![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Journal Report | |||||||||||
Report Run Date: 04/20/2025 Last Data Refresh: 04/19/2025 Report Generated from DOPPLER | |||||||||||
Facility ID: | 8943444 | ||||||||||
Facility Name: | CHAMPS SPORTS OFFICE COMPLEX | ||||||||||
08/01/2024 | Enforcement Tracking Activity | Kelley, Tanya | |||||||||
Activity Status: | Open | ||||||||||
06/25/2024 | Enforcement Referral Activity | Shanberg, Vincent | |||||||||
Activity Result: | Accepted | Activity Status: | Closed | ||||||||
Activity Closed Date: | 08/01/2024 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/01/2024 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was accepted on this date | Date: | 08/01/2024 | ||||||||
Comment: | Accepted by Tanya Kelley: Accepted Referral Activity | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was acknowledged on this date | Date: | 07/18/2024 | ||||||||
Comment: | Acknowledged and Assigned by Jayme Brock | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been assigned | Date: | 07/18/2024 | ||||||||
Comment: | Assigned to Tanya Kelley | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 06/25/2024 | ||||||||
Comment: | Submitted for approval by: Vincent Shanberg: Referred for Enforcement | ||||||||||
Comments: | |||||||||||
Comment Date: | 06/25/2024 | User: | SHANBERG_VJ_1 | ||||||||
Description: | Referred for Enforcement | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 06/25/2024 | User: | SHANBERG_VJ_1 | ||||||||
Description: | 8943444_Champ Sports_Enforcement Referral Form SWD | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 06/25/2024 | User: | SHANBERG_VJ_1 | ||||||||
Description: | 8943444_Champs Sport_MC Property Appraiser | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 06/25/2024 | User: | SHANBERG_VJ_1 | ||||||||
Description: | 8943444_Champs Sport_Sunbiz | ||||||||||
View Attachment | |||||||||||
03/25/2024 | Attachment | Trethewey, Mark B. | |||||||||
03/25/2024 | Editable Letter Activity | Trethewey, Mark B. | |||||||||
Activity Title: | Compliance Assistance Offer Letter | Activity Status: | Closed | ||||||||
Description: | Certified Contractor Form | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 03/25/2024 | ||||||||
Comment: | Finished | ||||||||||
Events: | |||||||||||
Event Type: | Compliance Assistance Offer Verbal | Date: | 03/25/2024 | ||||||||
Comment: | Compliance Assistance Offer Verbal | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 03/25/2024 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | CAO 2023-2024.051 | ||||||||||
View Attachment | |||||||||||
03/25/2024 | Violation Open | Trethewey, Mark B. | |||||||||
Significance: | SNC-B | Status: | Open | ||||||||
Criteria ID: | 7075 | ||||||||||
Rule: | 62-762.701(1), 62-762.701(1)(a), 62-762.701(1)(a)1, 62-762.701(1)(a)2, 62-762.701(1)(a)3, 62-762.702(1), 62-762.702(1)(a), 62-762.702(1)(a)1, 62-762.702(1)(a)2, 62-762.702(1)(a)3 | ||||||||||
03/25/2024 | Violation Open | Trethewey, Mark B. | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 7072 | ||||||||||
Rule: | 62-762.601(7), 62-762.602(7) | ||||||||||
03/25/2024 | Violation Open | Trethewey, Mark B. | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 7094 | ||||||||||
Rule: | 62-762.711(1) | ||||||||||
03/25/2024 | Violation Open | Trethewey, Mark B. | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 7003 | ||||||||||
Rule: | 62-762.401(4), 62-762.401(4)(a), 62-762.401(4)(a)1, 62-762.401(4)(a)2, 62-762.401(4)(b), 62-762.401(4)(c), 62-762.401(4)(d), 62-762.401(4)(e), 62-762.401(4)(f), 62-762.401(4)(g), 62-762.401(4)(h), 62-762.401(4)(i) | ||||||||||
03/25/2024 | Violation Open | Trethewey, Mark B. | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 7002 | ||||||||||
Rule: | 62-762.401(1)(b), 62-762.401(2), 62-762.401(3), 62-762.401(3)(a), 62-762.401(3)(b), 62-762.401(3)(c) | ||||||||||
03/22/2024 | Site Inspection Activity Closed | Trethewey, Mark B. | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 03/22/2024 | ||||||||||
Activity Closed Date: | 03/25/2024 | Activity Closed By: | TRETHEWEY_MB_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 03/25/2024 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 03/25/2024 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | RECORDS: #8943444, 3/22/2024 Placard: #643027; issued 7/6/2022, 1 tank listed. This is last year’s placard. Submit registration fees to FDEP. Financial Responsibility: Last provided, ACE American Insurance Company, 8/20/2020 - 8/20/2021. Current Proof of Financial Responsibility was not provided. Provide Manatee County NRD with copies of the required documents. CoFR: Not provided. Release Detection: a. This Facility has the following release detection methods: 1. Visual inspection of tank and equipment, electronic gauging of tank interstice. b. Facility monthly release detection results: 1. The monthly