiance contractor; elect. monitor of sumps & interstice, Visual inspection of spill buckets, disp. liners. - MLLD
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: Notification from Petroleum Technician Inc. - of impending tank change-out - commencing on 9/14/2006 - And tanks installed on 9/22/2006.
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: Visual inspection include CSLD printout from ATG - no failures or incidents with inspections.- 9/06/2006
Comments:
Comment Date: 12/08/2006 User: OWENS_JS_1
Description: Construction performed by: Petroleum Technicians Inc - PCC056694 out of Deland Florida.
Comments:
Comment Date: 09/28/2006 User: OWENS_JS_1
Description: Tank installed 9/21/06 - deadmen set and tank strapped and secured. Primary piping inspection: (3) product lines installed - tested to 50psi and visual soap test of all joints-10/03/06 -PASS. Hydrostatic test of all Spill buckets - 10/03/2006 - passed Vacuum test of EMCO Wheaton D/W spill bucket secondary - 10/03/06 - passed Secondary Piping tested Final inspection w/ operability test conducted 10/19/06 - all sensors passed (3 -piping interstice and sump sensors / (2) tank interstice. - all functioned properly when inverted to simulate a leak. Shear valves - (5) all secure and anchored (1 Diesel and 4 Gasoline) - Dispenser liners clean and dry (2) Spill buckets and VR buckets dry and clean - Straight drop tubes installed to function w/ installed ball check vent valve for overfill protection. ATG printout indicated "Normal Functions" when all sensors re-set.
Comments:
Comment Date: 10/04/2006 User: OWENS_JS_1
Description: EQUIPMENT NUMBERS FOR COMPONENTS: TANKS; METAL PRODUCTS - EQ# 333 PIPING: AMERON/LCX - EQ# 291 SUMPS; OPW PISCES - EQ# 368 DISPENSER LINERS: OPW - EQ# 368 SPILL BUCKETS: PRIMARY - EMCO/WHEATON #A1000 - EQ# 524 VAPOR RECOVERY - OPW - eq# 145 MLLD: REDJACKET - EQ# 373 ATG: VEEDEROOT - EQ# 033 BALL CHECK VEBT VALVE: OPW - EQ 223
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: DUE DATES: Annual operability Test of ATG sensors: 10/2007 MLLD test - 10/2007 Insurance Renewal due -6/2007 Breech of Integrity test for Cat. "C" tanks - 09/2011
09/28/2006 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 09/28/2006
Activity Closed Date: 11/06/2006 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: E-mail copy of installation inspection sent to Beth Fleming - AET Inc. compliance contractor - by E-mail. Copy of inspection sent to Tristar Investo Inc. - attn Raj Shau - by USPS.
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: MLLD test results received 11/06/06 - from Petroleum Technicians Inc. - (3) products passed. FXIDV - Redjacket MLLD for Diesel & FXIV - for gasoline products (2) - EQ# #373
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: RDRL presented with inspection package and posted in store near ATG. CSLD w/ tank tite test every 3 years. Visual of sumps and liners - MLLD. SUPERCEEDED RDRL: by compiance contractor; elect. monitor of sumps & interstice, Visual inspection of spill buckets, disp. liners. - MLLD
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: Notification from Petroleum Technician Inc. - of impending tank change-out - commencing on 9/14/2006 - And tanks installed on 9/22/2006.
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: Visual inspection include CSLD printout from ATG - no failures or incidents with inspections.- 9/06/2006
Comments:
Comment Date: 12/08/2006 User: OWENS_JS_1
Description: Construction performed by: Petroleum Technicians Inc - PCC056694 out of Deland Florida.
Comments:
Comment Date: 09/28/2006 User: OWENS_JS_1
Description: Tank installed 9/21/06 - deadmen set and tank strapped and secured. Primary piping inspection: (3) product lines installed - tested to 50psi and visual soap test of all joints-10/03/06 -PASS. Hydrostatic test of all Spill buckets - 10/03/2006 - passed Vacuum test of EMCO Wheaton D/W spill bucket secondary - 10/03/06 - passed Secondary Piping tested Final inspection w/ operability test conducted 10/19/06 - all sensors passed (3 -piping interstice and sump sensors / (2) tank interstice. - all functioned properly when inverted to simulate a leak. Shear valves - (5) all secure and anchored (1 Diesel and 4 Gasoline) - Dispenser liners clean and dry (2) Spill buckets and VR buckets dry and clean - Straight drop tubes installed to function w/ installed ball check vent valve for overfill protection. ATG printout indicated "Normal Functions" when all sensors re-set.
