DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Journal Report
Report Run Date: 04/27/2025        Last Data Refresh: 04/26/2025        Report Generated from DOPPLER
 
Facility ID: 8503503
Facility Name: SHELL-FIRST COAST ENERGY #1097/3038
 
04/29/2024 Enforcement Tracking Activity Paul, Jennifer
Activity Status: Open
04/29/2024 Enforcement Referral Activity Zimmerman, Robert A
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 04/29/2024
Events:
Event Type: Activity has been finished Date: 04/29/2024
Comment: Finished
Events:
Event Type: Activity has been submitted for approval Date: 04/29/2024
Comment: Submitted for approval by: Robert A Zimmerman: I was directed to refer this facility immediately.
Events:
Event Type: Activity has been assigned Date: 04/29/2024
Comment: Assigned to Jennifer Paul
Events:
Event Type: Activity/Document was accepted on this date Date: 04/29/2024
Comment: Accepted by Jennifer Paul: Accepted
Events:
Event Type: Activity/Document was acknowledged on this date Date: 04/29/2024
Comment: Acknowledged and Assigned by Jennifer Paul
Comments:
Comment Date: 04/29/2024 User: ZIMMERMAN_RA_2
Description: I was directed to refer this facility immediately.
Comments:
Comment Date: 04/29/2024 User: ZIMMERMAN_RA_2
Description: I was directed to refer this facility immediately.
04/29/2024 Enforcement Referral Activity Zimmerman, Robert A
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 04/29/2024
Events:
Event Type: Activity has been finished Date: 04/29/2024
Comment: Finished
Events:
Event Type: Activity has been submitted for approval Date: 04/29/2024
Comment: Submitted for approval by: Robert A Zimmerman: I was directed to refer this facility immediately.
Events:
Event Type: Activity has been assigned Date: 04/29/2024
Comment: Assigned to Jennifer Paul
Events:
Event Type: Activity/Document was accepted on this date Date: 04/29/2024
Comment: Accepted by Jennifer Paul: Accepted
Events:
Event Type: Activity/Document was acknowledged on this date Date: 04/29/2024
Comment: Acknowledged and Assigned by Jennifer Paul
Comments:
Comment Date: 04/29/2024 User: ZIMMERMAN_RA_2
Description: I was directed to refer this facility immediately.
Comments:
Comment Date: 04/29/2024 User: ZIMMERMAN_RA_2
Description: I was directed to refer this facility immediately.
01/26/2024 Violation Open Zimmerman, Robert A
Significance: Minor Status: Open
Criteria ID: 7064
Rule: 62-762.601(1)(d), 62-762.602(1)(d), 62-762.601(1)(g), 62-762.602(1)(g)
01/26/2024 Electronic Communication Activity Zimmerman, Robert A
Activity Closed Date: 01/26/2024 Activity Status: Closed
Date: 01/26/2024
Recipient: Karl Estock
Sender: Robert Zimmerman
Subject: TCI report
Message: Sent TCI report and associated compliance letter email attachments to facility representative; "Karl Estock" kestock@firstcoastenergy.com
Events:
Event Type: Activity has been finished Date: 01/26/2024
Comment: Finished
01/26/2024 Editable Letter Activity Zimmerman, Robert A
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 01/26/2024
Comment: Sent
Events:
Event Type: Activity has been finished Date: 01/26/2024
Comment: Finished
Attachments:
Attachment Date: 01/26/2024 User: ZIMMERMAN_RA_2
Description: CAO 8503503 , SHELL-FIRST COAST ENERGY #1097-3038 2024
View Attachment
01/10/2024 Site Inspection Activity Closed Zimmerman, Robert A
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 01/10/2024
Activity Closed Date: 01/26/2024 Activity Closed By: ZIMMERMAN_RA_2
Events:
Event Type: Activity has been finished Date: 01/26/2024
Comment: Finished
Comments:
Comment Date: 01/26/2024 User: ZIMMERMAN_RA_2
Description: Sent TCI report and associated compliance letter email attachments to facility representative; "Karl Estock" kestock@firstcoastenergy.com
12/19/2023 Phone Conversation Activity Zimmerman, Robert A
Call Type: Outgoing Activity Status: Closed
Phone Number: 904-596-3242 Activity Closed Date: 12/19/2023
Subject: Compliance assistance outreach contact with facility representative Kevin Kusmirek for notification and schedule upcoming TCI and to give a reminder that the three-year record file review requirement is: Registration Placard, Proof of Financial Responsibility, STFM and annual visual inspections.
Events:
Event Type: Activity has been finished Date: 12/19/2023
Comment: Finished
07/27/2021 Editable Letter Activity Zimmerman, Robert A
Activity Title: In Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 07/27/2021
Comment: Finished
Events:
Event Type: Document has been sent Date: 07/27/2021
Comment: Sent
Attachments:
Attachment Date: 07/27/2021 User: ZIMMERMAN_RA_2
Description: ICL 8503503, SHELL-FIRST COAST ENERGY #1097-3038.
View Attachment
07/27/2021 Electronic Communication Activity Zimmerman, Robert A
Activity Closed Date: 07/27/2021 Activity Status: Closed
Date: 07/27/2021
Recipient: Karl Estock
Sender: Robert Zimmerman
Subject: TCI report
Message: Sent TCI report and associated compliance letter email attachments to facility representative; "Karl Estock" kestock@firstcoastenergy.com
Events:
Event Type: Activity has been finished Date: 07/27/2021
Comment: Finished
07/16/2021 Site Inspection Activity Closed Zimmerman, Robert A
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 07/16/2021
Activity Closed Date: 07/27/2021 Activity Closed By: ZIMMERMAN_RA_2
Events:
Event Type: Activity has been finished Date: 07/27/2021
Comment: Finished
Comments:
Comment Date: 07/27/2021 User: ZIMMERMAN_RA_2
Description: Sent TCI report and associated compliance letter email attachments to facility representative; "Karl Estock" kestock@firstcoastenergy.com
07/09/2021 Phone Conversation Activity Zimmerman, Robert A
Call Type: Outgoing Activity Status: Closed
Phone Number: (904) 955-0399 Activity Closed Date: 07/09/2021
Subject: Compliance assistance outreach contact with facility representative for notification and schedule upcoming TCI and to give a reminder that the three-year record file review requirement is: Registration Placard, Proof of Financial Responsibility, STFM and annual visual inspections.
Events:
Event Type: Activity has been finished Date: 07/09/2021
Comment: Finished
12/16/2019 Editable Letter Activity Zimmerman, Robert A
Activity Title: In Compliance Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 12/16/2019
Comment: Sent
Events:
Event Type: Activity has been finished Date: 12/16/2019
Comment: Finished
Attachments:
Attachment Date: 12/16/2019 User: ZIMMERMAN_RA_2
Description: ICL 8503503, SHELL-FIRST COAST ENERGY #1097-3038.
View Attachment
11/21/2019 Site Inspection Activity Closed Zimmerman, Robert A
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 11/21/2019
Activity Closed Date: 12/16/2019 Activity Closed By: ZIMMERMAN_RA_2
Events:
Event Type: Activity has been finished Date: 12/16/2019
Comment: Finished
Comments:
Comment Date: 12/16/2019 User: ZIMMERMAN_RA_2
Description: Sent TCI report and ICL email attachments to facility representative; "Karl Estock"
11/07/2019 Comment Zimmerman, Robert A
Description: Karl Estock Environmental Compliance Specialist Petro Services, Inc. Management Company for First Coast Energy, L.L.P. and Southeast Energy L.L.C. Office: 904-596-3217 Cell: 904-860-5363 "Karl Estock"
10/25/2019 Electronic Communication Activity Zimmerman, Robert A
Activity Closed Date: 10/25/2019 Activity Status: Closed
Date: 10/25/2019
Recipient: Kevin Kusmirek
Sender: Robert Zimmerman
Subject: Compliance outreach TCI notification-scheduling
Message: Contacted facility representative Kevin Kusmirek for notification and schedule upcoming TCI and to give a reminder that the three-year record review requirement is: Registration Placard, Proof of Financial Responsibility, STFM, monthly visual inspections and electronic release detection records, containment integrity evaluation testing, annual overfill protection, line leak detector, operability test and A/B/C UST operator certifications.
Events:
Event Type: Activity has been finished Date: 10/25/2019
Comment: Finished
05/24/2018 Site Inspection Activity Closed Zimmerman, Robert A
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 05/24/2018
Activity Closed Date: 06/26/2018 Activity Closed By: ZIMMERMAN_RA_2
Events:
Event Type: Activity has been finished Date: 06/26/2018
Comment: Finished
03/29/2018 Record Document Activity Zimmerman, Robert A
Activity Status: Closed
Contact Name: Kevin Kusmirek Activity Closed Date: 03/29/2018
Events:
Event Type: Activity has been finished Date: 03/29/2018
Comment: Finished
03/29/2018 Editable Letter Activity Zimmerman, Robert A
Activity Title: Return to Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 03/29/2018
Comment: Finished
Attachments:
Attachment Date: 03/29/2018 User: ZIMMERMAN_RA_2
Description: RCL 8503503, SHELL-FIRST COAST ENERGY #1097-3038.
