Report Run Date: 04/20/2025        Last Data Refresh: 04/19/2025        Report Generated from DOPPLER
 
Facility ID: 8507717
Facility Name: CIRCLE K #8235
 
10/28/2024 TCAR Activity Elliott, Emily
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 10/28/2024
Events:
Event Type: Activity has been finished Date: 10/28/2024
Comment: Finished
10/28/2024 Document Management Activity Elliott, Emily
Activity Title: Closure Document Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 10/28/2024
Comment: Finished
Attachments:
Attachment Date: 10/28/2024 User: ELLIOTT_EV_1
Description: Closure Assessment Report (Regular & Premium SBs)
View Attachment
10/28/2024 Editable Letter Activity Elliott, Emily
Activity Title: Closure Assessment Report (Complete) Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 10/31/2024
Comment: Finished
Attachments:
Attachment Date: 10/31/2024 User: MCLEOD_SL_1
Description: Closure Assessment Report (Complete)
View Attachment
09/24/2024 Editable Letter Activity Elliott, Emily
Activity Title: In Compliance Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 09/24/2024
Comment: Sent
Events:
Event Type: Activity has been finished Date: 09/24/2024
Comment: Finished
Attachments:
Attachment Date: 09/24/2024 User: ELLIOTT_EV_1
Description: In Compliance Letter
View Attachment
09/23/2024 Site Inspection Activity Closed Elliott, Emily
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 09/23/2024
Activity Closed Date: 09/24/2024 Activity Closed By: ELLIOTT_EV_1
Events:
Event Type: Activity has been finished Date: 09/24/2024
Comment: Finished
Comments:
Comment Date: 09/23/2024 User: ELLIOTT_EV_1
Description: Type of Inspection: UST Component Installation Inspection. Location: 3013 E Cervantes Street, Pensacola, FL 32501 Facility Contact: Scott Janashak (850-454-1070 / sjanasha@circlek.com) and Mike Sawkiewicz (msawkiew@circlek.com). Facility Owner: Circle K Store, Inc. PSSC Contractor: Guardian Fueling Technologies, Adam Cliff (850-466-3050) PSSC License #: PCC056736 Consultant: Atlas. Closure Requirement: A Closure assessment Report for the replacement of Regular and Premium Spill Containments will be due to this office within 60 days of closure activities. Equipment Installed: The double wall Regular and Premium Spill Containments were installed, and vacuum tested by Guardian Fueling Technologies and passed. (see attachments for a copy of the test results). The testing was completed, and the results were reviewed by our office prior to the facility brining the system back into service. The installation of the Regular Spill Containment clears a previously cited violation. The new double wall Regular and Premium Spill Containments appears to have been installed per manufacturer’s instructions. No violations issued at the time of inspection.
07/23/2024 Incident Activity Elliott, Emily
Activity Result: Has not led to Discharge Activity Status: Closed
Activity Closed Date: 10/28/2024
Events:
Event Type: Activity has been finished Date: 10/28/2024
Comment: Finished
Comments:
Comment Date: 07/23/2024 User: ELLIOTT_EV_1
Description: 07/22/2024 – Elizabeth Sauser with Circle K Stores Inc. submitted an INF for the failed integrity testing of the Regular Spill Containment (Tank #2) and Premium Spill Containment. Spill Containments are planning on being replaced. 09/23/2024 – Component Installation Inspection was conducted. Sampling was conducted at the time of replacement. 10/18/2024 – Dennis Fisher with Atlas submitted in the Closure Assessment Report for the Regular and Premium Spill Containments. TRPH was reported above the STCL, however it was fractionated out. Based on the soil analytical results, there does not appear to be a discharged that occurred from this incident.
07/23/2024 Document Management Activity Elliott, Emily
Activity Title: Incident Notification Form Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 07/23/2024
Comment: Finished
Attachments:
Attachment Date: 07/23/2024 User: ELLIOTT_EV_1
Description: INF Circle K #2708235
View Attachment
05/15/2024 Enforcement Referral Activity Elliott, Emily
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 05/15/2024
Events:
Event Type: Activity has been submitted for approval Date: 05/15/2024
Comment: Submitted for approval by: Emily Elliott: Please see attachments for Enforcement Referral Memo and associated email chain.
Events:
Event Type: Activity has been finished Date: 05/15/2024
Comment: Finished
Events:
Event Type: Activity/Document was accepted on this date Date: 05/15/2024
Comment: Accepted by Mark Gillman: Accepted
Events:
Event Type: Activity has been assigned Date: 05/15/2024
Comment: Assigned to Mark Gillman
Events:
Event Type: Activity/Document was acknowledged on this date Date: 05/15/2024
Comment: Acknowledged and Assigned by Mark Gillman
Comments:
Comment Date: 05/15/2024 User: ELLIOTT_EV_1
Description: Please see attachments for Enforcement Referral Memo and associated email chain.
Comments:
Comment Date: 05/15/2024 User: ELLIOTT_EV_1
Description: Please see attachments for Enforcement Referral Memo and associated email chain.
05/15/2024 Enforcement Tracking Activity Gillman, Mark
Activity Status: Open
Attachments:
Attachment Date: 07/11/2024 User: BRISTOL_S
Description: First Contact E-mail Notice
View Attachment
Attachments:
Attachment Date: 08/28/2024 User: BRISTOL_S
Description: Warning Letter
View Attachment
Attachments:
Attachment Date: 03/07/2025 User: BRISTOL_S
Description: Proposed SFCO
View Attachment
Attachments:
Attachment Date: 03/07/2025 User: BRISTOL_S
Description: CPAM and PCW
View Attachment
05/15/2024 Enforcement Referral Activity Elliott, Emily
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 05/15/2024
Events:
Event Type: Activity has been submitted for approval Date: 05/15/2024
Comment: Submitted for approval by: Emily Elliott: Please see attachments for Enforcement Referral Memo and associated email chain.
Events:
Event Type: Activity has been finished Date: 05/15/2024
Comment: Finished
Events:
Event Type: Activity/Document was accepted on this date Date: 05/15/2024
Comment: Accepted by Mark Gillman: Accepted
Events:
Event Type: Activity has been assigned Date: 05/15/2024
Comment: Assigned to Mark Gillman
Events:
Event Type: Activity/Document was acknowledged on this date Date: 05/15/2024
Comment: Acknowledged and Assigned by Mark Gillman
Comments:
Comment Date: 05/15/2024 User: ELLIOTT_EV_1
Description: Please see attachments for Enforcement Referral Memo and associated email chain.
Comments:
Comment Date: 05/15/2024 User: ELLIOTT_EV_1
Description: Please see attachments for Enforcement Referral Memo and associated email chain.
04/05/2024 Electronic Communication Activity Elliott, Emily
Activity Closed Date: 04/05/2024 Activity Status: Closed
Date: 04/05/2024
Recipient: 'Scott Janashak (sjanasha@circleK.com)' ; 'Sawkiewicz, Mike'
Sender: Elliott, Emily V
Subject: RE: Fac ID# 17/8507717 - Circle K #8235 - Compliance Assistance Offer Letter
Message: Follow up on compliance assistance (refer to comments).
Events:
Event Type: Activity has been finished Date: 04/05/2024
Comment: Finished
Comments:
Comment Date: 04/05/2024 User: ELLIOTT_EV_1
Description: Good Morning! I am checking in to see if anything has been done to resolve the violation(s) mentioned in the inspection report? Emily Elliott Environmental Specialist II Florida Department of Health in Escambia County Environment Health Division 1300 W Gregory Street, Pensacola, Florida 32502 Office: 850-823-5808 Cell: 850-417-0362 Fax: 850-595-6774 www.EscambiaHealth.com Follow us on Twitter: @HealthyEscambia The Department’s mission is to protect, and improve the health of all people in Florida through integrated state, county, and community efforts NOTE: Florida has a very broad public records law. Most written communications to or from state officials regarding state business are public records available to the public and media upon request. Your email communication may therefore be subject to public disclosure. From: Elliott, Emily V Sent: Thursday, February 22, 2024 3:57 PM To: Scott Janashak (sjanasha@circleK.com) ; Sawkiewicz, Mike Cc: Payne, Charles L Subject: Fac ID# 17/8507717 - Circle K #8235 - Compliance Assistance Offer Letter Greetings, I have attached the above referenced facility’s Compliance Assistance Offer Letter and Inspection Report. Please be sure to submit the information needed to resolve the violations to this office by 05/15/2024 to avoid possible penalties. Please feel free to contact this office should you have any questions or concerns. Emily Elliott Environmental Specialist II Florida Department of Health in Escambia County Environment Health Division 1300 W Gregory Street, Pensacola, Florida 32502 Office: 850-823-5808 Cell: 850-417-0362 Fax: 850-595-6774 www.EscambiaHealth.com Follow us on Twitter: @HealthyEscambia The Department’s mission is to protect, and improve the health of all people in Florida through integrated state, county, and community efforts NOTE: Florida has a very broad public records law. Most written communications to or from state officials regarding state business are public records available to the public and media upon request. Your email communication may therefore be subject to public disclosure.
02/26/2024 Electronic Communication Activity Elliott, Emily
Activity Closed Date: 02/26/2024 Activity Status: Closed
Date: 02/26/2024
Recipient: Jason Meade
Sender: Elliott, Emily V
Subject: Escambia County Circle K Store Routine Tank Compliance Inspections
Message: Set TCI
Events:
Event Type: Activity has been finished Date: 02/26/2024
Comment: Finished
02/22/2024 Editable Letter Activity Elliott, Emily
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Description: 8506957_INF for failed STP and multiple dispenser sumps
Events:
Event Type: Activity has been finished Date: 02/22/2024
Comment: Finished
Events:
Event Type: Document has been sent Date: 02/22/2024
Comment: Sent
Attachments:
Attachment Date: 02/22/2024 User: ELLIOTT_EV_1
Description: Compliance Assistance Offer Letter
View Attachment
02/15/2024 Violation Closed Elliott, Emily
Significance: SNC-B Status: Closed
Criteria ID: 6063
Rule: 62-761.700(1), 62-761.700(1)(a), 62-761.700(1)(a)1, 62-761.700(1)(a)2
02/15/2024 Site Inspection Activity Closed Elliott, Emily
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 02/15/2024
Activity Closed Date: 02/22/2024 Activity Closed By: ELLIOTT_EV_1
Events:
Event Type: Activity has been finished Date: 02/22/2024
Comment: Finished
Comments:
Comment Date: 02/22/2024 User: ELLIOTT_EV_1
Description: Met onsite with Jason Meade (7G Compliance Technician) for this routine tank compliance inspection. A copy of this inspection report and compliance assistance offer letter will be emailed to Scott Janashak at sjanasha@circlek.com and Mike Sawkiewicz at msawkiew@circlek.com. Tanks: Tank #4, Tank #5 and Tank #6 are 9684 gallons Fiber Glass Systems, LP Owens-Corning CSI Double Wall Tanks (EQ-191) containing Unleaded Gas. All three tanks were installed February 1995. Piping: NOV Fiberglass Systems, Dualoy® 3000/L (EQ-378) with Red Jacket Pumps, Mechanical Line Leak Detectors (EQ-373). Dispensers: S. Bravo Systems, Inc. B-200 (EQ-045). The dispenser sumps were mostly clean and dry at the time of inspection. The boots appeared to be in good condition. Most of the hoses and nozzles appeared to be in good condition. Dispenser 1 Short Hose appears to be cracking -Violation Issued. STP Sumps: Fiber Glass Systems, LP Containment Solution Turbine Enclosures (EQ-395). The STP sumps were mostly clean and dry at the time of inspection. The boots appeared to be in good condition. The sensors were in the correct position. Spill Containments: The double wall spill containments. The spill containments were mostly clean and dry at the time of inspection. The Regular Spill Containment Gauge indicated liquid in the interstice -Violation Issued. Overfill Prevention: Drop Tube Devices. Release Detection: The tank’s interstitial sensors and STP sump sensors are being monitored by a Gilbarco, Inc. Automatic Tank Gauge (EQ-130). Monthly Visual Inspections are being conducted by 7G Environmental Technologies. Records: The current placard was posted at the facility and all facility records were received, including associated tank component testing, monthly visual inspection, financial responsibility forms, and operator training certificates. See Violation Section for Corrective Actions.