Comments:
Comment Date: 10/04/2006 User: OWENS_JS_1
Description: EQUIPMENT NUMBERS FOR COMPONENTS: TANKS; METAL PRODUCTS - EQ# 333 PIPING: AMERON/LCX - EQ# 291 SUMPS; OPW PISCES - EQ# 368 DISPENSER LINERS: OPW - EQ# 368 SPILL BUCKETS: PRIMARY - EMCO/WHEATON #A1000 - EQ# 524 VAPOR RECOVERY - OPW - eq# 145 MLLD: REDJACKET - EQ# 373 ATG: VEEDEROOT - EQ# 033 BALL CHECK VEBT VALVE: OPW - EQ 223
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: DUE DATES: Annual operability Test of ATG sensors: 10/2007 MLLD test - 10/2007 Insurance Renewal due -6/2007 Breech of Integrity test for Cat. "C" tanks - 09/2011
09/28/2006 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 09/28/2006
Activity Closed Date: 11/06/2006 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: E-mail copy of installation inspection sent to Beth Fleming - AET Inc. compliance contractor - by E-mail. Copy of inspection sent to Tristar Investo Inc. - attn Raj Shau - by USPS.
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: MLLD test results received 11/06/06 - from Petroleum Technicians Inc. - (3) products passed. FXIDV - Redjacket MLLD for Diesel & FXIV - for gasoline products (2) - EQ# #373
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: RDRL presented with inspection package and posted in store near ATG. CSLD w/ tank tite test every 3 years. Visual of sumps and liners - MLLD. SUPERCEEDED RDRL: by compiance contractor; elect. monitor of sumps & interstice, Visual inspection of spill buckets, disp. liners. - MLLD
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: Notification from Petroleum Technician Inc. - of impending tank change-out - commencing on 9/14/2006 - And tanks installed on 9/22/2006.
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: Visual inspection include CSLD printout from ATG - no failures or incidents with inspections.- 9/06/2006
Comments:
Comment Date: 12/08/2006 User: OWENS_JS_1
Description: Construction performed by: Petroleum Technicians Inc - PCC056694 out of Deland Florida.
Comments:
Comment Date: 09/28/2006 User: OWENS_JS_1
Description: Tank installed 9/21/06 - deadmen set and tank strapped and secured. Primary piping inspection: (3) product lines installed - tested to 50psi and visual soap test of all joints-10/03/06 -PASS. Hydrostatic test of all Spill buckets - 10/03/2006 - passed Vacuum test of EMCO Wheaton D/W spill bucket secondary - 10/03/06 - passed Secondary Piping tested Final inspection w/ operability test conducted 10/19/06 - all sensors passed (3 -piping interstice and sump sensors / (2) tank interstice. - all functioned properly when inverted to simulate a leak. Shear valves - (5) all secure and anchored (1 Diesel and 4 Gasoline) - Dispenser liners clean and dry (2) Spill buckets and VR buckets dry and clean - Straight drop tubes installed to function w/ installed ball check vent valve for overfill protection. ATG printout indicated "Normal Functions" when all sensors re-set.
Comments:
Comment Date: 10/04/2006 User: OWENS_JS_1
Description: EQUIPMENT NUMBERS FOR COMPONENTS: TANKS; METAL PRODUCTS - EQ# 333 PIPING: AMERON/LCX - EQ# 291 SUMPS; OPW PISCES - EQ# 368 DISPENSER LINERS: OPW - EQ# 368 SPILL BUCKETS: PRIMARY - EMCO/WHEATON #A1000 - EQ# 524 VAPOR RECOVERY - OPW - eq# 145 MLLD: REDJACKET - EQ# 373 ATG: VEEDEROOT - EQ# 033 BALL CHECK VEBT VALVE: OPW - EQ 223
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: DUE DATES: Annual operability Test of ATG sensors: 10/2007 MLLD test - 10/2007 Insurance Renewal due -6/2007 Breech of Integrity test for Cat. "C" tanks - 09/2011
09/28/2006 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 09/28/2006
Activity Closed Date: 11/06/2006 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: E-mail copy of installation inspection sent to Beth Fleming - AET Inc. compliance contractor - by E-mail. Copy of inspection sent to Tristar Investo Inc. - attn Raj Shau - by USPS.