View Attachment
12/26/2017 Record Document Activity Zimmerman, Robert A
Activity Status: Closed
Contact Name: Kevin Kusmirek Activity Closed Date: 12/26/2017
Events:
Event Type: Activity has been finished Date: 12/26/2017
Comment: Finished
Comments:
Comment Date: 12/26/2017 User: ZIMMERMAN_RA_2
Description: Received FR, MVI, electronic RD and annual testing documents; entered LLD and Op test certs into FIRST.
12/25/2017 Editable Letter Activity Zimmerman, Robert A
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Description: Return to Compliance Letter
Events:
Event Type: Activity has been finished Date: 12/25/2017
Comment: Finished
Attachments:
Attachment Date: 12/25/2017 User: ZIMMERMAN_RA_2
Description: CAO 8503503, SHELL-FIRST COAST ENERGY #1097-3038.
View Attachment
12/07/2017 Violation Closed Zimmerman, Robert A
Significance: Minor Status: Closed
Criteria ID: 4078
Rule: 62-761.710(1)
12/07/2017 Site Inspection Activity Closed Zimmerman, Robert A
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 12/07/2017
Activity Closed Date: 12/25/2017 Activity Closed By: ZIMMERMAN_RA_2
Events:
Event Type: Activity has been finished Date: 12/25/2017
Comment: Finished
Comments:
Comment Date: 12/25/2017 User: ZIMMERMAN_RA_2
Description: Discussed facilities compliance history and modification to the UST rule and presented the UST outreach tool to the facility representative. Upcoming 2018 deadlines for obtaining UST operator certifications, overfill protection operability testing and containment integrity testing as per the new tank rule. Release detection and overfill protection device testing and certification – by January 11, 2018 and, every 12 months thereafter. Periodic test for storage tank system components shall occur according to the following schedule; A. Single wall spill buckets – by January 11, 2018 and, every 12 months thereafter; B. Piping and dispenser sumps - by October 13, 2018 and, every 3 years thereafter; C. Double wall spill buckets - by October 13, 2018 and, every 3 years thereafter; UST operator’s certification; Each UST facility must have a Class A, Class B and Class C operator that is trained and certified in accordance with the rule by October 13, 2018. A Class A, B or C operator must be present at all times of operation unless the facility is unmanned.
Comments:
Comment Date: 12/25/2017 User: ZIMMERMAN_RA_2
Description: Sent TCI report and CAO email attachments to facility representative.
12/07/2017 Site Inspection Activity Closed Zimmerman, Robert A
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 12/07/2017
Activity Closed Date: 12/25/2017 Activity Closed By: ZIMMERMAN_RA_2
Events:
Event Type: Activity has been finished Date: 12/25/2017
Comment: Finished
Comments:
Comment Date: 12/25/2017 User: ZIMMERMAN_RA_2
Description: Discussed facilities compliance history and modification to the UST rule and presented the UST outreach tool to the facility representative. Upcoming 2018 deadlines for obtaining UST operator certifications, overfill protection operability testing and containment integrity testing as per the new tank rule. Release detection and overfill protection device testing and certification – by January 11, 2018 and, every 12 months thereafter. Periodic test for storage tank system components shall occur according to the following schedule; A. Single wall spill buckets – by January 11, 2018 and, every 12 months thereafter; B. Piping and dispenser sumps - by October 13, 2018 and, every 3 years thereafter; C. Double wall spill buckets - by October 13, 2018 and, every 3 years thereafter; UST operator’s certification; Each UST facility must have a Class A, Class B and Class C operator that is trained and certified in accordance with the rule by October 13, 2018. A Class A, B or C operator must be present at all times of operation unless the facility is unmanned.
Comments:
Comment Date: 12/25/2017 User: ZIMMERMAN_RA_2
Description: Sent TCI report and CAO email attachments to facility representative.
12/07/2017 Violation Closed Zimmerman, Robert A
Significance: Minor Status: Closed
Criteria ID: 4077
Rule: 62-761.700(3)(b), 62-761.700(3)(b)1., 62-761.700(3)(b)2.
12/01/2017 Comment Zimmerman, Robert A
Description: Kevin J. Kusmirek Environmental Specialist Petro Services, Inc. Management Company for First Coast Energy, L.L.P. and Southeast Energy L.L.C. 7014 A.C. Skinner Parkway; Suite 290 Jacksonville, FL 32256 Office: 904-596-3242 FAX: 904-596-8550 Cell: 904-955-0399 "Kevin Kusmirek"
12/01/2017 Phone Conversation Activity Zimmerman, Robert A
Call Type: Outgoing Activity Status: Closed
Phone Number: (904) 955-0399 Activity Closed Date: 12/01/2017
Subject: Contact facility representative for notification and schedule upcoming TCI and to give a reminder that the two year record review requirement is: Registration Placard, Proof of Financial Responsibility, CFR, Monthly visual inspections and Electronic release detection records, Annual Line leak detector, Operability test and A/B/C UST operator certifications.
Events:
Event Type: Activity has been finished Date: 12/01/2017
Comment: Finished
09/20/2015 Site Inspection Activity Closed Shulaw, Benjamin J.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 09/23/2015
Activity Closed Date: 10/01/2015 Activity Closed By: SHULAW_BJ_1
Events:
Event Type: Activity has been finished Date: 10/01/2015
Comment: Finished
Comments:
Comment Date: 10/01/2015 User: SHULAW_BJ_1
Description: No violations cited during this inspection. Comments: Two USTs, 1- 2 compartmented, with 4 dispensers. A TLS 350 monitors product levels, the 3 sumps and 2 interstices. Dispenser liners and spill buckets are monitored visually. The sumps were dry, sensors properly placed. Spill buckets had flapper overfill prevention at least 1 had BCV. Sumps spill buckets and liners look tight. Dispenser liners were dry, hoses good, the shear valves secured. The area is clean. The electronic and visual records matched. The monitor was on time, showed all normal and gave a printout. The registration placard and RDRL were posted. Insurance documentation was provided. The certificates for USTs were obtained by the operators. Discharge Information: EDI Inactive score 10 This report will be sent via USPS. If you have any questions please contact me at 386-758-2185, 386-697-7329 cell, fax 386-758-2187, or email Benjamin.Shulaw@flhealth.gov
10/16/2014 Issue Document Activity Perea, Aurelio O.
Activity Status: Closed
Contact Name: RPK / Rel Perea FDOH Columbia CHD Activity Closed Date: 10/16/2014
Events:
Event Type: Activity has been finished Date: 10/16/2014
Comment: Finished
10/16/2014 Issue Document Activity Perea, Aurelio O.
Activity Status: Closed
Contact Name: RPK / Rel Perea FDOH Columbia CHD Activity Closed Date: 10/16/2014
Events:
Event Type: Activity has been finished Date: 10/16/2014
Comment: Finished
10/15/2014 Editable Letter Activity Kassees, Ramsey D.
Activity Title: Limited Closure Summary Report (Complete) Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 10/15/2014
Comment: Finished
Attachments:
Attachment Date: 10/15/2014 User: KASSEES_RP_1
Description: LCSR Review Letter
View Attachment
10/14/2014 TCAR Activity Kassees, Ramsey D.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 10/15/2014
Events:
Event Type: Activity has been finished Date: 10/15/2014
Comment: Finished
Comments:
Comment Date: 10/14/2014 User: KASSEES_RP_1
Description: Our office is in receipt of a Limited Closure Summary Report (LCSR) that was submitteded in conjunction with a compromised spill bucket closure by removal activity, performed on or about 06/25/2014 (the removed spill bucket was replaced with an upgraded one). Please find attached, the LCSR and other pertinent supporting documentation attached, as well as the LCSR Rview Letter that is being issued.
06/10/2014 Site Inspection Activity Closed Kassees, Ramsey D.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 05/22/2014
Activity Closed Date: 06/25/2014 Activity Closed By: KASSEES_RP_1
Events:
Event Type: Activity has been finished Date: 06/25/2014
Comment: Finished
Comments:
Comment Date: 06/10/2014 User: KASSEES_RP_1
Description: This is a spill bucket closure inspection for the replacement of a compromised spill bucket that took place on 05/21/2013. Proper notifications were given, but I was not able to witness the replacement activities, due to previously scheduled appointments and commitments. Please see site visit tabs for dates and details of the inspection. No signature was obtained at the time of the inspection as this was an unaccompanied, unannounced inspection. The responsible party representative notified us by e-mail, phone and/or fax that the activities have been completed; then supplied us with a record of the documented activities. A confirmatory inspection was performed and the report was completed in the office without a representative signature. The open violation was resolved by virtue of the closure by removal, and replacement, of the compromised spill bucket. A copy of the inspection report mailed via USPS to the owner/operator upon its completion. If you have any questions or concerns please feel free to contact me at: phone number- (386) 758-2140 and / or E - mail address - Ramsey.Kassees@flhealth.gov.
06/10/2014 Site Inspection Activity Closed Kassees, Ramsey D.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 05/22/2014
Activity Closed Date: 06/25/2014 Activity Closed By: KASSEES_RP_1
Events:
Event Type: Activity has been finished Date: 06/25/2014
Comment: Finished
Comments:
Comment Date: 06/10/2014 User: KASSEES_RP_1
Description: This is a spill bucket installation inspection for the replacement of a compromised spill bucket that took place on 05/22/2013. Proper notifications were given, but I was not able to witness the replacement activities, due to previously scheduled appointments and commitments. Please see site visit tabs for dates and details of the inspection. No signature was obtained at the time of the inspection as this was an unaccompanied, unannounced inspection. The responsible party representative notified us by e-mail, phone and/or fax that the activities have been completed; then supplied us with a record of the documented activities. A confirmatory inspection was performed and the report was completed in the office without a representative signature. A copy of the inspection report mailed via USPS to the owner/operator upon its completion. If you have any questions or concerns please feel free to contact me at: phone number- (386) 758-2140 and / or E - mail address - Ramsey.Kassees@flhealth.gov.
