![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Journal Report | |||||||||||
Report Run Date: 04/27/2025 Last Data Refresh: 04/26/2025 Report Generated from DOPPLER | |||||||||||
Facility ID: | 8521491 | ||||||||||
Facility Name: | 786 AABAAD INC | ||||||||||
05/21/2024 | Record Document Activity | Muslic, Adis | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | Akbar Barmanwalla | Activity Closed Date: | 05/21/2024 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/21/2024 | ||||||||
Comment: | Finished | ||||||||||
05/07/2024 | Violation Open | Muslic, Adis | |||||||||
Significance: | SNC-B | Status: | Open | ||||||||
Criteria ID: | 6056 | ||||||||||
Rule: | 62-761.600(1)(d), 62-761.600(1)(e), 62-761.600(1)(g) | ||||||||||
05/07/2024 | Editable Letter Activity | Muslic, Adis | |||||||||
Activity Title: | Compliance Assistance Offer Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Activity/Document has been approved | Date: | 05/07/2024 | ||||||||
Comment: | Approved by George K. Juaristic: OK | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/07/2024 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 05/07/2024 | ||||||||
Comment: | Submitted for approval by: Adis Muslic | ||||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 05/07/2024 | ||||||||
Comment: | Sent | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 05/07/2024 | User: | MUSLIC_A_1 | ||||||||
Description: | Compliance Assistance Offer Letter | ||||||||||
View Attachment | |||||||||||
05/07/2024 | Violation Open | Muslic, Adis | |||||||||
Significance: | SNC-B | Status: | Open | ||||||||
Criteria ID: | 6063 | ||||||||||
Rule: | 62-761.700(1), 62-761.700(1)(a), 62-761.700(1)(a)1, 62-761.700(1)(a)2 | ||||||||||
05/07/2024 | Violation Open | Muslic, Adis | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 6062 | ||||||||||
Rule: | 62-761.600(4) | ||||||||||
05/07/2024 | Violation Open | Muslic, Adis | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 6075 | ||||||||||
Rule: | 62-761.710(4) | ||||||||||
05/07/2024 | Violation Open | Muslic, Adis | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 6053 | ||||||||||
Rule: | 62-761.500(7)(c), 62-761.500(7)(c)1, 62-761.500(7)(c)2, 62-761.500(7)(d) | ||||||||||
05/07/2024 | Violation Open | Muslic, Adis | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 6013 | ||||||||||
Rule: | 62-761.420(3), 62-761.420(4), 62-761.420(8) | ||||||||||
05/07/2024 | Violation Open | Muslic, Adis | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 6017 | ||||||||||
Rule: | 62-761.430(8) | ||||||||||
05/01/2024 | Site Inspection Activity Closed | Muslic, Adis | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 05/01/2024 | ||||||||||
Activity Closed Date: | 05/07/2024 | Activity Closed By: | MUSLIC_A_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/07/2024 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document has been approved | Date: | 05/07/2024 | ||||||||
Comment: | Approved by George K. Juaristic: OK | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 05/07/2024 | ||||||||
Comment: | Submitted for approval by: Adis Muslic | ||||||||||
Comments: | |||||||||||
Comment Date: | 05/02/2024 | User: | MUSLIC_A_1 | ||||||||
Description: | Records Review: Placard: On display in the store; expires 6/30/2024. Financial Responsibility: ACE American Insurance Company Part D (7/16/2022-7/16/2024) ***Part P financial responsibility not available for inspection. Release Detection: See Facility Records Section. ***No monthly visual inspection and electronic release detection records available from 10/1/2021 to 6/1/2022. Tests: See System Tests Section. ***The following tests were missed: 2 MLLD (10/4/2022, 10/4/2023), Veeder-Root and 5 sensors (10/4/2022, 10/4/2023), 3 OPW Visi-Gauges (1/26/2017, 1/26/2018, 1/26/2019, 1/26/2020, 1/26/2021, 1/26/2022, 1/26/2023, and 1/26/2024), 3 Flow shut-off valves (10/4/2022, 10/4/2023). | ||||||||||
03/04/2024 | Electronic Communication Activity | Muslic, Adis | |||||||||
Activity Closed Date: | 03/04/2024 | Activity Status: | Closed | ||||||||
Date: | 03/04/2024 | ||||||||||
Recipient: | AKBARBARMANWALLA@YAHOO.COM | ||||||||||
Sender: | Adis.Muslic@flhealth.gov | ||||||||||
Subject: | See attached. | ||||||||||
Message: | See attached. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 03/04/2024 | ||||||||
Comment: | Finished | ||||||||||
03/02/2022 | Record Document Activity | Juaristic, George K. | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: |
AKBAR BARMANWALLA |
Activity Closed Date: | 03/02/2022 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 03/02/2022 | ||||||||
Comment: | Finished | ||||||||||
11/04/2021 | Record Document Activity | Juaristic, George K. | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | Akbar Barmanwalla [akbarbarmanwalla@yahoo.com] | Activity Closed Date: | 11/04/2021 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 11/04/2021 | ||||||||
Comment: | Finished | ||||||||||
11/03/2021 | Violation Open | Juaristic, George K. | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 6062 | ||||||||||
Rule: | 62-761.600(4) | ||||||||||
11/03/2021 | Editable Letter Activity | Juaristic, George K. | |||||||||
Activity Title: | Compliance Assistance Offer Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 11/04/2021 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 11/04/2021 | ||||||||
Comment: | Sent | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 11/04/2021 | User: | JUARISTIC_GK_1 | ||||||||
Description: | 8521491 CAO Letter 20211104 | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 11/04/2021 | User: | JUARISTIC_GK_1 | ||||||||
Description: | Email to RP_Inspection Report and CAO Letter | ||||||||||
View Attachment | |||||||||||
11/03/2021 | Violation Closed | Juaristic, George K. | |||||||||
Significance: | SNC-B | Status: | Closed | ||||||||
Criteria ID: | 6063 | ||||||||||
Rule: | 62-761.700(1), 62-761.700(1)(a), 62-761.700(1)(a)1, 62-761.700(1)(a)2 | ||||||||||
11/03/2021 | Violation Closed | Juaristic, George K. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 6073 | ||||||||||
Rule: | 62-761.700(3)(b), 62-761.700(3)(b)1, 62-761.700(3)(b)2 | ||||||||||
11/03/2021 | Violation Closed | Juaristic, George K. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 6029 | ||||||||||
Rule: | 62-761.500(1)(e) | ||||||||||
11/03/2021 | Violation Closed | Juaristic, George K. | |||||||||
Significance: | SNC-B | Status: | Closed | ||||||||
Criteria ID: | 6063 | ||||||||||
Rule: | 62-761.700(1), 62-761.700(1)(a), 62-761.700(1)(a)1, 62-761.700(1)(a)2 | ||||||||||
11/03/2021 | Violation Closed | Juaristic, George K. | |||||||||
Significance: | SNC-B | Status: | Closed | ||||||||
Criteria ID: | 6063 | ||||||||||
Rule: | 62-761.700(1), 62-761.700(1)(a), 62-761.700(1)(a)1, 62-761.700(1)(a)2 | ||||||||||
11/03/2021 | Violation Open | Juaristic, George K. | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 6002 | ||||||||||
Rule: | 62-761.350(1), 62-761.350(1)(c), 62-761.350(1)(d), 62-761.350(3)(b)2, 62-761.350(5)(a), 62-761.350(5)(b), 62-761.350(5)(c), 62-761.350(7) | ||||||||||
10/29/2021 | Site Inspection Activity Closed | Juaristic, George K. | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 10/29/2021 | ||||||||||
Activity Closed Date: | 11/03/2021 | Activity Closed By: | JUARISTIC_GK_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 11/03/2021 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 10/29/2021 | User: | JUARISTIC_GK_1 | ||||||||
Description: | Records Review: Placard: Printed at time of inspection and displayed in the store; expires 6/30/2019. Financial Responsibility (FR): ACE 7/16/2021 to 7/16/2022, Part D. *Fill out attached Part P form, and keep onfile. This FR form must be filled out for every policy change, including renewals. UST Training Certificates: None *(5) Each UST facility must have a Class A, Class B, and Class C operator that are trained and certified in accordance with the rule by October 13, 2018. Release Detection: See Reviewed Records section. Tests: *(6) 10/15/2021 test results not available. Provide the 10/15/2021 test results. *(7) 2019 annual operability testing of the release detection (liquid sensors-monitoring panel, MLLDs, OPW VisiGauges), and overfill protection devices not conducted. Annual operability testing of the release detection and overfill protection devices shall be tested at least once every 365-days. Report will be emailed to Akbar Barmanwalla [akbarbarmanwalla@yahoo.com]. | ||||||||||
08/02/2021 | Electronic Communication Activity | Juaristic, George K. | |||||||||
Activity Closed Date: | 08/02/2021 | Activity Status: | Closed | ||||||||
Date: | 08/02/2021 | ||||||||||
Recipient: |
AKBAR BARMANWALLA |
||||||||||
Sender: | George K Juaristic | ||||||||||
Subject: | see attached NOI | ||||||||||
Message: | see attached NOI | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/02/2021 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 08/02/2021 | User: | JUARISTIC_GK_1 | ||||||||
Description: | Email to RP: Notice of Inspection | ||||||||||
View Attachment | |||||||||||
07/25/2019 | Record Document Activity | Juaristic, George K. | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | Akbar Barmanwai <786gasexpress@gmail.com> | Activity Closed Date: | 07/25/2019 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 07/25/2019 | ||||||||
Comment: | Finished | ||||||||||
07/12/2019 | Editable Letter Activity | Brownlee, Sarah M | |||||||||
Activity Title: | Warning Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 07/30/2019 | ||||||||
Comment: | Sent | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 08/20/2019 | ||||||||
Comment: | Submitted for approval by: Sarah M Brownlee | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document has been approved | Date: | 08/20/2019 | ||||||||
Comment: | Approved by Jayme Brock: Approved | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/22/2019 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 08/20/2019 | User: | BROWNLEE_S | ||||||||
Description: | Warning Letter Email | ||||||||||
View Attachment | |||||||||||
06/03/2019 | Enforcement Tracking Activity | Brownlee, Sarah M | |||||||||
Activity Status: | Open | ||||||||||
05/30/2019 | Enforcement Referral Activity | Juaristic, George K. | |||||||||
Activity Result: | Accepted | Activity Status: | Closed | ||||||||
Activity Closed Date: | 06/03/2019 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 06/03/2019 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was accepted on this date | Date: | 06/03/2019 | ||||||||
Comment: | Accepted by Sarah M Brownlee: Accept | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was acknowledged on this date | Date: | 05/31/2019 | ||||||||
Comment: | Acknowledged and Assigned by Jayme Brock | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been assigned | Date: | 05/31/2019 | ||||||||
Comment: | Assigned to Sarah M Brownlee | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 05/30/2019 | ||||||||
Comment: | Submitted for approval by: George K. Juaristic: Enforcement referral memo, property appraiser, and corporate filing sheet attached. | ||||||||||
Comments: | |||||||||||
Comment Date: | 05/30/2019 | User: | JUARISTIC_GK_1 | ||||||||
Description: | Enforcement referral memo, property appraiser, and corporate filing sheet attached. | ||||||||||
05/30/2019 | Phone Conversation Activity | Juaristic, George K. | |||||||||
Call Type: | Outgoing | Activity Status: | Closed | ||||||||
Phone Number: | (727) 642-4847 | Activity Closed Date: | 05/30/2019 | ||||||||
Subject: | GKJ_ Spoke with Akbar "Al" Barmanwalla. He said he has contracted Kevin Liddle with Precision Petroleum to conduct the testing. He will have Kevin send the test results as soon as they are completed. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/30/2019 | ||||||||
Comment: | Finished | ||||||||||
05/30/2019 | Phone Conversation Activity | Juaristic, George K. | |||||||||
Call Type: | Incoming | Activity Status: | Closed | ||||||||
Phone Number: | (727) 642-4847 | Activity Closed Date: | 05/30/2019 | ||||||||
Subject: | GKJ_Received phone call from Akbar "Al" Barmanwalla. He stated that Kevin Liddle with Precision Petroleum is backed-up, so he contacted Bob Wood, SPCI. He stated that Bob is also backed-up. He said he is going out of town and will return June 17th. He said when he gets back, he will have Bob or Kevin resolve the violations. I explained that this facility will be referred to the DEP-SW District for enforcement. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/30/2019 | ||||||||
Comment: | Finished | ||||||||||
05/30/2019 | Electronic Communication Activity | Juaristic, George K. | |||||||||
Activity Closed Date: | 05/30/2019 | Activity Status: | Closed | ||||||||
Date: | 05/30/2019 | ||||||||||
Recipient: | akbarbarmanwalla@yahoo.com' | ||||||||||
Sender: | George Juaristic | ||||||||||
Subject: | RE: Inspection Reports and Compliance Assistance Offer Letters for FAC IDs 8514985 (Aabaad Corp) and 8521491 (786 Aabaad Inc) | ||||||||||
Message: |
Good afternoon,
Please submit requested test results, Part P form filled out, service ticket with pictures for the addressed corrosion in the
RUL sump (786 Aabaad), and Class C training certificates. Tomorrow the violations will be open for 90 days. After that I
have to refer to the DEP-SW District for enforcement.
