DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Journal Report
Report Run Date: 04/30/2025        Last Data Refresh: 04/29/2025        Report Generated from DOPPLER
 
Facility ID: 8511137
Facility Name: THE BEST BY RASEL #7863
 
02/28/2025 Site Inspection Activity Closed Ramsey, Timothy H
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 02/28/2025
Activity Closed Date: 02/28/2025 Activity Closed By: RAMSEY_TH_1
Events:
Event Type: Activity has been finished Date: 02/28/2025
Comment: Finished
Comments:
Comment Date: 02/28/2025 User: RAMSEY_TH_1
Description: Routine Compliance Inspection >Unable to reach facility contact by phone or email, performed un-assisted inspection. No changes since lat Routine Inspection on 12/2/2022. > Facility has already been referred for Enforcement > Facility is vacant and boarded up. Tanks appear to be empty > Inspection of 2 Double Wall underground tanks. > Release detection methods for the facility's UST systems are: electronic monitoring for the interstice of the double-wall USTs and STP sumps, and visual inspections of STP & dispenser sumps, and double-wall spill buckets. > Registration fees not paid for 2021-2023. Please pay current registration fees > Financial responsibility records are not available expired 1/20/2022. Please provide copy of current Financial Responsibility documents > Entry boots in STP and Dispenser sumps need to be replaced and all sumps hydro tested before store can start selling fuel again > Double wall spill buckets will also need to be vacuum tested and all release detection devices tested before re-opening store, > A copy of the inspection report and Compliance Assistance Offer Letter were mailed to Golam Rabbani, Shopna Inc., 24280 NE Hwy 315, Fort McCoy, FL 32134
02/28/2025 Editable Letter Activity Ramsey, Timothy H
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 02/28/2025
Comment: Finished
Attachments:
Attachment Date: 02/28/2025 User: RAMSEY_TH_1
Description: Compliance Assistance Offer Letter
View Attachment
02/17/2025 Phone Conversation Activity Ramsey, Timothy H
Call Type: Outgoing Activity Status: Closed
Call Recipient: Golan Rabbani
Phone Number: (352) 228-7877 Activity Closed Date: 02/17/2025
Subject: Called facility representative by phone to schedule Routine Compliance Inspection, and discussed the following items: Results of past 2 Routine Inspections; New Rule requirements; have records from past 36 months available for review; mentioned Inspection prep Videos; requirement to have representative present to provide access to storage tank system components
Events:
Event Type: Activity has been finished Date: 02/17/2025
Comment: Finished
03/29/2023 Electronic Communication Activity Horvath, Kage
Activity Closed Date: 03/29/2023 Activity Status: Closed
Date: 03/29/2023
Recipient: MOHAMMED@THEBESTBYRASEL.COM; RASEL@THEBESTBYRASEL.COM
Sender: Kage.Horvath@floridadep.gov
Subject: OUTSTANDING VIOLATIONS – THE BEST BY RASEL #7863 – FACILITY ID #8511137
Message: Good morning, Your facility has been referred to The Department for Enforcement. At this time, there are several outstanding violations for this facility. The violations are listed below: No financial responsibility instrument or expired instrument for > 180 days. 62-761.420(2). - Please provide a copy of your most recent Financial Responsibility (FR) records. o Proof of FR must consist of the following items: o The insurance policy. o Part D or part C, Certificate of Insurance (this will come from the insurance company). o Part P, Certification of Financial Responsibility (this is a State Form). o A template of Part P can be found here, https://floridadep.gov/sites/default/files/62-761_900%283%29PartP-2020-02.pdf Registration fees not paid since 2021. 62-761.400(4). - Please pay current registration fees and provide documentation once complete. No Access or assistance provided for Inspection. 62-761.100(3). - Please get in touch with me to coordinate a time to inspect the facility. In lieu of formal enforcement, The Department would like to provide you until March 28, 2023 to obtain all of the information above and provide that information to the Department for review. Please provide all information to Kage.Horvath@FloridaDEP.gov. If you have any questions or concerns, please do not hesitate to contact me for assistance. Thank you, Kage Horvath Environmental Specialist I Florida Department of Environmental Protection Central District - Orlando Kage.Horvath@FloridaDEP.gov Office: 407-897-4334
Events:
Event Type: Activity has been finished Date: 03/29/2023
Comment: Finished
03/29/2023 Electronic Communication Activity Horvath, Kage
Activity Closed Date: 03/29/2023 Activity Status: Closed
Date: 03/29/2023
Recipient: Horvath, Kage
Sender: Mail Delivery Subsystem
Subject: Undeliverable: Delivery Status Notification (Failure)
Message: NEITHER EMAIL WAS VALID. MESSAGE NOT DELIVERED.