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: MLLD test results received 11/06/06 - from Petroleum Technicians Inc. - (3) products passed. FXIDV - Redjacket MLLD for Diesel & FXIV - for gasoline products (2) - EQ# #373
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: RDRL presented with inspection package and posted in store near ATG. CSLD w/ tank tite test every 3 years. Visual of sumps and liners - MLLD. SUPERCEEDED RDRL: by compiance contractor; elect. monitor of sumps & interstice, Visual inspection of spill buckets, disp. liners. - MLLD
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: Notification from Petroleum Technician Inc. - of impending tank change-out - commencing on 9/14/2006 - And tanks installed on 9/22/2006.
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: Visual inspection include CSLD printout from ATG - no failures or incidents with inspections.- 9/06/2006
Comments:
Comment Date: 12/08/2006 User: OWENS_JS_1
Description: Construction performed by: Petroleum Technicians Inc - PCC056694 out of Deland Florida.
Comments:
Comment Date: 09/28/2006 User: OWENS_JS_1
Description: Tank installed 9/21/06 - deadmen set and tank strapped and secured. Primary piping inspection: (3) product lines installed - tested to 50psi and visual soap test of all joints-10/03/06 -PASS. Hydrostatic test of all Spill buckets - 10/03/2006 - passed Vacuum test of EMCO Wheaton D/W spill bucket secondary - 10/03/06 - passed Secondary Piping tested Final inspection w/ operability test conducted 10/19/06 - all sensors passed (3 -piping interstice and sump sensors / (2) tank interstice. - all functioned properly when inverted to simulate a leak. Shear valves - (5) all secure and anchored (1 Diesel and 4 Gasoline) - Dispenser liners clean and dry (2) Spill buckets and VR buckets dry and clean - Straight drop tubes installed to function w/ installed ball check vent valve for overfill protection. ATG printout indicated "Normal Functions" when all sensors re-set.
Comments:
Comment Date: 10/04/2006 User: OWENS_JS_1
Description: EQUIPMENT NUMBERS FOR COMPONENTS: TANKS; METAL PRODUCTS - EQ# 333 PIPING: AMERON/LCX - EQ# 291 SUMPS; OPW PISCES - EQ# 368 DISPENSER LINERS: OPW - EQ# 368 SPILL BUCKETS: PRIMARY - EMCO/WHEATON #A1000 - EQ# 524 VAPOR RECOVERY - OPW - eq# 145 MLLD: REDJACKET - EQ# 373 ATG: VEEDEROOT - EQ# 033 BALL CHECK VEBT VALVE: OPW - EQ 223
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: DUE DATES: Annual operability Test of ATG sensors: 10/2007 MLLD test - 10/2007 Insurance Renewal due -6/2007 Breech of Integrity test for Cat. "C" tanks - 09/2011
09/28/2006 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 09/28/2006
Activity Closed Date: 11/06/2006 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: E-mail copy of installation inspection sent to Beth Fleming - AET Inc. compliance contractor - by E-mail. Copy of inspection sent to Tristar Investo Inc. - attn Raj Shau - by USPS.
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: MLLD test results received 11/06/06 - from Petroleum Technicians Inc. - (3) products passed. FXIDV - Redjacket MLLD for Diesel & FXIV - for gasoline products (2) - EQ# #373
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: RDRL presented with inspection package and posted in store near ATG. CSLD w/ tank tite test every 3 years. Visual of sumps and liners - MLLD. SUPERCEEDED RDRL: by compiance contractor; elect. monitor of sumps & interstice, Visual inspection of spill buckets, disp. liners. - MLLD
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: Notification from Petroleum Technician Inc. - of impending tank change-out - commencing on 9/14/2006 - And tanks installed on 9/22/2006.
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: Visual inspection include CSLD printout from ATG - no failures or incidents with inspections.- 9/06/2006
Comments:
Comment Date: 12/08/2006 User: OWENS_JS_1
Description: Construction performed by: Petroleum Technicians Inc - PCC056694 out of Deland Florida.