George K Juaristic
Florida Department of Health
Pinellas County
Petroleum Storage Tank Compliance
Tarpon Springs Center
301 S Disston Ave
Tarpon Springs FL 34689
Office 727-485-1817
Cell 727-543-5319
Fax 727-538-7293
george.juaristic@flhealth.gov
EFFECTIVE 12/4/2018 New Office # 727-485-1817
We value your feedback as a customer. We are committed to continuously assessing and improving the level and quality
of services provided to you. To comment on the quality of service you received, simply click on this link to our Customer
Survey. Thank you in advance for completing the survey.
Please consider our environment before printing this e-mail.
FDOH Mission: To protect, promote & improve the health of all people in Florida through integrated
state, county, & community efforts.
Please note: Florida has a very broad public records law. Most written communications to or from state officials regarding
state business are public records available to the public and media upon request. This e-mail communication may
therefore be subject to public disclosure.
From: Juaristic, George K
Sent: Friday, March 1, 2019 2:35 PM
To: 'akbarbarmanwalla@yahoo.com' |
||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/30/2019 | ||||||||
Comment: | Finished | ||||||||||
03/01/2019 | Violation Open | Juaristic, George K. | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 4067 | ||||||||||
Rule: | 62-761.600(4) | ||||||||||
03/01/2019 | Editable Letter Activity | Juaristic, George K. | |||||||||
Activity Title: | Compliance Assistance Offer Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 03/01/2019 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 03/01/2019 | ||||||||
Comment: | Sent | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 03/01/2019 | User: | JUARISTIC_GK_1 | ||||||||
Description: | CAO Letter 3.1.2019 | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 03/01/2019 | User: | JUARISTIC_GK_1 | ||||||||
Description: | Email to RP with attached report and CAO Letter. | ||||||||||
View Attachment | |||||||||||
03/01/2019 | Violation Open | Juaristic, George K. | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 4001 | ||||||||||
Rule: | 62-761.350(1), 62-761.350(1)(c), 62-761.350(1)(d), 62-761.350(3)(b)2., 62-761.350(5)(a), 62-761.350(5)(b), 62-761.350(5)(c), 62-761.350(7) | ||||||||||
03/01/2019 | Violation Open | Juaristic, George K. | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 4067 | ||||||||||
Rule: | 62-761.600(4) | ||||||||||
03/01/2019 | Violation Open | Juaristic, George K. | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 4067 | ||||||||||
Rule: | 62-761.600(4) | ||||||||||
03/01/2019 | Violation Open | Juaristic, George K. | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 4015 | ||||||||||
Rule: | 62-761.420(3), 62-761.420(4) | ||||||||||
03/01/2019 | Violation Open | Juaristic, George K. | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 4068 | ||||||||||
Rule: | 62-761.700(1), 62-761.700(1)(a), 62-761.700(1)(a)1., 62-761.700(1)(a)2. | ||||||||||
03/01/2019 | Violation Open | Juaristic, George K. | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 4057 | ||||||||||
Rule: | 62-761.500(7)(e) | ||||||||||
03/01/2019 | Violation Open | Juaristic, George K. | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 4076 | ||||||||||
Rule: | 62-761.700(3), 62-761.700(3)(a), 62-761.700(3)(a)1., 62-761.700(3)(a)1.a., 62-761.700(3)(a)1.b., 62-761.700(3)(a)1.c., 62-761.700(3)(a)1.d., 62-761.700(3)(a)1.e., 62-761.700(3)(a)1.f., 62-761.700(3)(a)2. | ||||||||||
02/26/2019 | Site Inspection Activity Closed | Juaristic, George K. | |||||||||
Activity Result: | Minor Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 02/26/2019 | ||||||||||
Activity Closed Date: | 03/01/2019 | Activity Closed By: | JUARISTIC_GK_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 03/01/2019 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 02/26/2019 | User: | JUARISTIC_GK_1 | ||||||||
Description: | Records Review: Placard: Printed at time of inspection and displayed in the store; expires 6/30/2019. FR: ACE 7/16/2018 to 7/16/2019, Part D. *(1) Need Part P form. UST Training Certificates: None *(2) Each UST facility must have a Class A, Class B, and Class C operator that are trained and certified in accordance with the rule by October 13, 2018. Release Detection: 1. Monthly visual inspections of the "spill bucket, STP sumps, and dispensers", conducted at least once every 35 days between 1/1/2017 and 2/2/2019, with no problems noted. 2. Liquid status printouts for the liquid sensors monitoring the tank interstices (2) and STP sumps (3), pulled at least once every 35 days between 1/1/2017 and 2/2/2019, with no fuel alarms for the dates checked. Tests: Three piping/STP sumps and three UDCs hydro tested by Moore's Maintenance on 8/16/2018. *(3) Initial operability of the overfill protection devices was due by 1/11/2018. As of 2/26/2019, they haven't been tested. *(4) Annual operability testing of the release detection devices, liquid sensors, monitoring panel, OPW VisiGauges and LLDs, was due by 1/26/2017. As of 2/26/2019, they haven't been tested. *(5) Initial integrity testing of the D/W SCUs was due by 10/13/2018. As of 2/26/2019, they haven't been tested. Have the overdue tests conducted and submit the test results to this office. Maintenance Records: DSL STP penetration boot replaced on 3/17/2017 by SPCI. | ||||||||||
02/13/2019 | Electronic Communication Activity | Juaristic, George K. | |||||||||
Activity Closed Date: | 02/13/2019 | Activity Status: | Closed | ||||||||
Date: | 02/13/2019 | ||||||||||
Recipient: | akbarbarmanwalla@yahoo.com | ||||||||||
Sender: | George Juaristic | ||||||||||
Subject: | see attached | ||||||||||
Message: | see attached | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 02/13/2019 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 02/13/2019 | User: | JUARISTIC_GK_1 | ||||||||
Description: | Email to RP to schedule routine inspection. | ||||||||||
View Attachment | |||||||||||
04/20/2017 | Site Inspection Activity Closed | Juaristic, George K. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 04/13/2017 | ||||||||||
Activity Closed Date: | 04/20/2017 | Activity Closed By: | JUARISTIC_GK_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 04/20/2017 | ||||||||
Comment: | Finished | ||||||||||
04/13/2017 | Site Inspection Activity Closed | Juaristic, George K. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 04/13/2017 | ||||||||||
Activity Closed Date: | 04/20/2017 | Activity Closed By: | JUARISTIC_GK_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 04/20/2017 | ||||||||
Comment: | Finished | ||||||||||
04/12/2017 | Phone Conversation Activity | Juaristic, George K. | |||||||||
Call Type: | Outgoing | Activity Status: | Closed | ||||||||
Phone Number: | (727) 645-5545 | Activity Closed Date: | 04/12/2017 | ||||||||
Subject: | GKJ_Spoke with Al about setting up a reinspection. He scheduled it for Thursday, April 13th at 1:00 pm. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 04/12/2017 | ||||||||
Comment: | Finished | ||||||||||
03/17/2017 | Record Document Activity | Juaristic, George K. | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | Robert Wood, SPCI [robertlwood@earthlink.net] | Activity Closed Date: | 03/17/2017 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 03/17/2017 | ||||||||
Comment: | Finished | ||||||||||
03/02/2017 | Electronic Communication Activity | Juaristic, George K. | |||||||||
Activity Closed Date: | 03/02/2017 | Activity Status: | Closed | ||||||||
Date: | 03/02/2017 | ||||||||||
Recipient: | robertlwood@earthlink.net | ||||||||||
Sender: | George Juaristic | ||||||||||
Subject: | AABAAD Corp. | ||||||||||
Message: | Hey Bob, I just got off the phone with Akhar Barmanwalla, AABAAD Corp. He said he spoke with you about repairing the DSL piping penetration boot at 8521491 and conducting the overdue test at 8514985. He asked that I send you the reports so that you know which facilities need what work. Please send me the test results after they are completed. Thanks, George Juaristic Environmental Specialist II PST Compliance & Cleanup Programs Division of Disease Control & Health Protection Florida Department of Health in Pinellas County 8751 Ulmerton Road, Suite 2000 - Largo, FL 33771 George.Juaristic@flhealth.gov Phone: 727-538-7277 xt. 6115 Cell: 727-543-5319 Fax: 727-538-7293 Attachments: TCI 1.19.2017; TCI 1.19.2017 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 03/02/2017 | ||||||||
Comment: | Finished | ||||||||||
03/02/2017 | Phone Conversation Activity | Juaristic, George K. | |||||||||
Call Type: | Incoming | Activity Status: | Closed | ||||||||
Phone Number: | (727) 642-4847 | Activity Closed Date: | 03/02/2017 | ||||||||
Subject: | GKJ_ Spoke with Akbar Barmanwalla. He stated that he has spoke with Bob Wood about replacing the torn boot. He asked that I send Bob a copy of the report so he knows which facility needs the repair. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 03/02/2017 | ||||||||
Comment: | Finished | ||||||||||
01/30/2017 | Violation Closed | Juaristic, George K. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 1117 | ||||||||||
Rule: | 62-761.700(1)(c)3. | ||||||||||
Comments: | Facility must prove that all release detection devices, such as in line leak detectors, sump and liner sensors, ATGs, etc. function properly. Sensing devices may be optical, vapor, float activated, discriminating, non-discriminating, or tied into electrical circuits. ATG probes inside of tanks require calibration testing, if used for release detection as well as inventory measurements. | ||||||||||
01/30/2017 | Editable Letter Activity | Juaristic, George K. | |||||||||
Activity Title: | 1st Non-Compliance Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 01/30/2017 | ||||||||
Comment: | Sent | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 01/30/2017 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/30/2017 | User: | JUARISTIC_GK_1 | ||||||||
Description: | NCL | ||||||||||
View Attachment | |||||||||||
01/19/2017 | Violation Closed | Juaristic, George K. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 1105 | ||||||||||
Rule: | 62-761.700(1)(a)1.a., 62-761.700(1)(a)1.b., 62-761.700(1)(a)1.c., 62-761.700(1)(a)1.d. | ||||||||||