Events:
Event Type: Activity has been finished Date: 03/29/2023
Comment: Finished
12/21/2022 Enforcement Tracking Activity Useche, Viviana
Activity Status: Open
12/02/2022 Violation Open Ramsey, Timothy H
Significance: SNC-A Status: Open
Criteria ID: 6012
Rule: 62-761.420(2)
12/02/2022 Editable Letter Activity Ramsey, Timothy H
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 12/02/2022
Comment: Finished
Events:
Event Type: Document has been sent Date: 12/02/2022
Comment: Sent
Attachments:
Attachment Date: 12/02/2022 User: RAMSEY_TH_1
Description: Compliance Assistance Offer Letter
View Attachment
12/02/2022 Enforcement Referral Activity Ramsey, Timothy H
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 12/21/2022
Events:
Event Type: Activity/Document was acknowledged on this date Date: 12/21/2022
Comment: Acknowledged and Assigned by Viviana Useche
Events:
Event Type: Activity/Document was accepted on this date Date: 12/21/2022
Comment: Accepted by Viviana Useche: Accepted
Events:
Event Type: Activity has been finished Date: 12/21/2022
Comment: Finished
Events:
Event Type: Activity has been assigned Date: 12/21/2022
Comment: Assigned to Viviana Useche
Events:
Event Type: Activity has been submitted for approval Date: 12/02/2022
Comment: Submitted for approval by: Timothy H Ramsey: Facility Referred for Enforcement
Comments:
Comment Date: 12/02/2022 User: RAMSEY_TH_1
Description: Facility Referred for Enforcement
Comments:
Comment Date: 12/02/2022 User: RAMSEY_TH_1
Description: Facility Referred for Enforcement
12/02/2022 Enforcement Referral Activity Ramsey, Timothy H
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 12/21/2022
Events:
Event Type: Activity/Document was acknowledged on this date Date: 12/21/2022
Comment: Acknowledged and Assigned by Viviana Useche
Events:
Event Type: Activity/Document was accepted on this date Date: 12/21/2022
Comment: Accepted by Viviana Useche: Accepted
Events:
Event Type: Activity has been finished Date: 12/21/2022
Comment: Finished
Events:
Event Type: Activity has been assigned Date: 12/21/2022
Comment: Assigned to Viviana Useche
Events:
Event Type: Activity has been submitted for approval Date: 12/02/2022
Comment: Submitted for approval by: Timothy H Ramsey: Facility Referred for Enforcement
Comments:
Comment Date: 12/02/2022 User: RAMSEY_TH_1
Description: Facility Referred for Enforcement
Comments:
Comment Date: 12/02/2022 User: RAMSEY_TH_1
Description: Facility Referred for Enforcement
12/02/2022 Site Inspection Activity Closed Ramsey, Timothy H
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 12/02/2022
Activity Closed Date: 12/02/2022 Activity Closed By: RAMSEY_TH_1
Events:
Event Type: Activity has been finished Date: 12/02/2022
Comment: Finished
Comments:
Comment Date: 12/02/2022 User: RAMSEY_TH_1
Description: Routine Compliance Inspection >Unable to reach facility contact by phone or email, performed un-assisted inspection > Facility is vacant and boarded up. Tanks appear to be empty > Inspection of 2 Double Wall underground tanks. > Release detection methods for the facility's UST systems are: electronic monitoring for the interstice of the double-wall USTs and STP sumps, and visual inspections of STP & dispenser sumps, and double-wall spill buckets. > Registration fees not paid for 2021-2023. Please pay current registration fees > Financial responsibility records are not available expired 1/20/2022. Please provide copy of current Financial Responsibility documents > Entry boots in STP and Dispenser sumps need to be replaced and all sumps hydro tested before store can start selling fuel again > Double wall spill buckets will also need to be vacuum tested and all release detection devices tested before re-opening store, > A copy of the inspection report and Compliance Assistance Offer Letter were mailed to Golam Rabbani, Shopna Inc., 24280 NE Hwy 315, Fort McCoy, FL 32134
12/02/2022 Violation Open Ramsey, Timothy H
Significance: Minor Status: Open
Criteria ID: 6005
Rule: 62-761.400(4), 62-761.400(4)(a), 62-761.400(4)(b), 62-761.400(4)(c), 62-761.400(4)(d), 62-761.400(4)(e), 62-761.400(4)(f)
12/02/2022 Violation Open Ramsey, Timothy H
Significance: Minor Status: Open
Criteria ID: 6001
Rule: 62-761.100(3)
12/01/2022 Phone Conversation Activity Ramsey, Timothy H
Call Type: Outgoing Activity Status: Closed
Phone Number: (352) 228-7877 Activity Closed Date: 12/01/2022
Subject: Called facility representative by phone to schedule Routine Compliance Inspection, and discuss the following items: Results of past 2 Routine Inspections; New Rule requirements; have records from past 36 months available for review; mentioned Inspection prep Videos; requirement to have representative present to provide access to storage tank system components.