02/15/2024 Violation Closed Elliott, Emily
Significance: SNC-B Status: Closed
Criteria ID: 6063
Rule: 62-761.700(1), 62-761.700(1)(a), 62-761.700(1)(a)1, 62-761.700(1)(a)2
04/20/2022 Editable Letter Activity Wilson, Monica L
Activity Title: Return to Compliance Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 04/20/2022
Comment: Sent
Events:
Event Type: Activity has been finished Date: 04/20/2022
Comment: Finished
Attachments:
Attachment Date: 04/20/2022 User: WILSON_ML_1
Description: Return to Compliance Letter
View Attachment
04/20/2022 Issue Document Activity Wilson, Monica L
Activity Status: Closed
Contact Name: Scott Janashak (sjanasha@circleK.com) ; Sherman, Kristen ; Bavuso, Christopher Activity Closed Date: 04/20/2022
Events:
Event Type: Activity has been finished Date: 04/20/2022
Comment: Finished
Comments:
Comment Date: 04/20/2022 User: WILSON_ML_1
Description: Greetings, I have attached the above referenced facility’s Return to Compliance Letter. Please feel free to contact this office should you have any questions or concerns. Kind Regards, Monica L. Wilson Planning Consultant I Florida Department of Health in Escambia County Environment Health Division 1300 W Gregory Street, Pensacola, Florida 32502 Phone: 850-595-6700 ext 2004 Cell: 850-554-4315 Fax: 850-595-6774 www.EscambiaHealth.com Follow us on Twitter: @HealthyEscambia The Department’s mission is to protect, and improve the health of all people in Florida through integrated state, county, and community efforts NOTE: Florida has a very broad public records law. Most written communications to or from state officials regarding state business are public records available to the public and media upon request. Your email communication may therefore be subject to public disclosure.
04/12/2022 Electronic Communication Activity Gartin, Daniel Q
Activity Closed Date: 04/12/2022 Activity Status: Closed
Date: 04/12/2022
Recipient: Gartin, Daniel Q
Sender: Bavuso, Christopher
Subject: FW: CrossForm: Dispatch of Order R8754928 Circle K Store #2708235 State ID: 17/8507717
Message: See Comment for email chain information.
Events:
Event Type: Activity has been finished Date: 04/12/2022
Comment: Finished
Comments:
Comment Date: 04/12/2022 User: GARTIN_D
Description: EXTERNAL EMAIL: DO NOT CLICK links or open attachments unless you recognize the sender and know the content is safe. Please see below work order notes regarding the Regular Spill Bucket interstitial gauge. Let me know if anything else is needed. I’m forwarding you notes for the other violations in a separate email since it was done by another company. Thank you - From: Phillip Robbins Sent: Monday, February 28, 2022 9:25 AM To: Bavuso, Christopher Subject: Re: CrossForm: Dispatch of Order R8754928 CAUTION: This email originated from outside Circle K. Do not click links or open attachments unless you recognize the sender and know the content is safe. ________________________________________ This work order has been completed. The spill bucket passed a 30 minute leak down test. On Wed, Feb 9, 2022, 11:31 AM wrote: The Circle K Service Contact Center has assigned a work order upon the request of Christopher Bavuso! The referenced work order number is R8754928 Here are the order particulars: Date Entered: Feb 9 2022 11:30AM CST Priority: P2 - 24 Buis Hrs Estimated Next Arrival/Target: Feb 14 2022 8:28AM CST Region: 1900 Gulf Coast Division Division: 1960 - Florida/Alabama District: MA1964 Site: 2708235 3013 E CERVANTES ST PENSACOLA, FL 32503-6420 Location within Site: Caller name: Christopher Bavuso Caller phone: (850) 435-3107 Problem Description: Compliance repair, retest required:> The interstitial guage is reading that there is liquid in the interstitial of the Regula Spill bucket. Please remove all liquid, and repair/replace the gauge as necessary. Retest the integrity of the spill bucket. Send all results to Christopher Bavuso at christopher.bavuso@circlek.com Assignment: PC Mechanical Services In Order Status: O - Open Warranty: No NOTE DE CONFIDENTIALITÉ: Ce courriel, ainsi que toute pièce y étant jointe, contient de l’information pouvant être confidentielle et protégée par le privilège avocat-client, ou toute autre privilège légal, et/ou de l’information exclusive et non publique. Si vous n’êtes pas le destinataire de ce message ni l’assistant autorisé du destinataire, veuillez en aviser l’émetteur en répondant à ce message pour que nous puissions corriger nos dossiers afin d’éviter que cette erreur se reproduise, et veuillez effacer ce message de votre système. L’utilisation, la diffusion, la distribution ou la reproduction de ce message et/ou de ses pièces jointes (le cas échéant) par des destinataires imprévus n’est pas autorisée et pourrait être illégale. Nous apprécions votre coopération quant à cette demande. CONFIDENTIALITY NOTE: This e-mail message, including any attachment(s), contains information that may be confidential, protected by the attorney-client or other legal privileges, and/or proprietary non-public information. If you are not an intended recipient of this message or an authorized assistant to an intended recipient, please notify the sender by replying to this message so that we can correct our records to avoid the mistake in the future and then delete it from your system. Use, dissemination, distribution, or reproduction of this message and/or any of its attachments (if any) by unintended recipients is not authorized and may be unlawful. Your cooperation with this request is appreciated. NOTE DE CONFIDENTIALITÉ: Ce courriel, ainsi que toute pièce y étant jointe, contient de l’information pouvant être confidentielle et protégée par le privilège avocat-client, ou toute autre privilège légal, et/ou de l’information exclusive et non publique. Si vous n’êtes pas le destinataire de ce message ni l’assistant autorisé du destinataire, veuillez en aviser l’émetteur en répondant à ce message pour que nous puissions corriger nos dossiers afin d’éviter que cette erreur se reproduise, et veuillez effacer ce message de votre système. L’utilisation, la diffusion, la distribution ou la reproduction de ce message et/ou de ses pièces jointes (le cas échéant) par des destinataires imprévus n’est pas autorisée et pourrait être illégale. Nous apprécions votre coopération quant à cette demande. CONFIDENTIALITY NOTE: This e-mail message, including any attachment(s), contains information that may be confidential, protected by the attorney-client or other legal privileges, and/or proprietary non-public information. If you are not an intended recipient of this message or an authorized assistant to an intended recipient, please notify the sender by replying to this message so that we can correct our records to avoid the mistake in the future and then delete it from your system. Use, dissemination, distribution, or reproduction of this message and/or any of its attachments (if any) by unintended recipients is not authorized and may be unlawful. Your cooperation with this request is appreciated.
03/02/2022 Electronic Communication Activity Gartin, Daniel Q
Activity Closed Date: 03/02/2022 Activity Status: Closed
Date: 03/02/2022
Recipient: Daniel Gartin; Daniel.Gartin@flhealth.gov
Sender: Bavuso, Christopher
Subject: Circle K Store #2708235 State ID: 17/8507717
Message: Good afternoon, Please see the following overfill tests for the subject site. I noticed that in the report, the violation stated that it was the premium overfill that failed testing. In fact, it was the regular overfill that needed to be reset in order to test. I have provided both just in case. Please note that I have dispatched a tech to address the SB interstitial gauge violation. I will forward you those results when I receive them. Thank you so much! Christopher Bavuso Environmental Specialist Circle K NA Environmental Shared Services Gulf Coast (GC) e: christopher.bavuso@circlek.com m: (850) 316-6673 Circle K 25 W Cedar St., Suite M Pensacola, Fl. 32502 Part of Alimentation Couche-Tard CONFIDENTIALITY NOTE: This e-mail message, including any attachment(s), contains information that may be confidential, protected by the attorney-client or other legal privileges, and/or proprietary non-public information. If you are not an intended recipient of this message or an authorized assistant to an intended recipient, please notify the sender by replying to this message so that we can correct our records to avoid the mistake in the future and then delete it from your system. Use, dissemination, distribution, or reproduction of this message and/or any of its attachments (if any) by unintended recipients is not authorized and may be unlawful. Your cooperation with this request is appreciated. NOTE DE CONFIDENTIALITÉ: Ce courriel, ainsi que toute pièce y étant jointe, contient de l’information pouvant être confidentielle et protégée par le privilège avocat-client, ou toute autre privilège légal, et/ou de l’information exclusive et non publique. Si vous n’êtes pas le destinataire de ce message ni l’assistant autorisé du destinataire, veuillez en aviser l’émetteur en répondant à ce message pour que nous puissions corriger nos dossiers afin d’éviter que cette erreur se reproduise, et veuillez effacer ce message de votre système. L’utilisation, la diffusion, la distribution ou la reproduction de ce message et/ou de ses pièces jointes (le cas échéant) par des destinataires imprévus n’est pas autorisée et pourrait être illégale. Nous apprécions votre coopération quant à cette demande. CONFIDENTIALITY NOTE: This e-mail message, including any attachment(s), contains information that may be confidential, protected by the attorney-client or other legal privileges, and/or proprietary non-public information. If you are not an intended recipient of this message or an authorized assistant to an intended recipient, please notify the sender by replying to this message so that we can correct our records to avoid the mistake in the future and then delete it from your system. Use, dissemination, distribution, or reproduction of this message and/or any of its attachments (if any) by unintended recipients is not authorized and may be unlawful. Your cooperation with this request is appreciated.
Events:
Event Type: Activity has been finished Date: 03/02/2022
Comment: Finished
02/01/2022 Violation Closed Gartin, Daniel Q
Significance: SNC-B Status: Closed
Criteria ID: 6063
Rule: 62-761.700(1), 62-761.700(1)(a), 62-761.700(1)(a)1, 62-761.700(1)(a)2
02/01/2022 Electronic Communication Activity Gartin, Daniel Q
Activity Closed Date: 02/01/2022 Activity Status: Closed
Date: 02/01/2022
Recipient: Jonathan Smith
Sender: Gartin, Daniel Q
Subject: Re: Scheduling Routine Compliance Inspections in January 2022 for Circle K Facilities
Message: Scheduling inspections with Jason Meade monthly inspections.
Events:
Event Type: Activity has been finished Date: 02/01/2022
Comment: Finished
02/01/2022 Issue Document Activity Wilson, Monica L
Activity Status: Closed
Contact Name: Scott Janashak ; Sherman, Kristen ; Bavuso, Christopher Activity Closed Date: 02/01/2022
Events:
Event Type: Activity has been finished Date: 02/01/2022
Comment: Finished
Comments:
Comment Date: 02/01/2022 User: WILSON_ML_1
Description: Greetings, I have attached the above referenced facility’s Compliance Assistance Offer Letter and Inspection Report. Please be sure to submit the information needed to resolve the violations to this office by April 19, 2022 to avoid possible penalties. Please feel free to contact this office should you have any questions or concerns. Kind Regards, Monica L. Wilson Planning Consultant I Florida Department of Health in Escambia County Environment Health Division 1300 W Gregory Street, Pensacola, Florida 32502 Phone: 850-595-6700 ext 2004 Cell: 850-554-4315 Fax: 850-595-6774 www.EscambiaHealth.com Follow us on Twitter: @HealthyEscambia The Department’s mission is to protect, and improve the health of all people in Florida through integrated state, county, and community efforts NOTE: Florida has a very broad public records law. Most written communications to or from state officials regarding state business are public records available to the public and media upon request. Your email communication may therefore be subject to public disclosure.