Comments: | Mark this as out of compliance if you observe a needed repair that hasn't been completed, and the potential for a release exists. Examples of components that would need repair include (but are not limited to) leaking dispensers, cracked spill containment, improperly anchored shear valves, or any compromised containment component. Upon the detection of one of the above conditions, has the facility initiated and completed repairs? | ||||||||||
01/19/2017 | Site Inspection Activity Closed | Juaristic, George K. | |||||||||
Activity Result: | Minor Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 01/19/2017 | ||||||||||
Activity Closed Date: | 01/30/2017 | Activity Closed By: | JUARISTIC_GK_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 01/30/2017 | ||||||||
Comment: | Finished | ||||||||||
01/19/2017 | Violation Closed | Juaristic, George K. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 1103 | ||||||||||
Rule: | 62-761.640(4)(a)1., 62-761.640(4)(a)2., 62-761.640(4)(a)3., 62-761.640(4)(a)4. | ||||||||||
Comments: | Installation - verify that the line leak detector has been installed during the final installation inspection. Compliance - check to see that the unit is present. Examine the annual function test data - a pass alone is not sufficient. The tester must demonstrate 3.0 gph discharge detection for the mechanical (flow restrictor). Note that the electronic (auto shut off) line leak detector does not need an annual test, but must still be able to detect a 0.2 gph leak after it has been tripped at 150% line operating pressure. Replacements - unit must be tested out of the box - function must be proven. 3.0 gph = 185.4 ml/min (To convert milliliters/minute to gallons/hour, multiple the milliliters by 0.0162162; or, 1 gph equals 61.8 ml/min). Values greater than 186 ml/min fail. Values less than 185 ml/min mean that the line leak detector will activate at a more restrictive rate. | ||||||||||
01/05/2017 | Phone Conversation Activity | Juaristic, George K. | |||||||||
Call Type: | Outgoing | Activity Status: | Closed | ||||||||
Phone Number: | (727) 642-4847 | Activity Closed Date: | 01/05/2017 | ||||||||
Subject: | GKJ_ Spoke with Akhar Barmanwalla about setting up a routine inspection on Thursday, January 19th. I went over the last inspection report and directed him to the video on the DEP website. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 01/05/2017 | ||||||||
Comment: | Finished | ||||||||||
02/25/2015 | Electronic Communication Activity | Juaristic, George K. | |||||||||
Activity Closed Date: | 02/25/2015 | Activity Status: | Closed | ||||||||
Date: | 02/25/2015 | ||||||||||
Recipient: | Akbar Barmanwalla | ||||||||||
Sender: | George Juaristic | ||||||||||
Subject: | Inspection report for 8521491 | ||||||||||
Message: | attached subject document | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 02/25/2015 | ||||||||
Comment: | Finished | ||||||||||
02/25/2015 | Emergency Preparedness Information Activity | Juaristic, George K. | |||||||||
Activity Result: | Satisfied | Activity Status: | Closed | ||||||||
Activity Closed Date: | 02/25/2015 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 02/25/2015 | ||||||||
Comment: | Finished | ||||||||||
02/17/2015 | Site Inspection Activity Closed | Juaristic, George K. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 02/17/2015 | ||||||||||
Activity Closed Date: | 02/25/2015 | Activity Closed By: | JUARISTIC_GK_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 02/25/2015 | ||||||||
Comment: | Finished | ||||||||||
07/22/2014 | Site Inspection Activity Closed | Juaristic, George K. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 07/11/2014 | ||||||||||
Activity Closed Date: | 07/22/2014 | Activity Closed By: | JUARISTIC_GK_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 07/22/2014 | ||||||||
Comment: | Finished | ||||||||||
07/22/2014 | Electronic Communication Activity | Juaristic, George K. | |||||||||
Activity Closed Date: | 07/22/2014 | Activity Status: | Closed | ||||||||
Date: | 07/22/2014 | ||||||||||
Recipient: | Akbar Barmanwalla | ||||||||||
Sender: | George Juaristic | ||||||||||
Subject: | see attachment | ||||||||||
Message: | see attachment | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 07/22/2014 | ||||||||
Comment: | Finished | ||||||||||
06/04/2014 | Electronic Communication Activity | Juaristic, George K. | |||||||||
Activity Closed Date: | 06/04/2014 | Activity Status: | Closed | ||||||||
Date: | 06/04/2014 | ||||||||||
Recipient: | George K Juaristic | ||||||||||
Sender: | Bob Wood, SPCI | ||||||||||
Subject: | Fwd: RE: Fwd: Inspection report and non-compliance letter for 786 AABAAD Inc., FAC ID 8521491 | ||||||||||
Message: | Al called me to do this entry boot. I like to do it on Thursday if that fits your schedule Thanks Bob | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 06/04/2014 | ||||||||
Comment: | Finished | ||||||||||
05/29/2014 | Violation Closed | Juaristic, George K. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 1105 | ||||||||||
Rule: | 62-761.700(1)(a)1.a., 62-761.700(1)(a)1.b., 62-761.700(1)(a)1.c., 62-761.700(1)(a)1.d. | ||||||||||
Comments: | Mark this as out of compliance if you observe a needed repair that hasn't been completed, and the potential for a release exists. Examples of components that would need repair include (but are not limited to) leaking dispensers, cracked spill containment, improperly anchored shear valves, or any compromised containment component. Upon the detection of one of the above conditions, has the facility initiated and completed repairs? | ||||||||||
05/29/2014 | Editable Letter Activity | Juaristic, George K. | |||||||||
Activity Title: | 1st Non-Compliance Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/29/2014 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 05/29/2014 | ||||||||
Comment: | Sent on Thu May 29 00:00:00 EDT 2014 | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 05/29/2014 | User: | JUARISTIC_GK_1 | ||||||||
Description: | 29MAY2014.GKJ_NCL. | ||||||||||
View Attachment | |||||||||||
05/29/2014 | Site Inspection Activity Closed | Juaristic, George K. | |||||||||
Activity Result: | Minor Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 05/29/2014 | ||||||||||
Activity Closed Date: | 05/29/2014 | Activity Closed By: | JUARISTIC_GK_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/29/2014 | ||||||||
Comment: | Finished | ||||||||||
06/10/2013 | Record Document Activity | Longen, Julie L. | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | Kevin w/PP submitted testing | Activity Closed Date: | 06/21/2013 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 06/21/2013 | ||||||||
Comment: | Finished | ||||||||||
05/10/2013 | Emergency Preparedness Information Activity | Longen, Julie L. | |||||||||
Activity Result: | Satisfied | Activity Status: | Closed | ||||||||
Activity Closed Date: | 05/10/2013 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/10/2013 | ||||||||
Comment: | Finished | ||||||||||
05/10/2013 | Editable Letter Activity | Longen, Julie L. | |||||||||
Activity Title: | 1st Non-Compliance Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/10/2013 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 05/10/2013 | User: | LONGEN_JL_1 | ||||||||
Description: | 2013may10.JLL. cover letter | ||||||||||
View Attachment | |||||||||||
05/09/2013 | Violation Closed | Longen, Julie L. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 1122 | ||||||||||
Rule: | 62-761.710(1) | ||||||||||
Comments: | Was reasonable access to the facility granted? If not, document the circumstances. Were the records available within the specified time frame? If five day pre-inspection notice was not given by the inspector, this item can not be marked as a discrepancy. Make note of the missing documents, and arrange a review period. | ||||||||||
05/09/2013 | Site Inspection Activity Closed | Longen, Julie L. | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 05/09/2013 | ||||||||||
Activity Closed Date: | 05/10/2013 | Activity Closed By: | LONGEN_JL_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 05/10/2013 | ||||||||
Comment: | Finished | ||||||||||
05/09/2013 | Violation Closed | Longen, Julie L. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 1123 | ||||||||||
Rule: | 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d), 62-761.710(2)(e), 62-761.710(2)(f), 62-761.710(2)(g), 62-761.710(2)(h) | ||||||||||
Comments: | If the problem involves failure to perform according to the standards in each of the following areas, then note these items in addition to the paperwork for this rule: a. and g. Inventory - rules 62-761.640(3)(b)1-2, 62-761.640(3)(c) & 62-761.700(1)(c)5 b. Repair, operation, and maintenance - rules 62-761.700(1)(a)1, 62-761.700(1)(a)5, 62-761.700(1)(a)6 & 62-761.700(1)(c)3 c. Release detection - rules 62-761.600(1)(e), 62-761.610(3)(b), 62-761.640(2)(c)4, 62-761.640(2)(e), 62-761.640(3)(d), 62-761.640(3)(e)1-5 & 62-761.640(3)(e)9 d. Release detection response level descriptions - rules 62-761.600(1)(b) & 62-761.640(1)(c) e. Tightness, pressure, and breach of integrity tests - rules 62-761.610(3)(a)1, 62-761.640(1)(a) & 62-761.640(4)(a) f. Financial responsibility - rule 62-761.400(3) g. Repairs and replacements - rule 62-761.700(1)(a)6 The following are not this rule's issues: Rules 62-761.450(1)(a)1, 62-761.450(1)(a)2, 62-761.450(1)(a)3 & 62-761.450(1)(a)4 are verbal notices of activities that may also be written Rule 62-761.450(1)(b) is a registration issue Rules 62-761.450(2), 62-761.450(3)(a) & 62-761.450(3)(b) are INF/DRF reporting issues Rules 62-761.600(1)(a)3 & 62-761.600(1)(f) are covered by rule 62-761.710(3) Anything with cathodic protection is covered by rule 62-761.710(3) | ||||||||||
05/09/2013 | Violation Closed | Longen, Julie L. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 1058 | ||||||||||
Rule: | 62-761.600(1)(a)1. | ||||||||||
Comments: | Mark this as out of compliance if the release detection method is not able to register or detect a new release. If you feel that the release detection system has lost its ability to detect a new release, document why in the inspection report. Examples include: a. An automatic tank gauge system already in alarm mode will not be able to detect a new release; b. sumps with water/product may impair detection abilities; c. monitoring wells at contaminated sites may also have impaired ability to detect new releases. See .640(2)(c)2. for further guidance on using contaminated monitoring wells for release detection. | ||||||||||