Events:
Event Type: Activity has been finished Date: 12/01/2022
Comment: Finished
01/22/2021 Site Inspection Activity Closed Ramsey, Timothy H
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 01/22/2021
Activity Closed Date: 01/22/2021 Activity Closed By: RAMSEY_TH_1
Events:
Event Type: Activity has been finished Date: 01/22/2021
Comment: Finished
Comments:
Comment Date: 01/22/2021 User: RAMSEY_TH_1
Description: Routine Compliance Inspection > Southeastern Petroleum Assisted with the tank inspection > Inspection of 2 Double Wall underground tanks. > Release detection methods for the facility's UST systems are: electronic monitoring for the interstice of the double-wall USTs and STP sumps, and visual inspections of STP & dispenser sumps, and double-wall spill buckets. > Current tank registration placard is displayed in store. > Financial responsibility records are satisfactory. > Monthly electronic and visual release detection and Annual Operability testing records were provided by SE Petroleum. > Facility is currently not selling fuel and only about 6 inched of product is in tanks. > Entry boots in STP and Dispenser sumps need to be replaced and all sumps hydro tested before store can start selling fuel again > Double wall spill buckets were hydro tested. > Overfill devices (Ball valves) were tested-passed. > UST vent risers and vent caps are satisfactory. > All fuel nozzles, fuel hoses, and break-away fittings are in good condition. > A copy of the inspection report and In Compliance Letter were emailed to Mohammed Meah (Mohammed@thebestbyrasel.com)
01/22/2021 Electronic Communication Activity Ramsey, Timothy H
Activity Closed Date: 01/22/2021 Activity Status: Closed
Date: 01/22/2021
Recipient: Mohammed Meah
Sender: Tim Ramsey
Subject: Copy of Inspection and In Compliance Letter
Message: Emailed Copy of Inspection and In Compliance Letter
Events:
Event Type: Activity has been finished Date: 01/22/2021
Comment: Finished
01/22/2021 Editable Letter Activity Ramsey, Timothy H
Activity Title: In Compliance Letter Activity Status: Closed
Description: IC 2020
Events:
Event Type: Activity has been finished Date: 01/22/2021
Comment: Finished
Events:
Event Type: Document has been sent Date: 01/22/2021
Comment: Sent
Attachments:
Attachment Date: 01/22/2021 User: RAMSEY_TH_1
Description: In Compliance Letter
View Attachment
12/29/2020 Electronic Communication Activity Ramsey, Timothy H
Activity Closed Date: 12/29/2020 Activity Status: Closed
Date: 12/29/2020
Recipient: Mohammed Meah
Sender: Tim Ramsey
Subject: Outreach email to schedule compliance inspection
Message: Sent Outreach email to schedule compliance inspection
Events:
Event Type: Activity has been finished Date: 12/29/2020
Comment: Finished
01/31/2019 Violation Closed Ramsey, Timothy H
Significance: Minor Status: Closed
Criteria ID: 4067
Rule: 62-761.600(4)
01/31/2019 Editable Letter Activity Ramsey, Timothy H
Activity Title: Return to Compliance Letter Activity Status: Closed
Description: 2019 Fuel Tank Release Detection OT
Events:
Event Type: Document has been sent Date: 01/31/2019
Comment: Sent
Events:
Event Type: Activity has been finished Date: 01/31/2019
Comment: Finished
Attachments:
Attachment Date: 01/31/2019 User: RAMSEY_TH_1
Description: Return to Compliance Letter
View Attachment
01/31/2019 Electronic Communication Activity Ramsey, Timothy H
Activity Closed Date: 01/31/2019 Activity Status: Closed
Date: 01/31/2019
Recipient: Pete Patel
Sender: Tim Ramsey
Subject: Copy of Inspection and Return to Compliance Letter
Message: Emailed Copy of Inspection and Return to Compliance Letter
Events:
Event Type: Activity has been finished Date: 01/31/2019
Comment: Finished
01/31/2019 Site Inspection Activity Closed Ramsey, Timothy H
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 01/31/2019
Activity Closed Date: 01/31/2019 Activity Closed By: RAMSEY_TH_1
Events:
Event Type: Activity has been finished Date: 01/31/2019
Comment: Finished
Comments:
Comment Date: 01/31/2019 User: RAMSEY_TH_1
Description: Routine Compliance Inspection > Inspection of 2 Double Wall underground tanks. > Release detection methods for the facility's UST systems are: electronic monitoring for the interstice of the double-wall USTs and STP sumps, and visual inspections of STP & dispenser sumps, and double-wall spill buckets. > 2018-2019 tank registration placard is displayed in store. > Financial responsibility records for the UST systems are satisfactory. > Monthly electronic and visual release detection and Annual Operability testing records for the UST system are not being recorded. Owner indicated that he thought monthly inspections were being conducted by SE Petroleum. > SE Petroleum has now started performing monthly visual inspections > Test records indicate annual operability tests for the MLLDs and ATG system were performed in January 2019. > STP and Dispenser sumps were hydro tested and all passed. Double wall spill buckets were hydro tested. > Overfill devices (Ball valves) were tested-passed. > All STP sumps, spill buckets, and dispenser sumps are satisfactory. > UST vent risers and vent caps are satisfactory. > All fuel nozzles, fuel hoses, and break-away fittings are in good condition. > Facility representative not available for signature > A copy of the inspection report and Return to Compliance Letter were emailed to Pete Patel (paresh4u1981@yahoo.com)
01/31/2019 Violation Closed Ramsey, Timothy H
Significance: SNC-B Status: Closed
Criteria ID: 4059
Rule: 62-761.600(1)(d), 62-761.600(1)(e)
01/31/2019 Violation Closed Ramsey, Timothy H
Significance: Minor Status: Closed
Criteria ID: 4076
Rule: 62-761.700(3), 62-761.700(3)(a), 62-761.700(3)(a)1., 62-761.700(3)(a)1.a., 62-761.700(3)(a)1.b., 62-761.700(3)(a)1.c., 62-761.700(3)(a)1.d., 62-761.700(3)(a)1.e., 62-761.700(3)(a)1.f., 62-761.700(3)(a)2.