03/31/2014 Issue Document Activity Perea, Aurelio O.
Activity Status: Closed
Contact Name: RPK / Rel Perea FDOH Columbia CHD Activity Closed Date: 03/31/2014
Events:
Event Type: Activity has been finished Date: 03/31/2014
Comment: Finished
03/27/2014 Editable Letter Activity Kassees, Ramsey D.
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 03/27/2014
Comment: Finished
Attachments:
Attachment Date: 03/27/2014 User: KASSEES_RP_1
Description: 1st NCL
View Attachment
03/12/2014 Violation Closed Kassees, Ramsey D.
Significance: Minor Status: Closed
Criteria ID: 1115
Rule: 62-761.700(1)(c)1.
Comments: Facility equipment shall be maintained to a degree to allow you access. Water in spill containment units, especially above the fill cap shall be removed. Water in any sumps and dispenser liners above the piping opening/penetration (invert) shall be removed. All regulated substance shall be removed from any of the specified system components. Regulated substances: sheen, free product, mixed product water. Petroleum contact water shall be disposed of in accordance with the Department Hazardous Waste Section's Ch. 62-740 F.A.C., "Petroleum Contact Water".
03/12/2014 Emergency Preparedness Information Activity Kassees, Ramsey D.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 03/12/2014
Events:
Event Type: Activity has been finished Date: 03/12/2014
Comment: Finished
03/12/2014 Site Inspection Activity Closed Kassees, Ramsey D.
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 03/12/2014
Activity Closed Date: 03/27/2014 Activity Closed By: KASSEES_RP_1
Events:
Event Type: Activity has been finished Date: 03/27/2014
Comment: Finished
Comments:
Comment Date: 03/12/2014 User: KASSEES_RP_1
Description: Violations: There was one violation cited during the inspection. Please find it detailed in the violations section of the inspection report. Please provide our office with documentation confirming that the violation has been corrected, within thirty (30) days of receipt of this inspection report. Attached, please find a non compliance letter notifying you of the violation cited within the main body of the inspection report. Please provide our office with documentation informing us that the violation has been resolved, within thirty (30) days of receipt of this inspection report and attached non compliance letter. Additional comments and notes: Please see the attached handwritten inspection field notes, site schematic and system description for raw details. Also, please see the attached typewritten inspection field notes addendum for inspection details. There were no additional observations or comments to be documented. Discharge Statement: There is no new information or obvious evidence of recent release or discharge. A copy of the inspection report mailed, to the owner/operator by USPS, upon its completion. If you have any questions or concerns please feel free to contact me at: phone number- (386) 758-2140 and / or E - mail address - Ramsey_Kassees@doh.state.fl.us .
12/18/2012 Issue Document Activity Towle, Michael
Activity Status: Closed
Contact Name: Towle Activity Closed Date: 12/18/2012
Events:
Event Type: Activity has been finished Date: 12/18/2012
Comment: Finished
11/30/2012 Record Document Activity Kassees, Ramsey D.
Activity Status: Closed
Contact Name: Chris Farmer Activity Closed Date: 11/30/2012
Events:
Event Type: Activity has been finished Date: 11/30/2012
Comment: Finished
Comments:
Comment Date: 11/30/2012 User: KASSEES_RP_1
Description: Our office is in receipt of adequate response that resolves the open violations: Adequate monthly visual inspections and liquid status interstitial monitoring are now being properly performed. Records from July 2012 through November 2012 have been presented. They are adequate. Proof of current insurance coverage and CFR have been presented. Hudson Insurance; 1 mil / 2 mil; 04/02/2012 - 04/02/2013; policy # STE 2865 11 12 01
08/31/2012 Editable Letter Activity Kassees, Ramsey D.
Activity Title: County Subsequent Non-Compliance Letter Activity Status: Closed
Description: UT-5354 12-12-2017 In-Compliance Letter
Events:
Event Type: Activity has been finished Date: 08/31/2012
Comment: Finished
Attachments:
Attachment Date: 08/31/2012 User: KASSEES_RP_1
Description: 2nd NCL
View Attachment
07/30/2012 Violation Closed Shulaw, Benjamin J.
Significance: SNC-B Status: Closed
Criteria ID: 1062
Rule: 62-761.600(1)(d)
Comments: Mark this as out of compliance if any release detection method has not been monitored as required. Look for evidence that the release detection system is not being properly monitored. Examples include: blocked access to monitoring wells; ATG in alarm; ATG panel hidden from view; ATG tape spool empty; buried or submerged sampling ports; corroded locks; or no dispenser keys. Be aware that manual tank gauging requires weekly sampling. Electronic line leak detectors may be wired into an ATG with a memory of test cycles. Facilities with static/periodic ATG systems are required to provide one passing test per product per month. This method has a minimum fuel capacity requirement. Facilities with continuous electronic leak detection ATG systems (e.g., Veeder-Root CSLD) are required to provide one passing test per product per month, although the system must be in daily operation with monthly summary logs. This method has no minimum fuel requirement. If there is a record keeping problem, see rule 62-761.710(2).
07/30/2012 Emergency Preparedness Information Activity Shulaw, Benjamin J.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 07/30/2012
Events:
Event Type: Activity has been finished Date: 07/30/2012
Comment: Finished
07/30/2012 Editable Letter Activity Shulaw, Benjamin J.
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 07/30/2012
Comment: Finished
Attachments:
Attachment Date: 07/30/2012 User: SHULAW_BJ_1
Description: 30Jul12 NCL
View Attachment
07/30/2012 Site Inspection Activity Closed Shulaw, Benjamin J.
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 07/24/2012
Activity Closed Date: 07/30/2012 Activity Closed By: SHULAW_BJ_1
Events:
Event Type: Activity has been finished Date: 07/30/2012
Comment: Finished
07/30/2012 Violation Closed Shulaw, Benjamin J.
Significance: SNC-B Status: Closed
Criteria ID: 1004
Rule: 62-761.400(3)(a)1.
Comments: There are various financial responsibility mechanisms available: Risk Retention Group (RRG) Endorsements Certificate of Insurance Guarantee Letter of Credit Fully Funded Trust Fund Self-Insurance with letter from CFO Stand-by Trust Fund Bond Rating Test (Local Governments) Local Government Financial Test Local Government Guarantee Local Government Fund For detailed information, refer to the DEP's Financial Responsibility Handbook pages 2-1, 2-2. Verify which mechanism(s) are used by the facility. State and federal facilities are exempt from financial responsibility, being considered a type of self insurance. They are always in compliance for this category. Document state or federal as appropriate. Financial responsibility must be maintained on out-of-service tanks. Note: Mark the absence of/or the lack of complete info in the certification of financial responsibility under Rule 62-761.710(2).
05/04/2012 Attachment Perea, Aurelio O.
05/18/2011 Site Inspection Activity Closed Defalco, Lynal
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 05/18/2011
Activity Closed Date: 05/25/2011 Activity Closed By: DEFALCO_L
Events:
Event Type: Activity has been finished Date: 05/25/2011
Comment: Finished
04/26/2011 Record Document Activity Shulaw, Benjamin J.
Activity Status: Closed
Contact Name: Robin Henson Activity Closed Date: 04/26/2011
Events:
Event Type: Activity has been finished Date: 04/26/2011
Comment: Finished
03/17/2011 Attachment Shulaw, Benjamin J.
03/17/2011 Editable Letter Activity Shulaw, Benjamin J.
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 03/17/2011
Comment: Finished
Attachments:
Attachment Date: 03/17/2011 User: SHULAW_BJ_1
Description: 17Mar11 NCL
View Attachment
03/16/2011 Violation Closed Shulaw, Benjamin J.
Significance: Minor Status: Closed
Criteria ID: 1123
Rule: 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d), 62-761.710(2)(e), 62-761.710(2)(f), 62-761.710(2)(g), 62-761.710(2)(h)
Comments: If the problem involves failure to perform according to the standards in each of the following areas, then note these items in addition to the paperwork for this rule: a. and g. Inventory - rules 62-761.640(3)(b)1-2, 62-761.640(3)(c) & 62-761.700(1)(c)5 b. Repair, operation, and maintenance - rules 62-761.700(1)(a)1, 62-761.700(1)(a)5, 62-761.700(1)(a)6 & 62-761.700(1)(c)3 c. Release detection - rules 62-761.600(1)(e), 62-761.610(3)(b), 62-761.640(2)(c)4, 62-761.640(2)(e), 62-761.640(3)(d), 62-761.640(3)(e)1-5 & 62-761.640(3)(e)9 d. Release detection response level descriptions - rules 62-761.600(1)(b) & 62-761.640(1)(c) e. Tightness, pressure, and breach of integrity tests - rules 62-761.610(3)(a)1, 62-761.640(1)(a) & 62-761.640(4)(a) f. Financial responsibility - rule 62-761.400(3) g. Repairs and replacements - rule 62-761.700(1)(a)6 The following are not this rule's issues: Rules 62-761.450(1)(a)1, 62-761.450(1)(a)2, 62-761.450(1)(a)3 & 62-761.450(1)(a)4 are verbal notices of activities that may also be written Rule 62-761.450(1)(b) is a registration issue Rules 62-761.450(2), 62-761.450(3)(a) & 62-761.450(3)(b) are INF/DRF reporting issues Rules 62-761.600(1)(a)3 & 62-761.600(1)(f) are covered by rule 62-761.710(3) Anything with cathodic protection is covered by rule 62-761.710(3)
03/16/2011 Site Inspection Activity Closed Shulaw, Benjamin J.