05/09/2013 | Violation Closed | Longen, Julie L. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 1103 | ||||||||||
Rule: | 62-761.640(4)(a)1., 62-761.640(4)(a)2., 62-761.640(4)(a)3., 62-761.640(4)(a)4. | ||||||||||
Comments: | Installation - verify that the line leak detector has been installed during the final installation inspection. Compliance - check to see that the unit is present. Examine the annual function test data - a pass alone is not sufficient. The tester must demonstrate 3.0 gph discharge detection for the mechanical (flow restrictor). Note that the electronic (auto shut off) line leak detector does not need an annual test, but must still be able to detect a 0.2 gph leak after it has been tripped at 150% line operating pressure. Replacements - unit must be tested out of the box - function must be proven. 3.0 gph = 185.4 ml/min (To convert milliliters/minute to gallons/hour, multiple the milliliters by 0.0162162; or, 1 gph equals 61.8 ml/min). Values greater than 186 ml/min fail. Values less than 185 ml/min mean that the line leak detector will activate at a more restrictive rate. | ||||||||||
05/09/2013 | Violation Closed | Longen, Julie L. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 1117 | ||||||||||
Rule: | 62-761.700(1)(c)3. | ||||||||||
Comments: | Facility must prove that all release detection devices, such as in line leak detectors, sump and liner sensors, ATGs, etc. function properly. Sensing devices may be optical, vapor, float activated, discriminating, non-discriminating, or tied into electrical circuits. ATG probes inside of tanks require calibration testing, if used for release detection as well as inventory measurements. | ||||||||||
05/09/2013 | Violation Closed | Longen, Julie L. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 1059 | ||||||||||
Rule: | 62-761.600(1)(a)2. | ||||||||||
Comments: | Mark this as out of compliance if release detection systems are not functioning or not maintained properly. The inspector will have to know what release detection components have been installed at the facility. Furthermore, develop a library of installation and system operation specifications. These documents will assist you in determining calibration/maintenance as required by the manufacturer. Additional guidance can be found in the Appendix sections of the USEPA "List of Leak Detection Evaluations for Underground Storage Tank Systems" and the DEP Master Equipment List. Installations - have the release detection components been function tested? Just because a piece of equipment is new out of the box does not mean it is fully functional. Have it demonstrated! Calibration/Maintenance - the facility must provide documentation attesting to these operability tests. Operation - The RDRL must be developed, and the facility personnel must be knowledgeable of all the components of the release detection system. Theoretically, they should be able to demonstrate to you how they monitor the release detection system. See rule 62-761.700(1)(c)3 | ||||||||||
05/09/2013 | Violation Closed | Longen, Julie L. | |||||||||
Significance: | SNC-B | Status: | Closed | ||||||||
Criteria ID: | 1062 | ||||||||||
Rule: | 62-761.600(1)(d) | ||||||||||
Comments: | Mark this as out of compliance if any release detection method has not been monitored as required. Look for evidence that the release detection system is not being properly monitored. Examples include: blocked access to monitoring wells; ATG in alarm; ATG panel hidden from view; ATG tape spool empty; buried or submerged sampling ports; corroded locks; or no dispenser keys. Be aware that manual tank gauging requires weekly sampling. Electronic line leak detectors may be wired into an ATG with a memory of test cycles. Facilities with static/periodic ATG systems are required to provide one passing test per product per month. This method has a minimum fuel capacity requirement. Facilities with continuous electronic leak detection ATG systems (e.g., Veeder-Root CSLD) are required to provide one passing test per product per month, although the system must be in daily operation with monthly summary logs. This method has no minimum fuel requirement. If there is a record keeping problem, see rule 62-761.710(2). | ||||||||||
09/19/2011 | Record Document Activity | Condoleon, George John | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | Al | Activity Closed Date: | 09/19/2011 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 09/19/2011 | ||||||||
Comment: | Finished | ||||||||||
08/18/2011 | Violation Closed | Condoleon, George John | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 1040 | ||||||||||
Rule: | 62-761.500(8)(c)1. | ||||||||||
Comments: | Mark this as out of compliance if the shear valves are not properly installed or anchored. The shear valve should be anchored to the dispenser frame in the ground. The valve should stay in place if the dispenser is knocked over. This is not intended to be the emergency fuel shut off system, and the emergency fuel shut off system already in place can not take the place of a shear valve. NFPA 30A Section 4-3.6 states: Small diameter piping systems connected to the dispenser should have a rigidly anchored automatically shutoff shear valve installed in accordance with the manufacturer's instructions. a. This valve should be at the base of each individual island type dispenser or at the inlet of each overhead dispensing device. b. This valve should incorporate a fusible link or other thermally activated device that will close the valve in the event of fire exposure. c. This valve should incorporate a mechanism to close the valve in the event of severe impact or displacement of the dispenser. d. The valve should be rigidly anchored so that the shear section functions as intended. An emergency shutoff valve incorporating a slip joint feature shall not be used. Note that NFPA 30A Section 4-3.6 suggests that shear valves be tested annually for functionality. However, Rule 761.500(8)(c)1 only requires installation standards to be met. You may recommend that the shear valves be tested annually but the Fire Marshall must enforce this. In an accident, as the dispenser is knocked over, these valves are intended to break and seal off the piping at the location of the valve to prevent a submersible pump from pumping out a geyser of fuel. It is both a fire hazard issue as well as environmental issue. | ||||||||||
08/18/2011 | Editable Letter Activity | Condoleon, George John | |||||||||
Activity Title: | 1st Non-Compliance Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/18/2011 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 08/18/2011 | User: | CONDOLEON_GJ_1 | ||||||||
Description: | NCL.8521491.Aabaad | ||||||||||
View Attachment | |||||||||||
08/18/2011 | Emergency Preparedness Information Activity | Condoleon, George John | |||||||||
Activity Result: | Satisfied | Activity Status: | Closed | ||||||||
Activity Closed Date: | 08/18/2011 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/18/2011 | ||||||||
Comment: | Finished | ||||||||||
08/18/2011 | Site Inspection Activity Closed | Condoleon, George John | |||||||||
Activity Result: | Minor Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 08/18/2011 | ||||||||||
Activity Closed Date: | 08/18/2011 | Activity Closed By: | CONDOLEON_GJ_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/18/2011 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 08/18/2011 | User: | CONDOLEON_GJ_1 | ||||||||
Description: | This inspection was conducted on 8/18/11. This facility consists of 1-20,000 gallon and 1-10,000 gallon (compartmented) double wall underground storage tanks and 3 dispensers. Release Detection Method-The release detection method is monthly visual inspection of the double wall spill buckets, dispenser sumps, and dispensing equipment. The facility is also monitored electronically (Veeder Root EQ-197,596) (STP sumps, tank interstitial). An operability test of the Veeder Root monitoring system, the double wall spill bucket gauges, and mechanical line leak detectors is required annually. Documentation Available-The the Release Detection Response Level form (RDRL), the Certificate of Financial Responsibility (CFR), proof of insurance, 2011-2012 Placard, and monthly visual inspections with tapes from 9/7/10 thru 8/1/11 were available. All the visual inspections were within the 35 day time limit and appeared to coincide with physical inspection observations. The Veeder Root "Alarm History Report" did not indicate any alarms, except for test dates. Physical Inspection-The type of piping of the system is double wall fiberglass Ameron. The STP sumps were dry at the time of inspection; mechanical line leak detectors and properly positioned sensors were observed. The primary of the spill buckets were dry; a straight drop tube with flapper was observed in the diesel fill, the gasoline fills contained co-axial drop tubes with flapper. The secondary of the spill buckets indicated "dry". (The "Edge" double wall spill bucket is equipped with a gauge for the secondary inspection. The dispenser sumps were dry. The #5/6 shear valves valve bolts were loose (See NOTE-1); all others appeared to be secured. No damage was noted on the dispensing equipment; however, there appears to be a leak at the #5 diesel swivel joint. (See NOTE-2) There were no Veeder Root alarms at the time of inspection. Testing- Norris and Samon tested and passed the mechanical line leak detectors and the Veeder Root tank monitor on 8/18/11. (See NOTE-3) The spill bucket secondary gauges were tested and passed on 8/1/10. (Checked monthly) NOTE 1) This violation will be closed using the Non-Compliance Letter (NCL) as the shear valve bolts were tightened during the inspection. 2) Within 14 days of receipt of this report, repair the swivel joint ant contact this office. 3) Two months overdue. Testing violations will be issued, then closed using the NCL. | ||||||||||
08/18/2011 | Violation Closed | Condoleon, George John | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 1103 | ||||||||||