Comments:
Comment Date: 09/28/2006 User: OWENS_JS_1
Description: Tank installed 9/21/06 - deadmen set and tank strapped and secured. Primary piping inspection: (3) product lines installed - tested to 50psi and visual soap test of all joints-10/03/06 -PASS. Hydrostatic test of all Spill buckets - 10/03/2006 - passed Vacuum test of EMCO Wheaton D/W spill bucket secondary - 10/03/06 - passed Secondary Piping tested Final inspection w/ operability test conducted 10/19/06 - all sensors passed (3 -piping interstice and sump sensors / (2) tank interstice. - all functioned properly when inverted to simulate a leak. Shear valves - (5) all secure and anchored (1 Diesel and 4 Gasoline) - Dispenser liners clean and dry (2) Spill buckets and VR buckets dry and clean - Straight drop tubes installed to function w/ installed ball check vent valve for overfill protection. ATG printout indicated "Normal Functions" when all sensors re-set.
Comments:
Comment Date: 10/04/2006 User: OWENS_JS_1
Description: EQUIPMENT NUMBERS FOR COMPONENTS: TANKS; METAL PRODUCTS - EQ# 333 PIPING: AMERON/LCX - EQ# 291 SUMPS; OPW PISCES - EQ# 368 DISPENSER LINERS: OPW - EQ# 368 SPILL BUCKETS: PRIMARY - EMCO/WHEATON #A1000 - EQ# 524 VAPOR RECOVERY - OPW - eq# 145 MLLD: REDJACKET - EQ# 373 ATG: VEEDEROOT - EQ# 033 BALL CHECK VEBT VALVE: OPW - EQ 223
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: DUE DATES: Annual operability Test of ATG sensors: 10/2007 MLLD test - 10/2007 Insurance Renewal due -6/2007 Breech of Integrity test for Cat. "C" tanks - 09/2011
09/28/2006 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 09/28/2006
Activity Closed Date: 11/06/2006 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: E-mail copy of installation inspection sent to Beth Fleming - AET Inc. compliance contractor - by E-mail. Copy of inspection sent to Tristar Investo Inc. - attn Raj Shau - by USPS.
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: MLLD test results received 11/06/06 - from Petroleum Technicians Inc. - (3) products passed. FXIDV - Redjacket MLLD for Diesel & FXIV - for gasoline products (2) - EQ# #373
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: RDRL presented with inspection package and posted in store near ATG. CSLD w/ tank tite test every 3 years. Visual of sumps and liners - MLLD. SUPERCEEDED RDRL: by compiance contractor; elect. monitor of sumps & interstice, Visual inspection of spill buckets, disp. liners. - MLLD
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: Notification from Petroleum Technician Inc. - of impending tank change-out - commencing on 9/14/2006 - And tanks installed on 9/22/2006.
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: Visual inspection include CSLD printout from ATG - no failures or incidents with inspections.- 9/06/2006
Comments:
Comment Date: 12/08/2006 User: OWENS_JS_1
Description: Construction performed by: Petroleum Technicians Inc - PCC056694 out of Deland Florida.
Comments:
Comment Date: 09/28/2006 User: OWENS_JS_1
Description: Tank installed 9/21/06 - deadmen set and tank strapped and secured. Primary piping inspection: (3) product lines installed - tested to 50psi and visual soap test of all joints-10/03/06 -PASS. Hydrostatic test of all Spill buckets - 10/03/2006 - passed Vacuum test of EMCO Wheaton D/W spill bucket secondary - 10/03/06 - passed Secondary Piping tested Final inspection w/ operability test conducted 10/19/06 - all sensors passed (3 -piping interstice and sump sensors / (2) tank interstice. - all functioned properly when inverted to simulate a leak. Shear valves - (5) all secure and anchored (1 Diesel and 4 Gasoline) - Dispenser liners clean and dry (2) Spill buckets and VR buckets dry and clean - Straight drop tubes installed to function w/ installed ball check vent valve for overfill protection. ATG printout indicated "Normal Functions" when all sensors re-set.
Comments:
Comment Date: 10/04/2006 User: OWENS_JS_1
Description: EQUIPMENT NUMBERS FOR COMPONENTS: TANKS; METAL PRODUCTS - EQ# 333 PIPING: AMERON/LCX - EQ# 291 SUMPS; OPW PISCES - EQ# 368 DISPENSER LINERS: OPW - EQ# 368 SPILL BUCKETS: PRIMARY - EMCO/WHEATON #A1000 - EQ# 524 VAPOR RECOVERY - OPW - eq# 145 MLLD: REDJACKET - EQ# 373 ATG: VEEDEROOT - EQ# 033 BALL CHECK VEBT VALVE: OPW - EQ 223
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: DUE DATES: Annual operability Test of ATG sensors: 10/2007 MLLD test - 10/2007 Insurance Renewal due -6/2007 Breech of Integrity test for Cat. "C" tanks - 09/2011
09/28/2006 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 09/28/2006
Activity Closed Date: 11/06/2006 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: E-mail copy of installation inspection sent to Beth Fleming - AET Inc. compliance contractor - by E-mail. Copy of inspection sent to Tristar Investo Inc. - attn Raj Shau - by USPS.