02/01/2022 Editable Letter Activity Gartin, Daniel Q
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 02/01/2022
Comment: Sent
Events:
Event Type: Activity has been finished Date: 02/01/2022
Comment: Finished
Attachments:
Attachment Date: 02/01/2022 User: WILSON_ML_1
Description: Compliance Assistance Offer Letter
View Attachment
02/01/2022 Violation Closed Gartin, Daniel Q
Significance: Minor Status: Closed
Criteria ID: 6053
Rule: 62-761.500(7)(c), 62-761.500(7)(c)1, 62-761.500(7)(c)2, 62-761.500(7)(d)
01/19/2022 Site Inspection Activity Closed Gartin, Daniel Q
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 01/19/2022
Activity Closed Date: 02/01/2022 Activity Closed By: GARTIN_D
Events:
Event Type: Activity has been finished Date: 02/01/2022
Comment: Finished
Comments:
Comment Date: 01/19/2022 User: GARTIN_D
Description: TANKS: Tank 4, tank 5, and tank 6 is a 9684 gallon USTs that contain unleaded gas and the USTs are double wall, fiberglass that was installed on 02/01/1995. STP SUMPS: The STP sump was clean and dry at the time of the inspection with sensors positioned correctly. SPILL CONTAINMENT: The double-walled spill buckets and vapor recover buckets were clean and dry at the time of inspection. The interstitial space for the regular spill bucket shows liquid is present - violation issued. OVERFILL PREVENTION: The facility uses drop tube for overfill prevention. DISPENSERS: The hoses and nozzles appeared to be in good condition at time of inspection. Dispenser sumps were mostly clean and dry at time of inspection with sensors positioned correctly. RELEASE DETECTION: The tank STP sump sensors, and dispenser sump sensors are monitored by a Veeder Root Automatic Tank Gauge (ATG). Spill buckets interstitial gauges are operational. All functions normal on ATG at time of inspection. CONTACT INFORMATION: Scott Janashak – sjanasha@circlek.com; Kristen Sherman –Daniel Q Gartin Ksherman@circlek.com; Christopher Bavuso – Christopher.Bavuso@circlek.com; Jonathan Smith – jonathan.smith@7g-enviro.com
09/17/2021 Editable Letter Activity Wilson, Monica L
Activity Title: In Compliance Letter Activity Status: Closed
Description: MA registration form
Events:
Event Type: Document has been sent Date: 09/17/2021
Comment: Sent
Events:
Event Type: Activity has been finished Date: 09/17/2021
Comment: Finished
Attachments:
Attachment Date: 09/17/2021 User: WILSON_ML_1
Description: In Compliance Letter
View Attachment
09/17/2021 TCAR Activity Wilson, Monica L
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 09/17/2021
Events:
Event Type: Activity has been finished Date: 09/17/2021
Comment: Finished
09/17/2021 Issue Document Activity Wilson, Monica L
Activity Status: Closed
Contact Name: Scott Janashak ; Le, An Activity Closed Date: 09/17/2021
Events:
Event Type: Activity has been finished Date: 09/17/2021
Comment: Finished
Comments:
Comment Date: 09/17/2021 User: WILSON_ML_1
Description: Greetings, I have attached the above referenced facility’s In Compliance Letter and Inspection Report. Please feel free to contact this office should you have any questions or concerns. Kind Regards, Monica L. Wilson Planning Consultant I Florida Department of Health in Escambia County Environment Health Division 1300 W Gregory Street, Pensacola, Florida 32502 Phone: 850-595-6700 ext 2004 Cell: 850-554-4315 Fax: 850-595-6774 www.EscambiaHealth.com Follow us on Twitter: @HealthyEscambia The Department’s mission is to protect, and improve the health of all people in Florida through integrated state, county, and community efforts NOTE: Florida has a very broad public records law. Most written communications to or from state officials regarding state business are public records available to the public and media upon request. Your email communication may therefore be subject to public disclosure.
09/17/2021 Editable Letter Activity Wilson, Monica L
Activity Title: Limited Closure Summary Report (Complete) Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 09/17/2021
Comment: Finished
Events:
Event Type: Document has been sent Date: 09/17/2021
Comment: Sent
Attachments:
Attachment Date: 09/17/2021 User: WILSON_ML_1
Description: Limited Closure Report Form Review Letter
View Attachment
09/16/2021 Site Inspection Activity Closed Payne, Charles L.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 09/15/2021
Activity Closed Date: 09/17/2021 Activity Closed By: PAYNE_CL_1
Events:
Event Type: Activity has been finished Date: 09/17/2021
Comment: Finished
Comments:
Comment Date: 09/17/2021 User: PAYNE_CL_1
Description: This component install inspection was originally conducted by Christopher Bavuso (Escambia County Inspector) but the information was never entered into FDEP's FIRST database before his departure. Component Install Inspection conducted by Charles Payne on 9/15/21. TYPE OF INSPECTION: UST Component Install Inspection for the replacement of the regular #2 spill bucket and regular #2 vapor recovery bucket. LOCATION: 3013 East Cervantes Street Pensacola, FL 32503 CONTRACTOR: Superior Petroleum Services, Inc. CONTRACTOR PSSC LICENSE #: 1256834 OWNER: Circle K Stores Inc. 25 W. Cedar ST STE M Pensacola, FL 32502 EQUIPMENT INSTALLED: Regular #2 Spill Bucket and Regular #2 Vapor Recovery Bucket CONSULTANT: NA - Passing Closure Integrity Evaluation Report Form The existing regular #2 spill bucket (regular spill bucket closest to the store) and the regular #2 vapor recovery bucket were replaced for routine maintenance. The existing/old double wall EBW regular #2 spill bucket and adjacent vapor recovery bucket were on their way to being damaged due to vehicular traffic. A closure assessment/soil sampling was not required due to a passing closure integrity evaluation report. The new regular #2 spill bucket installed was a double wall Franklin Fueling Defender Series Bucket (EQ-757) and the new vapor recovery bucket installed was a single wall Franklin Fueling Defender Series Bucket (EQ-757). The new double wall regular #2 spill bucket and the new single wall regular #2 vapor recovery bucket were installed per manufactures instructions. The new DW spill bucket was vacuum tested after installation and the new SW vapor bucket was hydrostatic tested post installation (both buckets passed testing). No records were reviewed during this inspection.
01/30/2020 Issue Document Activity Wilson, Monica L
Activity Status: Closed
Contact Name: Scott Janashak (sjanasha@circleK.com); Robbins, Cheri ; Gillman, Mark Activity Closed Date: 01/30/2020
Events:
Event Type: Activity has been finished Date: 01/30/2020
Comment: Finished
Comments:
Comment Date: 01/30/2020 User: WILSON_ML_1
Description: Greetings, I have attached the above referenced facility’s Return to Compliance Letter. Please feel free to contact this office should you have any questions or concerns. Kind Regards, Monica L. Wilson Planning Consultant I Florida Department of Health in Escambia County Environment Health Division 1300 W Gregory Street, Pensacola, Florida 32502 Phone: 850-595-6700 ext 2004 Cell: 850-554-4315 Fax: 850-595-6774 www.EscambiaHealth.com Follow us on Twitter: @HealthyEscambia The Department’s mission is to protect, and improve the health of all people in Florida through integrated state, county, and community efforts NOTE: Florida has a very broad public records law. Most written communications to or from state officials regarding state business are public records available to the public and media upon request. Your email communication may therefore be subject to public disclosure.
01/30/2020 Editable Letter Activity Wilson, Monica L
Activity Title: Return to Compliance Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 01/30/2020
Comment: Sent
Events:
Event Type: Activity has been finished Date: 01/30/2020
Comment: Finished
Attachments:
Attachment Date: 01/30/2020 User: WILSON_ML_1
Description: Return to Compliance Letter
View Attachment
01/29/2020 Document Management Activity Bragg, Shane D
Activity Title: Incident Notification Form Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 01/29/2020
Comment: Finished
Comments:
Comment Date: 01/29/2020 User: BRAGG_SD_2
Description: Violation for no INF received in the proper time frames has been resolved.
Attachments:
Attachment Date: 01/29/2020 User: BRAGG_SD_2
Description: Copy of INF
View Attachment
01/29/2020 Incident Activity Bragg, Shane D
Activity Result: Has not led to Discharge Activity Status: Closed
Activity Closed Date: 01/29/2020
Events:
Event Type: Activity has been finished Date: 01/29/2020
Comment: Finished
Comments:
Comment Date: 01/29/2020 User: BRAGG_SD_2
Description: 12/30/2019-INF, repair invoice, and testing record were submitted. 12/31/2019- Written report was submitted by Cheri Robbins. Copy of sensor report shows that no liquid was in the sumps at the time of or before the failed component testing. Records indicate that no discharge has occurred. All open violations have been resolved, facility has returned to compliance. Copy of the return to compliance letter sent to Scott Janashak at Sjanasha@CircleK.com, Cheri Robbins at Crobbins@CircleK.com, and Mark Gillman at Mark.Gillman@FloridaDEP.gov. Incident will be closed as has not lead to a discharge.
11/27/2019 Violation Closed Bragg, Shane D
Significance: SNC-B Status: Closed
Criteria ID: 4016
Rule: 62-761.430(2)
11/27/2019 Issue Document Activity Wilson, Monica L
Activity Status: Closed
Contact Name: Scott Janashak (sjanasha@circleK.com); Robbins, Cheri Activity Closed Date: 11/27/2019
Events:
Event Type: Activity has been finished Date: 11/27/2019
Comment: Finished
11/27/2019 Editable Letter Activity Bragg, Shane D
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 11/27/2019
Comment: Sent
Events:
Event Type: Activity has been finished Date: 11/27/2019
Comment: Finished
Attachments:
Attachment Date: 11/27/2019 User: WILSON_ML_1
Description: Compliance Assistance Offer Letter
View Attachment
11/27/2019 Violation Closed Bragg, Shane D
Significance: Minor Status: Closed
Criteria ID: 4068
Rule: 62-761.700(1), 62-761.700(1)(a), 62-761.700(1)(a)1., 62-761.700(1)(a)2.
11/27/2019 Violation Closed Bragg, Shane D
Significance: Minor Status: Closed
Criteria ID: 4012
Rule: 62-761.405(3)
11/18/2019 Site Inspection Activity Closed Bragg, Shane D
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 11/18/2019
Activity Closed Date: 11/27/2019 Activity Closed By: BRAGG_SD_2
Events:
Event Type: Activity has been finished Date: 11/27/2019
Comment: Finished
Comments:
Comment Date: 11/27/2019 User: BRAGG_SD_2
Description: For this inspection, the STP sumps appeared to be in good condition and were mostly clean and dry. The entry/penetration boots going into the STP sumps appeared to be in good condition. The spill buckets appeared to be in good condition and were mostly clean and dry. The dispenser sumps appeared to be in good condition and were mostly clean and dry. The entry/penetration boots going into the dispenser sumps appeared to be in good condition. The dispenser hoses and nozzles appeared to be in good condition. The records that were available and up to date for this inspection were: the placard, monthly visual inspections, financial responsibility, annual operability test, annual line leak detector test, BOI testing, and operator certificates. Refer to violations section of this inspection report for violations and corrective actions. Signed copy of this inspection report emailed to Scott Janashak at SJanasha@Circlek.com, and Cheri Robbins at Crobbins@CircleK.com.
08/10/2017 Issue Document Activity Wilson, Monica L
Activity Status: Closed
Contact Name: sjansha@circlek.com; crobbins@circlek.com Activity Closed Date: 08/11/2017
Events:
Event Type: Activity has been finished Date: 08/11/2017
Comment: Finished
Attachments:
Attachment Date: 08/11/2017 User: WILSON_ML_1
Description: In Compliance Letter
View Attachment
08/08/2017 Site Inspection Activity Closed Bragg, Shane D
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 08/08/2017
Activity Closed Date: 08/09/2017 Activity Closed By: BRAGG_SD_2
Events:
Event Type: Activity has been finished Date: 08/09/2017
Comment: Finished
Comments:
Comment Date: 08/09/2017 User: BRAGG_SD_2
Description: Annual Inspection conducted by Shane Bragg on 08/08/2017. Met on site with Phil Robbins (with PC Mechanical) for this inspection. Tanks: Double-Wall (DW) Owens-Corning FRP tanks (EQ-191) converted to dry sensors. Piping: DW 2-inch FRP Ameron Dualoy 3000/L (EQ-378). Dispenser Sumps :Steel Bravo Boxes Model B2315 (EQ-045). STP Sumps: Owens-Corning FRP (EQ-395). ATG/Release Detection: Gilbarco EMC Automatic Tank Gauge (EQ-130). Monthly visual inspections of spill buckets. MLLD: Red Jacket FX-1 series (EQ-373). For this inspection, the STP sumps appeared to be in good condition and were mostly clean and dry. The entry/penetration boots going into the STP sumps appeared to be in good condition. The spill buckets appeared to be in good condition and were mostly clean and dry. The dispenser liners appeared to be in good condition and were mostly clean and dry. The entry/penetration boots going into the dispenser liners appeared to be in good condition. The dispenser hoses and nozzles appeared to be in good condition. The records that were available and up to date for this inspection were: the placard, financial responsibility, monthly visual inspections, annual operability test, and annual line leak detector test. No current violations for this facility. Signed copy of this inspection emailed to Cheri Robins at CRobbins@CircleK.com. Unable to obtain signature due to FIRST/Tough pad issue.
03/15/2016 Comment Payne, Charles L.
Description: The old double wall EBW regular spill bucket and adjacent vapor recovery bucket were damaged due to vehicular traffic. The old buckets were removed and there did not appear to be visible contamination. The buckets installed were the regular and associated vapor recovery bucket. There are two regular spill buckets and the one replaced was the bucket closest to Cervantes Street. The new buckets installed are EBW-Franklin Fueling Defender Series spill containments (EQ-757).