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 03/16/2011
Activity Closed Date: 03/17/2011 Activity Closed By: SHULAW_BJ_1
Events:
Event Type: Activity has been finished Date: 03/17/2011
Comment: Finished
03/16/2011 Violation Closed Shulaw, Benjamin J.
Significance: Minor Status: Closed
Criteria ID: 2124
Rule: 62-762.701(2)(b)1.
Comments: Accumulated liquids reduce the 110% containment capacity. This applies to dispenser liners, piping sumps, and spill containment. To prevent stormwater from becoming contaminated, advise the facility to clean all spills and discharges within the secondary containment promptly.
03/16/2011 Violation Closed Shulaw, Benjamin J.
Significance: Minor Status: Closed
Criteria ID: 1117
Rule: 62-761.700(1)(c)3.
Comments: Facility must prove that all release detection devices, such as in line leak detectors, sump and liner sensors, ATGs, etc. function properly. Sensing devices may be optical, vapor, float activated, discriminating, non-discriminating, or tied into electrical circuits. ATG probes inside of tanks require calibration testing, if used for release detection as well as inventory measurements.
06/15/2010 Site Inspection Activity Closed Shulaw, Benjamin J.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 06/15/2010
Activity Closed Date: 06/18/2010 Activity Closed By: SHULAW_BJ_1
Events:
Event Type: Activity has been finished Date: 06/18/2010
Comment: Finished
Comments:
Comment Date: 06/18/2010 User: SHULAW_BJ_1
Description: There were no violations cited at the time of the inspection. Comments: The inspector is not noting maintenance and repair details on monthly log. Keep inspection intervals to 35 days or less. Discharge Information: EDI 10 There is no new information or obvious evidence of recent release. For more inspection information, please see the details and field notes. If you have any questions or concerns, please feel free to contact me at (386) 758-2140, cell 386-623-0831, fax 386-758-2187 or email Benjamin_Shulaw@doh.state.fl.us Please provide our office with documentation that confirms the resolution of the cited violation(s), within thirty (30) days of receipt of this non compliance letter and attached inspection report. If you have any questions or concerns, please feel free to contact me at (386) 758-2140, cell 386-623-0831, fax 386-758-2187 or email Benjamin_Shulaw@doh.state.fl.us
04/22/2009 Attachment Shulaw, Benjamin J.
04/22/2009 Site Inspection Activity Closed Shulaw, Benjamin J.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 04/22/2009
Activity Closed Date: 04/22/2009 Activity Closed By: SHULAW_BJ_1
Comments:
Comment Date: 04/22/2009 User: SHULAW_BJ_1
Description: There were no violations cited at the time of the inspection. Notes: Keep your records in better order; 1 monthly visual record was missing and 1 monthly electronic record was missing. Keep inspection intervals to 35 days or less. Discharge Information: There is no new information or obvious evidence of recent release or discharge, within the last year. For more detailed discharge information, please consult the Petroleum Clean Up Section at the F D E P H.Q. in Tallahassee; or the F D E P Northeast District Office in Jacksonville; or the official compliance facility file at the Columbia C H D, Environmental Health Section, in Lake City. For more inspection details and information; please see the copy of the inspection field notes, site schematic and system description that is electronically, as well as physically, attached to this inspection report. If you have any questions or concerns, please feel free to contact me at (386) 758-2140 or (386) 758-1058.
04/22/2009 Attachment Shulaw, Benjamin J.
04/22/2009 Attachment Shulaw, Benjamin J.
12/19/2008 TCAR Activity Kassees, Ramsey D.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 12/19/2008
Comments:
Comment Date: 12/19/2008 User: KASSEES_RP_1
Description: The Department is in receipt of a LCSR dated August 07, 2008, submitted by Robin Ryan-Henson of First Coast Energy, on Septemberber 05, 2008, documenting the existence of contamination at this facility. Please find a copy attached in page 5 of this level.
12/19/2008 Editable Letter Activity Kassees, Ramsey D.
Activity Title: Closure Review Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 12/19/2008
Comment: Sent on Fri Dec 19 10:28:00 EST 2008
Comments:
Comment Date: 12/19/2008 User: KASSEES_RP_1
Description: Please see the actual LCSR review Letter, that was sent, attached in page 5 of this level.
10/12/2008 TCAR Activity Kassees, Ramsey D.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 12/19/2008
Comments:
Comment Date: 10/12/2008 User: KASSEES_RP_1
Description: This LCSR dated August 07, 2008 was submitted by Ms. Robin Ryan-Henson, of Frst Coast Energy, and received by the Department on September 05, 2008. Please find a copy attached in page five (5).
08/19/2008 Attachment Oymayan, Avo J.
07/23/2008 Site Inspection Activity Closed Oymayan, Avo J.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 07/23/2008
Activity Closed Date: 08/19/2008 Activity Closed By: OYMAYAN_AJ_1
Comments:
Comment Date: 08/19/2008 User: OYMAYAN_AJ_1
Description: This is the closure by removal of three underground storage tanks at this facility. On 7-17-2008, Universal Petroleum of Jacksonville (PCC # 052627), successfully removed three USTs. The excavated USTs were single wall 10,000 gallon Owens Corning fiberglass tanks, as follows: A 10k unleaded gas UST A 10K premium gas UST A 10K midgrade gas UST (was already closed in place long ago). The USTs were first pumped dry, degassed, excavated, degassed again, cut open and cleaned out by steam. The cleaning out contractor was Permafix. The removed piping associated with the UST system was sigle wall fiberglass A.O. Smith. All excavated USTs and piping appeared to be in good condition with no degradation related punctures evident. They were transported offsite for proper disposal. Photos of the closure were taken.
07/23/2008 Site Inspection Activity Closed Oymayan, Avo J.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 07/23/2008
Activity Closed Date: 08/19/2008 Activity Closed By: OYMAYAN_AJ_1
Comments:
Comment Date: 07/23/2008 User: OYMAYAN_AJ_1
Description: On 7-23-2008, two new USTs were dropped successfully by Universal Petroleum of Jacksonville, Florida (PCC # 052627). The USTS are double wall steel (MPC Plasteel) , 15,000 gallon, double compartment (10 / 5), tanks. They arrived with annular space pressure of 4 in of Hg (both tanks). The tanks were set level. The newly installed piping is A.O.Smith fiberglass double wall. On 7-31-2008, the primary piping soap pressure leak test was performed. The pressure on all primary piping was set at 57 psi (regular, premium and diesel lines). No leaks were found. On 8-7-2008, the secondary piping soap pressure leak test and the hydrostatic tests were performed. Pressure was set at 3.5 psi on all three secondary lines for 24 hours now. No leaks were detected. All hydrostatic tests passed, with no leaks found in the all sumps and containments. Water held at its mark for about 24 hrs. Start up testing paperwork will be forthcoming.
12/24/2007 Emergency Preparedness Information Activity Oymayan, Avo J.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 12/24/2007
12/12/2007 Site Inspection Activity Closed Oymayan, Avo J.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 12/12/2007
Activity Closed Date: 12/24/2007 Activity Closed By: OYMAYAN_AJ_1
Comments:
Comment Date: 12/24/2007 User: OYMAYAN_AJ_1
Description: Violations Summary: There were no violations cited at the time of the inspection. Additional Notes: None at this time. Discharge Information: There is no new information or obvious evidence of recent release or discharge. However, the facility appears to have a history of past contamination, as it appears to have a record of EDI eligibility - inactive score of 6. Other Comments: Please be aware that this facility will be required to upgrade by December 31, 2009; if it is to continue to operate as a fuel storage and dispensing facility. Also, please be aware that FDEP has never granted any extensions to any of its previous deadlines. For more inspection details and information, please see the copy of the inspection fieldnotes, site schematic and system description, that is electronically as well as physically attached to this inspection report. If you have any questions or concerns, please feel free to contact me at (386) 758-2140 or (386) 758-1058.
10/12/2007 Site Inspection Activity Closed Oymayan, Avo J.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 10/12/2007
Activity Closed Date: 10/12/2007 Activity Closed By: OYMAYAN_AJ_1
Comments:
Comment Date: 10/12/2007 User: OYMAYAN_AJ_1
Description: All open violations at this facility have been resolved. Department has received documentation confirming this.
08/10/2007 Editable Letter Activity Kassees, Ramsey D.
Activity Title: Warning Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 08/10/2007
Comment: Sent on Fri Aug 10 00:00:00 EST 2007
Attachments:
Attachment Date: 08/10/2007 User: KASSEES_RP_1
Description: Warning Letter Report
View Attachment
07/30/2007 Record Document Activity Defalco, Lynal
Activity Status: Closed
Contact Name: gruzlovic pcs Activity Closed Date: 07/30/2007
Comments:
Comment Date: 07/30/2007 User: DEFALCO_L
Description: DIST REC'D PCS REV COMMNETS DATED JUN 19, 2007 FOR A GROUNDWATER SAMPLING REPORT AND A REQUEST TO RESCIND DRF OF NOV 2005 SUBMITTED BY TERRA COM.