visual inspection records from 10/1/2020 to present were not provided. Provide Manatee County NRD with copies of the required records. Visual inspections should include condition of the tank, equipment, piping and the tank interstice. Inspections were performed at least once a month not exceeding 35 days apart. Tests: a. Annual or periodic test results: 1. An operability test of the interstitial sensor was conducted monthly by Facility, last performed on 10/1/2020 with passing results. The next test was due by 10/1/2021. Current test was not provided. Provide Manatee County NRD with copies of the required tests. PHYSICAL: Tank and equipment: The tank and equipment are in fair condition. There is corrosion around the tank top and flange. Remove corrosion and repaint affected areas. | ||||||||||
03/18/2024 | Issue Document Activity | Trethewey, Mark B. | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | Matt Sibley | Activity Closed Date: | 03/25/2024 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 03/25/2024 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 03/25/2024 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | 3-18-2024 Notification Letter 2 | ||||||||||
View Attachment | |||||||||||
03/14/2024 | Issue Document Activity | Trethewey, Mark B. | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | Tim Hoover | Activity Closed Date: | 03/25/2024 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 03/25/2024 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 03/25/2024 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | 3/14/2024 Notification Letter 1 | ||||||||||
View Attachment | |||||||||||
10/29/2020 | Site Inspection Activity Closed | Trethewey, Mark B. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 10/29/2020 | ||||||||||
Activity Closed Date: | 10/29/2020 | Activity Closed By: | TRETHEWEY_MB_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 10/29/2020 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 10/29/2020 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | RECORDS: #8943444, 10/29/2020 Placard: #595299; issued 10/27/2020, 1 tank listed. Financial Responsibility: ACE American Insurance Company, 8/20/2020 - 8/20/2021. Coverage also provided for 8/20/2019 to 8/20/2020. CoFR: Available & complete, with FR. Release Detection: a. This Facility has the following release detection methods: 1. Visual inspection of tank and equipment, electronic gauging of tank interstice. b. Facility monthly release detection results: 1. Reviewed the monthly visual inspection records from 10/1/2018 to 10/1/2020. Visual inspections include condition of the tank, equipment, piping and the tank interstice. Inspections were performed at least once a month not exceeding 35 days apart. Tests: a. Annual or periodic test results: 1. An operability test of the interstitial sensor is conducted monthly by Facility, last performed on 10/1/2020 with passing results. The next test is due by 10/1/2021. PHYSICAL: Tank and equipment: The tank and equipment are in good condition. | ||||||||||
10/29/2020 | Issue Document Activity | Trethewey, Mark B. | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | Tim Hoover | Activity Closed Date: | 10/29/2020 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 10/29/2020 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 10/29/2020 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | 10/29/2020 TCI Compliance Letter | ||||||||||
View Attachment | |||||||||||
10/22/2020 | Issue Document Activity | Trethewey, Mark B. | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | Tim Hoover | Activity Closed Date: | 10/29/2020 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 10/29/2020 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 10/29/2020 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | 10/22/2020 Notification Letter | ||||||||||
View Attachment | |||||||||||
10/22/2018 | Attachment | Trethewey, Mark B. | |||||||||
10/22/2018 | Phone Conversation Activity | Trethewey, Mark B. | |||||||||
Call Type: | Incoming | Activity Status: | Closed | ||||||||
Phone Number: | (941) 744-3215 | Activity Closed Date: | 10/22/2018 | ||||||||
Subject: | Agreed to reschedule for 10-22-2018 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 10/22/2018 | ||||||||
Comment: | Finished | ||||||||||
10/22/2018 | Issue Document Activity | Trethewey, Mark B. | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | Tim Hoover | Activity Closed Date: | 10/22/2018 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 10/22/2018 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 10/22/2018 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | 10-22-2018 TCI Compliance Letter | ||||||||||
View Attachment | |||||||||||
10/22/2018 | Site Inspection Activity Closed | Trethewey, Mark B. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 10/22/2018 | ||||||||||