02/24/2016 Editable Letter Activity Wilson, Monica L
Activity Title: Limited Closure Summary Report (Complete) Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 02/24/2016
Comment: Finished
Attachments:
Attachment Date: 02/24/2016 User: WILSON_ML_1
Description: LCSR Review Letter
View Attachment
02/22/2016 Site Inspection Activity Closed Payne, Charles L.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 02/12/2016
Activity Closed Date: 02/22/2016 Activity Closed By: PAYNE_CL_1
Events:
Event Type: Activity has been finished Date: 02/22/2016
Comment: Finished
Comments:
Comment Date: 02/22/2016 User: PAYNE_CL_1
Description: Component Closure Inspection conducted by Charles Payne on 02/22/2016. Met onsite with Superior Petroleum Services (SPS) for this inspection. The old double wall EBW regular spill bucket and adjacent vapor recovery bucket were damaged due to vehicular traffic. The old buckets were hydrostatic tested and passed but the buckets still needed to be replaced. The old buckets were removed and there did not appear to be visible contamination. Facility has a discharge from 1990 and RA is ongoing. A full closure assessment is not required but a limited closure summary report must be submitted to the County within 60 days of completion of the closure. See attachments for work release form, UST certified contractors form and pictures of the spill containment removed. No records were reviewed during this inspection.
02/22/2016 Site Inspection Activity Closed Payne, Charles L.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 02/22/2016
Activity Closed Date: 02/26/2016 Activity Closed By: PAYNE_CL_1
Events:
Event Type: Activity has been finished Date: 02/26/2016
Comment: Finished
Comments:
Comment Date: 02/26/2016 User: PAYNE_CL_1
Description: Component Install Inspection conducted by Charles Payne. Met onsite with Superior Petroleum Services (SPS) for this inspection. The old double wall EBW regular spill bucket and adjacent vapor recovery bucket were damaged due to vehicular traffic. The old buckets were removed and there did not appear to be visible contamination. The buckets installed were the regular and associated vapor recovery bucket. There are two regular spill buckets and the one replaced was the bucket closest to Cervantes Street. The new buckets installed are EBW-Franklin Fueling Defender Series spill containments (EQ-757). The new double wall regular spill bucket and vapor recovery bucket were installed per manufactures instructions and hydrostatic tested. Hydrostatic test was verified as passing by this department. No records were reviewed during this inspection.
12/01/2015 Site Inspection Activity Closed Payne, Charles L.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 12/01/2015
Activity Closed Date: 12/07/2015 Activity Closed By: PAYNE_CL_1
Events:
Event Type: Activity has been finished Date: 12/07/2015
Comment: Finished
Comments:
Comment Date: 12/07/2015 User: PAYNE_CL_1
Description: TCI conducted by Charles Payne on 12/01/2015. Met onsite with Tyler Lehman (Superior Petroleum Service Technician) for this compliance inspection. The UST Systems appeared mostly clean and dry. The STP sumps and dispenser sumps were dry and dispenser shear valves were tight. All the spill buckets contained Petroleum Contact Water (PCW) but not to violation level. This PCW should be removed and properly disposed of as soon as possible. The dispenser hoses and nozzles appeared to be in good condition. Sub-pump sumps and tank interstice are monitored electronically by a Veeder-Root TLS 350 and there are line leak detectors for product lines. Veeder-Root showed all sensors normal. Valley Tank Testing conducts the monthly inspections and all tank tests. The Placard, Financial Responsibility, Release Detection Response Level, System Tests and Monthly Electronic and Visual Inspections are up-to-date and available for this inspection. No violations noted at time of inspection. Signed copy of inspection emailed to Cheri Robbins with Circle K Stores INC.
12/01/2015 Emergency Preparedness Information Activity Payne, Charles L.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 12/01/2015
Events:
Event Type: Activity has been finished Date: 12/01/2015
Comment: Finished
02/11/2014 Site Inspection Activity Closed Payne, Charles L.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 02/11/2014
Activity Closed Date: 02/12/2014 Activity Closed By: PAYNE_CL_1
Events:
Event Type: Activity has been finished Date: 02/12/2014
Comment: Finished
Comments:
Comment Date: 02/12/2014 User: PAYNE_CL_1
Description: Annual Tank Compliance Inspection conducted by Charles Payne on 02/11/2014. Meet onsite with Valley Tank Testing for this inspection. The UST Systems appeared mostly clean and dry. The tank sumps, spill buckets and dispenser sumps were dry and shear valves were tight. Sub pump sumps and tank interstice are monitored electronically by a Veeder root TLS 350 and there are line leak detectors for product lines. Valley Tank Testing conducts the monthly inspections and all tank tests. The Placard, Financial Responsibility, Release Detection Response Level, System Tests and Monthly Electronic and Visual Inspections are up-to-date and available for this inspection. No violations noted at time of inspection. Signed copy of inspection given to Heather Gilmore.
02/11/2014 Emergency Preparedness Information Activity Payne, Charles L.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 02/11/2014
Events:
Event Type: Activity has been finished Date: 02/11/2014
Comment: Finished
09/13/2011 Site Inspection Activity Closed Tissington, Arthur B.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 09/13/2011
Activity Closed Date: 09/13/2011 Activity Closed By: TISSINGTON_AB_1
Events:
Event Type: Activity has been finished Date: 09/13/2011
Comment: Finished
Comments:
Comment Date: 09/13/2011 User: TISSINGTON_AB_1
Description: RD by monthly visual inspection of dispensers and spill buckets SUb pump sumps and tank interstice monitored electronically Veeder root tls 350 Line leak detectors for product lines. Dispenser sumps and subpump sumps dry Shear valves tight Spill buckets dry, but water in north reg spill bucket interstice Inspector could not open middle reg spill bucket interstice or prem. No alarms
03/17/2011 Meeting Activity Gillman, Mark
Activity Closed Date: 07/11/2011 Activity Status: Closed
Location: 160 Governmental Center, Pensacola, FL
Subject: On March 16, 2011, we met with Heather Gilmore, Regional Environmental Manager for Circle K, Stores, Inc. The meeting¿s purpose was to discuss compliance issues at 16 Escambia Circle K Stores facilities. The meeting was held at the request of the District. The meeting request was offered in a letter, issued on February 24, 2011, which names the specific compliance problems at the 16 Escambia County facilities. The letter is attached. Mr. Harp expressed the concerns described in the said letter. He explained that a history of the same violation at the same facility suggests a pattern of poor tank management. He mentioned that the violations cited are subject to Department enforcement action including civil penalties, particularly when they occur routinely and are not corrected promptly. Ms. Gilmore explained that work was being done to correct some of the problems related to the electronic release detection systems. She did not propose any resolution to the problem of sump maintenance and the removal of collected water. Messrs. Harp and Hollingshead suggested that sumps be inspected on a monthly basis (as required by the rule), and that any discovered water be pumped out and disposed of properly. She stated that she would take action to prevent these violations from recurring. Attendees: Charles Harp (FDEP), Mark Gillman (FDEP), Johnn Hollingshead (ECHD), Aric Porter (ECHD), Heather Gilmore, (Circle K Stores, Inc.)
Events:
Event Type: Activity has been finished Date: 07/11/2011
Comment: Finished
01/25/2011 Site Inspection Activity Closed Porter, Aric J.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 01/25/2011
Activity Closed Date: 02/10/2011 Activity Closed By: PORTER_AJ_1
Events:
Event Type: Activity has been finished Date: 02/10/2011
Comment: Finished
Comments:
Comment Date: 02/03/2011 User: PORTER_AJ_1
Description: TIN conducted 2/2/2011 at 1:30 pm: Tyler, with Superior Petroleum Services, Inc, was onsite finishing electronic connections to the ATG for this UST System. He stated that Valley Testing had just completed the Precision Line Test and all piping lines passed. Valley Testing will be back tomorrow to conduct the Tank Tightness Tests. Tyler signed the PSSC Contractor Form (attached) as well as this Installation Inspection and was instructed to have Valley Testing call this office following the tank test so that this Installation can be approved.
Comments:
Comment Date: 01/25/2011 User: PORTER_AJ_1
Description: TIN conducted 1/25/2010 at 10:00 am: This initial Installation Inspection made to check the progress of Superior Petroleum Services, Inc. with exposing, disconnecting, and removing the existing STP Sumps at this facility. Personnel were onsite disconnecting piping and electrical conduits into the STP Sumps (see photos). The sump diameter for these tanks is different than most and the replacement sumps were special ordered and should be onsite this week. Skyler, with Superior Petroleum Services, Inc, will keep this office posted with installation progress.
Comments:
Comment Date: 01/31/2011 User: PORTER_AJ_1
Description: TIN conducted 1/31/2011 at 10:00 am and 3:00 pm: This inspection (10:00 am) made to check the air pressure test of the Primary Piping. Air gauges on the Regular and Premium Primary Piping held at 50 psi during this inspection (see photo). All connections/junctions, to reconnect the Primary Piping, was soap-tested and no leaks were found. Superior Petroleum personnel will install the Secondary fittings today and have the Secondary Piping Air Test ready this afternoon. This inspection (3:00 pm) made to check the air pressure test of the Secondary Piping. Only three Secondary Piping fittings were required to complete this system's piping which held at 5 psi (see photo). The fittings were soap-tested during this inspection and no leaks were found. Hydro-Tests on the STP Sumps will be ready for inspection tomorrow morning.
Comments:
Comment Date: 02/01/2011 User: PORTER_AJ_1
Description: TIN conducted 2/1/2011 at 9:00 am: This inspection made to check hydro-tests on the new Phil-Tite STP Sumps. All three sumps held the water level at or very near the orange paint line above all penetrations (see photos). No bubbles were observed from the piping that was still under pressure. The concrete contractor was onsite and will begin pouring following backfill activities.
Comments:
Comment Date: 01/31/2011 User: PORTER_AJ_1
Description: TIN conducted 1/27/2011 at 3:00 pm: This inspection conducted to check the progress of this installation. All piping/electrical conduits, to the STP Sumps, has been disconnected. The new STP Sump sections were being positioned and fiberglassed together by Superior Petroleum personnel. The sumps will be finished and the Primary Piping Air Test should be ready Monday morning, January 31, 2011.
01/25/2011 Site Inspection Activity Closed Porter, Aric J.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 01/25/2011
Activity Closed Date: 02/10/2011 Activity Closed By: PORTER_AJ_1
Events:
Event Type: Activity has been finished Date: 02/10/2011
Comment: Finished
Comments:
Comment Date: 02/03/2011 User: PORTER_AJ_1
Description: TIN conducted 2/2/2011 at 1:30 pm: Tyler, with Superior Petroleum Services, Inc, was onsite finishing electronic connections to the ATG for this UST System. He stated that Valley Testing had just completed the Precision Line Test and all piping lines passed. Valley Testing will be back tomorrow to conduct the Tank Tightness Tests. Tyler signed the PSSC Contractor Form (attached) as well as this Installation Inspection and was instructed to have Valley Testing call this office following the tank test so that this Installation can be approved.
Comments:
Comment Date: 01/25/2011 User: PORTER_AJ_1
Description: TIN conducted 1/25/2010 at 10:00 am: This initial Installation Inspection made to check the progress of Superior Petroleum Services, Inc. with exposing, disconnecting, and removing the existing STP Sumps at this facility. Personnel were onsite disconnecting piping and electrical conduits into the STP Sumps (see photos). The sump diameter for these tanks is different than most and the replacement sumps were special ordered and should be onsite this week. Skyler, with Superior Petroleum Services, Inc, will keep this office posted with installation progress.
Comments:
Comment Date: 01/31/2011 User: PORTER_AJ_1
Description: TIN conducted 1/31/2011 at 10:00 am and 3:00 pm: This inspection (10:00 am) made to check the air pressure test of the Primary Piping. Air gauges on the Regular and Premium Primary Piping held at 50 psi during this inspection (see photo). All connections/junctions, to reconnect the Primary Piping, was soap-tested and no leaks were found. Superior Petroleum personnel will install the Secondary fittings today and have the Secondary Piping Air Test ready this afternoon. This inspection (3:00 pm) made to check the air pressure test of the Secondary Piping. Only three Secondary Piping fittings were required to complete this system's piping which held at 5 psi (see photo). The fittings were soap-tested during this inspection and no leaks were found. Hydro-Tests on the STP Sumps will be ready for inspection tomorrow morning.
Comments:
Comment Date: 02/01/2011 User: PORTER_AJ_1
Description: TIN conducted 2/1/2011 at 9:00 am: This inspection made to check hydro-tests on the new Phil-Tite STP Sumps. All three sumps held the water level at or very near the orange paint line above all penetrations (see photos). No bubbles were observed from the piping that was still under pressure. The concrete contractor was onsite and will begin pouring following backfill activities.