01/17/2019 Comment Ramsey, Timothy H
Description: New owner contact: Pete Patel 352-361-4479, email: paresh4u1981@yahoo.com
11/28/2018 Electronic Communication Activity Ramsey, Timothy H
Activity Closed Date: 11/28/2018 Activity Status: Closed
Date: 11/28/2018
Recipient: Tim Norman
Sender: Tim Ramsey
Subject: Outreach email to schedule Compliance Inspection
Message: Sent Outreach email to schedule Compliance Inspection
Events:
Event Type: Activity has been finished Date: 11/28/2018
Comment: Finished
06/29/2018 Electronic Communication Activity Ramsey, Timothy H
Activity Closed Date: 06/29/2018 Activity Status: Closed
Date: 06/29/2018
Recipient: Ramon Inciong
Sender: Tim Ramsey
Subject: Email to schedule Routine Compliance Inspection
Message: Email to schedule Routine Compliance Inspection
Events:
Event Type: Activity has been finished Date: 06/29/2018
Comment: Finished
12/29/2017 Electronic Communication Activity Keim, Michael J
Activity Closed Date: 12/29/2017 Activity Status: Closed
Date: 12/29/2017
Recipient: Patel
Sender: M Keim
Subject: Outstanding violations satus
Message: see attachments
Events:
Event Type: Activity has been finished Date: 12/29/2017
Comment: Finished
12/29/2017 Enforcement Referral Activity Keim, Michael J
Activity Status: Withdrawn
Events:
Event Type: Activity has been withdrawn from submission by the requestor Date: 01/26/2018
Comment: Withdrawn by Michael J Keim: This referral was withdrawn at the districts request
Events:
Event Type: Activity has been submitted for approval Date: 12/29/2017
Comment: Submitted for approval by: Michael J Keim: -
Comments:
Comment Date: 12/29/2017 User: KEIM_MJ_1
Description: This facility may have new owners although it is still registered as a Circle K facility. Two e-mails were sent to the new owners.
Comments:
Comment Date: 12/29/2017 User: KEIM_MJ_1
Description: -
12/29/2017 Enforcement Referral Activity Keim, Michael J
Activity Status: Withdrawn
Events:
Event Type: Activity has been withdrawn from submission by the requestor Date: 01/26/2018
Comment: Withdrawn by Michael J Keim: This referral was withdrawn at the districts request
Events:
Event Type: Activity has been submitted for approval Date: 12/29/2017
Comment: Submitted for approval by: Michael J Keim: -
Comments:
Comment Date: 12/29/2017 User: KEIM_MJ_1
Description: This facility may have new owners although it is still registered as a Circle K facility. Two e-mails were sent to the new owners.
Comments:
Comment Date: 12/29/2017 User: KEIM_MJ_1
Description: -
12/01/2017 Electronic Communication Activity Ramsey, Timothy H
Activity Closed Date: 12/01/2017 Activity Status: Closed
Date: 12/01/2017
Recipient: Pete Patel
Sender: Tim Ramsey
Subject: Check on compliance status
Message: Sent email to facility owner to check on status of open citations
Events:
Event Type: Activity has been finished Date: 12/01/2017
Comment: Finished
Attachments:
Attachment Date: 12/01/2017 User: RAMSEY_TH_1
Description: Email
View Attachment
09/19/2016 Editable Letter Activity Keim, Michael J
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 09/19/2016
Comment: Finished
Attachments:
Attachment Date: 09/19/2016 User: KEIM_MJ_1
Description: NCL 8511137
View Attachment
09/19/2016 Phone Conversation Activity Keim, Michael J
Call Type: Outgoing Activity Status: Closed
Phone Number: 352-443-2545 Activity Closed Date: 09/19/2016
Subject: Spoke with Irv Lafferman regarding scheduling TCI's.
Events:
Event Type: Activity has been finished Date: 09/19/2016
Comment: Finished
09/12/2016 Violation Closed Keim, Michael J
Significance: Minor Status: Closed
Criteria ID: 1105
Rule: 62-761.700(1)(a)1.a., 62-761.700(1)(a)1.b., 62-761.700(1)(a)1.c., 62-761.700(1)(a)1.d.