07/30/2007 Issue Document Activity Defalco, Lynal
Activity Status: Closed
Contact Name: DEFALCO DOHANEY Activity Closed Date: 07/30/2007
Comments:
Comment Date: 07/30/2007 User: DEFALCO_L
Description: DIST ISSUED RP PCS REV COMMNETS DATED JUN 19, 2007 FOR A GROUNDWATER SAMPLING REPORT AND A REQUEST TO RESCIND DRF OF NOV 2005 SUBMITTED BY TERRA COM. SUBMIT LCAR AND SRFA BY NOV 1, 2007.
05/23/2007 Emergency Preparedness Information Activity Kassees, Ramsey D.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 05/23/2007
05/23/2007 Emergency Preparedness Information Activity Kassees, Ramsey D.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 05/23/2007
03/27/2007 Discharge Reporting Activity Defalco, Lynal
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 02/18/2011
Events:
Event Type: Activity has been finished Date: 02/18/2011
Comment: Finished
03/27/2007 Issue Document Activity Defalco, Lynal
Activity Status: Closed
Contact Name: DEFALCO Activity Closed Date: 03/27/2007
Comments:
Comment Date: 03/27/2007 User: DEFALCO_L
Description: DISTRICT ISSUED MEMO TO PCS FOR REVIEW OF LSAR DATED 3/2/07 FOR DISCHARGE DATED 11/02/05. TERRA-COM RECOMMNEDS THAT DISCHARGE BE RESCINDED.
03/27/2007 Record Document Activity Defalco, Lynal
Activity Status: Closed
Contact Name: terra-com Activity Closed Date: 03/27/2007
Comments:
Comment Date: 03/27/2007 User: DEFALCO_L
Description: DISTRICT REC'D LSAR DATED 3/2/07 FOR DISCHARGE DATED 11/02/05.
03/26/2007 Violation Closed Oymayan, Avo J.
Significance: Minor Status: Closed
Criteria ID: 1111
Rule: 62-761.700(1)(b)1., 62-761.700(1)(b)2.a., 62-761.700(1)(b)2.b., 62-761.700(1)(b)2.c.
Comments: The Rule requires the performance of a yearly structure to soil potential measurement for both galvanic sacrificial anode and impressed current systems, with the exception of factory installed systems where the cycle is every three years. The structure to soil measurement results will vary with the type of cathodic protection systems, how the measurement was obtained as well as the type of structure being protected. If you are reviewing structure to soil potential galvanic measurements, providing continuous corrosion protection means a value of negative 0.85 volts or negative 850 millivolts. Impressed current systems may utilize the 100 millivolt polarization decay method also known as instant on/instant off as described in NACE RP-0285-95. During the inspection of the impressed current system, document the following: location of the electrical breaker and rectifier box; presence of a system function light (red/green); presence of a clock hour gauge (if so, has the hour value changed since the last 60 day period or since your last inspection); condition of outside wiring. Other records: date of installation, date of last structure to soil test, test results, name and license number of tester. See the following chart. Note that impressed current systems may use the galvanic measurement process too. See rules 62-761.500(1)(e)1, 62-761.500(1)(e)3 & 62-761.510(1)(b)2 for test stations. LUSTLINE Bulletin 25 (December 1996) page 18 NACE RP-0285-95 describes the use of the 100 millivolt (0.1 volt) polarization decay criterion, as follows: 1. The test monitors the change in voltage of the structure that occurs after the power to the rectifier is shut-off. This procedure requires two people to execute properly. 2. When the power to the rectifier is interrupted, there will be an immediate drop in the voltage reading at the tank, followed by a continuing slow decline in the voltage. The person monitoring the voltmeter must note the reading immediately after the power to the rectifier is interrupted. 3. If the meter is digital, the numbers will change rapidly. The reading you want is the second number that appears on the meter's display, after the immediate drop. The voltage is then monitored for several minutes with the rectifier turned off. 4. The criterion for cathodic protection is a voltage shift of at least 0.1 volt from the initial reading AFTER the power to the rectifier is cut off. For example: A system might have a voltage of -1.1 volts with the power to the rectifier turned on. Immediately after shutting off the power, the voltage might drop to -0.83 volt. The voltage MUST then drop below -0.73 volt to meet the criterion for effective cathodic protection. 5. Another way to determine if this criterion was met is to know the original voltage of the tank before any cathodic protection was applied. If the voltage IMMEDIATELY after the rectifier is turned off is at least 100 mv, more negative, the criterion has been met. LUSTLINE Bulletin 25 (December 1996) page 16 "Interesting What Your Voltmeter is Telling You" READING: > -1.65 volts with magnesium anodes INTERPRETATION: The maximum voltage output from a magnesium anode is 1.65 volts. If your reading is greater than this, the system could have impressed current versus galvanic protection, or there could be stray currents in the vicinity. If this is not an Impressed Current system, have a corrosion engineer investigate immediately. READING: > -1.1 volts with zinc anodes INTERPRETATION: Same rationale as the above section, just change anode material and voltages. READING: > -0.88 volt INTERPRETATION: Structure is adequately protected. READING: -0.85 volt to -0.88 volt INTERPRETATION: Structure meets corrosion standard, but there is little safety margin. Monitor closely. READING: < -0.85 volt INTERPRETATION: Structure does not meet corrosion standard. This does not mean that the system is leaking. READING: -0.4 volt to -0.6 volt INTERPRETATION: Expect this voltage range from steel that has no cathodic protection. This may indicate that the structure was not protected originally, or that the anodes are completely shot. READING: -0.3 volt to -0.4 volt INTERPRETATION: Rusty steel will sometimes register in this range. READING: 0.0 volt to -0.1 volt INTERPRETATION: Reading likely to occur is measuring copper. READING: Variable INTERPRETATION: Could indicate stray current. Check meter operation. Check that test lead connections are in solid contact with shiny metal surfaces. READING: Widely Fluctuating Readings (digital meters) INTERPRETATION: One of the test connections is not good or the reference cell is dry. Extremely dry conditions in the backfill. Insure all connections are metal-to-metal.
03/26/2007 Editable Letter Activity Oymayan, Avo J.
Activity Title: District Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 03/26/2007
Comment: Sent on Mon Mar 26 00:00:00 EST 2007
Attachments:
Attachment Date: 03/26/2007 User: OYMAYAN_AJ_1
Description: NCL Report
View Attachment
03/26/2007 Violation Closed Oymayan, Avo J.
Significance: Minor Status: Closed
Criteria ID: 1115
Rule: 62-761.700(1)(c)1.
Comments: Facility equipment shall be maintained to a degree to allow you access. Water in spill containment units, especially above the fill cap shall be removed. Water in any sumps and dispenser liners above the piping opening/penetration (invert) shall be removed. All regulated substance shall be removed from any of the specified system components. Regulated substances: sheen, free product, mixed product water. Petroleum contact water shall be disposed of in accordance with the Department Hazardous Waste Section's Ch. 62-740 F.A.C., "Petroleum Contact Water".
02/21/2007 Site Inspection Activity Closed Oymayan, Avo J.
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 02/21/2007
Activity Closed Date: 03/26/2007 Activity Closed By: OYMAYAN_AJ_1
Comments:
Comment Date: 03/26/2007 User: OYMAYAN_AJ_1
Description: Comments: Violations Summary: A few minor violations were resolved and corrected by facility personnel at the time of the inspection, in my presence. The violations that remained unresolved are: 1). The regular unleaded gasoline spill containment bucket had about four inches of petroleum contact water (P C W ). Please remove this liquid properly and keep spill buckets clean and dry. 2). The premium sump containment unit had about one inch of petroleum contact water. Please remove this liquid properly and keep it clean and dry. 3). The midgrade dispenser piping on pumps 1/2, 4/5 and 7/8 are missing the security plate. Please install these plates properly. A non-compliance letter citing the violations accompanies this inspection report. Please find it attached. Please provide our office with documentation confirming the resolution of the cited violations within thirty days of receipt of this inspection report and attached non compliance letter. Additional Notes: There are no additional notes at this time. Discharge Information: There is no new information or obvious evidence of a release or discharge. However, the facility appears to have a history of past contamination, as it appears to have a record of E D I eligibility. Other Comments: For more inspection details and information, please see the copy of the inspection fieldnotes, site schematic and system description that is electronically, as well as physically, attached to this inspection report. If you have any questions or concerns, please feel free to contact me at (386) 758-2140 or (386) 758-1058.
02/14/2007 Emergency Preparedness Information Activity Kassees, Ramsey D.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 02/14/2007
09/22/2006 Emergency Preparedness Information Activity Kassees, Ramsey D.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 09/22/2006
08/22/2006 Issue Document Activity Dohaney, Tim
Activity Status: Closed
Contact Name: LEIGHTON Activity Closed Date: 08/22/2006
Comments:
Comment Date: 08/22/2006 User: DOHANEY_T
Description: DISTRICT SENT PCS REVIEW COMMENTS TO RP AND REQUESTED LSAR SUBMITTAL BY 10/31/06.