Comments:
Comment Date: 01/31/2011 User: PORTER_AJ_1
Description: TIN conducted 1/27/2011 at 3:00 pm: This inspection conducted to check the progress of this installation. All piping/electrical conduits, to the STP Sumps, has been disconnected. The new STP Sump sections were being positioned and fiberglassed together by Superior Petroleum personnel. The sumps will be finished and the Primary Piping Air Test should be ready Monday morning, January 31, 2011.
01/25/2011 Site Inspection Activity Closed Porter, Aric J.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 01/25/2011
Activity Closed Date: 02/10/2011 Activity Closed By: PORTER_AJ_1
Events:
Event Type: Activity has been finished Date: 02/10/2011
Comment: Finished
Comments:
Comment Date: 02/03/2011 User: PORTER_AJ_1
Description: TIN conducted 2/2/2011 at 1:30 pm: Tyler, with Superior Petroleum Services, Inc, was onsite finishing electronic connections to the ATG for this UST System. He stated that Valley Testing had just completed the Precision Line Test and all piping lines passed. Valley Testing will be back tomorrow to conduct the Tank Tightness Tests. Tyler signed the PSSC Contractor Form (attached) as well as this Installation Inspection and was instructed to have Valley Testing call this office following the tank test so that this Installation can be approved.
Comments:
Comment Date: 01/25/2011 User: PORTER_AJ_1
Description: TIN conducted 1/25/2010 at 10:00 am: This initial Installation Inspection made to check the progress of Superior Petroleum Services, Inc. with exposing, disconnecting, and removing the existing STP Sumps at this facility. Personnel were onsite disconnecting piping and electrical conduits into the STP Sumps (see photos). The sump diameter for these tanks is different than most and the replacement sumps were special ordered and should be onsite this week. Skyler, with Superior Petroleum Services, Inc, will keep this office posted with installation progress.
Comments:
Comment Date: 01/31/2011 User: PORTER_AJ_1
Description: TIN conducted 1/31/2011 at 10:00 am and 3:00 pm: This inspection (10:00 am) made to check the air pressure test of the Primary Piping. Air gauges on the Regular and Premium Primary Piping held at 50 psi during this inspection (see photo). All connections/junctions, to reconnect the Primary Piping, was soap-tested and no leaks were found. Superior Petroleum personnel will install the Secondary fittings today and have the Secondary Piping Air Test ready this afternoon. This inspection (3:00 pm) made to check the air pressure test of the Secondary Piping. Only three Secondary Piping fittings were required to complete this system's piping which held at 5 psi (see photo). The fittings were soap-tested during this inspection and no leaks were found. Hydro-Tests on the STP Sumps will be ready for inspection tomorrow morning.
Comments:
Comment Date: 02/01/2011 User: PORTER_AJ_1
Description: TIN conducted 2/1/2011 at 9:00 am: This inspection made to check hydro-tests on the new Phil-Tite STP Sumps. All three sumps held the water level at or very near the orange paint line above all penetrations (see photos). No bubbles were observed from the piping that was still under pressure. The concrete contractor was onsite and will begin pouring following backfill activities.
Comments:
Comment Date: 01/31/2011 User: PORTER_AJ_1
Description: TIN conducted 1/27/2011 at 3:00 pm: This inspection conducted to check the progress of this installation. All piping/electrical conduits, to the STP Sumps, has been disconnected. The new STP Sump sections were being positioned and fiberglassed together by Superior Petroleum personnel. The sumps will be finished and the Primary Piping Air Test should be ready Monday morning, January 31, 2011.
01/25/2011 Site Inspection Activity Closed Porter, Aric J.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 01/25/2011
Activity Closed Date: 02/10/2011 Activity Closed By: PORTER_AJ_1
Events:
Event Type: Activity has been finished Date: 02/10/2011
Comment: Finished
Comments:
Comment Date: 02/03/2011 User: PORTER_AJ_1
Description: TIN conducted 2/2/2011 at 1:30 pm: Tyler, with Superior Petroleum Services, Inc, was onsite finishing electronic connections to the ATG for this UST System. He stated that Valley Testing had just completed the Precision Line Test and all piping lines passed. Valley Testing will be back tomorrow to conduct the Tank Tightness Tests. Tyler signed the PSSC Contractor Form (attached) as well as this Installation Inspection and was instructed to have Valley Testing call this office following the tank test so that this Installation can be approved.
Comments:
Comment Date: 01/25/2011 User: PORTER_AJ_1
Description: TIN conducted 1/25/2010 at 10:00 am: This initial Installation Inspection made to check the progress of Superior Petroleum Services, Inc. with exposing, disconnecting, and removing the existing STP Sumps at this facility. Personnel were onsite disconnecting piping and electrical conduits into the STP Sumps (see photos). The sump diameter for these tanks is different than most and the replacement sumps were special ordered and should be onsite this week. Skyler, with Superior Petroleum Services, Inc, will keep this office posted with installation progress.
Comments:
Comment Date: 01/31/2011 User: PORTER_AJ_1
Description: TIN conducted 1/31/2011 at 10:00 am and 3:00 pm: This inspection (10:00 am) made to check the air pressure test of the Primary Piping. Air gauges on the Regular and Premium Primary Piping held at 50 psi during this inspection (see photo). All connections/junctions, to reconnect the Primary Piping, was soap-tested and no leaks were found. Superior Petroleum personnel will install the Secondary fittings today and have the Secondary Piping Air Test ready this afternoon. This inspection (3:00 pm) made to check the air pressure test of the Secondary Piping. Only three Secondary Piping fittings were required to complete this system's piping which held at 5 psi (see photo). The fittings were soap-tested during this inspection and no leaks were found. Hydro-Tests on the STP Sumps will be ready for inspection tomorrow morning.
Comments:
Comment Date: 02/01/2011 User: PORTER_AJ_1
Description: TIN conducted 2/1/2011 at 9:00 am: This inspection made to check hydro-tests on the new Phil-Tite STP Sumps. All three sumps held the water level at or very near the orange paint line above all penetrations (see photos). No bubbles were observed from the piping that was still under pressure. The concrete contractor was onsite and will begin pouring following backfill activities.
Comments:
Comment Date: 01/31/2011 User: PORTER_AJ_1
Description: TIN conducted 1/27/2011 at 3:00 pm: This inspection conducted to check the progress of this installation. All piping/electrical conduits, to the STP Sumps, has been disconnected. The new STP Sump sections were being positioned and fiberglassed together by Superior Petroleum personnel. The sumps will be finished and the Primary Piping Air Test should be ready Monday morning, January 31, 2011.
01/25/2011 Site Inspection Activity Closed Porter, Aric J.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 01/25/2011
Activity Closed Date: 02/10/2011 Activity Closed By: PORTER_AJ_1
Events:
Event Type: Activity has been finished Date: 02/10/2011
Comment: Finished
Comments:
Comment Date: 02/03/2011 User: PORTER_AJ_1
Description: TIN conducted 2/2/2011 at 1:30 pm: Tyler, with Superior Petroleum Services, Inc, was onsite finishing electronic connections to the ATG for this UST System. He stated that Valley Testing had just completed the Precision Line Test and all piping lines passed. Valley Testing will be back tomorrow to conduct the Tank Tightness Tests. Tyler signed the PSSC Contractor Form (attached) as well as this Installation Inspection and was instructed to have Valley Testing call this office following the tank test so that this Installation can be approved.
Comments:
Comment Date: 01/25/2011 User: PORTER_AJ_1
Description: TIN conducted 1/25/2010 at 10:00 am: This initial Installation Inspection made to check the progress of Superior Petroleum Services, Inc. with exposing, disconnecting, and removing the existing STP Sumps at this facility. Personnel were onsite disconnecting piping and electrical conduits into the STP Sumps (see photos). The sump diameter for these tanks is different than most and the replacement sumps were special ordered and should be onsite this week. Skyler, with Superior Petroleum Services, Inc, will keep this office posted with installation progress.
Comments:
Comment Date: 01/31/2011 User: PORTER_AJ_1
Description: TIN conducted 1/31/2011 at 10:00 am and 3:00 pm: This inspection (10:00 am) made to check the air pressure test of the Primary Piping. Air gauges on the Regular and Premium Primary Piping held at 50 psi during this inspection (see photo). All connections/junctions, to reconnect the Primary Piping, was soap-tested and no leaks were found. Superior Petroleum personnel will install the Secondary fittings today and have the Secondary Piping Air Test ready this afternoon. This inspection (3:00 pm) made to check the air pressure test of the Secondary Piping. Only three Secondary Piping fittings were required to complete this system's piping which held at 5 psi (see photo). The fittings were soap-tested during this inspection and no leaks were found. Hydro-Tests on the STP Sumps will be ready for inspection tomorrow morning.
Comments:
Comment Date: 02/01/2011 User: PORTER_AJ_1
Description: TIN conducted 2/1/2011 at 9:00 am: This inspection made to check hydro-tests on the new Phil-Tite STP Sumps. All three sumps held the water level at or very near the orange paint line above all penetrations (see photos). No bubbles were observed from the piping that was still under pressure. The concrete contractor was onsite and will begin pouring following backfill activities.
Comments:
Comment Date: 01/31/2011 User: PORTER_AJ_1
Description: TIN conducted 1/27/2011 at 3:00 pm: This inspection conducted to check the progress of this installation. All piping/electrical conduits, to the STP Sumps, has been disconnected. The new STP Sump sections were being positioned and fiberglassed together by Superior Petroleum personnel. The sumps will be finished and the Primary Piping Air Test should be ready Monday morning, January 31, 2011.
12/13/2010 Editable Letter Activity Pierce, Linda L.
Activity Title: County Subsequent Non-Compliance Letter Activity Status: Closed
Description: 2017-11-28 CAO.
Events:
Event Type: Document has been sent Date: 12/13/2010
Comment: Sent on Mon Dec 13 00:00:00 EST 2010
Events:
Event Type: Activity has been finished Date: 12/13/2010
Comment: Finished
Attachments:
Attachment Date: 12/13/2010 User: PIERCE_LL_1
Description: 3rd NCL letter
View Attachment
12/10/2010 Site Inspection Activity Closed Porter, Aric J.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 12/10/2010
Activity Closed Date: 12/10/2010 Activity Closed By: PORTER_AJ_1
Events:
Event Type: Activity has been finished Date: 12/10/2010
Comment: Finished
Comments:
Comment Date: 12/10/2010 User: PORTER_AJ_1
Description: TCR conducted 12/10/2010 at 3:15 pm: Heather Gilmore, with Circle K, called at 2:45 pm to let me know Aaron Oil Co. will be at this facility in approx. 10 minutes. I agreed to meet them and show them that all spill bucket secondary containments have excessive PCW. All secondary containments were checked, all PCW was removed (violation resolved) and the Veeder Root System does not display any alarms. Only a "Delivery Needed" warning is displayed. This facility is now operating in compliance with F.A.C. 62-761. Note: The Financial Resposibility (Insurance Policy) remains in effect and no records were reviewed during this inspection.
12/03/2010 Document Management Activity Porter, Aric J.
Activity Title: Incident Notification Form Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 12/03/2010
Comment: Finished
Attachments:
Attachment Date: 12/03/2010 User: PORTER_AJ_1
Description: INF
View Attachment
12/03/2010 Incident Activity Porter, Aric J.
Activity Result: Has not led to Discharge Activity Status: Closed
Activity Closed Date: 12/14/2010
Events:
Event Type: Activity has been finished Date: 12/14/2010
Comment: Finished
Comments:
Comment Date: 12/14/2010 User: PORTER_AJ_1
Description: Excessive PCW was found in the Spill Bucket Secondary Containments during the Annual Tank Compliance Inspection. PCW was removed from the STP Sumps and the Spill Buckets but the Spill Bucket Secondary Containments remained in violation (see Reinspections of 10/26/2010 and 12/2/2010). After meeting Aaron Oil Co. onsite on 12/10/2010, I explained to the technician that access to the Spill Bucket's Secondary Containments must be completed and all PCW pumped-out. He agreed to complete this at all Circle K facilities with Spill Bucket Secondary Containments. It does not appear that this Incident has resulted in a discharge.
12/02/2010 Site Inspection Activity Closed Porter, Aric J.
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 12/02/2010
Activity Closed Date: 12/02/2010 Activity Closed By: PORTER_AJ_1
Events:
Event Type: Activity has been finished Date: 12/02/2010
Comment: Finished
Comments:
Comment Date: 12/02/2010 User: PORTER_AJ_1
Description: TCR conducted 12/2/2010 at 12:30 am: This Reinspection conducted following receipt of Aaron Oil Co. Disposal Manifest (attached) for the removal of PCW. All three Spill Bucket secondary containments still contain excessive PCW (at least 30 inches in each) - violation remains uncorrected. The Veeder Root System displays "L3: Reg 2 Sump Fuel Alarm" and this sump was visually inspected (see photo). Although the PCW level is below sump penetrations, it is in contact with the sensor causing the alarm. This PCW should also be removed prior to the next Reinspection. Note: The Financial Responsibility (Insurance Policy) is still current and no other records were reviewed for this inspection.