Comments: Mark this as out of compliance if you observe a needed repair that hasn't been completed, and the potential for a release exists. Examples of components that would need repair include (but are not limited to) leaking dispensers, cracked spill containment, improperly anchored shear valves, or any compromised containment component. Upon the detection of one of the above conditions, has the facility initiated and completed repairs?
09/12/2016 Site Inspection Activity Closed Keim, Michael J
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 09/12/2016
Activity Closed Date: 09/19/2016 Activity Closed By: KEIM_MJ_1
Events:
Event Type: Activity has been finished Date: 09/19/2016
Comment: Finished
Comments:
Comment Date: 09/19/2016 User: KEIM_MJ_1
Description: Compliance inspection report sent via e-mail to Ramon Inciong, rinciong@circlek.com Compliance assist by Irv Lafferman
05/15/2015 Editable Letter Activity Owens, Joe S.
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 05/15/2015
Comment: Sent on Fri May 15 00:00:00 EDT 2015
Events:
Event Type: Activity has been finished Date: 05/15/2015
Comment: Finished
Attachments:
Attachment Date: 05/15/2015 User: OWENS_JS_1
Description: 1. 2015-05-15 - NCL from tank component inspection
View Attachment
05/12/2015 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 05/12/2015
Activity Closed Date: 05/15/2015 Activity Closed By: OWENS_JS_1
Events:
Event Type: Activity has been finished Date: 05/15/2015
Comment: Finished
Comments:
Comment Date: 05/15/2015 User: OWENS_JS_1
Description: Report emailed to Ramon Inciong, Pantry. Delivery receipt for the inspection report will be attached to FIRST upon return.
05/11/2015 Violation Closed Owens, Joe S.
Significance: Minor Status: Closed
Criteria ID: 1007
Rule: 62-761.450(1)(a)3.a., 62-761.450(1)(a)3.b.
Comments: A good working relationship with the PSSC contractors should minimize scheduling problems. Notice can be accepted in these formats: Verbal Written Fax Email
05/11/2015 Site Inspection Activity Closed Owens, Joe S.
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 05/11/2015
Activity Closed Date: 05/15/2015 Activity Closed By: OWENS_JS_1
Events:
Event Type: Activity has been finished Date: 05/15/2015
Comment: Finished
Comments:
Comment Date: 05/15/2015 User: OWENS_JS_1
Description: NCL & Inspection report emailed to Ramon Inciong - delivery receipt for report will be attached to FIRST upon return confirmation
01/09/2015 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 01/09/2015
Activity Closed Date: 01/30/2015 Activity Closed By: OWENS_JS_1
Events:
Event Type: Activity has been finished Date: 01/30/2015
Comment: Finished
Comments:
Comment Date: 01/30/2015 User: OWENS_JS_1
Description: Inspection emailed to Ramon Inciong - notification of delivery attached to Electronic file
05/05/2014 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 05/05/2014
Activity Closed Date: 05/05/2014 Activity Closed By: OWENS_JS_1
Events:
Event Type: Activity has been finished Date: 05/05/2014
Comment: Finished
08/30/2013 Emergency Preparedness Information Activity Owens, Joe S.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 08/30/2013
Events:
Event Type: Activity has been finished Date: 08/30/2013
Comment: Finished
08/22/2013 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 08/22/2013
Activity Closed Date: 08/30/2013 Activity Closed By: OWENS_JS_1
Events:
Event Type: Activity has been finished Date: 08/30/2013
Comment: Finished
Comments:
Comment Date: 08/22/2013 User: OWENS_JS_1
Description: Spill buckets tested and passed by Crompco - 10/18/2012
Comments:
Comment Date: 08/30/2013 User: OWENS_JS_1
Description: Report completed offsite and emailed to Ramon Inciong, Pantry
08/22/2013 Site Inspection Activity Closed Owens, Joe S.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 08/22/2013
Activity Closed Date: 08/30/2013 Activity Closed By: OWENS_JS_1
Events:
Event Type: Activity has been finished Date: 08/30/2013
Comment: Finished
Comments:
Comment Date: 08/22/2013 User: OWENS_JS_1
Description: Spill buckets tested and passed by Crompco - 10/18/2012
Comments:
Comment Date: 08/30/2013 User: OWENS_JS_1
Description: Report completed offsite and emailed to Ramon Inciong, Pantry
05/18/2012 Attachment Perea, Aurelio O.
05/15/2012 Emergency Preparedness Information Activity Oymayan, Avo J.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 05/15/2012
Events:
Event Type: Activity has been finished Date: 05/15/2012
Comment: Finished
05/07/2012 Site Inspection Activity Closed Oymayan, Avo J.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 05/07/2012
Activity Closed Date: 05/15/2012 Activity Closed By: OYMAYAN_AJ_1
Events:
Event Type: Activity has been finished Date: 05/15/2012
Comment: Finished
Comments:
Comment Date: 05/15/2012 User: OYMAYAN_AJ_1
Description: There were no violations cited at the time of the inspection.ASdditional Notes: None at this time. Discharge Information: There is no evidence or new information of a recent release or discharge at this facility. For more detailed discharge information, please consult the FDEP HQs in Tallahasse, the FDEP Central District in Orlando, or the Petroleum Tank Regulation Section of the Columbia CHD in Lake City, Florida. Other Comments: For more inspection details, please see the copy of the inspection fieldnotes, site schematics and system description that is electronically as well as physically attached to this report. If you have any questions or concerns, please feel free to contact me at (386) 758-2140 or (386) 758-1058.