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: MLLD test results received 11/06/06 - from Petroleum Technicians Inc. - (3) products passed. FXIDV - Redjacket MLLD for Diesel & FXIV - for gasoline products (2) - EQ# #373
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: RDRL presented with inspection package and posted in store near ATG. CSLD w/ tank tite test every 3 years. Visual of sumps and liners - MLLD. SUPERCEEDED RDRL: by compiance contractor; elect. monitor of sumps & interstice, Visual inspection of spill buckets, disp. liners. - MLLD
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: Notification from Petroleum Technician Inc. - of impending tank change-out - commencing on 9/14/2006 - And tanks installed on 9/22/2006.
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: Visual inspection include CSLD printout from ATG - no failures or incidents with inspections.- 9/06/2006
Comments:
Comment Date: 12/08/2006 User: OWENS_JS_1
Description: Construction performed by: Petroleum Technicians Inc - PCC056694 out of Deland Florida.
Comments:
Comment Date: 09/28/2006 User: OWENS_JS_1
Description: Tank installed 9/21/06 - deadmen set and tank strapped and secured. Primary piping inspection: (3) product lines installed - tested to 50psi and visual soap test of all joints-10/03/06 -PASS. Hydrostatic test of all Spill buckets - 10/03/2006 - passed Vacuum test of EMCO Wheaton D/W spill bucket secondary - 10/03/06 - passed Secondary Piping tested Final inspection w/ operability test conducted 10/19/06 - all sensors passed (3 -piping interstice and sump sensors / (2) tank interstice. - all functioned properly when inverted to simulate a leak. Shear valves - (5) all secure and anchored (1 Diesel and 4 Gasoline) - Dispenser liners clean and dry (2) Spill buckets and VR buckets dry and clean - Straight drop tubes installed to function w/ installed ball check vent valve for overfill protection. ATG printout indicated "Normal Functions" when all sensors re-set.
Comments:
Comment Date: 10/04/2006 User: OWENS_JS_1
Description: EQUIPMENT NUMBERS FOR COMPONENTS: TANKS; METAL PRODUCTS - EQ# 333 PIPING: AMERON/LCX - EQ# 291 SUMPS; OPW PISCES - EQ# 368 DISPENSER LINERS: OPW - EQ# 368 SPILL BUCKETS: PRIMARY - EMCO/WHEATON #A1000 - EQ# 524 VAPOR RECOVERY - OPW - eq# 145 MLLD: REDJACKET - EQ# 373 ATG: VEEDEROOT - EQ# 033 BALL CHECK VEBT VALVE: OPW - EQ 223
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: DUE DATES: Annual operability Test of ATG sensors: 10/2007 MLLD test - 10/2007 Insurance Renewal due -6/2007 Breech of Integrity test for Cat. "C" tanks - 09/2011
09/28/2006 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 09/28/2006
Activity Closed Date: 11/06/2006 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: E-mail copy of installation inspection sent to Beth Fleming - AET Inc. compliance contractor - by E-mail. Copy of inspection sent to Tristar Investo Inc. - attn Raj Shau - by USPS.
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: MLLD test results received 11/06/06 - from Petroleum Technicians Inc. - (3) products passed. FXIDV - Redjacket MLLD for Diesel & FXIV - for gasoline products (2) - EQ# #373
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: RDRL presented with inspection package and posted in store near ATG. CSLD w/ tank tite test every 3 years. Visual of sumps and liners - MLLD. SUPERCEEDED RDRL: by compiance contractor; elect. monitor of sumps & interstice, Visual inspection of spill buckets, disp. liners. - MLLD
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: Notification from Petroleum Technician Inc. - of impending tank change-out - commencing on 9/14/2006 - And tanks installed on 9/22/2006.
Comments:
Comment Date: 12/11/2006 User: OWENS_JS_1
Description: Visual inspection include CSLD printout from ATG - no failures or incidents with inspections.- 9/06/2006
Comments:
Comment Date: 12/08/2006 User: OWENS_JS_1
Description: Construction performed by: Petroleum Technicians Inc - PCC056694 out of Deland Florida.