12/02/2010 Electronic Communication Activity Porter, Aric J.
Activity Closed Date: 12/02/2010 Activity Status: Closed
Date: 12/02/2010
Recipient: Aric Porter
Sender: Heather Gilmore
Subject: Violation for PCW in Secondary Containments
Message: Circle K has approval to repair/fix the existing Secondary Containments that fill-up with groundwater/stormwater (see attached email).
Events:
Event Type: Activity has been finished Date: 12/02/2010
Comment: Finished
11/15/2010 Editable Letter Activity Pierce, Linda L.
Activity Title: County Subsequent Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 11/15/2010
Comment: Sent on Mon Nov 15 00:00:00 EST 2010
Events:
Event Type: Activity has been finished Date: 11/15/2010
Comment: Finished
Attachments:
Attachment Date: 11/15/2010 User: PIERCE_LL_1
Description: 2nd NCL
View Attachment
10/26/2010 Site Inspection Activity Closed Porter, Aric J.
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 10/26/2010
Activity Closed Date: 10/26/2010 Activity Closed By: PORTER_AJ_1
Events:
Event Type: Activity has been finished Date: 10/26/2010
Comment: Finished
Comments:
Comment Date: 10/26/2010 User: PORTER_AJ_1
Description: TCR conducted 10/26/2010 at 2:30 pm: All STP Sumps appeared clean and dry (see photo) for this inspection. The South most Regular Unleaded Fillport Spill Bucket secondary containment and the Premium Fillport Spill Bucket secondary containment had 30" and 21" of excessive PCW (see photos) - violation remains uncorrected. The PCW in the spill bucket's secondary containments should be removed and disposed of properly. The Veeder Root ATG displays no alarms, only delivery needed alerts. Note: This facility's Financial Responsibility is current and no records were reviewed during this inspection.
10/04/2010 Attachment Porter, Aric J.
10/04/2010 Document Management Activity Porter, Aric J.
Activity Title: Incident Notification Form Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 10/04/2010
Comment: Finished
Attachments:
Attachment Date: 10/04/2010 User: PORTER_AJ_1
Description: INF
View Attachment
10/04/2010 Incident Activity Porter, Aric J.
Activity Result: Has not led to Discharge Activity Status: Closed
Activity Closed Date: 10/04/2010
Events:
Event Type: Activity has been finished Date: 10/04/2010
Comment: Finished
Comments:
Comment Date: 10/04/2010 User: PORTER_AJ_1
Description: INF submitted for a faulty STP Sump Sensor - the sensor was replaced, the alarm discontinued, and this incident has not resulted in a discharge.
09/24/2010 Incident Activity Porter, Aric J.
Activity Result: Has not led to Discharge Activity Status: Closed
Activity Closed Date: 12/14/2010
Events:
Event Type: Activity has been finished Date: 12/14/2010
Comment: Finished
Comments:
Comment Date: 12/14/2010 User: PORTER_AJ_1
Description: Excessive PCW in the STP Sumps, Spill Buckets, and Spill Bucket Secondary Containments during the Annual Tank Compliance Inspection. PCW was removed from the STP Sumps and the Spill Buckets but the Spill Bucket Secondary Containments remained in violation (see Reinspections of 10/26/2010 and 12/2/2010). After meeting Aaron Oil Co. onsite on 12/10/2010, I explained to the technician that access to the Spill Bucket's Secondary Containments must be completed and all PCW pumped-out. He agreed to complete this at all Circle K facilities with Spill Bucket Secondary Containments. It does not appear that this Incident has resulted in a discharge.
09/24/2010 Document Management Activity Porter, Aric J.
Activity Title: Incident Notification Form Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 12/03/2010
Comment: Finished
Attachments:
Attachment Date: 09/24/2010 User: PORTER_AJ_1
Description: INF
View Attachment
09/23/2010 Editable Letter Activity Pierce, Linda L.
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 09/23/2010
Comment: Finished
Events:
Event Type: Document has been sent Date: 09/23/2010
Comment: Sent on Thu Sep 23 00:00:00 EDT 2010
Attachments:
Attachment Date: 09/23/2010 User: PIERCE_LL_1
Description: NCL letter
View Attachment
09/10/2010 Incident Activity Porter, Aric J.
Activity Result: Has not led to Discharge Activity Status: Closed
Activity Closed Date: 12/14/2010
Events:
Event Type: Activity has been finished Date: 12/14/2010
Comment: Finished
Comments:
Comment Date: 12/14/2010 User: PORTER_AJ_1
Description: Superior Petroleum Sevices, Inc. identified the Veeder Root Alarm was caused by excessive brine solution in all three tank interstices (see attachments). The brine level was reduced and monitored by Superior Petroleum Sevices, Inc. and the alarms have been corrected (verified during the Reinspections on 10/26/2010, 12/2/2010 and 12/10/2010). It does not appear that this Incident has resulted in a discharge.
09/10/2010 Document Management Activity Porter, Aric J.
Activity Title: Incident Notification Form Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 09/10/2010
Comment: Finished
Attachments:
Attachment Date: 09/10/2010 User: PORTER_AJ_1
Description: INF
View Attachment
09/08/2010 Violation Closed Porter, Aric J.
Significance: SNC-B Status: Closed
Criteria ID: 1106
Rule: 62-761.700(1)(a)2.
Comments: For systems or components that were required to shut down, check the product inventory data to confirm.
09/08/2010 Emergency Preparedness Information Activity Porter, Aric J.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 09/08/2010
Events:
Event Type: Activity has been finished Date: 09/08/2010
Comment: Finished
09/08/2010 Phone Conversation Activity Porter, Aric J.
Call Type: Incoming Activity Status: Closed
Phone Number: (850) 682-4911 Activity Closed Date: 09/08/2010
Subject: Tyler, with Superior Petroleum Services, called me from this facility. He advises that the tank's intersticial alarms are due to fluctuations in the brine solution of these tanks - not from a primary or secondary tank leak. He believes he over-filled the brine in the tanks causing the High Liquid Level Alarms. Tyler will submit a letter that details his work to correct the alarms following completion.
Events:
Event Type: Activity has been finished Date: 09/08/2010
Comment: Finished
09/08/2010 Site Inspection Activity Closed Porter, Aric J.
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 09/08/2010
Activity Closed Date: 09/08/2010 Activity Closed By: PORTER_AJ_1
Events:
Event Type: Activity has been finished Date: 09/08/2010
Comment: Finished
Comments:
Comment Date: 09/08/2010 User: PORTER_AJ_1
Description: TCI conducted 9/8/2010 at 10:30 am: The UST Systems appeared clean but not dry. The Premium and South-most Regular STP Sump had petroleum contaminated water (PCW) in them just below integral piping penetrations. All three primary and secondary Fillport spill containments have excessive PCW in them (see photo) - violation issued. All PCW should be removed from containments and disposed of properly. The Placard, Financial Responsibility, Release Detection Response Level, System Tests and Monthly Electronic and Visual Inspections are up-to-date and available for this inspection. Monthly Electronic Inspections show two USTs have "High Liquid Alarms" for their interstices - violation issued. This violation must be evaluated and corrected within 10 days. Release Detection is electrical liquid detectors in each tank interstice, and single-float liquid detectors in each STP Sump (each section of the integral Ameron Piping (EQ-378) interstices is open into its STP Sump and APT Dispenser Sump (EQ-612). The system isl monitored by a Gilbarco EMC Automatic Tank Gauge (EQ-130). Each pump carries a Mechanical Line Leak Detector: three Red Jacket FX-1 series (EQ-373.)
09/08/2010 Violation Closed Porter, Aric J.
Significance: Minor Status: Closed
Criteria ID: 1010
Rule: 62-761.450(2)(a)1., 62-761.450(2)(a)2., 62-761.450(2)(a)3., 62-761.450(2)(a)4., 62-761.450(2)(a)5., 62-761.450(2)(a)6., 62-761.450(2)(a)7.
Comments: Multiple incidents occurring at the same time at the facility may be reported on one form. #1-3 - Evidence of these types of INF situations are generally found during the inspector's paperwork review. Ask the facility representative what action they took in response, and in what time frame. If the situations are resolved within 24 hours, the owner/operator is not required to submit an INF to the local program. However, the actions they took to resolve the issue must be documented. #4-5, and 7 - Evidence of these types of situations are generally found during the outside or physical portion of the inspection. Give the facility owner/operator 24 hours to resolve, provided they document their actions. If they can not resolve the issues then they must submit the INF, at which time the two week investigative window opens. #6 - Evidence of this type of situation may be found during the physical examination of the release detection device (e.g. alarm mode), or during the examination of the records associated with the method. Note: Inspectors may find events that qualify as incidents during their review of the facility's paperwork. Such issues must have been resolved within 24 hours if an INF was not submitted at the time of the event.
09/08/2010 Violation Closed Porter, Aric J.
Significance: Minor Status: Closed
Criteria ID: 1115
Rule: 62-761.700(1)(c)1.
Comments: Facility equipment shall be maintained to a degree to allow you access. Water in spill containment units, especially above the fill cap shall be removed. Water in any sumps and dispenser liners above the piping opening/penetration (invert) shall be removed. All regulated substance shall be removed from any of the specified system components. Regulated substances: sheen, free product, mixed product water. Petroleum contact water shall be disposed of in accordance with the Department Hazardous Waste Section's Ch. 62-740 F.A.C., "Petroleum Contact Water".
02/05/2010 Document Management Activity Porter, Aric J.
Activity Title: Incident Notification Form Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 02/05/2010
Comment: Finished
Comments:
Comment Date: 02/05/2010 User: PORTER_AJ_1
Description: Following ATG alarm, Superior Petroleum Services, Inc. (SPS) initiated an investigation. Apparently during recent piping/dispenser upgrade activities, the backho bumped and cracked the secondary tank of the regular unleaded UST. The ATG, working properly, identified the intersticial breech and sounded an alarm. SPS cut the concrete and exposed the area near the STP Sump and the cracks in the secondary tank were identified. Fiberglass mesh patching was used to seal and restore the integrity of the secondary tank (see photos). Stewart, with SPS, was onsite and monitoring the intersticial brine that has been holding its' level for nearly three hours. Following monitoring the remainder of the day, the sensor will be reinstalled and the ATG/intersticial alarm checked prior to backfilling and concrete replacement. The primary UST's integrity was not compromised and no evidence of a discharge was found - a DRF is not required at this time.
Attachments:
Attachment Date: 02/05/2010 User: PORTER_AJ_1
Description: INF
View Attachment
02/05/2010 Incident Activity Porter, Aric J.
Activity Result: Has not led to Discharge Activity Status: Closed
Activity Closed Date: 02/23/2010
Events:
Event Type: Activity has been finished Date: 02/23/2010
Comment: Finished
Comments:
Comment Date: 02/10/2010 User: PORTER_AJ_1
Description: Following completion of the UST repair, a site visit was conducted 02-09-2010 to check the Veeder Root System. No intersticial alarms were shown which provides evidence the UST's repair was successfully completed. Furthermore, this incident has not resulted in a discharge and does not require further assessment.
01/05/2010 Site Inspection Activity Closed Porter, Aric J.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 01/05/2010
Activity Closed Date: 01/14/2010 Activity Closed By: PORTER_AJ_1
Events:
Event Type: Activity has been finished Date: 01/14/2010
Comment: Finished
Comments:
Comment Date: 01/05/2010 User: PORTER_AJ_1
Description: TIN conducted 1-4-10 10:00 am: This inspection was made to check the Ameron Primary Piping (EQ#378). Both Premium and Regular piping held 50.0 psi pressure during the inspection. All junctions, fittings and connections were soap tested and no leaks were found. SPS will continue working on the Secondary Piping, new dispenser sumps, and old STP sumps. The Secondary Piping and all Sumps should be ready for pressure test/hydro test tomorrow.
Comments:
Comment Date: 01/05/2010 User: PORTER_AJ_1
Description: TIN conducted 1-5-10 12:00am: This inspection made to check the secondary piping preesure test/soap test. Both the Regular and Premium piping held 4.5 psi pressure during this inspection. No leaks were found while all connections/junctions were soap tested. Both new dispenser sumps and tank sumps were hydro-tested and appeared water tight. An electriacian must wire the UST Sumps and Dispenser Sumps prior to filling, compaction and concrete.Work on the new dispenser canopy was ongoing during this inspection. A final inspection of the new dispensers/sheer valves and finished tank sumps must be conducted prior to finalling this installation.