05/09/2011 Site Inspection Activity Closed Oymayan, Avo J.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 05/02/2011
Activity Closed Date: 05/09/2011 Activity Closed By: OYMAYAN_AJ_1
Events:
Event Type: Activity has been finished Date: 05/09/2011
Comment: Finished
Comments:
Comment Date: 05/09/2011 User: OYMAYAN_AJ_1
Description: This inspection report is for a compliance inspection that took place on 05/02/2011. There were no violations cited at the time of the inspection.ASdditional Notes: None at this time. Discharge Information: There is no evidence or new information of a recent release or discharge at this facility. For more detailed discharge information, please consult the FDEP HQs in Tallahasse, the FDEP Central District in Orlando, or the Petroleum Tank Regulation Section of the Columbia CHD in Lake City, Florida. Other Comments: For more inspection details, please see the copy of the inspection fieldnotes, site schematics and system description that is electronically as well as physically attached to this report. If you have any questions or concerns, please feel free to contact me at (386) 758-2140 or (386) 758-1058. Attachments (1)
05/09/2011 Emergency Preparedness Information Activity Oymayan, Avo J.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 05/09/2011
Events:
Event Type: Activity has been finished Date: 05/09/2011
Comment: Finished
12/23/2010 Editable Letter Activity Kassees, Ramsey D.
Activity Title: Closure Assessment Report (Complete) Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 12/23/2010
Comment: Finished
Attachments:
Attachment Date: 12/23/2010 User: KASSEES_RP_1
Description: TCAR review letter
View Attachment
05/10/2010 Site Inspection Activity Closed Oymayan, Avo J.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 05/10/2010
Activity Closed Date: 05/10/2010 Activity Closed By: OYMAYAN_AJ_1
Events:
Event Type: Activity has been finished Date: 05/10/2010
Comment: Finished
Comments:
Comment Date: 05/10/2010 User: OYMAYAN_AJ_1
Description: This inspection report is for a compliance inspection that took place on 05/05/2010. There were no violations cited at the time of the inspection, and all previously open violations have been resolved and closed. Additional Notes: Dispenser 1/2 had three loose shear valve bolts. These bolts were fastened in my presence. Discharge Information: There is no evidence or new information of a recent release or discharge at this facility. For more detailed discharge information, please consult the FDEP HQs in Tallahasse, the FDEP Central District in Orlando, or the Petroleum Tank Regulation Section of the Columbia CHD in Lake City, Florida. Other Comments: For more inspection details, please see the copy of the inspection fieldnotes, site schematics and system description that is electronically as well as physically attached to this report. If you have any questions or concerns, please feel free to contact me at (386) 758-2140 or (386) 758-1058.
06/14/2009 TCAR Activity Kassees, Ramsey D.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 12/28/2010
Events:
Event Type: Activity has been finished Date: 12/28/2010
Comment: Finished
Comments:
Comment Date: 06/14/2009 User: KASSEES_RP_1
Description: This Tank Closure Asessment Report (TCAR) Dated March 20, 2009, was submitted by AECOM Technical Services Inc. (formerly Earth Tech) on or about April 01, 2009. Please find the narrative attached. Also attached, please find the TCAR review letter.
05/13/2009 Attachment Kassees, Ramsey D.
05/13/2009 Site Inspection Activity Closed Kassees, Ramsey D.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 05/13/2009
Activity Closed Date: 05/13/2009 Activity Closed By: KASSEES_RP_1
Comments:
Comment Date: 05/13/2009 User: KASSEES_RP_1
Description: This inspection report is for a compliance inspection that took place on 05/05/2009. There were no violations cited at the time of the inspection, and all previously open violations have been resolved and closed. Additional Notes: There were no additional observations or notations to document. If you have any questions or concerns, please feel free to contact me at (386) 758-2140 or (386) 758-1058.
05/13/2009 Attachment Kassees, Ramsey D.
05/13/2009 Attachment Kassees, Ramsey D.
03/11/2009 Attachment Oymayan, Avo J.