Comments:
Comment Date: 09/28/2006 User: OWENS_JS_1
Description: Tank installed 9/21/06 - deadmen set and tank strapped and secured. Primary piping inspection: (3) product lines installed - tested to 50psi and visual soap test of all joints-10/03/06 -PASS. Hydrostatic test of all Spill buckets - 10/03/2006 - passed Vacuum test of EMCO Wheaton D/W spill bucket secondary - 10/03/06 - passed Secondary Piping tested Final inspection w/ operability test conducted 10/19/06 - all sensors passed (3 -piping interstice and sump sensors / (2) tank interstice. - all functioned properly when inverted to simulate a leak. Shear valves - (5) all secure and anchored (1 Diesel and 4 Gasoline) - Dispenser liners clean and dry (2) Spill buckets and VR buckets dry and clean - Straight drop tubes installed to function w/ installed ball check vent valve for overfill protection. ATG printout indicated "Normal Functions" when all sensors re-set.
Comments:
Comment Date: 10/04/2006 User: OWENS_JS_1
Description: EQUIPMENT NUMBERS FOR COMPONENTS: TANKS; METAL PRODUCTS - EQ# 333 PIPING: AMERON/LCX - EQ# 291 SUMPS; OPW PISCES - EQ# 368 DISPENSER LINERS: OPW - EQ# 368 SPILL BUCKETS: PRIMARY - EMCO/WHEATON #A1000 - EQ# 524 VAPOR RECOVERY - OPW - eq# 145 MLLD: REDJACKET - EQ# 373 ATG: VEEDEROOT - EQ# 033 BALL CHECK VEBT VALVE: OPW - EQ 223
Comments:
Comment Date: 11/06/2006 User: OWENS_JS_1
Description: DUE DATES: Annual operability Test of ATG sensors: 10/2007 MLLD test - 10/2007 Insurance Renewal due -6/2007 Breech of Integrity test for Cat. "C" tanks - 09/2011
09/19/2006 Emergency Preparedness Information Activity Owens, Joe S.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 09/19/2006
09/14/2006 Attachment Owens, Joe S.
09/11/2006 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 09/11/2006
Activity Closed Date: 09/11/2006 Activity Closed By: OWENS_JS_1
Comments:
Comment Date: 09/11/2006 User: OWENS_JS_1
Description: DOCUMENTS REVIEWED: CFR form complete ¿ OK - FR record updated. RDRL ¿ present and applicable for facility ¿ TANKS: CSLD for tanks, PIPING: visua linspections of sumps, dispenser liners and spill buckets - suction for Diesel product. Site Diagram for accuracy, attached to facility level ATTACHMENTS. Facility registration information including tank system attributes appear to be accurate. Monthly release detection records ¿ ATG printouts complete¿ Accepted. CSLD printouts ¿ complete w/ no inconclusive results w/o investigation. FILL ports have straight drop tube for overfill prevention. Spill buckets clean and dry ¿ OK Date range for Inspection records: 8/2006 to present ADVISED CONTACT OF FOLLOWING: MLLD required testing due:2/2007 Tank Insurance Renewal Due: 6/2007 Placard Registration renewal due: 6/2007 REMINDER FOR SINGLE-WALL TANK OWNERS - UPGRADE DEADLINE 12/2009. VIsual inspection of all sumps, spill buckets and liners - all clean and well maintained.
09/06/2006 Comment Owens, Joe S.
Description: Visual inspection include CSLD printout from ATG - no failures or incidents with inspections.
09/06/2006 Comment Owens, Joe S.
Description: RDRL presented with inspection package and posted in store near ATG. CSLD w/ tank tite test every 3 years. Visual of sumps and liners - MLLD.
09/06/2006 Comment Owens, Joe S.
Description: Notification from Petroleum Technician Inc. - of impending tank change-out - commencing on 9/14/2006 - And tanks installed on 9/22/2006.
08/15/2006 Attachment Owens, Joe S.