Rule: | 62-761.640(4)(a)1., 62-761.640(4)(a)2., 62-761.640(4)(a)3., 62-761.640(4)(a)4. | ||||||||||
Comments: | Installation - verify that the line leak detector has been installed during the final installation inspection. Compliance - check to see that the unit is present. Examine the annual function test data - a pass alone is not sufficient. The tester must demonstrate 3.0 gph discharge detection for the mechanical (flow restrictor). Note that the electronic (auto shut off) line leak detector does not need an annual test, but must still be able to detect a 0.2 gph leak after it has been tripped at 150% line operating pressure. Replacements - unit must be tested out of the box - function must be proven. 3.0 gph = 185.4 ml/min (To convert milliliters/minute to gallons/hour, multiple the milliliters by 0.0162162; or, 1 gph equals 61.8 ml/min). Values greater than 186 ml/min fail. Values less than 185 ml/min mean that the line leak detector will activate at a more restrictive rate. | ||||||||||
08/18/2011 | Violation Closed | Condoleon, George John | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 1117 | ||||||||||
Rule: | 62-761.700(1)(c)3. | ||||||||||
Comments: | Facility must prove that all release detection devices, such as in line leak detectors, sump and liner sensors, ATGs, etc. function properly. Sensing devices may be optical, vapor, float activated, discriminating, non-discriminating, or tied into electrical circuits. ATG probes inside of tanks require calibration testing, if used for release detection as well as inventory measurements. | ||||||||||
08/18/2011 | Violation Closed | Condoleon, George John | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 1105 | ||||||||||
Rule: | 62-761.700(1)(a)1.a., 62-761.700(1)(a)1.b., 62-761.700(1)(a)1.c., 62-761.700(1)(a)1.d. | ||||||||||
Comments: | Mark this as out of compliance if you observe a needed repair that hasn't been completed, and the potential for a release exists. Examples of components that would need repair include (but are not limited to) leaking dispensers, cracked spill containment, improperly anchored shear valves, or any compromised containment component. Upon the detection of one of the above conditions, has the facility initiated and completed repairs? | ||||||||||
08/06/2010 | Violation Closed | Condoleon, George John | |||||||||
Significance: | SNC-B | Status: | Closed | ||||||||
Criteria ID: | 1066 | ||||||||||
Rule: | 62-761.600(1)(h) | ||||||||||
Comments: | Visual monitoring or manual sampling: The idea is to visually inspect the interstice or inside containment area for product. Works well with piping sumps, dispenser liners, integral piping J ports, tanks with interstitial ports. Continuous electronic sensing equipment: Panel on the wall, probe in the interstice. Variety of probes: liquid (petroleum discriminating/ non discriminating), vapor, optical. Hydrostatic monitoring systems: Liquid level readings recorded monthly, or electronically monitored with an alarm. Vacuum monitoring: Vacuum readings recorded monthly, or equipped with a low vacuum alarm. | ||||||||||
08/06/2010 | Editable Letter Activity | Condoleon, George John | |||||||||
Activity Title: | 1st Non-Compliance Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/06/2010 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 08/06/2010 | User: | CONDOLEON_GJ_1 | ||||||||
Description: | NCL.NOT.SENT | ||||||||||
View Attachment | |||||||||||
08/06/2010 | Emergency Preparedness Information Activity | Condoleon, George John | |||||||||
Activity Result: | Satisfied | Activity Status: | Closed | ||||||||
Activity Closed Date: | 08/06/2010 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/06/2010 | ||||||||
Comment: | Finished | ||||||||||
08/06/2010 | Site Inspection Activity Closed | Condoleon, George John | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 08/06/2010 | ||||||||||
Activity Closed Date: | 08/06/2010 | Activity Closed By: | CONDOLEON_GJ_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/06/2010 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 08/06/2010 | User: | CONDOLEON_GJ_1 | ||||||||
Description: | This inspection was conducted on 11/24/09. This facility consists of 1-20,000 gallon and 1-10,000 gallon (compartmented) double wall underground storage tanks and 3 dispensers. Release Detection Method-The release detection method is monthly visual inspection of the double wall spill buckets, dispenser sumps, and dispensing equipment. The facility is also monitored electronically (Veeder Root EQ-197,596) (STP sumps, tank interstitial). An operability test of the Veeder Root monitoring system and mechanical line leak detectors is required annually. Documentation Available-The the Release Detection Response Level form (RDRL), the Certificate of Financial Responsibility (CFR), proof of insurance, 2010-2011 Placard (See NOTE-1), and monthly visual inspections with tapes from 12/1/09 thru 8/4/10 were available. All the visual inspections were within the 35 day time limit and appeared to coincide with physical inspection observations. (See NOTE-2) The Veeder Root "Alarm History Report" indicated 2 interstitial alarms. (See NOTE-3) Physical Inspection-The type of piping of the system is double wall fiberglass Ameron. The STP sumps were dry at the time of inspection; mechanical line leak detectors and properly positioned sensors were observed. The primary of the spill buckets were dry; a straight drop tube with flapper was observed in the diesel fill, the gasoline fills contained co-axial drop tubes with flapper. The secondary of the spill buckets indicated "dry". (The "Edge" double wall spill bucket is equipped with a gauge for the secondary inspection-See NOTE-4) The dispenser sumps were dry and the shear valves appeared to be secured. No damage was noted on the dispensing equipment. There were no Veeder Root alarms at the time of inspection. Testing- Precision Petroleum tested and passed the mechanical line leak detectors and the Veeder Root tank monitor on 6/17/10. The spill bucket secondary gauges were tested and passed on 8/6/10. NOTE 1) The 2010-2011 registration fees were paid a few days prior to the inspection. The Placard was available as an E-mail attachment. The owner will print out the Placard and display. 2) AS NOTED IN THE 2009 COMPLIANCE INSPECTION, IT APPEARS THAT THE DOUBLE WALL SPACE OF THE SPILL BUCKET IS NOT BEING INSPECTED (DOCUMENTED) REVISE YOUR FORM IMMEDIATELY. The citation will be issued, then closed using the (Not mailed) Non-Compliance Letter (NCL). IF THIS IS REAPEATED DURING THE NEXT ANNUAL INSPECTION, THIS FACILITY WILL BE REFERRED FOR ENFORCEMENT ACTION. 3) These alarms occurred the day before the sensors were tested and documentation showed they were not long lasting. 4) The gauge was tested and passed by the facility owner on the inspection date. | ||||||||||
11/24/2009 | Site Inspection Activity Closed | Condoleon, George John | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 11/24/2009 | ||||||||||
Activity Closed Date: | 11/25/2009 | Activity Closed By: | CONDOLEON_GJ_1 | ||||||||
Comments: | |||||||||||
Comment Date: | 11/25/2009 | User: | CONDOLEON_GJ_1 | ||||||||
Description: | Note- This facility was upgraded to a double wall system in June of 2009. The previous owner (the Pantry, Inc.) submitted compliance documentation to this office from the last compliance inspection in February of 2009 to the single tank removal in May, 2009. This inspection was conducted on 11/24/09. This facility consists of 1-20,000 gallon and 1-10,000 gallon (compartmented) double wall underground storage tanks and 3 dispensers. Release Detection Method-The release detection method is monthly visual inspection of the double wall spill buckets, Submersible Turbine Pump (STP) and dispenser sumps, and dispensing equipment. The facility is also monitored electronically (Veeder Root EQ-197,596) (STP sumps, tank interstitial). An operability test of the Veeder Root monitoring system and mechanical line leak detectors is required annually. Documentation Available-The the Release Detection Response Level form (RDRL), the Certificate of Financial Responsibility (CFR), proof of insurance, 2009-2010 Placard, and monthly visual inspections with tapes from 7/31/09 thru 11/2/09 were available. (See NOTE-1) All the visual inspections were within the 35 day time limit and appeared to coincide with physical inspection observations. This facility recently registered the new tanks. (See NOTE-2) The Veeder Root ¿Alarm History Report¿ did not indicate any alarms, except for test dates. Physical Inspection-The type of piping of the system is double wall fiberglass Ameron. The STP sumps were dry at the time of inspection; mechanical line leak detectors and properly positioned sensors were observed. The primary of the spill buckets were dry; a straight drop tube with flapper was observed in the diesel fill, the gasoline fills contained co-axial drop tubes with flapper. The secondary of the spill buckets indicated ¿dry¿. (The ¿Edge¿ double wall spill bucket is equipped with a gauge for the secondary inspection-See NOTE-3) The dispenser sumps were dry and the shear valves appeared to be secured. No damage was noted on the dispensing equipment. There were no ¿liquid Status¿ Veeder Root alarms at the time of inspection. Testing ¿ Precision Petroleum tested and passed he tanks, lines, mechanical line leak detectors, spill buckets, and the Veeder Root tank monitor, on 6/19/09. NOTE 1) There was no specific documentation noted on the inspection form showing the double wall spaces of the spill buckets are being inspected. Please revise your inspection sheet IMMEDIATELY. Failure to do so may result in possible enforcement. 2) The new tanks were being fueled without a valid Placard or registration; the Florida Department of Environmental Protection (FDEP) has decided not to pursue enforcement. 3) This gauge must be tested annually and documented. | ||||||||||
08/18/2009 | Record Document Activity | Condoleon, George John | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | Al | Activity Closed Date: | 08/18/2009 | ||||||||
07/15/2009 | TCAR Activity | Condoleon, George John | |||||||||
Activity Result: | Satisfied | Activity Status: | Closed | ||||||||
Activity Closed Date: | 07/15/2009 | ||||||||||