Activity Closed Date: | 10/22/2018 | Activity Closed By: | TRETHEWEY_MB_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 10/22/2018 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 10/22/2018 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | RECORDS: #8943444, 10/22/2018 Placard: #543357; issued 8/7/2018, 1 tank listed. Financial Responsibility: ACE American Insurance Company, 8/20/2018 - 8/20/2019. Coverage also provided for 8/20/2017 to 8/20/2018. CoFR: Available & complete, on new form. Release Detection: a. This Facility has the following release detection methods: 1. Visual inspection of tank and equipment, electronic gauging of tank interstice. b. Facility monthly release detection results: 1. Reviewed the monthly visual inspection records from 9/2/2016 to 10/1/2018. Visual inspections include condition of the tank, equipment, piping and the tank interstice. Inspections were performed at least once a month not exceeding 35 days apart. Tests: a. Annual or periodic test results: 1. The operability test of the interstitial sensor is conducted monthly by Facility, last performed on 10/1/2018 with passing results. The next test is due by 10/1/2019. PHYSICAL: Tank and equipment: The tank and equipment are in good condition. | ||||||||||
10/22/2018 | Attachment | Trethewey, Mark B. | |||||||||
10/05/2018 | Issue Document Activity | Trethewey, Mark B. | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | Tim Hoover | Activity Closed Date: | 10/22/2018 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 10/22/2018 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 10/22/2018 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | 10-5-2018 Notification Letter | ||||||||||
View Attachment | |||||||||||
09/09/2016 | Issue Document Activity | Trethewey, Mark B. | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | Tim Hoover | Activity Closed Date: | 09/09/2016 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 09/09/2016 | ||||||||
Comment: | Finished | ||||||||||
09/08/2016 | Site Inspection Activity Closed | Trethewey, Mark B. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 09/08/2016 | ||||||||||
Activity Closed Date: | 09/09/2016 | Activity Closed By: | TRETHEWEY_MB_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 09/09/2016 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 09/09/2016 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | RECORDS: #8943444, 9/8/2016 Placard: #474050; issued 5/20/2016, 1 tank listed. Financial Responsibility: ACE American Insurance Company, 8/20/2016 - 8/20/2017. Coverage also provided for 8/20/2015 to 8/20/2016. CoFR: Available, accurate & complete. RDRL: With Release Detection Records. Release Detection: a. This Facility has the following release detection methods: 1. Visual inspection of tank and equipment, electronic gauging of tank interstice. b. Facility monthly release detection results: 1. Reviewed the monthly visual inspection records from 11/3/2014 to 9/2/2016. Visual inspections include condition of the tank, equipment, piping and the tank interstice. Inspections were performed at least once a month not exceeding 35 days apart. Tests: a. Annual or periodic test results: 1. An operability test of the interstitial sensor is conducted monthly by Facility, last performed on 9/2/2016 with passing results. The next test is due by 9/2/2017. PHYSICAL: Tank and equipment: The tank and equipment are in good condition. Tank has recently been repainted. | ||||||||||
08/24/2016 | Issue Document Activity | Trethewey, Mark B. | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | Tim Hoover | Activity Closed Date: | 09/09/2016 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 09/09/2016 | ||||||||
Comment: | Finished | ||||||||||
11/20/2014 | Site Inspection Activity Closed | Trethewey, Mark B. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 11/20/2014 | ||||||||||
Activity Closed Date: | 11/20/2014 | Activity Closed By: | TRETHEWEY_MB_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 11/20/2014 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 11/20/2014 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | RECORDS: #8943444, 11/20/2014 Placard: #430362; issued 6/12/2014, 1 tank listed. Financial Responsibility: ACE American Insurance Company, 8/20/2014 - 8/20/2015. CoFR: Available, accurate & complete. RDRL: With Release Detection Records. Release Detection: a. This Facility has the following release detection methods: 1. Visual inspection of tank and equipment, electronic gauging of tank interstice. b. Facility monthly release detection results: 1. Reviewed the monthly visual inspection records from 7/1/2013 to 11/3/2014. Visual inspections include condition of the tank, equipment, piping and the tank interstice. Inspections were performed at least once a month not exceeding 35 days apart. Tests: 1. An operability test of the interstitial sensor is conducted monthly by Facility, last performed on 11/3/2014. All passed. The next test is due by 11/3/2015. PHYSICAL: Tank and equipment: The tank and equipment are in good condition. | ||||||||||