03/06/2006 Legacy Activity Ramsey, Timothy H
Activity Name: TANK COMPLIANCE RE-INSPECTION Activity Status: Closed
Completion Notes: VISUAL INSPECTION OF SUMP LID REPLACEMENT. MLLD & LINE TEST 2/15/06
12/21/2005 Legacy Activity Ramsey, Timothy H
Activity Name: DISCHARGE MINOR - 770 CU NOT REQUIRED Activity Status: Closed
Completion Notes: RECEIVED REPORT FROM ECT INDICATING NO PETROLEUM IMPACT TO SOIL
11/07/2005 Legacy Activity Ramsey, Timothy H
Activity Name: INCIDENT REPORT FORM RECEIVED Activity Status: Closed
Completion Notes: RECEIVED INCIDENT REPORT FORM IN RESPONSE TO TCI CONDUCTED 11/2/05
11/02/2005 Violation Closed Ramsey, Timothy H
Significance: Minor Status: Closed
Rule: 761.700(1)(a)1
11/02/2005 Legacy Activity Ramsey, Timothy H
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
Completion Notes: MLLD TEST 11/17/05, DUE THIS MONTH
01/31/2005 Legacy Activity Ramsey, Timothy H
Activity Name: TANK COMPLIANCE RE-INSPECTION Activity Status: Closed
Completion Notes: PROPER OVERFILL INSTALLED, SIR DATA PRESENTED, LLD TEST 1/19/05, VIEW LENSES ON SUMPS REPAIRED
11/23/2004 Violation Closed Ramsey, Timothy H
Significance: SNC-B Status: Closed
Rule: 761.500(5)
11/23/2004 Legacy Activity Ramsey, Timothy H
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
11/23/2004 Violation Closed Ramsey, Timothy H
Significance: Minor Status: Closed
Rule: 761.700(1)(a)1
11/23/2004 Violation Closed Ramsey, Timothy H
Significance: Minor Status: Closed
Rule: 761.640(4)(a)
11/23/2004 Violation Closed Ramsey, Timothy H
Significance: Minor Status: Closed
Rule: 761.640(3)(e)
12/17/2003 Comment MIGRATION
Description: REGISTRATION: 911 ADDRESS UPDATE
12/04/2003 Legacy Activity Ramsey, Timothy H
Activity Name: TANK INSTALLATION - FINAL INSPECTION Activity Status: Closed
10/14/2003 Legacy Activity Ramsey, Timothy H
Activity Name: RESPONSE RECEIVED BY DEPARTMENT Activity Status: Closed
Completion Notes: RECEIVED PHONE CALL FROM OWNER REP, RECORDS NOT AVAILABLE PRIOR TO CHANGE OF OWNERSHIP. CLOSED OUT VILATION
10/01/2003 Violation Closed Ramsey, Timothy H
Significance: Minor Status: Closed
Rule: 640(3)(c)3
10/01/2003 Legacy Activity Ramsey, Timothy H
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
Completion Notes: LLD, TANKS AND LINE TESTS 2/4/03
12/20/2002 Legacy Activity Ramsey, Timothy H
Activity Name: TANK COMPLIANCE RE-INSPECTION Activity Status: Closed
Completion Notes: LLD TEST 11/11/02, INTERNAL INSPECTION 1/21/03, TANK TIGHTNESS TEST 2/4/03
12/10/2002 Legacy Activity Ramsey, Timothy H
Activity Name: TELEPHONE CONVERSATION Activity Status: Closed
Completion Notes: RECEIVED CALL FROM COMPLIANCE CONTRACTOR INDICATING COMPLIANCE ISSUES WILL BE RESOLVED BY JANUARY 2003
11/01/2002 Violation Closed Ramsey, Timothy H
Significance: Minor Status: Closed
Rule: 640(3)(d)
11/01/2002 Legacy Activity Ramsey, Timothy H
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
11/01/2002 Violation Closed Ramsey, Timothy H
Significance: Minor Status: Closed
Rule: 700(2)(e)
11/01/2002 Violation Closed Ramsey, Timothy H
Significance: Minor Status: Closed
Rule: 700(1)(c)1
09/21/2001 Legacy Activity Ramsey, Timothy H
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
Completion Notes: COMPLIANCE INSPECTION
01/09/2001 Legacy Activity Ramsey, Timothy H
Activity Name: TANK DISCHARGE INVESTIGATION Activity Status: Closed
Completion Notes: DISCHARGE EVALUATION
12/07/2000 Legacy Activity Ramsey, Timothy H
Activity Name: TANK COMPLIANCE RE-INSPECTION Activity Status: Closed
Completion Notes: COMPLIANCE REINSPECTION
09/25/2000 Violation Closed Ramsey, Timothy H
Significance: Minor Status: Closed
Rule: 640(2)(d)2
09/25/2000 Legacy Activity Ramsey, Timothy H
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
Completion Notes: COMPLIANCE INSPECTION
09/20/1999 Legacy Activity Buono, Mike
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
05/13/1999 Legacy Activity Buono, Mike
Activity Name: WARNING LETTER ISSUED Activity Status: Closed
04/01/1999 Violation Closed Buono, Mike
Significance: Minor Status: Closed
Rule: 600(1)(a)1
Comments:
Comment Date: 10/17/2024 User: ULRICH_CA_1
Description: Tank 4 is actually two 500 gallon steel tanks in a concrete containment structure. Non-regulated.