07/15/2009 | Editable Letter Activity | Condoleon, George John | |||||||||
Activity Title: | Closure Review Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Document has been sent | Date: | 07/29/2009 | ||||||||
Comment: | Sent on Wed Jul 29 12:56:54 EST 2009 | ||||||||||
06/30/2009 | Editable Letter Activity | Condoleon, George John | |||||||||
Activity Title: | 1st Non-Compliance Letter | Activity Status: | Closed | ||||||||
06/29/2009 | Violation Closed | Condoleon, George John | |||||||||
Significance: | SNC-B | Status: | Closed | ||||||||
Criteria ID: | 1004 | ||||||||||
Rule: | 62-761.400(3)(a)1. | ||||||||||
Comments: | There are various financial responsibility mechanisms available: Risk Retention Group (RRG) Endorsements Certificate of Insurance Guarantee Letter of Credit Fully Funded Trust Fund Self-Insurance with letter from CFO Stand-by Trust Fund Bond Rating Test (Local Governments) Local Government Financial Test Local Government Guarantee Local Government Fund For detailed information, refer to the DEP's Financial Responsibility Handbook pages 2-1, 2-2. Verify which mechanism(s) are used by the facility. State and federal facilities are exempt from financial responsibility, being considered a type of self insurance. They are always in compliance for this category. Document state or federal as appropriate. Financial responsibility must be maintained on out-of-service tanks. Note: Mark the absence of/or the lack of complete info in the certification of financial responsibility under Rule 62-761.710(2). | ||||||||||
06/29/2009 | Violation Closed | Condoleon, George John | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 1123 | ||||||||||
Rule: | 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d), 62-761.710(2)(e), 62-761.710(2)(f), 62-761.710(2)(g), 62-761.710(2)(h) | ||||||||||
Comments: | If the problem involves failure to perform according to the standards in each of the following areas, then note these items in addition to the paperwork for this rule: a. and g. Inventory - rules 62-761.640(3)(b)1-2, 62-761.640(3)(c) & 62-761.700(1)(c)5 b. Repair, operation, and maintenance - rules 62-761.700(1)(a)1, 62-761.700(1)(a)5, 62-761.700(1)(a)6 & 62-761.700(1)(c)3 c. Release detection - rules 62-761.600(1)(e), 62-761.610(3)(b), 62-761.640(2)(c)4, 62-761.640(2)(e), 62-761.640(3)(d), 62-761.640(3)(e)1-5 & 62-761.640(3)(e)9 d. Release detection response level descriptions - rules 62-761.600(1)(b) & 62-761.640(1)(c) e. Tightness, pressure, and breach of integrity tests - rules 62-761.610(3)(a)1, 62-761.640(1)(a) & 62-761.640(4)(a) f. Financial responsibility - rule 62-761.400(3) g. Repairs and replacements - rule 62-761.700(1)(a)6 The following are not this rule's issues: Rules 62-761.450(1)(a)1, 62-761.450(1)(a)2, 62-761.450(1)(a)3 & 62-761.450(1)(a)4 are verbal notices of activities that may also be written Rule 62-761.450(1)(b) is a registration issue Rules 62-761.450(2), 62-761.450(3)(a) & 62-761.450(3)(b) are INF/DRF reporting issues Rules 62-761.600(1)(a)3 & 62-761.600(1)(f) are covered by rule 62-761.710(3) Anything with cathodic protection is covered by rule 62-761.710(3) | ||||||||||
06/15/2009 | Comment | Condoleon, George John | |||||||||
Description: | Upgraded June, 2009. 2-Modern Welding "Glasteel" II DW Steel fiberglass coated tanks; DW Fiberglass Ameron (coaxial) piping. | ||||||||||
06/15/2009 | Attachment | Condoleon, George John | |||||||||
05/22/2009 | Site Inspection Activity Closed | Condoleon, George John | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 05/22/2009 | ||||||||||
Activity Closed Date: | 06/30/2009 | Activity Closed By: | CONDOLEON_GJ_1 | ||||||||
Comments: | |||||||||||
Comment Date: | 06/29/2009 | User: | CONDOLEON_GJ_1 | ||||||||
Description: | Contactor: Precision Petroleum, phone 727-547-0070, PCC-056781 Major parts list: 1) Tanks- (E Q-156) 1-20,000 gallon and 1-10,000 gallon (Compartmented 6k Premium and 4k Diesel)¿Glasteel II¿ Double Wall Fiberglass Coated Steel Underground Storage Tanks. 2) Piping-(E Q-291) Ameron LCX Double Wall Fiberglass. 3) Overfill Protection (EQ-414) Emco Wheaton A1004-065/Drop tube/flapper 4) STP Sumps-(EQ-318) OPW TSDF 4536 5) Dispenser sumps-(EQ-318) OPW 6) Line Leak Detection-(EQ-373) Red Jacket FX1V Mechanical 7) Spill Buckets- (EQ-708) OPW DW ¿Edge¿ 8) Release Detection-(EQ-197,596) Veeder Root TLS 350 5/22/09- The tanks were delivered with a vacuum; the vacuum at the factory was 22¿ Hg and 23¿ Hg at delivery for the compartmented tank and 21¿ Hg both at deliver and at the factory for the non-compartmented tank. The 20,000 gallon tank was already in the pit when the inspector arrived. The 10,000 gallon tank was placed into the pit without incident. The tanks will not use deadmen; overburden will be used. 6/2/09 ¿ The primary lines were pressurized to 52 pounds per square inch (psi) in the morning. Line pressures were 54 psi or greater in the afternoon. The lines were soap tested at all joints with no apparent leaks. (All Pass) 6/4/09- (Inspector not present) Per the Pasco County Fire Marshall inspector, the secondary of the lines were pressurized and all joints were soap tested and passed. Final Inspection- 6/19/09 (Michael Martin) Release Detection-Release Detection method for this facility will be monthly visual inspection of the spill buckets, dispenser and STP sumps, and dispensing equipment. The interstitial space of the tanks and the STP sumps (also) will be monitored electronically. The mechanical line leak detectors and the tank monitor will be tested annually. Physical Inspection- The tank pad was inspected and passed by the Pasco County Building Department on an earlier date. The STP sumps were dry; mechanical line leak detectors and properly positioned sensors were observed, and the test boots were open. The spill buckets (secondary and primary) were dry; a straight drop tube with flapper was observed in the diesel fill, and a co-axial drop tube with flapper was observed in the gasoline fills. The dispenser sumps were dry and the shear valves appeared to be secured. The Veeder Root was reading ¿normal¿. Documentation- The updated Release Detection Response Level, (RDRL), the 2008-2009 Placard, the Certified Contractors form, tank install and delivery information was available. The updated proof of insurance and Certification of Financial Responsibility (CFR) were not available. As of 6/29/09, the new tanks have not been registered. Please submit the registration form to Tallahassee no later than 7/19/09. (Tank #2 must also be registered as ¿removed from site¿) Test Results- The lines, tanks, spill buckets, Veeder Root, and mechanical line leak detectors were tested and passed by Precision Petroleum on 6/19/09. The inspector could not be onsite to witness the hydro testing of the sumps; a statement by the contractor indicates the sumps were tested and passed. Reminder-The Limited Tank Closure Report will be due on 7/6/09. | ||||||||||
05/06/2009 | Site Inspection Activity Closed | Condoleon, George John | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 05/06/2009 | ||||||||||
Activity Closed Date: | 05/08/2009 | Activity Closed By: | CONDOLEON_GJ_1 | ||||||||
Comments: | |||||||||||
Comment Date: | 05/08/2009 | User: | CONDOLEON_GJ_1 | ||||||||
Description: | Contractor: Southern Pump & Tank Company PCC 056875 Phone (904) 388-7571 Environmentalist ¿ Earth Tech (407) 262-2931 OVA Instrument: Unknown Activity- Removal of 2-10,000 and 2-6,000 gallon fiberglass coated steel Underground Storage Tanks. Discharge History- One Discharge Reported at this site. 4/28/1990- Petroleum Liability and Restoration Program-eligible; Score 95; Status- Active. Program site manager: Michael Pennington /Phone (850) 245-8851. 5/5/09- (Michael Martin, 12PM) The contractor stated the tanks were pumped down on 5/4/09 and were washed and rinsed on 5/5/09 by Moran Environmental Services. Staining was observed around the fills; the highest OVA reading while the inspector was present was 225ppm. All of the tanks were removed on this date, however, scheduling conflicts prevented the inspector to be onsite while the tanks were removed. The method of tank inertion is unknown. 5/6/09- (George Condoleon, 7:30 AM) Two of the tanks were loaded on a flatbed for removal when the inspector arrived. All of the tanks appeared to be in good condition. A strong petroleum odor was detected by the pit. Most of the piping and the dispenser pans will be removed when the new tanks (new owner) are installed. The contractor stated that 150 tons of soil was segregated for removal. Depth to groundwater is approximately 10ft. Reminder: Please include the manifest for the tank wash, any sludge, and the tanks in the Closure Report, which will be due by July 6th, 2009. Please submit a registration form to Tallahassee showing the tank(s) removal by June 6, 2009. | ||||||||||
03/05/2009 | Record Document Activity | Condoleon, George John | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | Amy | Activity Closed Date: | 03/05/2009 | ||||||||
02/26/2009 | Record Document Activity | Condoleon, George John | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | Amy Rennie | Activity Closed Date: | 02/26/2009 | ||||||||
02/26/2009 | Emergency Preparedness Information Activity | Condoleon, George John | |||||||||
Activity Result: | Satisfied | Activity Status: | Closed | ||||||||
Activity Closed Date: | 02/26/2009 | ||||||||||
02/19/2009 | Violation Closed | Condoleon, George John | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 1123 | ||||||||||
Rule: | 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d), 62-761.710(2)(e), 62-761.710(2)(f), 62-761.710(2)(g), 62-761.710(2)(h) | ||||||||||