11/20/2014 | Issue Document Activity | Trethewey, Mark B. | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | Tim Hoover | Activity Closed Date: | 11/20/2014 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 11/20/2014 | ||||||||
Comment: | Finished | ||||||||||
08/01/2013 | Issue Document Activity | Trethewey, Mark B. | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | Tim Hoover | Activity Closed Date: | 08/01/2013 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/01/2013 | ||||||||
Comment: | Finished | ||||||||||
07/31/2013 | Site Inspection Activity Closed | Trethewey, Mark B. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 07/31/2013 | ||||||||||
Activity Closed Date: | 07/31/2013 | Activity Closed By: | TRETHEWEY_MB_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 07/31/2013 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 07/31/2013 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | RECORDS: #8943444, 7/31/2013 Placard: #411418; issued 6/12/2013, 1 tank listed. Financial Responsibility: Illinois Union Insurance Company, 8/20/2012 - 8/20/2013. CoFR: Available, accurate & complete. RDRL: With Release Detection Records. Release Detection: a. This Facility has the following release detection methods: 1. Visual inspection of tank and equipment, electronic gauging of tank interstice. b. Facility monthly release detection results: 1. Reviewed the monthly visual inspection records from 8/17/2011 to 7/17/2013. Visual inspections include condition of the tank, equipment, piping and the tank interstice. Inspections were performed at least once a month not exceeding 35 days apart. Tests: a. Annual or periodic test results: 1. An operability test of the interstitial sensor is conducted monthly by Facility, last performed on 7/1/2013. All passed. The next test is due by 7/1/2014. PHYSICAL: Tank and equipment: The tank and equipment are in good condition. | ||||||||||
08/24/2011 | Site Inspection Activity Closed | Mason, Steve | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 08/24/2011 | ||||||||||
Activity Closed Date: | 08/24/2011 | Activity Closed By: | MASON_RS_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/24/2011 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 08/24/2011 | User: | MASON_RS_1 | ||||||||
Description: | RECORDS: #8943444, 8/24/2011 Placard: #362114; issued 6/3/2011, 1 tank listed Financial Responsibility: Illinois Union Insurance Company, 8/20/2011 - 8/20/2012 CoFR: Available, accurate & complete RDRL: With Release Detection Records Release Detection: a. This Facility has the following release detection methods: 1. Visual inspection of tank and equipment, electronic gauging of tank interstice b. Facility monthly release detection results: 1. Reviewed the monthly visual inspection records for the time period 9/1/2010 through 8/17/2011. Visual inspections include an inspection of the tank, equipment, and piping along with the condition of the tank interstice. Inspections were performed once a month and did not exceed 35 days apart. Tests: a. Annual or periodic test results: 1. An annual operability test of the interstitial sensor was conducted on 9/1/2010 by TAW. All components passed. The next test is due by 9/1/2011. PHYSICAL: Tank and equipment: The tank and equipment are in good condition | ||||||||||
01/25/2011 | Document Management Activity | Brock, Lindsay | |||||||||
Activity Title: | Short Form Consent Order | Activity Status: | Closed | ||||||||
Description: | CAO Letter 5157 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 01/25/2011 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/25/2011 | User: | BROCK_L | ||||||||
Description: | Short Form Consent Order, OGC #10-3584 | ||||||||||
View Attachment | |||||||||||
12/06/2010 | Record Document Activity | Brock, Lindsay | |||||||||
Activity Status: | Closed | ||||||||||
Contact Name: | Anna Long (Attorney) | Activity Closed Date: | 12/06/2010 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 12/06/2010 | ||||||||
Comment: | Finished | ||||||||||
12/06/2010 | Electronic Communication Activity | Brock, Lindsay | |||||||||
Activity Closed Date: | 12/06/2010 | Activity Status: | Closed | ||||||||
Date: | 12/06/2010 | ||||||||||
Recipient: | Lindsay Brock (FDEP) | ||||||||||
Sender: | Anna Long (attorney for Robby's Sporting Goods) | ||||||||||
Subject: | Proposed Settlement for Team Edition Apparel Inc. & Champs Sports Office Complex | ||||||||||
Message: | See attached email correspondence. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 12/06/2010 | ||||||||
Comment: | Finished | ||||||||||
11/02/2010 | Enforcement Tracking Activity | Brock, Lindsay | |||||||||