03/11/2009 Site Inspection Activity Closed Oymayan, Avo J.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 03/11/2009
Activity Closed Date: 03/11/2009 Activity Closed By: OYMAYAN_AJ_1
Comments:
Comment Date: 03/11/2009 User: OYMAYAN_AJ_1
Description: This is a new UST installation inspection report, for a UST installation that took place on 12-22-2008. 12-22-2008 The newly installed USTs are as follows: One 12,000 gallon regular gasoline and one 8,000 gallon premium gasoline USTs. Both USTs are Glassteel II by Modern Welding, double wall steel tanks. The UST installation contractor is Coastal Contruction and Petroleum Services (PCC # 1256760). The USTs arrived with interstitial vacuum gauges in tact. The 12,000 gallon UST had lost its vacuum upon installation. Contractor had pulled this tank back out of the ground and called the tank manufacturer. The contractor had noticed a flaw in the fiberglass coating of the tank, near the bottom. He had properly fiberglassed and repaired this flaw, based on manufacturer recommendations. The flaw may have happened during transportation. The interstice pressure was brought back up to 22 psi, after all proper repair was completed. The interstitial gauge reading for the premium UST was 19 inches of Hg, upon installation. Each UST fillport is provide with a Universal Valve Co. spill bucket. 1-13-2009 The newly installed piping is double wall Western Flex 1.5 synthetic piping. The primary piping was pressurized as follows: Regular unleaded primary piping - 62 psi Regular unleaded secondary piping - 6 psi Premium primary piping - 62 psi Premium secondary piping - 7 psi Primary and secondary piping leak test was conducted and no leaks were found (pressure and soap test). UST I.M.on the premium UST was holding at 19 inches of Hg. UST I.M. on the unleaded UST was holding at 22 inches of Hg. All hydrostatic tests on all sumps and the dispenser liner passed. No leaks were found. Water held at its mark. Precision Testing All precision testing will be forthcoming. New UST system equipment list was as follows: Spill buckets - double wall Universal Valve Co. 70-C Dispenser liner - PCI Sump containment units - PCI Line leak detectors and STPs - Red jacket Piping - Western Flex 1.5 double wall synthetic ATG - Veeder Root TLS-300
03/11/2009 Site Inspection Activity Closed Oymayan, Avo J.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 03/11/2009
Activity Closed Date: 03/11/2009 Activity Closed By: OYMAYAN_AJ_1
Comments:
Comment Date: 03/11/2009 User: OYMAYAN_AJ_1
Description: On 12-30-2008 two (2) singlewall steel underground storage tanks (USTs) were removed. The excavated USTs were as follows: A 10,000 gallon regular gas and a 10,000 gallon premium gas tanks. They were made by Buffalo Tank Division (Bethlehem Steel). Both USTs were emptied, cleaned out, degassed, excavated and made ready for transportation off site for disposal. The USTs were cleaned out by Aqua-clean of Jacksonville, Florida on 12-29-2008, using the "butterworth method". The excavated USTs were dry iced prior to shipment for extra safety measures. Both U S Ts appeared to be in good condition. There was no heavy rusting, pitting or corrosion related punctures. All piping was also removed as were the two dispenser units. The piping was single wall steel and it all appeared to be in good condition, with no apparent degradation, no holes, no apparent punctures. The contractor performing the removal was Coastal Construction and Petroleum Services Inc. (PCC # 1256760). The environmental consultant performing the Closure Assessment was Earth Tech of Orlando, Florida. There was no visual evidence of contamination at the tank excavation pit. The UST Closure Assessment Report is forthcoming.
03/11/2009 Attachment Oymayan, Avo J.
09/07/2007 Record Document Activity Jones, Fred H
Activity Status: Closed
Contact Name: Brent R. Puzak, The Pantry, Inc. Manager Environmental Compliance, Office (904) 464-7219, Cell (904) 219-7170 Activity Closed Date: 09/10/2007
05/11/2007 Violation Closed Lake, John A.
Significance: Minor Status: Closed
Criteria ID: 1105
Rule: 62-761.700(1)(a)1.a., 62-761.700(1)(a)1.b., 62-761.700(1)(a)1.c., 62-761.700(1)(a)1.d.
Comments: Mark this as out of compliance if you observe a needed repair that hasn't been completed, and the potential for a release exists. Examples of components that would need repair include (but are not limited to) leaking dispensers, cracked spill containment, improperly anchored shear valves, or any compromised containment component. Upon the detection of one of the above conditions, has the facility initiated and completed repairs?
05/11/2007 Editable Letter Activity Lake, John A.
Activity Title: District Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 05/11/2007
Comment: Sent on Fri May 11 00:00:00 EST 2007
Attachments:
Attachment Date: 05/11/2007 User: LAKE_JA
Description: NCL Report
View Attachment
05/11/2007 Violation Closed Lake, John A.
Significance: Minor Status: Closed
Criteria ID: 1115
Rule: 62-761.700(1)(c)1.
Comments: Facility equipment shall be maintained to a degree to allow you access. Water in spill containment units, especially above the fill cap shall be removed. Water in any sumps and dispenser liners above the piping opening/penetration (invert) shall be removed. All regulated substance shall be removed from any of the specified system components. Regulated substances: sheen, free product, mixed product water. Petroleum contact water shall be disposed of in accordance with the Department Hazardous Waste Section's Ch. 62-740 F.A.C., "Petroleum Contact Water".
05/08/2007 Violation Closed Lake, John A.