Comments:
Comment Date: 04/11/2005 User: UNKNOWN
Description: REGISTRATION: CORP NAME CHANGE FROM BOMBARDIER MOTOR CORP OF AMERICA TO BRP US INC. FOR FURTHER INFO - SEE REGIS FILE. /AWM
04/01/1999 Legacy Activity Buono, Mike
Activity Name: TANK INSTALLATION - FINAL INSPECTION Activity Status: Closed
04/01/1999 Violation Closed Buono, Mike
Significance: Minor Status: Closed
Rule: 600(1)(a)1
Comments:
Comment Date: 10/17/2024 User: ULRICH_CA_1
Description: Tank 4 is actually two 500 gallon steel tanks in a concrete containment structure. Non-regulated.
Comments:
Comment Date: 04/11/2005 User: UNKNOWN
Description: REGISTRATION: CORP NAME CHANGE FROM BOMBARDIER MOTOR CORP OF AMERICA TO BRP US INC. FOR FURTHER INFO - SEE REGIS FILE. /AWM
03/18/1999 Legacy Activity Buono, Mike
Activity Name: TANK CLOSURE INSPECTION Activity Status: Closed
03/03/1999 Violation Closed Buono, Mike
Significance: Minor Status: Closed
Rule: 450(1)b
Comments:
Comment Date: 09/10/2003 User: UNKNOWN
Description: REGISTRATION: Address change via request from Margaret Silva, Brownfield Coordinator @ (305) 372-6829 or silvam@miamidade.gov on Sept. 8, 2003.
03/03/1999 Legacy Activity Buono, Mike
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
03/03/1999 Violation Closed Buono, Mike
Significance: Minor Status: Closed
Rule: 700(1)(c)1
03/03/1999 Violation Closed Buono, Mike
Significance: Minor Status: Closed
Rule: 700(1)(c)1
Comments:
Comment Date: 10/31/2015 User: RUTHERFOORD_ME_2
Description: RD: Visual, including outerwalls for dw tanks, containments for sw tanks, all piping, supply and return lines all the way to pumps.
Comments:
Comment Date: 10/31/2015 User: RUTHERFOORD_ME_2
Description: EQs: (9) dw ASTs (2) sw ASTs in containment
03/03/1999 Violation Closed Buono, Mike
Significance: Minor Status: Closed
Rule: 700(1)(c)1
Comments:
Comment Date: 10/31/2015 User: RUTHERFOORD_ME_2
Description: RD: Visual, including outerwalls for dw tanks, containments for sw tanks, all piping, supply and return lines all the way to pumps.
Comments:
Comment Date: 10/31/2015 User: RUTHERFOORD_ME_2
Description: EQs: (9) dw ASTs (2) sw ASTs in containment
11/04/1997 Violation Closed Unknown, User
Significance: Minor Status: Closed
Rule: 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762
Comments:
Comment Date: 03/17/2005 User: UNKNOWN
Description: REGISTRATION: ABANDONED TANKS FOUND ON CITY OF PANAMA CITY'S PROPERTY, UNSURE OF ACTUAL TANK SIZE(S) AT THIS POINT PER CHRIS @ SUNCOM 777-5782. SEE REGIS FILE. Rafique and David went to Neil Fraveil's office (City of Panama City) to get paperwork completed. Neil signed on LCSR form and added info for the tank on STRF. these documents will be scanned.. The STRF AND LSCR could not be saved as scanned = larger size than can be saved.THEY ARE IN FILE. The Two (2) Abandoned were removed, according to city personnel records back in April of 2006. The Alternate Procedure for not having a closure assessment performed was approved by Tallahassee. The two (2) underground storage tanks were removed from the site and cut up for scrap metal according to Neil Fraveil.
11/04/1997 Legacy Activity Carawan, Lorraine S.
Activity Name: UST ROUTINE COMPLIANCE INSPECTION Activity Status: Closed