Comments:
Comment Date: 01/08/2010 User: PORTER_AJ_1
Description: TIN conducted 1-8-2010 1:00pm: The dispensers have been positioned/bolted down. Both dispenser sump sheer valves have been bolted tight to the dispenser brackets and the brackets have been installed correctly on the sumps. 3" to 2" Piping Boots have been loosened and pushed off of the 3" piping in dispenser and UST sumps (see photos). UST sumps appear correctly configured for the upgrade. I informed SPS that following a passing Precision Line Test, this facility will be allowed to reopen.
01/05/2010 Site Inspection Activity Closed Porter, Aric J.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 01/05/2010
Activity Closed Date: 01/14/2010 Activity Closed By: PORTER_AJ_1
Events:
Event Type: Activity has been finished Date: 01/14/2010
Comment: Finished
Comments:
Comment Date: 01/05/2010 User: PORTER_AJ_1
Description: TIN conducted 1-4-10 10:00 am: This inspection was made to check the Ameron Primary Piping (EQ#378). Both Premium and Regular piping held 50.0 psi pressure during the inspection. All junctions, fittings and connections were soap tested and no leaks were found. SPS will continue working on the Secondary Piping, new dispenser sumps, and old STP sumps. The Secondary Piping and all Sumps should be ready for pressure test/hydro test tomorrow.
Comments:
Comment Date: 01/05/2010 User: PORTER_AJ_1
Description: TIN conducted 1-5-10 12:00am: This inspection made to check the secondary piping preesure test/soap test. Both the Regular and Premium piping held 4.5 psi pressure during this inspection. No leaks were found while all connections/junctions were soap tested. Both new dispenser sumps and tank sumps were hydro-tested and appeared water tight. An electriacian must wire the UST Sumps and Dispenser Sumps prior to filling, compaction and concrete.Work on the new dispenser canopy was ongoing during this inspection. A final inspection of the new dispensers/sheer valves and finished tank sumps must be conducted prior to finalling this installation.
Comments:
Comment Date: 01/08/2010 User: PORTER_AJ_1
Description: TIN conducted 1-8-2010 1:00pm: The dispensers have been positioned/bolted down. Both dispenser sump sheer valves have been bolted tight to the dispenser brackets and the brackets have been installed correctly on the sumps. 3" to 2" Piping Boots have been loosened and pushed off of the 3" piping in dispenser and UST sumps (see photos). UST sumps appear correctly configured for the upgrade. I informed SPS that following a passing Precision Line Test, this facility will be allowed to reopen.
01/05/2010 Site Inspection Activity Closed Porter, Aric J.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 01/05/2010
Activity Closed Date: 01/14/2010 Activity Closed By: PORTER_AJ_1
Events:
Event Type: Activity has been finished Date: 01/14/2010
Comment: Finished
Comments:
Comment Date: 01/05/2010 User: PORTER_AJ_1
Description: TIN conducted 1-4-10 10:00 am: This inspection was made to check the Ameron Primary Piping (EQ#378). Both Premium and Regular piping held 50.0 psi pressure during the inspection. All junctions, fittings and connections were soap tested and no leaks were found. SPS will continue working on the Secondary Piping, new dispenser sumps, and old STP sumps. The Secondary Piping and all Sumps should be ready for pressure test/hydro test tomorrow.
Comments:
Comment Date: 01/05/2010 User: PORTER_AJ_1
Description: TIN conducted 1-5-10 12:00am: This inspection made to check the secondary piping preesure test/soap test. Both the Regular and Premium piping held 4.5 psi pressure during this inspection. No leaks were found while all connections/junctions were soap tested. Both new dispenser sumps and tank sumps were hydro-tested and appeared water tight. An electriacian must wire the UST Sumps and Dispenser Sumps prior to filling, compaction and concrete.Work on the new dispenser canopy was ongoing during this inspection. A final inspection of the new dispensers/sheer valves and finished tank sumps must be conducted prior to finalling this installation.
Comments:
Comment Date: 01/08/2010 User: PORTER_AJ_1
Description: TIN conducted 1-8-2010 1:00pm: The dispensers have been positioned/bolted down. Both dispenser sump sheer valves have been bolted tight to the dispenser brackets and the brackets have been installed correctly on the sumps. 3" to 2" Piping Boots have been loosened and pushed off of the 3" piping in dispenser and UST sumps (see photos). UST sumps appear correctly configured for the upgrade. I informed SPS that following a passing Precision Line Test, this facility will be allowed to reopen.
09/23/2009 Editable Letter Activity Porter, Aric J.
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Comments:
Comment Date: 09/23/2009 User: PORTER_AJ_1
Description: Non-Compliance Letter dated September 22, 2009
09/17/2009 Violation Closed Porter, Aric J.
Significance: Minor Status: Closed
Criteria ID: 1123
Rule: 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d), 62-761.710(2)(e), 62-761.710(2)(f), 62-761.710(2)(g), 62-761.710(2)(h)
Comments: If the problem involves failure to perform according to the standards in each of the following areas, then note these items in addition to the paperwork for this rule: a. and g. Inventory - rules 62-761.640(3)(b)1-2, 62-761.640(3)(c) & 62-761.700(1)(c)5 b. Repair, operation, and maintenance - rules 62-761.700(1)(a)1, 62-761.700(1)(a)5, 62-761.700(1)(a)6 & 62-761.700(1)(c)3 c. Release detection - rules 62-761.600(1)(e), 62-761.610(3)(b), 62-761.640(2)(c)4, 62-761.640(2)(e), 62-761.640(3)(d), 62-761.640(3)(e)1-5 & 62-761.640(3)(e)9 d. Release detection response level descriptions - rules 62-761.600(1)(b) & 62-761.640(1)(c) e. Tightness, pressure, and breach of integrity tests - rules 62-761.610(3)(a)1, 62-761.640(1)(a) & 62-761.640(4)(a) f. Financial responsibility - rule 62-761.400(3) g. Repairs and replacements - rule 62-761.700(1)(a)6 The following are not this rule's issues: Rules 62-761.450(1)(a)1, 62-761.450(1)(a)2, 62-761.450(1)(a)3 & 62-761.450(1)(a)4 are verbal notices of activities that may also be written Rule 62-761.450(1)(b) is a registration issue Rules 62-761.450(2), 62-761.450(3)(a) & 62-761.450(3)(b) are INF/DRF reporting issues Rules 62-761.600(1)(a)3 & 62-761.600(1)(f) are covered by rule 62-761.710(3) Anything with cathodic protection is covered by rule 62-761.710(3)
09/17/2009 Emergency Preparedness Information Activity Porter, Aric J.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 09/17/2009
Comments:
Comment Date: 09/17/2009 User: PORTER_AJ_1
Description: This facility has four fueling stations.
09/17/2009 Site Inspection Activity Closed Porter, Aric J.
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 09/17/2009
Activity Closed Date: 09/17/2009 Activity Closed By: PORTER_AJ_1
Comments:
Comment Date: 09/17/2009 User: PORTER_AJ_1
Description: TCI conducted 9-17-09 - Dispenser sumps appeared dry and in good condition. Tank sumps were mostly dry - regular tank sump had approx. 1.5" of PCW (petroleum contaminated water), with sheen, at base of pipe entry. All fillport spill buckets contained excessive amounts of stormwater and secondary containment half-filled. Yellow 55 gallon drum onsite for PCW removal - all PCW should be removed from the system ASAP. Release Detection is electrical liquid detectors in each tank interstice, and single-float liquid detectors in each STP Sump (each section of the integral piping interstices is open into its STP Sump,) all monitored by a Gilbarco EMC Automatic Tank Gauge (EQ-130.) Each pump carries a Mechanical Line Leak Detector: three Red Jacket FX-1 series (EQ-373.) This facility is Upgrade Compliant.
09/17/2009 Violation Closed Porter, Aric J.
Significance: SNC-B Status: Closed
Criteria ID: 1062
Rule: 62-761.600(1)(d)
Comments: Mark this as out of compliance if any release detection method has not been monitored as required. Look for evidence that the release detection system is not being properly monitored. Examples include: blocked access to monitoring wells; ATG in alarm; ATG panel hidden from view; ATG tape spool empty; buried or submerged sampling ports; corroded locks; or no dispenser keys. Be aware that manual tank gauging requires weekly sampling. Electronic line leak detectors may be wired into an ATG with a memory of test cycles. Facilities with static/periodic ATG systems are required to provide one passing test per product per month. This method has a minimum fuel capacity requirement. Facilities with continuous electronic leak detection ATG systems (e.g., Veeder-Root CSLD) are required to provide one passing test per product per month, although the system must be in daily operation with monthly summary logs. This method has no minimum fuel requirement. If there is a record keeping problem, see rule 62-761.710(2).
05/08/2009 Editable Letter Activity Stevenson, John
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Comments:
Comment Date: 05/08/2009 User: STEVENSON_JS
Description: Notified by e-mail copy of delivery of current placard to store: Resolved 05/06/09. -JSS
05/06/2009 Attachment Stevenson, John
05/05/2009 Violation Closed Stevenson, John
Significance: Minor Status: Closed
Criteria ID: 1003
Rule: 62-761.400(2)(f)
Comments: All federal facilities with USTs will have a placard. Per FS 376.3077, "It is unlawful for any owner, operator, or supplier to pump or otherwise deposit any motor fuel into a tank required to be registered under section 376.303 FS, unless proof of valid registration is displayed on such tank itself or the dispensing or measuring device connected thereto or, where appropriate, in the office or kiosk of the facility where the tank is located." Penalties can be assessed to the facility owner for failure to properly register tank systems. Note that penalties can be assessed to the supplier that delivers motor fuel to an unregistered facility. Check the details on the placard. Do they agree with the location you are inspecting? Owners of multiple facilities may switch placards by mistake. Placards are not always issued or received in a timely manner at the change of year period (June and July). Provide the DEP Tallahassee phone number to the facility so they may resolve problems (850) 245-8850; (850) 245-8840. Check STCM in the registration/placard section for the date that the payment was made and the date that the placard was issued. The location of the placard in plain view can be subjective in interpretation: a. For vehicular fuel facilities, plain view is meant to allow the transport delivery driver to view the placard prior to delivering fuel. b. A legal definition is an exception to the general requirement of a valid search warrant to legitimize a search or seizure; a search implies prying into hidden places, and it is not a search to observe what is open to view.
05/05/2009 Site Inspection Activity Closed Stevenson, John
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 05/05/2009
Activity Closed Date: 05/05/2009 Activity Closed By: STEVENSON_JS
Comments:
Comment Date: 05/05/2009 User: STEVENSON_JS
Description: Inspection 05/05/2009. No physical problems found at facility except the red alarm light on Gilbarco EMC ATG is not working and should be replaced. The audible alarm functions OK. Records generally good, but no current placard found on site. This facility is upgrade compliant. -JSS Release Detection is electrical liquid detectors in each tank interstice, and single-float liquid detectors in each STP Sump (each section of the integral piping interstices is open into its STP Sump,) all monitored by a Gilbarco EMC Automatic Tank Gauge (EQ-130.) Each pump carries a Mechanical Line Leak Detector: three Red Jacket FX-1 series (EQ-373.)
10/06/2008 Record Document Activity Stevenson, John
Activity Status: Closed
Contact Name: Fran Franconi Activity Closed Date: 10/07/2008
03/04/2008 Site Inspection Activity Closed Stevenson, John
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 03/04/2008
Activity Closed Date: 03/04/2008 Activity Closed By: STEVENSON_JS
Comments:
Comment Date: 03/04/2008 User: STEVENSON_JS
Description: Inspection 03/04/2008. Containments clean and mostly dry. No violations found this inspection. -JSS Release Detection is electrical liquid detectors in each tank interstice, and single-float liquid detectors in each STP Sump (each section of the integral piping interstices is open into its STP Sump,) all monitored by a Gilbarco EMC Automatic Tank Gauge (EQ-130.) Each pump carries a Mechanical Line Leak Detector: two Red Jacket FX-1 series (EQ-373,) and one VMI LD-2000 (EQ-360.) NOTE No changes to Emergency Preparedness data (phone # or number of fueling positions.)