OGC Case Number: | 10-3584 | Activity Status: | Closed | ||||||||
Activity Result: | Closed With Enforcement | Activity Closed Date: | 01/25/2011 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 01/25/2011 | ||||||||
Comment: | Finished | ||||||||||
09/28/2010 | Enforcement Referral Activity | Trethewey, Mark B. | |||||||||
Activity Result: | Accepted | Activity Status: | Closed | ||||||||
Activity Closed Date: | 11/02/2010 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 10/01/2010 | ||||||||
Comment: | Submitted for approval by: TRETHEWEY_MB_1 | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was acknowledged on this date | Date: | 11/01/2010 | ||||||||
Comment: | Acknowledged and Assigned by: CULBRETH_L | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been assigned | Date: | 11/01/2010 | ||||||||
Comment: | Assigned to BROCK_L | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was accepted on this date | Date: | 11/02/2010 | ||||||||
Comment: | Accepted by: BROCK_L | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 11/02/2010 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 10/01/2010 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | Referral for lack of FR (2006 to 2010), notification and fueling unregistered tank. | ||||||||||
09/24/2010 | Attachment | Trethewey, Mark B. | |||||||||
09/24/2010 | Editable Letter Activity | Trethewey, Mark B. | |||||||||
Activity Title: | 1st Non-Compliance Letter | Activity Status: | Closed | ||||||||
Description: | Incompliance letter | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 09/24/2010 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 09/24/2010 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | NCL 2010-2011.011 | ||||||||||
View Attachment | |||||||||||
09/24/2010 | Attachment | Trethewey, Mark B. | |||||||||
09/24/2010 | Attachment | Trethewey, Mark B. | |||||||||
09/01/2010 | Violation Closed | Trethewey, Mark B. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 2007 | ||||||||||
Rule: | 62-762.451(1)(a)3.a., 62-762.451(1)(a)3.b., 62-762.451(1)(a)3.c. | ||||||||||
Comments: | A good working relationship with the contractors should minimize scheduling problems. Notice can be accepted in these formats: Verbal Written Fax Email | ||||||||||
Comments: | |||||||||||
Comment Date: | 08/15/2024 | User: | FRENCH_EC_1 | ||||||||
Description: | Henning Inc. AST (EQ#749); Madison overfill level switch (EQ#682); Madison basin alarm (EQ#682). | ||||||||||
09/01/2010 | Violation Closed | Trethewey, Mark B. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 2002 | ||||||||||
Rule: | 62-762.401(2)(a)1.a., 62-762.401(2)(a)1.b. | ||||||||||
Comments: | Does STCM accurately reflect the tanks at the facility? This question concerns the registration process and payment of fees only - it is not about accurate registration. Check the number of tanks listed on the registration placard. Does STCM show that all DEP fees are paid? At the time of tank closure, a registration form should be submitted showing the change in tank codes. | ||||||||||
09/01/2010 | Violation Closed | Trethewey, Mark B. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 2001 | ||||||||||
Rule: | 62-762.401(1)(a), 62-762.401(1)(b) | ||||||||||
Comments: | Does STCM accurately reflect the tanks at the facility? This question concerns the registration process and payment of fees only - it is not about accurate registration. Check the number of tanks listed on the registration placard. Can the facility owner/operator produce a registration form to document submittal to DEP? At the time of tank closure, a registration form should be submitted showing the change in tank codes. | ||||||||||
Comments: | |||||||||||
Comment Date: | 11/02/2023 | User: | MCKINNEY_EK_1 | ||||||||
Description: | Release Detection: -Visual inspections of tank system and components. -Electronic monitoring of tank interstice using a Rotating Beacon Sensor (EQ #868) that alarms to a Rolls Royce Solutions Panel located within generator housing and additional annunciating panel located near spill bucket. Note: System does not have printing capabilities. Tank #103486: (1) 1,590 double-walled Tramont Manufacturing sub-based generator (EQ #662) located on a 69"x15"x12" concrete pad and equipped with: -Product label: Diesel. -Normal and emergency venting. -Top-mounted Tramont Manufacturing spill containment bucket (EQ #662) inspected - appeared dry and intact. -Overfill Protection: Morrison bros overfill valve (EQ #858) present as primary overfill protection method. Overfill protection sensor also present as additional overfill protection (EQ #868). Fuel level sight gauge also present as additional overfill protection valve. -Aboveground single-walled flexible supply and return lines run from tank directly to generator above - appeared in good condition. -System does not produce a gravity head, therefore no anti-siphon or manual isolation valves are required. | ||||||||||