Significance: Minor Status: Closed
Criteria ID: 1105
Rule: 62-761.700(1)(a)1.a., 62-761.700(1)(a)1.b., 62-761.700(1)(a)1.c., 62-761.700(1)(a)1.d.
Comments: Mark this as out of compliance if you observe a needed repair that hasn't been completed, and the potential for a release exists. Examples of components that would need repair include (but are not limited to) leaking dispensers, cracked spill containment, improperly anchored shear valves, or any compromised containment component. Upon the detection of one of the above conditions, has the facility initiated and completed repairs?
05/08/2007 Violation Closed Lake, John A.
Significance: Minor Status: Closed
Criteria ID: 1115
Rule: 62-761.700(1)(c)1.
Comments: Facility equipment shall be maintained to a degree to allow you access. Water in spill containment units, especially above the fill cap shall be removed. Water in any sumps and dispenser liners above the piping opening/penetration (invert) shall be removed. All regulated substance shall be removed from any of the specified system components. Regulated substances: sheen, free product, mixed product water. Petroleum contact water shall be disposed of in accordance with the Department Hazardous Waste Section's Ch. 62-740 F.A.C., "Petroleum Contact Water".
05/07/2007 Site Inspection Activity Closed Lake, John A.
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 05/07/2007
Activity Closed Date: 05/11/2007 Activity Closed By: LAKE_JA
02/08/2007 Emergency Preparedness Information Activity Sweeney, Angie
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 02/08/2007
Comments:
Comment Date: 02/08/2007 User: SWEENEY_A
Description: data collected by john lake
11/22/2006 Attachment McCann, Ken C.
11/22/2006 Attachment McCann, Ken C.
09/22/2006 Emergency Preparedness Information Activity McCann, Ken C.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 09/22/2006
05/01/2006 Site Inspection Activity Closed McCann, Ken C.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 05/01/2006
Activity Closed Date: 05/02/2006 Activity Closed By: MCCANN_KC
Comments:
Comment Date: 05/01/2006 User: MCCANN_KC
Description: Note registration is not updated on the First site
Comments:
Comment Date: 05/02/2006 User: MCCANN_KC
Description: Fills good, Dispensers good, Hoses Good
Comments:
Comment Date: 05/01/2006 User: MCCANN_KC
Description: Sirs good March 2005 to March 2006
05/01/2006 Site Inspection Activity Closed McCann, Ken C.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 05/01/2006
Activity Closed Date: 05/02/2006 Activity Closed By: MCCANN_KC
Comments:
Comment Date: 05/01/2006 User: MCCANN_KC
Description: Note registration is not updated on the First site
Comments:
Comment Date: 05/02/2006 User: MCCANN_KC
Description: Fills good, Dispensers good, Hoses Good
Comments:
Comment Date: 05/01/2006 User: MCCANN_KC
Description: Sirs good March 2005 to March 2006
05/01/2006 Site Inspection Activity Closed McCann, Ken C.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 05/01/2006
Activity Closed Date: 05/02/2006 Activity Closed By: MCCANN_KC
Comments:
Comment Date: 05/01/2006 User: MCCANN_KC
Description: Note registration is not updated on the First site
Comments:
Comment Date: 05/02/2006 User: MCCANN_KC
Description: Fills good, Dispensers good, Hoses Good
Comments:
Comment Date: 05/01/2006 User: MCCANN_KC
Description: Sirs good March 2005 to March 2006
06/14/2005 Legacy Activity Sweeney, Angie
Activity Name: TANK INSTALLATION - FINAL INSPECTION Activity Status: Closed
Completion Notes: 2 DW MODERN STEEL TANKS INSTALLED WESTERN FIBERGLASS FLEX FIBER PIPING, VEEDEROOT SYSTEM WITH INTERSTICE AND SUMP PROBES, TANKS INSTALLED BY SOUTHERN PUMP AND TANK PCC056875
05/26/2005 Legacy Activity Sweeney, Angie
Activity Name: TANK CLOSURE INSPECTION Activity Status: Closed
Completion Notes: TANKS REMOVED BY SOUTHERN PUMP AND TANK TANKS WILL BE REPLACED WITH A DOUBLE WALLED SYSTEM
05/03/2005 Legacy Activity Sweeney, Angie
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
05/04/2004 Legacy Activity Sweeney, Angie
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
05/20/2003 Legacy Activity Sweeney, Angie
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
Completion Notes: SW CATHOTIC PROTECTED PIPING
06/10/2002 Legacy Activity Sweeney, Angie
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
05/01/2001 Legacy Activity Sweeney, Angie
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
06/19/2000 Legacy Activity Sweeney, Angie
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
Completion Notes: NEED EMERGENCY SHUT OFF, SITE VISIT 6/19, PAPERWORK 6/21, TANK TEST 6/17/99, CATHODIC SURVERY 4/3/00, CATHODIC 9 VOLT .2 AMP, 30572 TRACKING
06/14/1999 Legacy Activity Sweeney, Angie
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
Completion Notes: DISPENSERS OK, REGISTRATION OK, TANKS 6-99, CATHODICS 5-99, L AND LD 9-98