Comments: | If the problem involves failure to perform according to the standards in each of the following areas, then note these items in addition to the paperwork for this rule: a. and g. Inventory - rules 62-761.640(3)(b)1-2, 62-761.640(3)(c) & 62-761.700(1)(c)5 b. Repair, operation, and maintenance - rules 62-761.700(1)(a)1, 62-761.700(1)(a)5, 62-761.700(1)(a)6 & 62-761.700(1)(c)3 c. Release detection - rules 62-761.600(1)(e), 62-761.610(3)(b), 62-761.640(2)(c)4, 62-761.640(2)(e), 62-761.640(3)(d), 62-761.640(3)(e)1-5 & 62-761.640(3)(e)9 d. Release detection response level descriptions - rules 62-761.600(1)(b) & 62-761.640(1)(c) e. Tightness, pressure, and breach of integrity tests - rules 62-761.610(3)(a)1, 62-761.640(1)(a) & 62-761.640(4)(a) f. Financial responsibility - rule 62-761.400(3) g. Repairs and replacements - rule 62-761.700(1)(a)6 The following are not this rule's issues: Rules 62-761.450(1)(a)1, 62-761.450(1)(a)2, 62-761.450(1)(a)3 & 62-761.450(1)(a)4 are verbal notices of activities that may also be written Rule 62-761.450(1)(b) is a registration issue Rules 62-761.450(2), 62-761.450(3)(a) & 62-761.450(3)(b) are INF/DRF reporting issues Rules 62-761.600(1)(a)3 & 62-761.600(1)(f) are covered by rule 62-761.710(3) Anything with cathodic protection is covered by rule 62-761.710(3) | ||||||||||
02/19/2009 | Editable Letter Activity | Condoleon, George John | |||||||||
Activity Title: | 1st Non-Compliance Letter | Activity Status: | Closed | ||||||||
02/19/2009 | Violation Closed | Condoleon, George John | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 1105 | ||||||||||
Rule: | 62-761.700(1)(a)1.a., 62-761.700(1)(a)1.b., 62-761.700(1)(a)1.c., 62-761.700(1)(a)1.d. | ||||||||||
Comments: | Mark this as out of compliance if you observe a needed repair that hasn't been completed, and the potential for a release exists. Examples of components that would need repair include (but are not limited to) leaking dispensers, cracked spill containment, improperly anchored shear valves, or any compromised containment component. Upon the detection of one of the above conditions, has the facility initiated and completed repairs? | ||||||||||
02/18/2009 | Site Inspection Activity Closed | Condoleon, George John | |||||||||
Activity Result: | Minor Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 02/18/2009 | ||||||||||
Activity Closed Date: | 02/19/2009 | Activity Closed By: | CONDOLEON_GJ_1 | ||||||||
Comments: | |||||||||||
Comment Date: | 02/19/2009 | User: | CONDOLEON_GJ_1 | ||||||||
Description: | Release Detection ¿ Statistical Inventory Reconciliation (SIR) for the tank with tank tightness test every three years, visual inspection of the Submersible Turbine Pump (STP) and dispenser sumps, spill buckets, and annual certification of the mechanical line leak detectors. Physical Inspection Results ¿ The piping is Western double wall flexible piping. The STP sumps were dry; mechanical line leak detectors were observed. The spill buckets were dry; co-axial drop tubes with flappers were observed in the gasoline fill pipes. The diesel fill pipe contained a straight drop tube with flapper. The dispenser sumps were dry; the shear valves appeared to be secured. There were no apparent damage/leaks observed from the dispensing equipment. Records Available ¿ The 2008-2009 Placard, the Released Detection Response Level (RDRL), the Certification of Financial Responsibility (CFR), and proof of insurance were available. The monthly visual inspections from 2/12/08 to 1/5/09 (see NOTE-1) were available; all were within the 35 day time period, and the visual inspection results appeared to coincide with physical inspection observations. The dispenser sumps were dry (see NOTE-2) and the shear valves appeared to be secured. There was no apparent leaks/wear noted on the inspection equipment. The SIR reports (USTman version 95.2B, EQ-458) from 2/08 to 11/08 (all passed) were also available. Test Results ¿ Down Under Tank Testing tested and passed the mechanical line leak detectors on 3/4/08. Down Under Tank Testing tested and passed the mechanical line leak detectors, the lines, and the tanks on 3/15/07. NOTE 1) The 11/4/08 inspection report indicated product in the Premium and Regular STP sumps. Please provide documentation showing when/how the product was removed. 2) The # 3 diesel dispenser meter appeared to have a very slow leak; no product was noted in the dispenser sump. Repair the apparent slow leak. Also, please be aware that all underground single walled storage tank systems must meet the new standards as double walled systems (tank and piping) by December 31st, 2009. It is highly recommended that you upgrade your system as soon as possible. This will insure product and contractor availability, cost savings and no need for enforcement actions. | ||||||||||
02/13/2008 | Emergency Preparedness Information Activity | Condoleon, George John | |||||||||
Activity Result: | Satisfied | Activity Status: | Closed | ||||||||
Activity Closed Date: | 02/13/2008 | ||||||||||
02/12/2008 | Site Inspection Activity Closed | Condoleon, George John | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 02/12/2008 | ||||||||||
Activity Closed Date: | 02/13/2008 | Activity Closed By: | CONDOLEON_GJ_1 | ||||||||
Comments: | |||||||||||
Comment Date: | 02/13/2008 | User: | CONDOLEON_GJ_1 | ||||||||
Description: | Release Detection ¿ Statistical Inventory Reconciliation (SIR) for the tank with tank tightness test every three years, visual inspection of the Submersible Turbine Pump (STP) and dispenser sumps, spill buckets, and annual certification of the mechanical line leak detectors. Physical Inspection Results ¿ The piping is Western double wall flexible piping. The STP sumps were dry; mechanical line leak detectors were observed. The spill buckets were dry; co-axial drop tubes with flappers were observed in the gasoline fill pipes. The diesel fill pipe contained a straight drop tube with flapper. The dispenser sumps were dry; the shear valves appeared to be secured. There were no apparent damage/leaks observed from the dispensing equipment. Records Available ¿ The placard 2007-2008, the Released Detection Response Level (RDRL), the Certification of Financial Responsibility (C F R), and proof of insurance were available. The monthly visual inspections from 2/20/07 to 1/10/08 were available; all were within the 35 day time period, and the visual inspection results appeared to coincide with physical inspection observations. The SIR reports (USTman version 95.2B, EQ-458) from 1/07 to 1/08 (all passed) were also available. Test Results ¿ Down Under Tank Testing (RQ# 0060202) tested and passed the mechanical line leak detectors, the lines, and the tanks on 3/15/07. Also, please be aware that all underground single walled storage tank systems must meet the new standards as double walled systems (tank and piping) by December 31st, 2009. It is highly recommended that you upgrade your system as soon as possible. This will insure product and contractor availability, cost savings and no need for enforcement actions. | ||||||||||
02/20/2007 | Site Inspection Activity Closed | Condoleon, George John | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 02/20/2007 | ||||||||||
Activity Closed Date: | 02/21/2007 | Activity Closed By: | CONDOLEON_GJ_1 | ||||||||
Comments: | |||||||||||
Comment Date: | 02/21/2007 | User: | CONDOLEON_GJ_1 | ||||||||
Description: | Release Detection ¿ Statistical Inventory Reconciliation (S I R) for the tank with tank tightness test every three years, visual inspection of the Submersible Turbine Pump (S T P) and dispenser sumps, spill buckets, and annual certification of the mechanical line leak detectors. Physical Inspection Results ¿ The piping is Western double wall flexible piping. The mid-grade S T P sump contained a very small amount of old product; it was cleaned at the time of inspection by Mr. Robert Arenburgh of The Pantry, Inc. All other S T P sumps were dry; Mechanical leak detectors were observed. The spill buckets were dry; co-axial drop tubes with flappers were observed in the gasoline fill pipes. The diesel fill pipe contained a straight drop tube with flapper. The dispenser sumps were dry; the shear valves appeared to be secured. There were no apparent leaks coming from the dispensing equipment. Records Available ¿ The placard 2006-2007, the Released Detection Response Level (R D R L), the Certificate of Financial Responsibility (C F R), and proof of insurance were available. The monthly visual inspections from 4/18/06 to 12/13/06 were available, there was one period (8/15/06 to 9/21/06) that exceeded the 35 day time period, and the visual inspection results coincided with physical inspection observations. The SIR reports (USTman version 95.2B, EQ-458) from 4/06 to 12/06 (all passed) were also available. Test Results ¿ Down Under Tank Testing (RQ# 0060202) tested and passed the mechanical line leak detectors on 3/14/06. Down Under Tank Testing tested and passed the 4 tanks on 3/9/04. Reminder-The 3 year Tank tightness testing will be due on 3/9/07, and the mechanical line leak detector annual test will be due on 3/14/07. Remark- Please schedule your monthly inspections so they do not exceed the 35 day time limit. Also, please be aware that all underground single walled storage tank systems must meet the new standards as double walled systems (tank and piping) by December 31st, 2009. It is highly recommended that you upgrade your system as soon as possible. This will insure product and contractor availability, cost savings and no need for enforcement actions. | ||||||||||
02/19/2007 | Comment | Condoleon, George John | |||||||||
Description: | Facility consists of 2-10,000 and 2-6000 gallon fiberglass-clad steel single wall tanks. The pipng is double wall Western flex. | ||||||||||
02/19/2007 | Attachment | Condoleon, George John | |||||||||
02/12/2007 | Emergency Preparedness Information Activity | Condoleon, George John | |||||||||
Activity Result: | Satisfied | Activity Status: | Closed | ||||||||
Activity Closed Date: | 02/12/2007 | ||||||||||
09/18/2006 | Emergency Preparedness Information Activity | Condoleon, George John | |||||||||
Activity Result: | Satisfied | Activity Status: | Closed | ||||||||
Activity Closed Date: | 09/27/2006 | ||||||||||
06/20/2006 | Record Document Activity | Condoleon, George John | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | B. Puzak | Activity Closed Date: | 06/20/2006 | ||||||||
04/19/2006 | Comment | MIGRATION | |||||||||
Description: | COMMUNICATION: TO: PENNINGTON_M, SITE MANAGER Email: Mike.Pennington@dep.state.fl.us Email Date: 04/19/2006 ACTIVITY ID: 11717653 - TANK ANNUAL COMPLIANCE INSPECTION WAS PERFORMED AT FACILITY ID: 8521491 ON 04/18/2006 BY CONDOLEON, G J. EVALUATION RESULT = MINOR OUT-OF-COMPLIANCE. ACTIVITY RECORDED ON 04/19/2006 USER: GEORGE CONDOLEON OF PASCO COUNTY HEALTH DEPARTMENT | ||||||||||
04/19/2006 | Legacy Activity | Condoleon, George John | |||||||||