08/14/2006 Record Document Activity Dohaney, Tim
Activity Status: Closed
Contact Name: PCS Activity Closed Date: 08/22/2006
Comments:
Comment Date: 08/14/2006 User: DOHANEY_T
Description: RECEIVED PCS REVIEW COMMENTS FOR REQUEST TO RESCIND 11/2/05 DRF. PCS REQUESTS SUBMITTAL OF LSAR FOR FURTHER INFO.
05/18/2006 Record Document Activity Dohaney, Tim
Activity Status: Closed
Contact Name: TERRA-COM Activity Closed Date: 08/14/2006
Comments:
Comment Date: 05/18/2006 User: DOHANEY_T
Description: RECEIVED REPORT REQUESTING THAT THE RECENT DRF BE RESCINDED. REPORT SENT TO PCS FOR REVIEW ON 5/18/06.
05/18/2006 Record Document Activity Kassees, Ramsey D.
Activity Status: Closed
Contact Name: To whom may be reviewing Activity Closed Date: 05/18/2006
05/17/2006 Record Document Activity Kassees, Ramsey D.
Activity Status: Closed
Contact Name: Ms Robin Ryan-Henson Activity Closed Date: 05/17/2006
Comments:
Comment Date: 05/17/2006 User: KASSEES_RP_1
Description: This facility is in compliance without enforcement.
12/05/2005 Legacy Activity Kassees, Ramsey D.
Activity Name: TANK CLOSURE INSPECTION Activity Status: Closed
Completion Notes: THIS CLOSURE INSPECTION IS FOR THE PERMANENT CLOSURE OF THE LEAKING MIDGRADE UST ONLY. NO VIOLATIONS WERE CLOSED OR ADDED, THEREFORE I DEFERRED SETTING AN EVALUATION UNTIL VIOLATIONS ARE CLOSED.
11/21/2005 Violation Closed Unknown, User
Significance: Minor Status: Closed
Criteria ID: 1117
Rule: 62-761.700(1)(c)3.
Comments: Facility must prove that all release detection devices, such as in line leak detectors, sump and liner sensors, ATGs, etc. function properly. Sensing devices may be optical, vapor, float activated, discriminating, non-discriminating, or tied into electrical circuits. ATG probes inside of tanks require calibration testing, if used for release detection as well as inventory measurements.
Comments:
Comment Date: 02/14/2018 User: PANGAHAS_RL_1
Description: 20,000 gallon single wall Hall Tank F921 (EQ #711) containing aviation gas; with conditional approval of- HDPE Agro-America 60mil liner in 110% concrete dike (EQ #603) PIPING: Aboveground piping; no contact with soil. RELEASE DETECTION: Monthly visual inspections of the tank system; secondary containment; audible alarm. OVERFILL PROTECTION: Veederoot TLS 350 ATG with tank, sump & liner sensors (EQ #033); Morrison Overflow Prevent valves (EQ #356); Airport Hydrant system.
Comments:
Comment Date: 06/18/2009 User: THAYER_JD_1
Description: Hall Tank F921 EQ#-711 with conditional approval of- HDPE Agro-America 60mil liner in 110% concrete dike EQ#-603 Veederoot TLS 350 ATG with tank, sump & liner sensors EQ#-033 Morrison Overflow Prevent valves EQ#-356 Airport Hydrant system too! RD- Monthly visuals of tank & containment with ATG & alarms
11/21/2005 Legacy Activity Kassees, Ramsey D.
Activity Name: TANK COMPLIANCE/DISCHARGE INPSECTION Activity Status: Closed
11/21/2005 Violation Closed Unknown, User
Significance: Minor Status: Closed
Criteria ID: 1103
Rule: 62-761.640(4)(a)1., 62-761.640(4)(a)2., 62-761.640(4)(a)3., 62-761.640(4)(a)4.
Comments: Installation - verify that the line leak detector has been installed during the final installation inspection. Compliance - check to see that the unit is present. Examine the annual function test data - a pass alone is not sufficient. The tester must demonstrate 3.0 gph discharge detection for the mechanical (flow restrictor). Note that the electronic (auto shut off) line leak detector does not need an annual test, but must still be able to detect a 0.2 gph leak after it has been tripped at 150% line operating pressure. Replacements - unit must be tested out of the box - function must be proven. 3.0 gph = 185.4 ml/min (To convert milliliters/minute to gallons/hour, multiple the milliliters by 0.0162162; or, 1 gph equals 61.8 ml/min). Values greater than 186 ml/min fail. Values less than 185 ml/min mean that the line leak detector will activate at a more restrictive rate.
Comments:
Comment Date: 02/14/2018 User: PANGAHAS_RL_1
Description: 20,000 gallon single wall Hall Tank F921 (EQ #711) containing aviation gas; with conditional approval of- HDPE Agro-America 60mil liner in 110% concrete dike (EQ #603) PIPING: Aboveground piping; no contact with soil. RELEASE DETECTION: Monthly visual inspections of the tank system; secondary containment; audible alarm. OVERFILL PROTECTION: Veederoot TLS 350 ATG with tank, sump & liner sensors (EQ #033); Morrison Overflow Prevent valves (EQ #356); Airport Hydrant system.
Comments:
Comment Date: 06/18/2009 User: THAYER_JD_1
Description: Hall Tank F921 EQ#-711 with conditional approval of- HDPE Agro-America 60mil liner in 110% concrete dike EQ#-603 Veederoot TLS 350 ATG with tank, sump & liner sensors EQ#-033 Morrison Overflow Prevent valves EQ#-356 Airport Hydrant system too! RD- Monthly visuals of tank & containment with ATG & alarms
11/21/2005 Violation Closed Unknown, User
Significance: Minor Status: Closed
Criteria ID: 1103
Rule: 62-761.640(4)(a)1., 62-761.640(4)(a)2., 62-761.640(4)(a)3., 62-761.640(4)(a)4.
Comments: Installation - verify that the line leak detector has been installed during the final installation inspection. Compliance - check to see that the unit is present. Examine the annual function test data - a pass alone is not sufficient. The tester must demonstrate 3.0 gph discharge detection for the mechanical (flow restrictor). Note that the electronic (auto shut off) line leak detector does not need an annual test, but must still be able to detect a 0.2 gph leak after it has been tripped at 150% line operating pressure. Replacements - unit must be tested out of the box - function must be proven. 3.0 gph = 185.4 ml/min (To convert milliliters/minute to gallons/hour, multiple the milliliters by 0.0162162; or, 1 gph equals 61.8 ml/min). Values greater than 186 ml/min fail. Values less than 185 ml/min mean that the line leak detector will activate at a more restrictive rate.
Comments:
Comment Date: 02/14/2018 User: PANGAHAS_RL_1
Description: 20,000 gallon single wall Hall Tank F921 (EQ #711) containing aviation gas; with conditional approval of- HDPE Agro-America 60mil liner in 110% concrete dike (EQ #603) PIPING: Aboveground piping; no contact with soil. RELEASE DETECTION: Monthly visual inspections of the tank system; secondary containment; audible alarm. OVERFILL PROTECTION: Veederoot TLS 350 ATG with tank, sump & liner sensors (EQ #033); Morrison Overflow Prevent valves (EQ #356); Airport Hydrant system.
Comments:
Comment Date: 06/18/2009 User: THAYER_JD_1
Description: Hall Tank F921 EQ#-711 with conditional approval of- HDPE Agro-America 60mil liner in 110% concrete dike EQ#-603 Veederoot TLS 350 ATG with tank, sump & liner sensors EQ#-033 Morrison Overflow Prevent valves EQ#-356 Airport Hydrant system too! RD- Monthly visuals of tank & containment with ATG & alarms
11/21/2005 Violation Closed Unknown, User
Significance: Minor Status: Closed
Criteria ID: 1102
Rule: 62-761.640(3)(f)1., 62-761.640(3)(f)2., 62-761.640(3)(f)3., 62-761.640(3)(f)4.
Comments: a. Tightness test method meets 0.1 gph performance standard. What is the pass/fail threshold? Look up the test method in the DEP Master Equipment book. Compare the threshold to the actual test data. b. The various test effects are compensated for by the test developer. Request a copy of the operation manual from the RQ tester or the test developer. While not specifically mentioned, the amount of water present in the tank at the start of the test is required to be recorded. c. Test methods generally test the: wetted portion of the tank (product), and the ullage (air space above the product). d. Define which test method is used: volumetric or non volumetric. e. The tester, especially with single-walled tanks, must know the depth to groundwater especially relative to the tank and the product level. The rule compensates for this by setting two minimum product volume values. 30% if depth actually known, 65% if unknown. f. Do overfill and spill containment devices interfere with the test method? This is something the RQ tester must determine, and they may remove these pieces of equipment.
Comments:
Comment Date: 06/18/2009 User: THAYER_JD_1
Description: Hall Tank F921 EQ#-711 with conditional approval of- HDPE Agro-America 60mil liner in 110% concrete dike EQ#-603 Veederoot TLS 350 ATG with tank, sump & liner sensors EQ#-033 Morrison Overflow Prevent valves EQ#-356 Airport Hydrant system too! RD- Monthly visuals of tank & containment with ATG & alarms
Comments:
Comment Date: 02/14/2018 User: PANGAHAS_RL_1
Description: 20,000 gallon single wall Hall Tank F921 (EQ #711) containing aviation gas; with conditional approval of- HDPE Agro-America 60mil liner in 110% concrete dike (EQ #603) PIPING: Aboveground piping; no contact with soil. RELEASE DETECTION: Monthly visual inspections of the tank system; secondary containment; audible alarm. OVERFILL PROTECTION: Veederoot TLS 350 ATG with tank, sump & liner sensors (EQ #033); Morrison Overflow Prevent valves (EQ #356); Airport Hydrant system.