09/01/2010 | Violation Closed | Trethewey, Mark B. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 2005 | ||||||||||
Rule: | 62-762.451(1)(a)1. | ||||||||||
Comments: | The local program should receive notice of upgrade, replacement, and installation tasks prior to the initiation of the work. Local program may accept less notice and still consider this item in compliance. This rule citation is not a requirement to submit construction plans. Notice can be accepted in these formats: Verbal Written Fax Email | ||||||||||
09/01/2010 | Violation Closed | Trethewey, Mark B. | |||||||||
Significance: | SNC-B | Status: | Closed | ||||||||
Criteria ID: | 2004 | ||||||||||
Rule: | 62-762.401(3)(a)1. | ||||||||||
Comments: | There are various financial responsibility mechanisms available: Risk Retention Group (RRG) Endorsements Certificate of Insurance Guarantee Letter of Credit Fully Funded Trust Fund Self-Insurance with letter from CFO Stand-by Trust Fund Bond Rating Test (Local Governments) Local Government Financial Test Local Government Guarantee Local Government Fund For detailed information, refer to the DEP's Financial Responsibility Handbook pages 2-1, 2-2. Verify which mechanism(s) are used by the facility. State and federal facilities are exempt from financial responsibility, being considered a type of self insurance. They are always in compliance for this category. Document state or federal as appropriate. Financial responsibility must be maintained on out-of-service tanks. Note: Mark the absence of/or the lack of complete info in the certification of financial responsibility under Rule 62-762.401(3). | ||||||||||
09/01/2010 | Site Inspection Activity Closed | Trethewey, Mark B. | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 08/19/2010 | ||||||||||
Activity Closed Date: | 09/24/2010 | Activity Closed By: | TRETHEWEY_MB_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 09/24/2010 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 09/01/2010 | User: | TRETHEWEY_MB_1 | ||||||||
Description: | Facility Name: Champs Sports Installation Inspection Field Notes 08/19/2010 ¿ Mark Trethewey on-site, contacted by Facility due to supplier refusal to refill. Please note that this inspection is being completed after-the-fact. It is estimated that the tank system was installed in October of 2006. Tank is fueled by: Bradenton Fuel Oil, Inc. 6116 21st St., E. Bradenton, FL 34203 (941) 741-3900 Contractor: Power Secure, Inc. 1609 Heritage Commerce Ct. Wake Forest, NC 27587 (919) 556-3056 The Caterpillar GenSet with a 1,000 gallon belly tank was on-site and in-service. The tank was manufactured by: JRS, Inc (EQ-497) 186 NW 68th Avenue Ocala, FL 34482 Phone: (352) 351-2100 Model #JRS-1000 Tank is equipped with a Morrison Brothers spill bucket (EQ-345), Krueger sight gauge w/alarm (EQ pending) for overfill protection, and an electronic interstitial float sensor wired to NexGear Switching Unit for relay of alarm status to Power Secure in North Carolina. Inspections of the system are performed on the First and Third Wednesday of the month, inspection sheets were provided to include condition of all tank components. RDRL was also provided at inspection. Passing Annual Operability Test of the interstitial sensor was not provided at inspection, passing test performed on 9/1/2010 was supplied after inspection. Current Proof of Financial responsibility was not provided at inspection. FR from 8/20/2010 to 8/20/2011 was supplied after inspection. STRF was signed for submittal to FLDEP. (Note: Facility ID received on 8/27/2010). Historical note: This Facility was previously issued a registration in May 1989 as a result of a contamination assessment performed December 1988. A UST was suspected but determined to have been removed sometime prior to assessment. RELEASE DETECTION, as of 8/19/2010: a. Monthly visual inspections which includes electronic interstitial monitoring of the double-walled tank. Inspections shall also include the tank exterior, spill containment, fill gauge, generator interior, and surrounding area. b. Annual operability test of the tank interstitial sensor. Please note the following: 1. Monthly visual inspections must include remote verification of proper operation of the tank interstitial sensor. 2. The tank interstitial sensor must be physically operability tested annually. ENFORCEMENT ACTION TO BE INITIATED. Please be advised that this facility is being referred to the Department of Environmental Protection (¿Department¿), Temple Terrace, FL, for formal enforcement proceedings. After referral, you may contact the Department at: Ms. Laurel Culbreth, Environmental Manager Petroleum Storage Tanks Section The Department of Environmental Protection 13051 North Telecom Parkway Temple Terrace, FL 33637-0926 (813) 632-7600, X414 |