02/21/2008 Record Document Activity Stevenson, John
Activity Status: Closed
Contact Name: Fran Franconi Activity Closed Date: 02/21/2008
Comments:
Comment Date: 02/21/2008 User: STEVENSON_JS
Description: Products listed on p. 2 in error: Only in regular U/L sump in this INF. -JSS
Comments:
Comment Date: 04/11/2008 User: STEVENSON_JS
Description: Faxed memo from Circle K confirms no release. See attached. -JSS
02/21/2008 Record Document Activity Stevenson, John
Activity Status: Closed
Contact Name: Fran Franconi Activity Closed Date: 02/21/2008
Comments:
Comment Date: 02/21/2008 User: STEVENSON_JS
Description: Products listed on p. 2 in error: Only in regular U/L sump in this INF. -JSS
Comments:
Comment Date: 04/11/2008 User: STEVENSON_JS
Description: Faxed memo from Circle K confirms no release. See attached. -JSS
10/15/2007 Record Document Activity Stevenson, John
Activity Status: Closed
Contact Name: Fran Franconi Activity Closed Date: 10/15/2007
Comments:
Comment Date: 10/15/2007 User: STEVENSON_JS
Description: No further action required for INF. See attached. Open violation has been corrected but a reinspection cannot be made in a new contract year. It will be inspected at the upcoming annual inspection. -JSS
06/29/2007 Attachment Stevenson, John
03/26/2007 Editable Letter Activity Stevenson, John
Activity Title: District Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 05/17/2007
Comment: Sent on Thu May 17 00:00:00 EST 2007
Attachments:
Attachment Date: 05/17/2007 User: STEVENSON_JS
Description: NCL Report
View Attachment
03/06/2007 Attachment Stevenson, John
03/06/2007 Violation Closed Stevenson, John
Significance: Minor Status: Closed
Criteria ID: 1104
Rule: 62-761.640(4)(a)5.
Comments: Have the 10 gph leak detection rate proven. The sensor needs to be placed at a height so that it would detect a loss of 10 gallons or less of product, within one hour, and shut off the pump. Installation inspection - document demonstration of capability.
03/06/2007 Attachment Stevenson, John
02/06/2007 Emergency Preparedness Information Activity Tissington, Arthur B.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 02/06/2007
12/26/2006 Site Inspection Activity Closed Stevenson, John
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 12/26/2006
Activity Closed Date: 03/06/2007 Activity Closed By: STEVENSON_JS
09/19/2006 Emergency Preparedness Information Activity Hale, Joseph S.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 09/19/2006
09/18/2006 Emergency Preparedness Information Activity Hale, Joseph S.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 02/06/2007
01/03/2006 Legacy Activity Pierce, Linda L.
Activity Name: RESPONSE RECEIVED BY DEPARTMENT Activity Status: Closed
10/26/2005 Violation Closed Pierce, Linda L.
Significance: Minor Status: Closed
Rule: 761.640(2)(e)
Comments:
Comment Date: 06/25/2008 User: FRASIER_RD_1
Description: Tank - Tramont U Liftbase - EQ662
10/26/2005 Legacy Activity Pierce, Linda L.
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
02/23/2005 Legacy Activity Pierce, Linda L.
Activity Name: RESPONSE RECEIVED BY DEPARTMENT Activity Status: Closed
02/01/2005 Violation Closed Pierce, Linda L.
Significance: Minor Status: Closed
Rule: 761.700(1)(c)3
02/01/2005 Legacy Activity Pierce, Linda L.
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
11/24/2004 Legacy Activity Pierce, Linda L.
Activity Name: TANK COMPLIANCE RE-INSPECTION Activity Status: Closed
04/30/2004 Violation Closed Pierce, Linda L.
Significance: Minor Status: Closed
Rule: 450(1)(a)3
Comments:
Comment Date: 09/30/2009 User: CASSELS_CR_1
Description: SW painted steel tank in sealed concrete secondary containment. All aboveground small diameter copper suction supply and return lines exit containment and have isolation and anti-siphon valves on supply line at point of exit from tank.
04/30/2004 Legacy Activity Pierce, Linda L.
Activity Name: TANK INSTALLATION - FINAL INSPECTION Activity Status: Closed
Completion Notes: REPLACED SPILL BUCKET.
04/30/2004 Violation Closed Pierce, Linda L.
Significance: Minor Status: Closed
Rule: 450(2)(a)
Comments:
Comment Date: 02/14/2008 User: KHAN_MR_1
Description: dw tanks ALABAMA TANK COMPANY EQ=277 STIPIII TANKS sacrificial anode cathodic protection overfill protection=ball floats release detection atg TLS 350 EQ=197, 5 total dispenser piping= dw FIBERGLASS=COULDNT FIND THE BRAND IN FILE HAVE SENSORS INSUMPS sumps = Total Containment Sumps EQ=295 All records kept well.
10/02/2003 Legacy Activity Pierce, Linda L.
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
01/14/2003 Legacy Activity Pierce, Linda L.
Activity Name: RESPONSE RECEIVED BY DEPARTMENT Activity Status: Closed
12/18/2002 Violation Closed Pierce, Linda L.
Significance: SNC-B Status: Closed
Rule: 400(3)
12/18/2002 Legacy Activity Pierce, Linda L.
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
12/18/2002 Violation Closed Pierce, Linda L.
Significance: SNC-B Status: Closed
Rule: 610(1)(a)
11/20/2002 Legacy Activity Pierce, Linda L.
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
01/24/2002 Legacy Activity Pierce, Linda L.
Activity Name: RESPONSE RECEIVED BY DEPARTMENT Activity Status: Closed
11/28/2001 Legacy Activity Pierce, Linda L.
Activity Name: RESPONSE RECEIVED BY DEPARTMENT Activity Status: Closed
11/15/2001 Violation Closed Pierce, Linda L.
Significance: Minor Status: Closed
Rule: 500(4)(c)1
Comments:
Comment Date: 05/10/2011 User: RUNTE_C_3
Description: EQ# 668
11/15/2001 Legacy Activity Pierce, Linda L.
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
11/15/2001 Violation Closed Pierce, Linda L.
Significance: Minor Status: Closed
Rule: 710(1)
11/15/2001 Violation Closed Pierce, Linda L.
Significance: Minor Status: Closed
Rule: 700(1)(c)3
11/15/2001 Violation Closed Pierce, Linda L.
Significance: SNC-B Status: Closed
Rule: 600(1)(d)
11/15/2001 Violation Closed Pierce, Linda L.
Significance: Minor Status: Closed
Rule: 600(1)(a)1
Comments:
Comment Date: 05/10/2011 User: RUNTE_C_3
Description: EQ# 668
12/13/2000 Legacy Activity Pierce, Linda L.
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
03/13/2000 Legacy Activity Pierce, Linda L.
Activity Name: RESPONSE RECEIVED BY DEPARTMENT Activity Status: Closed
01/04/2000 Violation Closed Pierce, Linda L.
Significance: Minor Status: Closed
Rule: 640(3)(c)2
01/04/2000 Legacy Activity Pierce, Linda L.
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
12/08/1998 Violation Closed Unknown, User
Significance: Minor Status: Closed
Rule: 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762
Comments:
Comment Date: 07/15/2017 User: BRAZILE_DO_1
Description: 7/13/2017 Jerry Parrell - outgoing phone call 850-233-1973 - jerry.parnell@faa.gov David Brazile Request setting up a storage tank compliance inspection. Please have available the following records: Monthly visuals records, operability test data.
Comments:
Comment Date: 04/16/2015 User: BRAZILE_DO_1
Description: 2015/04/16 - TCI - Tank #1- ENVIROVAULT- 2000 gallon Double Wall, Aboveground Storage Tank ( EQ-002) RELEASE DETECTION =TANK IS EQUIPPED WITH PHOENIX PRODUCT MIDGIT CONSOLE ATG. and has one sensor in Tank interstice, also they have two sensor in supply and Return Line Sumps. PIPING = FIBERGLASS/STEEL overfill Protection = CLock gauge in the square spill box above the tank. TRANSITION SUMP= STAINLESS STEEL. There are shut off valves on both the supply and return product lines.
Comments:
Comment Date: 03/29/2007 User: KHAN_MR_1
Description: TANK = ENVIROVAULT. 2000 gallon DW AST RELEASE DETECTION =TANK IS EQUIPPED WITH PHOENIX PRODUCTS¿ MIDGIT CONSOLE ATG. and has one sensor in Tank interstice, also they have two sensor in supply and Return Line Sumps. All 3 sensors were un-installed by mike Campbell and were Tilted upside down, As a result of this action, on Midget console audible alarm and light turned red for interstitial sensor and only light turn on for each individual tenser in supply and return lines PIPING = FIBERGLASS/STEEL overfill Protection = CLock gauge in square spill box above the tank. TRANSITION SUMP= STAINLESS STEEL. Located in The generator form next to generator above The ground, aero have shut off valves on both supply and return lines.
12/08/1998 Legacy Activity Pierce, Linda L.
Activity Name: UST ROUTINE COMPLIANCE INSPECTION Activity Status: Closed
12/08/1998 Violation Closed Unknown, User
Significance: Minor Status: Closed
Rule: 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762
Comments:
Comment Date: 07/15/2017 User: BRAZILE_DO_1
Description: 7/13/2017 Jerry Parrell - outgoing phone call 850-233-1973 - jerry.parnell@faa.gov David Brazile Request setting up a storage tank compliance inspection. Please have available the following records: Monthly visuals records, operability test data.
Comments:
Comment Date: 04/16/2015 User: BRAZILE_DO_1
Description: 2015/04/16 - TCI - Tank #1- ENVIROVAULT- 2000 gallon Double Wall, Aboveground Storage Tank ( EQ-002) RELEASE DETECTION =TANK IS EQUIPPED WITH PHOENIX PRODUCT MIDGIT CONSOLE ATG. and has one sensor in Tank interstice, also they have two sensor in supply and Return Line Sumps. PIPING = FIBERGLASS/STEEL overfill Protection = CLock gauge in the square spill box above the tank. TRANSITION SUMP= STAINLESS STEEL. There are shut off valves on both the supply and return product lines.
Comments:
Comment Date: 03/29/2007 User: KHAN_MR_1
Description: TANK = ENVIROVAULT. 2000 gallon DW AST RELEASE DETECTION =TANK IS EQUIPPED WITH PHOENIX PRODUCTS¿ MIDGIT CONSOLE ATG. and has one sensor in Tank interstice, also they have two sensor in supply and Return Line Sumps. All 3 sensors were un-installed by mike Campbell and were Tilted upside down, As a result of this action, on Midget console audible alarm and light turned red for interstitial sensor and only light turn on for each individual tenser in supply and return lines PIPING = FIBERGLASS/STEEL overfill Protection = CLock gauge in square spill box above the tank. TRANSITION SUMP= STAINLESS STEEL. Located in The generator form next to generator above The ground, aero have shut off valves on both supply and return lines.
12/08/1998 Violation Closed Unknown, User
Significance: Minor Status: Closed
Rule: 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762
Comments:
Comment Date: 07/15/2017 User: BRAZILE_DO_1
Description: 7/13/2017 Jerry Parrell - outgoing phone call 850-233-1973 - jerry.parnell@faa.gov David Brazile Request setting up a storage tank compliance inspection. Please have available the following records: Monthly visuals records, operability test data.
Comments:
Comment Date: 04/16/2015 User: BRAZILE_DO_1
Description: 2015/04/16 - TCI - Tank #1- ENVIROVAULT- 2000 gallon Double Wall, Aboveground Storage Tank ( EQ-002) RELEASE DETECTION =TANK IS EQUIPPED WITH PHOENIX PRODUCT MIDGIT CONSOLE ATG. and has one sensor in Tank interstice, also they have two sensor in supply and Return Line Sumps. PIPING = FIBERGLASS/STEEL overfill Protection = CLock gauge in the square spill box above the tank. TRANSITION SUMP= STAINLESS STEEL. There are shut off valves on both the supply and return product lines.
Comments:
Comment Date: 03/29/2007 User: KHAN_MR_1
Description: TANK = ENVIROVAULT. 2000 gallon DW AST RELEASE DETECTION =TANK IS EQUIPPED WITH PHOENIX PRODUCTS¿ MIDGIT CONSOLE ATG. and has one sensor in Tank interstice, also they have two sensor in supply and Return Line Sumps. All 3 sensors were un-installed by mike Campbell and were Tilted upside down, As a result of this action, on Midget console audible alarm and light turned red for interstitial sensor and only light turn on for each individual tenser in supply and return lines PIPING = FIBERGLASS/STEEL overfill Protection = CLock gauge in square spill box above the tank. TRANSITION SUMP= STAINLESS STEEL. Located in The generator form next to generator above The ground, aero have shut off valves on both supply and return lines.
05/22/1995 Comment MIGRATION
Description: CLEANUP: REC'D IRA REPORT 4/12/95; APPR'D 5/18/95