11/21/2005 Violation Closed Unknown, User
Significance: Minor Status: Closed
Criteria ID: 1102
Rule: 62-761.640(3)(f)1., 62-761.640(3)(f)2., 62-761.640(3)(f)3., 62-761.640(3)(f)4.
Comments: a. Tightness test method meets 0.1 gph performance standard. What is the pass/fail threshold? Look up the test method in the DEP Master Equipment book. Compare the threshold to the actual test data. b. The various test effects are compensated for by the test developer. Request a copy of the operation manual from the RQ tester or the test developer. While not specifically mentioned, the amount of water present in the tank at the start of the test is required to be recorded. c. Test methods generally test the: wetted portion of the tank (product), and the ullage (air space above the product). d. Define which test method is used: volumetric or non volumetric. e. The tester, especially with single-walled tanks, must know the depth to groundwater especially relative to the tank and the product level. The rule compensates for this by setting two minimum product volume values. 30% if depth actually known, 65% if unknown. f. Do overfill and spill containment devices interfere with the test method? This is something the RQ tester must determine, and they may remove these pieces of equipment.
Comments:
Comment Date: 06/18/2009 User: THAYER_JD_1
Description: Hall Tank F921 EQ#-711 with conditional approval of- HDPE Agro-America 60mil liner in 110% concrete dike EQ#-603 Veederoot TLS 350 ATG with tank, sump & liner sensors EQ#-033 Morrison Overflow Prevent valves EQ#-356 Airport Hydrant system too! RD- Monthly visuals of tank & containment with ATG & alarms
Comments:
Comment Date: 02/14/2018 User: PANGAHAS_RL_1
Description: 20,000 gallon single wall Hall Tank F921 (EQ #711) containing aviation gas; with conditional approval of- HDPE Agro-America 60mil liner in 110% concrete dike (EQ #603) PIPING: Aboveground piping; no contact with soil. RELEASE DETECTION: Monthly visual inspections of the tank system; secondary containment; audible alarm. OVERFILL PROTECTION: Veederoot TLS 350 ATG with tank, sump & liner sensors (EQ #033); Morrison Overflow Prevent valves (EQ #356); Airport Hydrant system.
11/21/2005 Violation Closed Unknown, User
Significance: Minor Status: Closed
Criteria ID: 1123
Rule: 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d), 62-761.710(2)(e), 62-761.710(2)(f), 62-761.710(2)(g), 62-761.710(2)(h)
Comments: If the problem involves failure to perform according to the standards in each of the following areas, then note these items in addition to the paperwork for this rule: a. and g. Inventory - rules 62-761.640(3)(b)1-2, 62-761.640(3)(c) & 62-761.700(1)(c)5 b. Repair, operation, and maintenance - rules 62-761.700(1)(a)1, 62-761.700(1)(a)5, 62-761.700(1)(a)6 & 62-761.700(1)(c)3 c. Release detection - rules 62-761.600(1)(e), 62-761.610(3)(b), 62-761.640(2)(c)4, 62-761.640(2)(e), 62-761.640(3)(d), 62-761.640(3)(e)1-5 & 62-761.640(3)(e)9 d. Release detection response level descriptions - rules 62-761.600(1)(b) & 62-761.640(1)(c) e. Tightness, pressure, and breach of integrity tests - rules 62-761.610(3)(a)1, 62-761.640(1)(a) & 62-761.640(4)(a) f. Financial responsibility - rule 62-761.400(3) g. Repairs and replacements - rule 62-761.700(1)(a)6 The following are not this rule's issues: Rules 62-761.450(1)(a)1, 62-761.450(1)(a)2, 62-761.450(1)(a)3 & 62-761.450(1)(a)4 are verbal notices of activities that may also be written Rule 62-761.450(1)(b) is a registration issue Rules 62-761.450(2), 62-761.450(3)(a) & 62-761.450(3)(b) are INF/DRF reporting issues Rules 62-761.600(1)(a)3 & 62-761.600(1)(f) are covered by rule 62-761.710(3) Anything with cathodic protection is covered by rule 62-761.710(3)
Comments:
Comment Date: 06/18/2009 User: THAYER_JD_1
Description: Hall Tank F921 EQ#-711 with conditional approval of- HDPE Agro-America 60mil liner in 110% concrete dike EQ#-603 Veederoot TLS 350 ATG with tank, sump & liner sensors EQ#-033 Morrison Overflow Prevent valves EQ#-356 FRP transition sump EQ#-605 FRP dispenser sump EQ#-296 APT DW piping EQ#-569 RD- Monthly visuals of tank & containment with ATG & alarms
Comments:
Comment Date: 02/14/2018 User: PANGAHAS_RL_1
Description: Tank #5R1: 25,000 gallon single wall Hall Tank F921 (EQ #711) containing unleaded gasoline; with conditional approval of- HDPE Agro-America 60mil liner in 110% concrete dike (EQ #603) PIPING: Aboveground double wall APT piping (EQ #569). RELEASE DETECTION: Monthly visual inspections of the tank system; secondary containment; audible alarm. OVERFILL PROTECTION: Veederoot TLS 350 ATG with tank, sump & liner sensors (EQ #033); Morrison Overflow Prevent valves (EQ #356). OTHERS: FRP transition sump (EQ #605); FRP dispenser sump (EQ #296).
11/21/2005 Violation Closed Unknown, User
Significance: Minor Status: Closed
Criteria ID: 1123
Rule: 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d), 62-761.710(2)(e), 62-761.710(2)(f), 62-761.710(2)(g), 62-761.710(2)(h)
Comments: If the problem involves failure to perform according to the standards in each of the following areas, then note these items in addition to the paperwork for this rule: a. and g. Inventory - rules 62-761.640(3)(b)1-2, 62-761.640(3)(c) & 62-761.700(1)(c)5 b. Repair, operation, and maintenance - rules 62-761.700(1)(a)1, 62-761.700(1)(a)5, 62-761.700(1)(a)6 & 62-761.700(1)(c)3 c. Release detection - rules 62-761.600(1)(e), 62-761.610(3)(b), 62-761.640(2)(c)4, 62-761.640(2)(e), 62-761.640(3)(d), 62-761.640(3)(e)1-5 & 62-761.640(3)(e)9 d. Release detection response level descriptions - rules 62-761.600(1)(b) & 62-761.640(1)(c) e. Tightness, pressure, and breach of integrity tests - rules 62-761.610(3)(a)1, 62-761.640(1)(a) & 62-761.640(4)(a) f. Financial responsibility - rule 62-761.400(3) g. Repairs and replacements - rule 62-761.700(1)(a)6 The following are not this rule's issues: Rules 62-761.450(1)(a)1, 62-761.450(1)(a)2, 62-761.450(1)(a)3 & 62-761.450(1)(a)4 are verbal notices of activities that may also be written Rule 62-761.450(1)(b) is a registration issue Rules 62-761.450(2), 62-761.450(3)(a) & 62-761.450(3)(b) are INF/DRF reporting issues Rules 62-761.600(1)(a)3 & 62-761.600(1)(f) are covered by rule 62-761.710(3) Anything with cathodic protection is covered by rule 62-761.710(3)
Comments:
Comment Date: 06/18/2009 User: THAYER_JD_1
Description: Hall Tank F921 EQ#-711 with conditional approval of- HDPE Agro-America 60mil liner in 110% concrete dike EQ#-603 Veederoot TLS 350 ATG with tank, sump & liner sensors EQ#-033 Morrison Overflow Prevent valves EQ#-356 FRP transition sump EQ#-605 FRP dispenser sump EQ#-296 APT DW piping EQ#-569 RD- Monthly visuals of tank & containment with ATG & alarms
Comments:
Comment Date: 02/14/2018 User: PANGAHAS_RL_1
Description: Tank #5R1: 25,000 gallon single wall Hall Tank F921 (EQ #711) containing unleaded gasoline; with conditional approval of- HDPE Agro-America 60mil liner in 110% concrete dike (EQ #603) PIPING: Aboveground double wall APT piping (EQ #569). RELEASE DETECTION: Monthly visual inspections of the tank system; secondary containment; audible alarm. OVERFILL PROTECTION: Veederoot TLS 350 ATG with tank, sump & liner sensors (EQ #033); Morrison Overflow Prevent valves (EQ #356). OTHERS: FRP transition sump (EQ #605); FRP dispenser sump (EQ #296).
11/21/2005 Violation Closed Unknown, User
Significance: Minor Status: Closed
Criteria ID: 1117
Rule: 62-761.700(1)(c)3.
Comments: Facility must prove that all release detection devices, such as in line leak detectors, sump and liner sensors, ATGs, etc. function properly. Sensing devices may be optical, vapor, float activated, discriminating, non-discriminating, or tied into electrical circuits. ATG probes inside of tanks require calibration testing, if used for release detection as well as inventory measurements.