Activity Name: | NON-COMPLIANCE LETTER ISSUED | Activity Status: | Closed | ||||||||
04/19/2006 | Comment | MIGRATION | |||||||||
Description: | COMMUNICATION: TO: PENNINGTON_M, SITE MANAGER Email: Mike.Pennington@dep.state.fl.us Email Date: 04/19/2006 ACTIVITY ID: 11717653 - TANK ANNUAL COMPLIANCE INSPECTION WAS PERFORMED AT FACILITY ID: 8521491 ON 04/18/2006 BY CONDOLEON, G J. EVALUATION RESULT = MINOR OUT-OF-COMPLIANCE. ACTIVITY RECORDED ON 04/19/2006 USER: GEORGE CONDOLEON OF PASCO COUNTY HEALTH DEPARTMENT | ||||||||||
04/19/2006 | Comment | MIGRATION | |||||||||
Description: | COMMUNICATION: TO: PENNINGTON_M, SITE MANAGER Email: Mike.Pennington@dep.state.fl.us Email Date: 04/19/2006 ACTIVITY ID: 11717653 - TANK ANNUAL COMPLIANCE INSPECTION WAS PERFORMED AT FACILITY ID: 8521491 ON 04/18/2006 BY CONDOLEON, G J. EVALUATION RESULT = MINOR OUT-OF-COMPLIANCE. ACTIVITY RECORDED ON 04/19/2006 USER: GEORGE CONDOLEON OF PASCO COUNTY HEALTH DEPARTMENT | ||||||||||
04/19/2006 | Comment | MIGRATION | |||||||||
Description: | COMMUNICATION: TO: PENNINGTON_M, SITE MANAGER Email: Mike.Pennington@dep.state.fl.us Email Date: 04/19/2006 ACTIVITY ID: 11717653 - TANK ANNUAL COMPLIANCE INSPECTION WAS PERFORMED AT FACILITY ID: 8521491 ON 04/18/2006 BY CONDOLEON, G J. EVALUATION RESULT = MINOR OUT-OF-COMPLIANCE. ACTIVITY RECORDED ON 04/19/2006 USER: GEORGE CONDOLEON OF PASCO COUNTY HEALTH DEPARTMENT | ||||||||||
04/19/2006 | Comment | MIGRATION | |||||||||
Description: | COMMUNICATION: TO: PENNINGTON_M, SITE MANAGER Email: Mike.Pennington@dep.state.fl.us Email Date: 04/19/2006 ACTIVITY ID: 11717653 - TANK ANNUAL COMPLIANCE INSPECTION WAS PERFORMED AT FACILITY ID: 8521491 ON 04/18/2006 BY CONDOLEON, G J. EVALUATION RESULT = MINOR OUT-OF-COMPLIANCE. ACTIVITY RECORDED ON 04/19/2006 USER: GEORGE CONDOLEON OF PASCO COUNTY HEALTH DEPARTMENT | ||||||||||
04/19/2006 | Comment | MIGRATION | |||||||||
Description: | COMMUNICATION: TO: PENNINGTON_M, SITE MANAGER Email: Mike.Pennington@dep.state.fl.us Email Date: 04/19/2006 ACTIVITY ID: 11717653 - TANK ANNUAL COMPLIANCE INSPECTION WAS PERFORMED AT FACILITY ID: 8521491 ON 04/18/2006 BY CONDOLEON, G J. EVALUATION RESULT = MINOR OUT-OF-COMPLIANCE. ACTIVITY RECORDED ON 04/19/2006 USER: GEORGE CONDOLEON OF PASCO COUNTY HEALTH DEPARTMENT | ||||||||||
04/19/2006 | Comment | MIGRATION | |||||||||
Description: | COMMUNICATION: TO: PENNINGTON_M, SITE MANAGER Email: Mike.Pennington@dep.state.fl.us Email Date: 04/19/2006 ACTIVITY ID: 11717653 - TANK ANNUAL COMPLIANCE INSPECTION WAS PERFORMED AT FACILITY ID: 8521491 ON 04/18/2006 BY CONDOLEON, G J. EVALUATION RESULT = MINOR OUT-OF-COMPLIANCE. ACTIVITY RECORDED ON 04/19/2006 USER: GEORGE CONDOLEON OF PASCO COUNTY HEALTH DEPARTMENT | ||||||||||
04/19/2006 | Comment | MIGRATION | |||||||||
Description: | COMMUNICATION: TO: PENNINGTON_M, SITE MANAGER Email: Mike.Pennington@dep.state.fl.us Email Date: 04/19/2006 ACTIVITY ID: 11717653 - TANK ANNUAL COMPLIANCE INSPECTION WAS PERFORMED AT FACILITY ID: 8521491 ON 04/18/2006 BY CONDOLEON, G J. EVALUATION RESULT = MINOR OUT-OF-COMPLIANCE. ACTIVITY RECORDED ON 04/19/2006 USER: GEORGE CONDOLEON OF PASCO COUNTY HEALTH DEPARTMENT | ||||||||||
04/19/2006 | Comment | MIGRATION | |||||||||
Description: | COMMUNICATION: TO: PENNINGTON_M, SITE MANAGER Email: Mike.Pennington@dep.state.fl.us Email Date: 04/19/2006 ACTIVITY ID: 11717653 - TANK ANNUAL COMPLIANCE INSPECTION WAS PERFORMED AT FACILITY ID: 8521491 ON 04/18/2006 BY CONDOLEON, G J. EVALUATION RESULT = MINOR OUT-OF-COMPLIANCE. ACTIVITY RECORDED ON 04/19/2006 USER: GEORGE CONDOLEON OF PASCO COUNTY HEALTH DEPARTMENT | ||||||||||
04/19/2006 | Comment | MIGRATION | |||||||||
Description: | COMMUNICATION: TO: PENNINGTON_M, SITE MANAGER Email: Mike.Pennington@dep.state.fl.us Email Date: 04/19/2006 ACTIVITY ID: 11717653 - TANK ANNUAL COMPLIANCE INSPECTION WAS PERFORMED AT FACILITY ID: 8521491 ON 04/18/2006 BY CONDOLEON, G J. EVALUATION RESULT = MINOR OUT-OF-COMPLIANCE. ACTIVITY RECORDED ON 04/19/2006 USER: GEORGE CONDOLEON OF PASCO COUNTY HEALTH DEPARTMENT | ||||||||||
04/19/2006 | Comment | MIGRATION | |||||||||
Description: | COMMUNICATION: TO: PENNINGTON_M, SITE MANAGER Email: Mike.Pennington@dep.state.fl.us Email Date: 04/19/2006 ACTIVITY ID: 11717653 - TANK ANNUAL COMPLIANCE INSPECTION WAS PERFORMED AT FACILITY ID: 8521491 ON 04/18/2006 BY CONDOLEON, G J. EVALUATION RESULT = MINOR OUT-OF-COMPLIANCE. ACTIVITY RECORDED ON 04/19/2006 USER: GEORGE CONDOLEON OF PASCO COUNTY HEALTH DEPARTMENT | ||||||||||
04/18/2006 | Violation Closed | Unknown, User | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 1103 | ||||||||||
Rule: | 62-761.640(4)(a)1., 62-761.640(4)(a)2., 62-761.640(4)(a)3., 62-761.640(4)(a)4. | ||||||||||
Comments: | Installation - verify that the line leak detector has been installed during the final installation inspection. Compliance - check to see that the unit is present. Examine the annual function test data - a pass alone is not sufficient. The tester must demonstrate 3.0 gph discharge detection for the mechanical (flow restrictor). Note that the electronic (auto shut off) line leak detector does not need an annual test, but must still be able to detect a 0.2 gph leak after it has been tripped at 150% line operating pressure. Replacements - unit must be tested out of the box - function must be proven. 3.0 gph = 185.4 ml/min (To convert milliliters/minute to gallons/hour, multiple the milliliters by 0.0162162; or, 1 gph equals 61.8 ml/min). Values greater than 186 ml/min fail. Values less than 185 ml/min mean that the line leak detector will activate at a more restrictive rate. | ||||||||||
04/18/2006 | Legacy Activity | Condoleon, George John | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
04/18/2006 | Violation Closed | Unknown, User | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 1123 | ||||||||||
Rule: | 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d), 62-761.710(2)(e), 62-761.710(2)(f), 62-761.710(2)(g), 62-761.710(2)(h) | ||||||||||
Comments: | If the problem involves failure to perform according to the standards in each of the following areas, then note these items in addition to the paperwork for this rule: a. and g. Inventory - rules 62-761.640(3)(b)1-2, 62-761.640(3)(c) & 62-761.700(1)(c)5 b. Repair, operation, and maintenance - rules 62-761.700(1)(a)1, 62-761.700(1)(a)5, 62-761.700(1)(a)6 & 62-761.700(1)(c)3 c. Release detection - rules 62-761.600(1)(e), 62-761.610(3)(b), 62-761.640(2)(c)4, 62-761.640(2)(e), 62-761.640(3)(d), 62-761.640(3)(e)1-5 & 62-761.640(3)(e)9 d. Release detection response level descriptions - rules 62-761.600(1)(b) & 62-761.640(1)(c) e. Tightness, pressure, and breach of integrity tests - rules 62-761.610(3)(a)1, 62-761.640(1)(a) & 62-761.640(4)(a) f. Financial responsibility - rule 62-761.400(3) g. Repairs and replacements - rule 62-761.700(1)(a)6 The following are not this rule's issues: Rules 62-761.450(1)(a)1, 62-761.450(1)(a)2, 62-761.450(1)(a)3 & 62-761.450(1)(a)4 are verbal notices of activities that may also be written Rule 62-761.450(1)(b) is a registration issue Rules 62-761.450(2), 62-761.450(3)(a) & 62-761.450(3)(b) are INF/DRF reporting issues Rules 62-761.600(1)(a)3 & 62-761.600(1)(f) are covered by rule 62-761.710(3) Anything with cathodic protection is covered by rule 62-761.710(3) | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/02/2018 | User: | HARRINGTON_RD_1 | ||||||||
Description: | Tank 7 Containment Certification 11-14-2017 | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 03/10/2024 | User: | HARRINGTON_RD_1 | ||||||||
Description: | Tank 7 Containment Certification. 1-14-2024 | ||||||||||
View Attachment | |||||||||||
03/15/2005 | Legacy Activity | Condoleon, George John | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
02/17/2004 | Legacy Activity | Rodriguez, Ivan | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
03/12/2003 | Legacy Activity | Unknown, User | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
03/26/2002 | Legacy Activity | Harris, Danny L. | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
05/16/2001 | Legacy Activity | Harris, Danny L. | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
05/05/2000 | Legacy Activity | Harris, Danny L. | |||||||||
Activity Name: | TANK INSTALLATION - FINAL INSPECTION | Activity Status: | Closed | ||||||||
12/21/1999 | Legacy Activity | Harris, Danny L. | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
04/14/1999 | Legacy Activity | Peterson, Jan E. | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
01/06/1999 | Legacy Activity | Harris, Danny L. | |||||||||
Activity Name: | INCIDENT REPORT FORM RECEIVED | Activity Status: | Closed | ||||||||
Completion Notes: | NO DISCHARGE | ||||||||||
03/24/1998 | Violation Closed | Hansen, David W. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Rule: | 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762 | ||||||||||
Comments: | |||||||||||
Comment Date: | 03/10/2004 | User: | UNKNOWN | ||||||||
Description: | REGISTRATION: I(CAROLYN C) TALKED TO MR TOM MCKENZIE WHO OWNS THE PROPERTY & HE SAID HE LEASED TO MULTI-CHOICE OILS LUBRICANTS, AFTER A YEAR THEY JUST GOT UP LEFT MR TOM MCKENZIE WITH & ALONG WITH BILLS. | ||||||||||
Comments: | |||||||||||
Comment Date: | 03/09/2004 | User: | UNKNOWN | ||||||||
Description: | REGISTRATION: THE ADDRESS CHANGED FROM 4412 BLOUNTSTOWN HWY,TALLA,FL 32304 TO THE PO BOX 2200. | ||||||||||
03/24/1998 | Violation Closed | Hansen, David W. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Rule: | 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762, 62-761/762 | ||||||||||
Comments: | |||||||||||
Comment Date: | 03/10/2004 | User: | UNKNOWN | ||||||||
Description: | REGISTRATION: I(CAROLYN C) TALKED TO MR TOM MCKENZIE WHO OWNS THE PROPERTY & HE SAID HE LEASED TO MULTI-CHOICE OILS LUBRICANTS, AFTER A YEAR THEY JUST GOT UP LEFT MR TOM MCKENZIE WITH & ALONG WITH BILLS. | ||||||||||
Comments: | |||||||||||
Comment Date: | 03/09/2004 | User: | UNKNOWN | ||||||||
Description: | REGISTRATION: THE ADDRESS CHANGED FROM 4412 BLOUNTSTOWN HWY,TALLA,FL 32304 TO THE PO BOX 2200. | ||||||||||
03/24/1998 | Legacy Activity | Peterson, Jan E. | |||||||||
Activity Name: | UST ROUTINE COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
Completion Notes: | 51 | ROUTINE COMPLIANCE |