Comments:
Comment Date: 02/14/2018 User: PANGAHAS_RL_1
Description: 20,000 gallon single wall Hall Tank F921 (EQ #711) containing aviation gas; with conditional approval of- HDPE Agro-America 60mil liner in 110% concrete dike (EQ #603) PIPING: Aboveground piping; no contact with soil. RELEASE DETECTION: Monthly visual inspections of the tank system; secondary containment; audible alarm. OVERFILL PROTECTION: Veederoot TLS 350 ATG with tank, sump & liner sensors (EQ #033); Morrison Overflow Prevent valves (EQ #356); Airport Hydrant system.
Comments:
Comment Date: 06/18/2009 User: THAYER_JD_1
Description: Hall Tank F921 EQ#-711 with conditional approval of- HDPE Agro-America 60mil liner in 110% concrete dike EQ#-603 Veederoot TLS 350 ATG with tank, sump & liner sensors EQ#-033 Morrison Overflow Prevent valves EQ#-356 Airport Hydrant system too! RD- Monthly visuals of tank & containment with ATG & alarms
10/31/2005 Legacy Activity Kassees, Ramsey D.
Activity Name: TANK COMPLIANCE/COMPLAINT INSPECTION Activity Status: Closed
06/16/2005 Legacy Activity Kassees, Ramsey D.
Activity Name: TANK COMPLIANCE RE-INSPECTION Activity Status: Closed
03/29/2005 Violation Closed Kassees, Ramsey D.
Significance: SNC-B Status: Closed
Rule: 761.600(1)(d)
Comments:
Comment Date: 06/18/2020 User: SANPEDRO_A_2
Description: Installation of new double-walled fiberglass product piping (EQ-378) for the diesel product line from two (2) existing dispenser liners to one (1) new standalone dispenser liner (EQ-203).
Comments:
Comment Date: 06/18/2020 User: SANPEDRO_A_2
Description: Three (3) new 5-gallon OPW Edge double-walled spill containment buckets (EQ-708) installed at the diesel, regular, and premium fill ports for overspill prevention and three (3) new 5-gallon OPW Edge single-walled vapor recovery buckets (EQ-718).
Comments:
Comment Date: 06/07/2011 User: RUNTE_C_3
Description: EQ# 200
03/29/2005 Legacy Activity Kassees, Ramsey D.
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
03/29/2005 Violation Closed Kassees, Ramsey D.
Significance: Minor Status: Closed
Rule: 761.710(2)
Comments:
Comment Date: 06/18/2020 User: SANPEDRO_A_2
Description: Installation of new double-walled fiberglass product piping (EQ-378) for the diesel product line from two (2) existing dispenser liners to one (1) new standalone dispenser liner (EQ-203).
Comments:
Comment Date: 06/18/2020 User: SANPEDRO_A_2
Description: Three (3) new 5-gallon OPW Edge double-walled spill containment buckets (EQ-708) installed at the diesel, regular, and premium fill ports for overspill prevention and three (3) new 5-gallon OPW Edge single-walled vapor recovery buckets (EQ-718).
Comments:
Comment Date: 06/07/2011 User: RUNTE_C_3
Description: EQ# 200
03/29/2005 Violation Closed Kassees, Ramsey D.
Significance: Minor Status: Closed
Rule: 761.710(2)
Comments:
Comment Date: 06/18/2020 User: SANPEDRO_A_2
Description: Installation of new double-walled fiberglass product piping (EQ-378) for the diesel product line from two (2) existing dispenser liners to one (1) new standalone dispenser liner (EQ-203).
Comments:
Comment Date: 06/18/2020 User: SANPEDRO_A_2
Description: Three (3) new 5-gallon OPW Edge double-walled spill containment buckets (EQ-708) installed at the diesel, regular, and premium fill ports for overspill prevention and three (3) new 5-gallon OPW Edge single-walled vapor recovery buckets (EQ-718).
Comments:
Comment Date: 06/07/2011 User: RUNTE_C_3
Description: EQ# 200
03/29/2005 Violation Closed Kassees, Ramsey D.
Significance: Minor Status: Closed
Rule: 761.710(2)
Comments:
Comment Date: 06/18/2020 User: SANPEDRO_A_2
Description: Installation of new double-walled fiberglass product piping (EQ-378) for the diesel product line from two (2) existing dispenser liners to one (1) new standalone dispenser liner (EQ-203).
Comments:
Comment Date: 06/18/2020 User: SANPEDRO_A_2
Description: Three (3) new 5-gallon OPW Edge double-walled spill containment buckets (EQ-708) installed at the diesel, regular, and premium fill ports for overspill prevention and three (3) new 5-gallon OPW Edge single-walled vapor recovery buckets (EQ-718).
Comments:
Comment Date: 06/07/2011 User: RUNTE_C_3
Description: EQ# 200
03/29/2005 Violation Closed Kassees, Ramsey D.
Significance: Minor Status: Closed
Rule: 761.700(1)(c)1
Comments:
Comment Date: 06/18/2020 User: SANPEDRO_A_2
Description: Three (3) new 5-gallon OPW Edge double-walled spill containment buckets (EQ-708) installed at the diesel, regular, and premium fill ports for overspill prevention and three (3) new 5-gallon OPW Edge single-walled vapor recovery buckets (EQ-718).
Comments:
Comment Date: 06/18/2020 User: SANPEDRO_A_2
Description: Installation of new double-walled fiberglass product piping (EQ-378) for the diesel product line from two (2) existing dispenser liners to one (1) new standalone dispenser liner (EQ-203).
Comments:
Comment Date: 06/07/2011 User: RUNTE_C_3
Description: EQ# 200
03/29/2005 Violation Closed Kassees, Ramsey D.
Significance: Minor Status: Closed
Rule: 761.700(1)(c)1
Comments:
Comment Date: 06/18/2020 User: SANPEDRO_A_2
Description: Three (3) new 5-gallon OPW Edge double-walled spill containment buckets (EQ-708) installed at the diesel, regular, and premium fill ports for overspill prevention and three (3) new 5-gallon OPW Edge single-walled vapor recovery buckets (EQ-718).
Comments:
Comment Date: 06/18/2020 User: SANPEDRO_A_2
Description: Installation of new double-walled fiberglass product piping (EQ-378) for the diesel product line from two (2) existing dispenser liners to one (1) new standalone dispenser liner (EQ-203).
Comments:
Comment Date: 06/07/2011 User: RUNTE_C_3
Description: EQ# 200
03/29/2005 Violation Closed Kassees, Ramsey D.
Significance: Minor Status: Closed
Rule: 761.700(1)(c)1
Comments:
Comment Date: 06/18/2020 User: SANPEDRO_A_2
Description: Three (3) new 5-gallon OPW Edge double-walled spill containment buckets (EQ-708) installed at the diesel, regular, and premium fill ports for overspill prevention and three (3) new 5-gallon OPW Edge single-walled vapor recovery buckets (EQ-718).
Comments:
Comment Date: 06/18/2020 User: SANPEDRO_A_2
Description: Installation of new double-walled fiberglass product piping (EQ-378) for the diesel product line from two (2) existing dispenser liners to one (1) new standalone dispenser liner (EQ-203).
Comments:
Comment Date: 06/07/2011 User: RUNTE_C_3
Description: EQ# 200
03/29/2005 Violation Closed Kassees, Ramsey D.
Significance: SNC-B Status: Closed
Rule: 761.600(1)(d)
Comments:
Comment Date: 06/18/2020 User: SANPEDRO_A_2
Description: Installation of new double-walled fiberglass product piping (EQ-378) for the diesel product line from two (2) existing dispenser liners to one (1) new standalone dispenser liner (EQ-203).
Comments:
Comment Date: 06/18/2020 User: SANPEDRO_A_2
Description: Three (3) new 5-gallon OPW Edge double-walled spill containment buckets (EQ-708) installed at the diesel, regular, and premium fill ports for overspill prevention and three (3) new 5-gallon OPW Edge single-walled vapor recovery buckets (EQ-718).
Comments:
Comment Date: 06/07/2011 User: RUNTE_C_3
Description: EQ# 200
03/29/2005 Violation Closed Kassees, Ramsey D.
Significance: SNC-B Status: Closed
Rule: 761.600(1)(d)
Comments:
Comment Date: 06/18/2020 User: SANPEDRO_A_2
Description: Installation of new double-walled fiberglass product piping (EQ-378) for the diesel product line from two (2) existing dispenser liners to one (1) new standalone dispenser liner (EQ-203).
Comments:
Comment Date: 06/18/2020 User: SANPEDRO_A_2
Description: Three (3) new 5-gallon OPW Edge double-walled spill containment buckets (EQ-708) installed at the diesel, regular, and premium fill ports for overspill prevention and three (3) new 5-gallon OPW Edge single-walled vapor recovery buckets (EQ-718).
Comments:
Comment Date: 06/07/2011 User: RUNTE_C_3
Description: EQ# 200
12/02/2003 Legacy Activity Leighton, Susan
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
05/05/2003 Legacy Activity Kassees, Ramsey D.
Activity Name: RESPONSE RECEIVED BY DEPARTMENT Activity Status: Closed
04/04/2002 Violation Closed Kassees, Ramsey D.
Significance: Minor Status: Closed
Rule: 640(3)(d)
04/04/2002 Legacy Activity Defalco, Lynal
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
11/22/2000 Legacy Activity Kassees, Ramsey D.
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
05/26/1999 Legacy Activity Kassees, Ramsey D.
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed