Facility ID: 8945262
Facility Name: PORT 32 TIERRA VERDE
 
03/21/2024 Editable Letter Activity Puhr, Nicholas M
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 03/21/2024
Comment: Finished
Events:
Event Type: Document has been sent Date: 03/21/2024
Comment: Sent
Attachments:
Attachment Date: 03/21/2024 User: PUHR_NM_1
Description: 3/21/2024 CAO Letter
View Attachment
03/19/2024 Site Inspection Activity Closed Puhr, Nicholas M
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 03/07/2024
Activity Closed Date: 03/21/2024 Activity Closed By: PUHR_NM_1
Events:
Event Type: Activity has been finished Date: 03/21/2024
Comment: Finished
08/29/2022 Editable Letter Activity Wilkerson, Philip
Activity Title: Warning Letter Activity Status: Closed
Description: 2020/12/21, Krueger gauge
Events:
Event Type: Activity has been finished Date: 08/29/2022
Comment: Finished
Events:
Event Type: Activity/Document has been approved Date: 08/29/2022
Comment: Approved by Jayme Brock: Approved
Events:
Event Type: Activity has been submitted for approval Date: 08/29/2022
Comment: Submitted for approval by: Philip Wilkerson
Attachments:
Attachment Date: 08/29/2022 User: WILKERSON_P
Description: Warning Letter - WL22-120TK52SWD
View Attachment
06/24/2022 Record Document Activity Colson, Nathan J
Activity Status: Closed
Contact Name: Trini Uhlmann Activity Closed Date: 07/14/2022
Events:
Event Type: Activity has been finished Date: 07/14/2022
Comment: Finished
06/01/2022 Attachment Colson, Nathan J
06/01/2022 Editable Letter Activity Colson, Nathan J
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 06/01/2022
Comment: Finished
Events:
Event Type: Document has been sent Date: 06/01/2022
Comment: Sent
Attachments:
Attachment Date: 06/01/2022 User: COLSON_NJ_1
Description: 06/01/2022 CAO Letter
View Attachment
06/01/2022 Electronic Communication Activity Colson, Nathan J
Activity Closed Date: 06/01/2022 Activity Status: Closed
Date: 06/01/2022
Recipient: Nathan Colson
Sender: Trini Uhlmann
Subject: Re: 8945262 Routine Tanks Inspection - May 18
Message: see attachment
Events:
Event Type: Activity has been finished Date: 06/01/2022
Comment: Finished
Attachments:
Attachment Date: 06/01/2022 User: COLSON_NJ_1
Description: Emails scheduling routine inspection
View Attachment
06/01/2022 Site Inspection Activity Closed Colson, Nathan J
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 05/18/2022
Activity Closed Date: 06/01/2022 Activity Closed By: COLSON_NJ_1
Events:
Event Type: Activity has been finished Date: 06/01/2022
Comment: Finished
06/01/2022 Violation Open Colson, Nathan J
Significance: Minor Status: Open
Criteria ID: 6062
Rule: 62-761.600(4)
Comments:
Comment Date: 07/13/2022 User: WILKERSON_P
Description: Ongoing violation. It was cited back in 5/7/2019.
Comments:
Comment Date: 03/21/2024 User: PUHR_NM_1
Description: Photos were provided dated "3/3" showing the Emco EZ Gauges; although, there was no indication of pass/fail. Photos were submitted on 3/21/24.
06/01/2022 Violation Open Colson, Nathan J
Significance: Minor Status: Open
Criteria ID: 6062
Rule: 62-761.600(4)
Comments:
Comment Date: 07/13/2022 User: WILKERSON_P
Description: Ongoing violation. It was cited back in 5/7/2019.
Comments:
Comment Date: 03/21/2024 User: PUHR_NM_1
Description: Photos were provided dated "3/3" showing the Emco EZ Gauges; although, there was no indication of pass/fail. Photos were submitted on 3/21/24.
06/01/2022 Violation Closed Colson, Nathan J
Significance: SNC-B Status: Closed
Criteria ID: 6063
Rule: 62-761.700(1), 62-761.700(1)(a), 62-761.700(1)(a)1, 62-761.700(1)(a)2
Comments:
Comment Date: 10/10/2022 User: WILKERSON_P
Description: Hose Replaced on 10/8/22
06/01/2022 Violation Open Colson, Nathan J
Significance: Minor Status: Open
Criteria ID: 6013
Rule: 62-761.420(3), 62-761.420(4), 62-761.420(8)
Comments:
Comment Date: 07/14/2022 User: COLSON_NJ_1
Description: FR Part D Forms were submitted for 07/01/2019 through 07/26/2022. *Need the current Part P Form.
Comments:
Comment Date: 03/21/2024 User: PUHR_NM_1
Description: As of 3/21/2024, no FR forms (Part D or Part P) have been received. The site said that they are trying to get the forms signed.
06/01/2022 Violation Open Colson, Nathan J
Significance: Minor Status: Open
Criteria ID: 6013
Rule: 62-761.420(3), 62-761.420(4), 62-761.420(8)
Comments:
Comment Date: 07/14/2022 User: COLSON_NJ_1
Description: FR Part D Forms were submitted for 07/01/2019 through 07/26/2022. *Need the current Part P Form.
Comments:
Comment Date: 03/21/2024 User: PUHR_NM_1
Description: As of 3/21/2024, no FR forms (Part D or Part P) have been received. The site said that they are trying to get the forms signed.
06/01/2022 Violation Closed Colson, Nathan J
Significance: SNC-A Status: Closed
Criteria ID: 6012
Rule: 62-761.420(2)
06/01/2022 Violation Open Colson, Nathan J
Significance: SNC-B Status: Open
Criteria ID: 6063
Rule: 62-761.700(1), 62-761.700(1)(a), 62-761.700(1)(a)1, 62-761.700(1)(a)2
Comments:
Comment Date: 03/21/2024 User: PUHR_NM_1
Description: As of the 3/7/2024 inspection, the corrosion of metal components in the Rec 90 STP sump had not been addressed. The dock dispensers were new.
06/01/2022 Violation Open Colson, Nathan J
Significance: Minor Status: Open
Criteria ID: 6062
Rule: 62-761.600(4)
Comments:
Comment Date: 03/21/2024 User: PUHR_NM_1
Description: As of 3/7/2024, the monitoring system had been down since December 2023 and the sensor status was unavailable due to work in progress by Spacto and Suncoast Electric (according to monthly visual sheet comment). A photo of the monitoring system screen was provided on 3/18/2024 showing what appeared to be no active alarms; however, the photo was blurry. Additionally, the interstitial sensor had not been tested according to the provided liquid sensor test (unsure if interstitial alarm is being properly recorded on monitoring panel).
06/01/2022 Violation Open Colson, Nathan J
Significance: Minor Status: Open
Criteria ID: 6074
Rule: 62-761.710(1), 62-761.710(2), 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d), 62-761.710(3), 62-761.710(3)(a), 62-761.710(3)(b), 62-761.710(3)(c), 62-761.710(3)(d), 62-761.710(3)(e), 62-761.710(3)(f), 62-761.710(3)(g), 62-761.710(3)(h), 62-761.710(3)(i)
Comments:
Comment Date: 03/21/2024 User: PUHR_NM_1
Description: Passing test results for the (2) line leak detectors were submitted, dated 3/6/2024.
06/01/2022 Violation Open Colson, Nathan J
Significance: Minor Status: Open
Criteria ID: 6053
Rule: 62-761.500(7)(c), 62-761.500(7)(c)1, 62-761.500(7)(c)2, 62-761.500(7)(d)
Comments:
Comment Date: 03/21/2024 User: PUHR_NM_1
Description: Passing, overfill test results were provided, dated 3/6/2024.
06/01/2022 Violation Open Colson, Nathan J
Significance: Minor Status: Open
Criteria ID: 6073
Rule: 62-761.700(3)(b), 62-761.700(3)(b)1, 62-761.700(3)(b)2
Comments:
Comment Date: 03/21/2024 User: PUHR_NM_1
Description: During the 3/7/2024 inspection, it was noted that (2) new dispensers were installed on the dock. The diesel dispenser was currently OOS at the time. No integrity testing of the dispenser liners was available for review. The shear valves also need to be tightened on the Rec 90 dock dispenser.
02/21/2020 Record Document Activity Colson, Nathan J
Activity Status: Closed
Contact Name: Trini Uhlmann (trini@port32tierraverde.com) Activity Closed Date: 02/21/2020
Events:
Event Type: Activity has been finished Date: 02/21/2020
Comment: Finished
02/21/2020 Record Document Activity Colson, Nathan J
Activity Status: Closed
Contact Name: Trini Uhlmann and Alex Pacelko Activity Closed Date: 02/21/2020
Events:
Event Type: Activity has been finished Date: 02/21/2020
Comment: Finished
02/21/2020 Electronic Communication Activity Pacelko, Alexander
Activity Closed Date: 02/21/2020 Activity Status: Closed
Date: 02/21/2020
Recipient: Alexander.Pacelko@FloridaDEP.gov
Sender: trini@port32tierraverde.com
Subject: Violation Resolution
Message: Facility provided documentation of FR for the all months of ownership. Prior FR documents could not be obtained due to different ownership.
Events:
Event Type: Activity has been finished Date: 02/21/2020
Comment: Finished
Attachments:
Attachment Date: 02/21/2020 User: PACELKO_A
Description: 2018-2019 Policy
View Attachment
Attachments:
Attachment Date: 02/21/2020 User: PACELKO_A
Description: Certificate of Insurance
View Attachment
Attachments:
Attachment Date: 02/21/2020 User: PACELKO_A
Description: 2019-2020 Policy
View Attachment
09/27/2019 Electronic Communication Activity Pacelko, Alexander
Activity Closed Date: 09/27/2019 Activity Status: Closed
Date: 09/27/2019
Recipient: trini@port32tierraverde.com
Sender: Alex Pacelko
Subject: Open Violation Correspondence Spill Buckets
Message: Hey, The following testing is overdue: 1. Overfill protection devices (flapper valves) – due at least once every 12 months. Should be verified operational and properly set to engage at no more than 95% of the tank capacity. 2. Spill bucket EZ Gauges – due at least once every 12 months. Verify that the float gauge is functioning properly. 3. Double walled spill bucket integrity – due at least once every 36 months. Vacuum test the Emco Wheaton buckets at 30”WC for 1 min.
Events:
Event Type: Activity has been finished Date: 09/27/2019
Comment: Finished
Attachments:
Attachment Date: 09/27/2019 User: PACELKO_A
Description: 8945262 - Tierra Verde Marina Resort - Email 2
View Attachment
08/15/2019 Electronic Communication Activity Pacelko, Alexander
Activity Closed Date: 09/27/2019 Activity Status: Closed
Date: 08/15/2019
Recipient: brad@port32tierraverde.com
Sender: Alex Pacelko
Subject: Florida Department of Environmental Protection – Tierra Verde Marina Resort - Facility ID #8945262
Message: Initial Enforcement Email
Events:
Event Type: Activity has been finished Date: 09/27/2019
Comment: Finished
Attachments:
Attachment Date: 08/15/2019 User: PACELKO_A
Description: 8945262 - Tierra Verde Marina Resort
View Attachment
08/14/2019 Enforcement Tracking Activity Pacelko, Alexander
Activity Status: Open
08/05/2019 Enforcement Referral Activity Colson, Nathan J
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 08/14/2019
Events:
Event Type: Activity/Document was acknowledged on this date Date: 08/13/2019
Comment: Acknowledged and Assigned by Jayme Brock
Events:
Event Type: Activity has been assigned Date: 08/13/2019
Comment: Assigned to Alexander Pacelko
Events:
Event Type: Activity has been submitted for approval Date: 08/05/2019
Comment: Submitted for approval by: Nathan J. Colson: Outstanding violations open for 90 days.
Events:
Event Type: Activity has been finished Date: 08/14/2019
Comment: Finished
Events:
Event Type: Activity/Document was accepted on this date Date: 08/14/2019
Comment: Accepted by Alexander Pacelko: Accept
Comments:
Comment Date: 08/05/2019 User: COLSON_NJ_1
Description: Outstanding violations open for 90 days.
08/05/2019 Electronic Communication Activity Colson, Nathan J
Activity Closed Date: 08/05/2019 Activity Status: Closed
Date: 08/05/2019
Recipient: Trini Uhlmann, Andrew Hingson, & Brad O'Brien
Sender: Nathan Colson
Subject: RE: Emailing Leak Detector Test - Form(11).pdf
Message: see attachment
Events:
Event Type: Activity has been finished Date: 08/05/2019
Comment: Finished
Comments:
Comment Date: 08/05/2019 User: COLSON_NJ_1
Description: Note: Will also need the insurance policy for 07/01/2018 to 07/01/2019.
08/05/2019 Electronic Communication Activity Colson, Nathan J
Activity Closed Date: 08/05/2019 Activity Status: Closed
Date: 08/05/2019
Recipient: Nathan Colson
Sender: Trini Uhlmann
Subject: Re: 8945262 Tierra Verde Marina Resort
Message: see attachment
Events:
Event Type: Activity has been finished Date: 08/05/2019
Comment: Finished
08/05/2019 Electronic Communication Activity Colson, Nathan J
Activity Closed Date: 08/05/2019 Activity Status: Closed
Date: 08/05/2019
Recipient: Brad O'Brien & Trini Uhlmann
Sender: Nathan Colson
Subject: FW: 8945262 Tierra Verde Marina Resort
Message: see attachment
Events:
Event Type: Activity has been finished Date: 08/05/2019
Comment: Finished
08/02/2019 Record Document Activity Colson, Nathan J
Activity Status: Closed
Contact Name: Trini Uhlmann Activity Closed Date: 08/05/2019
Events:
Event Type: Activity has been finished Date: 08/05/2019
Comment: Finished
05/31/2019 Phone Conversation Activity Colson, Nathan J
Call Type: Incoming Activity Status: Closed
Phone Number: (727) 866-1562 Activity Closed Date: 05/31/2019
Subject: Received a call from Brad O'Brien. They are working on addressing the rust in the STP sump and will send photos of resolution activities soon.
Events:
Event Type: Activity has been finished Date: 05/31/2019
Comment: Finished
05/07/2019 Violation Closed Colson, Nathan J
Significance: Minor Status: Closed
Criteria ID: 4079
Rule: 62-761.710(2), 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d)
05/07/2019 Editable Letter Activity Colson, Nathan J
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 05/07/2019
Comment: Sent
Events:
Event Type: Activity has been finished Date: 05/07/2019
Comment: Finished
Attachments:
Attachment Date: 05/07/2019 User: COLSON_NJ_1
Description: 05/07/2019 CAO Letter
View Attachment
05/07/2019 Violation Closed Colson, Nathan J
Significance: Minor Status: Closed
Criteria ID: 4015
Rule: 62-761.420(3), 62-761.420(4)
05/07/2019 Violation Closed Colson, Nathan J
Significance: Minor Status: Closed
Criteria ID: 4057
Rule: 62-761.500(7)(e)
05/07/2019 Violation Closed Colson, Nathan J
Significance: SNC-B Status: Closed
Criteria ID: 4014
Rule: 62-761.420(2)
05/07/2019 Violation Closed Colson, Nathan J
Significance: Minor Status: Closed
Criteria ID: 4077
Rule: 62-761.700(3)(b), 62-761.700(3)(b)1., 62-761.700(3)(b)2.
05/07/2019 Violation Closed Colson, Nathan J
Significance: Minor Status: Closed
Criteria ID: 4067
Rule: 62-761.600(4)
05/07/2019 Violation Closed Colson, Nathan J
Significance: Minor Status: Closed
Criteria ID: 4077
Rule: 62-761.700(3)(b), 62-761.700(3)(b)1., 62-761.700(3)(b)2.
05/07/2019 Violation Closed Colson, Nathan J
Significance: Minor Status: Closed
Criteria ID: 4076
Rule: 62-761.700(3), 62-761.700(3)(a), 62-761.700(3)(a)1., 62-761.700(3)(a)1.a., 62-761.700(3)(a)1.b., 62-761.700(3)(a)1.c., 62-761.700(3)(a)1.d., 62-761.700(3)(a)1.e., 62-761.700(3)(a)1.f., 62-761.700(3)(a)2.
Comments:
Comment Date: 08/05/2019 User: COLSON_NJ_1
Description: Received hydro test results for all sumps and dispenser liners (and spill buckets). All testing performed by AT&L on 07/29/2019. All results Passing. *Need vacuum test results for the spill bucket interstices.
05/07/2019 Violation Open Colson, Nathan J
Significance: SNC-B Status: Open
Criteria ID: 4059
Rule: 62-761.600(1)(d), 62-761.600(1)(e)
Comments:
Comment Date: 06/01/2022 User: COLSON_NJ_1
Description: Proper release detection inspections are still not being completely documented. The transition sump sensor (L7) has been inoperable & there are no visual inspections documented. Sensors were all out of position in the dispenser liners. Alarm History documentation has not been properly recorded.
Comments:
Comment Date: 03/21/2024 User: PUHR_NM_1
Description: No visual inspections were performed from June of 2022 to December of 2022; although, a monthly sensor status was available (no interstitial alarms on monthly's). No interstitial alarms were recorded until the monitoring system was offline starting in December of 2023. No printouts available for this time.
05/07/2019 Violation Open Colson, Nathan J
Significance: SNC-B Status: Open
Criteria ID: 4059
Rule: 62-761.600(1)(d), 62-761.600(1)(e)
Comments:
Comment Date: 06/01/2022 User: COLSON_NJ_1
Description: Proper release detection inspections are still not being completely documented. The transition sump sensor (L7) has been inoperable & there are no visual inspections documented. Sensors were all out of position in the dispenser liners. Alarm History documentation has not been properly recorded.
Comments:
Comment Date: 03/21/2024 User: PUHR_NM_1
Description: No visual inspections were performed from June of 2022 to December of 2022; although, a monthly sensor status was available (no interstitial alarms on monthly's). No interstitial alarms were recorded until the monitoring system was offline starting in December of 2023. No printouts available for this time.
05/07/2019 Violation Closed Colson, Nathan J
Significance: Minor Status: Closed
Criteria ID: 4068
Rule: 62-761.700(1), 62-761.700(1)(a), 62-761.700(1)(a)1., 62-761.700(1)(a)2.
05/07/2019 Violation Closed Colson, Nathan J
Significance: Minor Status: Closed
Criteria ID: 4077
Rule: 62-761.700(3)(b), 62-761.700(3)(b)1., 62-761.700(3)(b)2.
05/07/2019 Violation Closed Colson, Nathan J
Significance: Minor Status: Closed
Criteria ID: 4067
Rule: 62-761.600(4)
Comments:
Comment Date: 06/01/2022 User: COLSON_NJ_1
Description: The EZ Gauges were tested on 03/12/2020 (Pass), but are once again overdue.
04/26/2019 Electronic Communication Activity Colson, Nathan J
Activity Closed Date: 04/26/2019 Activity Status: Closed
Date: 04/26/2019
Recipient: Brad O'Brien
Sender: Nathan Colson
Subject: Routine Compliance Tank Inspection
Message: (see attachment)
Events:
Event Type: Activity has been finished Date: 04/26/2019
Comment: Finished
Attachments:
Attachment Date: 04/26/2019 User: COLSON_NJ_1
Description: 04/02/2019 email scheduling routine inspection
View Attachment
04/24/2019 Site Inspection Activity Closed Colson, Nathan J
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 04/24/2019
Activity Closed Date: 05/07/2019 Activity Closed By: COLSON_NJ_1
Events:
Event Type: Activity has been finished Date: 05/07/2019
Comment: Finished
05/10/2016 Record Document Activity Colson, Nathan J
Activity Status: Closed
Contact Name: John Brown (bigbadjohn222@hotmail.com) Activity Closed Date: 05/10/2016
Events:
Event Type: Activity has been finished Date: 05/10/2016
Comment: Finished
03/11/2016 Attachment Colson, Nathan J
03/11/2016 Editable Letter Activity Colson, Nathan J
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 03/11/2016
Comment: Sent on Fri Mar 11 00:00:00 EST 2016
Events:
Event Type: Activity has been finished Date: 03/11/2016
Comment: Finished
Attachments:
Attachment Date: 03/11/2016 User: COLSON_NJ_1
Description: NCL 03/11/2016
View Attachment
03/02/2016 Violation Closed Colson, Nathan J
Significance: SNC-B Status: Closed
Criteria ID: 1062
Rule: 62-761.600(1)(d)
Comments: Mark this as out of compliance if any release detection method has not been monitored as required. Look for evidence that the release detection system is not being properly monitored. Examples include: blocked access to monitoring wells; ATG in alarm; ATG panel hidden from view; ATG tape spool empty; buried or submerged sampling ports; corroded locks; or no dispenser keys. Be aware that manual tank gauging requires weekly sampling. Electronic line leak detectors may be wired into an ATG with a memory of test cycles. Facilities with static/periodic ATG systems are required to provide one passing test per product per month. This method has a minimum fuel capacity requirement. Facilities with continuous electronic leak detection ATG systems (e.g., Veeder-Root CSLD) are required to provide one passing test per product per month, although the system must be in daily operation with monthly summary logs. This method has no minimum fuel requirement. If there is a record keeping problem, see rule 62-761.710(2).
03/02/2016 Site Inspection Activity Closed Colson, Nathan J
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 03/02/2016
Activity Closed Date: 03/11/2016 Activity Closed By: COLSON_NJ_1
Events:
Event Type: Activity has been finished Date: 03/11/2016
Comment: Finished
02/23/2016 Phone Conversation Activity Colson, Nathan J
Call Type: Outgoing Activity Status: Closed
Phone Number: (727) 251-5765 Activity Closed Date: 02/23/2016
Subject: Spoke with Chris Longrie (813-838-0540) in the morning in an attempt to set up a routine compliance inspection. Received a voicemail from John Brown (United Oil) later that afternoon. Called John back & scheduled the inspection for 03/02/2016. Emailed a copy of the FDEP Inspection Prep Video link to chris@tierraverdemarinaresort.com. No violations since system Installation was completed last summer.
Events:
Event Type: Activity has been finished Date: 02/23/2016
Comment: Finished
06/26/2015 Attachment Colson, Nathan J
06/26/2015 Issue Document Activity Colson, Nathan J
Activity Status: Closed
Contact Name: Chris Longrie Activity Closed Date: 06/26/2015
Events:
Event Type: Activity has been finished Date: 06/26/2015
Comment: Finished
06/26/2015 Attachment Colson, Nathan J
06/26/2015 Attachment Colson, Nathan J
07/26/2013 Site Inspection Activity Closed Roggelin, Ernest M.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 07/26/2013
Activity Closed Date: 06/26/2015 Activity Closed By: COLSON_NJ_1
Events:
Event Type: Activity has been finished Date: 06/26/2015
Comment: Finished
Comments:
Comment Date: 06/25/2015 User: JUARISTIC_GK_1
Description: 25JUN2015.GKJ_Received COFR and policy. ACE is the insurer with a coverage date of 05/11/2015 to 05/11/2016.
Comments:
Comment Date: 06/25/2015 User: JUARISTIC_GK_1
Description: 24JUN2015.GKJ_ Equipment Installed: Tank: 15,000-g d/w Metal Products Plasteel Elutron. [EQ 333] Compartmented 8,000/7,000 for Rec90 and Diesel. Leak Detection: OPW Site Sentinel Integra 500 Console [EQ 720] Liquid Sensors: Piping/STP sumps and Boat Dock Dispensers-OPW Single-Level Sump Sensor 30-0231-L; Boat Ramp Dispenser-OPW Discriminating Dispenser Pan Sensor with Polymer Strip; Annular Space- Piping: Franklin Fueling Systems semi-rigid UPP [EQ 297] Sumps/Liners: OPW Flexworks Spill Containment Unit: Double-walled Emco Wheaton Spill Buckets. [EQ 695] Overfill Prevention: Diesel straight drop tube equipped with OPW 71SO flow shut-off valve [EQ 697]; Rec90 coaxial drop tube equipped with OPW 61SO flow shut-off valve. [EQ 223]
Comments:
Comment Date: 06/26/2015 User: COLSON_NJ_1
Description: Site Visit Date: 06/26/2015 By: Nathan Colson The spill bucket lid for the Recreation fuel has now been properly painted. The alarm status is now clear.
Comments:
Comment Date: 06/25/2015 User: JUARISTIC_GK_1
Description: 25JUN2015.GKJ_Spoke with Chris Longrie. He said he is trying to find the COFR and insurance policy. He will email in the next few days. Sent an email to chris@tierraverdemarinaresort.com requesting the COFR and policy.
07/26/2013 Site Inspection Activity Closed Roggelin, Ernest M.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 07/26/2013
Activity Closed Date: 06/26/2015 Activity Closed By: COLSON_NJ_1
Events:
Event Type: Activity has been finished Date: 06/26/2015
Comment: Finished
Comments:
Comment Date: 06/25/2015 User: JUARISTIC_GK_1
Description: 25JUN2015.GKJ_Received COFR and policy. ACE is the insurer with a coverage date of 05/11/2015 to 05/11/2016.
Comments:
Comment Date: 06/25/2015 User: JUARISTIC_GK_1
Description: 24JUN2015.GKJ_ Equipment Installed: Tank: 15,000-g d/w Metal Products Plasteel Elutron. [EQ 333] Compartmented 8,000/7,000 for Rec90 and Diesel. Leak Detection: OPW Site Sentinel Integra 500 Console [EQ 720] Liquid Sensors: Piping/STP sumps and Boat Dock Dispensers-OPW Single-Level Sump Sensor 30-0231-L; Boat Ramp Dispenser-OPW Discriminating Dispenser Pan Sensor with Polymer Strip; Annular Space- Piping: Franklin Fueling Systems semi-rigid UPP [EQ 297] Sumps/Liners: OPW Flexworks Spill Containment Unit: Double-walled Emco Wheaton Spill Buckets. [EQ 695] Overfill Prevention: Diesel straight drop tube equipped with OPW 71SO flow shut-off valve [EQ 697]; Rec90 coaxial drop tube equipped with OPW 61SO flow shut-off valve. [EQ 223]
Comments:
Comment Date: 06/26/2015 User: COLSON_NJ_1
Description: Site Visit Date: 06/26/2015 By: Nathan Colson The spill bucket lid for the Recreation fuel has now been properly painted. The alarm status is now clear.
Comments:
Comment Date: 06/25/2015 User: JUARISTIC_GK_1
Description: 25JUN2015.GKJ_Spoke with Chris Longrie. He said he is trying to find the COFR and insurance policy. He will email in the next few days. Sent an email to chris@tierraverdemarinaresort.com requesting the COFR and policy.
07/26/2013 Site Inspection Activity Closed Roggelin, Ernest M.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 07/26/2013
Activity Closed Date: 06/26/2015 Activity Closed By: COLSON_NJ_1
Events:
Event Type: Activity has been finished Date: 06/26/2015
Comment: Finished
Comments:
Comment Date: 06/25/2015 User: JUARISTIC_GK_1
Description: 25JUN2015.GKJ_Received COFR and policy. ACE is the insurer with a coverage date of 05/11/2015 to 05/11/2016.
Comments:
Comment Date: 06/25/2015 User: JUARISTIC_GK_1
Description: 24JUN2015.GKJ_ Equipment Installed: Tank: 15,000-g d/w Metal Products Plasteel Elutron. [EQ 333] Compartmented 8,000/7,000 for Rec90 and Diesel. Leak Detection: OPW Site Sentinel Integra 500 Console [EQ 720] Liquid Sensors: Piping/STP sumps and Boat Dock Dispensers-OPW Single-Level Sump Sensor 30-0231-L; Boat Ramp Dispenser-OPW Discriminating Dispenser Pan Sensor with Polymer Strip; Annular Space- Piping: Franklin Fueling Systems semi-rigid UPP [EQ 297] Sumps/Liners: OPW Flexworks Spill Containment Unit: Double-walled Emco Wheaton Spill Buckets. [EQ 695] Overfill Prevention: Diesel straight drop tube equipped with OPW 71SO flow shut-off valve [EQ 697]; Rec90 coaxial drop tube equipped with OPW 61SO flow shut-off valve. [EQ 223]
Comments:
Comment Date: 06/26/2015 User: COLSON_NJ_1
Description: Site Visit Date: 06/26/2015 By: Nathan Colson The spill bucket lid for the Recreation fuel has now been properly painted. The alarm status is now clear.
Comments:
Comment Date: 06/25/2015 User: JUARISTIC_GK_1
Description: 25JUN2015.GKJ_Spoke with Chris Longrie. He said he is trying to find the COFR and insurance policy. He will email in the next few days. Sent an email to chris@tierraverdemarinaresort.com requesting the COFR and policy.
07/26/2013 Site Inspection Activity Closed Roggelin, Ernest M.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 07/26/2013
Activity Closed Date: 06/26/2015 Activity Closed By: COLSON_NJ_1
Events:
Event Type: Activity has been finished Date: 06/26/2015
Comment: Finished
Comments:
Comment Date: 06/25/2015 User: JUARISTIC_GK_1
Description: 25JUN2015.GKJ_Received COFR and policy. ACE is the insurer with a coverage date of 05/11/2015 to 05/11/2016.
Comments:
Comment Date: 06/25/2015 User: JUARISTIC_GK_1
Description: 24JUN2015.GKJ_ Equipment Installed: Tank: 15,000-g d/w Metal Products Plasteel Elutron. [EQ 333] Compartmented 8,000/7,000 for Rec90 and Diesel. Leak Detection: OPW Site Sentinel Integra 500 Console [EQ 720] Liquid Sensors: Piping/STP sumps and Boat Dock Dispensers-OPW Single-Level Sump Sensor 30-0231-L; Boat Ramp Dispenser-OPW Discriminating Dispenser Pan Sensor with Polymer Strip; Annular Space- Piping: Franklin Fueling Systems semi-rigid UPP [EQ 297] Sumps/Liners: OPW Flexworks Spill Containment Unit: Double-walled Emco Wheaton Spill Buckets. [EQ 695] Overfill Prevention: Diesel straight drop tube equipped with OPW 71SO flow shut-off valve [EQ 697]; Rec90 coaxial drop tube equipped with OPW 61SO flow shut-off valve. [EQ 223]
Comments:
Comment Date: 06/26/2015 User: COLSON_NJ_1
Description: Site Visit Date: 06/26/2015 By: Nathan Colson The spill bucket lid for the Recreation fuel has now been properly painted. The alarm status is now clear.
Comments:
Comment Date: 06/25/2015 User: JUARISTIC_GK_1
Description: 25JUN2015.GKJ_Spoke with Chris Longrie. He said he is trying to find the COFR and insurance policy. He will email in the next few days. Sent an email to chris@tierraverdemarinaresort.com requesting the COFR and policy.
11/22/2010 Editable Letter Activity Sowers, Joseph A.
Activity Title: Closure Assessment Report (Complete) Activity Status: Closed
Events:
Event Type: Document has been sent Date: 11/22/2010
Comment: Sent on Mon Nov 22 00:00:00 EST 2010
Events:
Event Type: Activity has been finished Date: 11/22/2010
Comment: Finished
Attachments:
Attachment Date: 11/22/2010 User: SOWERS_JA_1
Description: PinCHD Review Letter
View Attachment
11/22/2010 TCAR Activity Sowers, Joseph A.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 11/22/2010
Events:
Event Type: Activity has been finished Date: 11/22/2010
Comment: Finished
07/21/2010 Editable Letter Activity Sowers, Joseph A.
Activity Title: Site Assessment Request Activity Status: Closed
Events:
Event Type: Document has been sent Date: 07/21/2010
Comment: Sent on Wed Jul 21 00:00:00 EDT 2010
Events:
Event Type: Activity has been finished Date: 07/21/2010
Comment: Finished
Attachments:
Attachment Date: 07/21/2010 User: SOWERS_JA_1
Description: PinCHD SAR Request Letter
View Attachment
07/21/2010 Discharge Reporting Activity Sowers, Joseph A.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 07/21/2010
Events:
Event Type: Activity has been finished Date: 07/21/2010
Comment: Finished
07/21/2010 Document Management Activity Sowers, Joseph A.
Activity Title: Discharge Report Form Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 07/21/2010
Comment: Finished
Attachments:
Attachment Date: 07/21/2010 User: SOWERS_JA_1
Description: DRF and Lab Data
View Attachment
07/02/2010 Issue Document Activity Strauss, Randall
Activity Status: Closed
Contact Name: Bernie Hefner, Marina Manager Activity Closed Date: 07/02/2010
Events:
Event Type: Activity has been finished Date: 07/02/2010
Comment: Finished
06/30/2010 Site Inspection Activity Closed Strauss, Randall
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 06/30/2010
Activity Closed Date: 07/02/2010 Activity Closed By: STRAUSS_RH_1
Events:
Event Type: Activity has been finished Date: 07/02/2010
Comment: Finished
Comments:
Comment Date: 07/01/2010 User: STRAUSS_RH_1
Description: There are no reported discharges for this site in the DEP database. A full closure assessment per the DEP's "Storage Tank System Closure Assessment Requirements" must be submitted within 60 days of completion of the work. 7/1/2010 PM Telephone conversation with transporter - Trademark Pinellas Park facility does not accept steel tanks with FRP-cladding, had to take tanks to Trademark, Tampa facility 7/1/2010 Telecphone conversation with Dan Wolf, they are leaving piping in place per Bernie Hefner's request - will cap piping ends in excavation and attempt deeper borings at dispenser sites to sample below piping level, and/or will laterally bore below piping from excavation 7/2/2010 Telephone conversation with facility manager, Bernie Hefner: Third tank was cut open and he observed was clean, transported off-site 7/1/10 PM
06/18/2010 Enforcement Tracking Activity Meetze, Alison
Activity Status: Closed
Activity Result: Closed Without Enforcement Activity Closed Date: 11/03/2010
Events:
Event Type: Activity has been finished Date: 11/03/2010
Comment: Finished
06/17/2010 Enforcement Referral Activity Strauss, Randall
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 06/18/2010
Events:
Event Type: Activity/Document was acknowledged on this date Date: 06/18/2010
Comment: Acknowledged and Assigned by: CULBRETH_L
Events:
Event Type: Activity has been submitted for approval Date: 06/17/2010
Comment: Submitted for approval by: STRAUSS_RH_1
Events:
Event Type: Activity has been assigned Date: 06/18/2010
Comment: Assigned to MEETZE_A
Events:
Event Type: Activity/Document was accepted on this date Date: 06/18/2010
Comment: Accepted by: MEETZE_A
Events:
Event Type: Activity has been finished Date: 06/18/2010
Comment: Finished
Comments:
Comment Date: 06/17/2010 User: STRAUSS_RH_1
Description: No FR for 3 SW USTs that are out-of-service as of 1/1/10 with no other open violations
03/12/2010 Meeting Activity Strauss, Randall
Activity Closed Date: 04/12/2010 Activity Status: Closed
Location: PCHD office
Subject: review of DEP registration records indicates fees paid, placard issued - resolves violations
Events:
Event Type: Activity has been finished Date: 04/12/2010
Comment: Finished
02/17/2010 Site Inspection Activity Closed Strauss, Randall
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 02/11/2010
Activity Closed Date: 02/17/2010 Activity Closed By: STRAUSS_RH_1
Events:
Event Type: Activity has been finished Date: 02/17/2010
Comment: Finished
Comments:
Comment Date: 02/17/2010 User: STRAUSS_RH_1
Description: 2010feb11_rhs Inspection to stick tanks after tanks were reportedly pumped-out several days earlier Measured the following amounts: Diesel = slightly less than one inch Both Mid-Grade unleaded tanks = dry Tank fill caps locked and dispensers secured Violations continue for 09-10 registration fees not paid and no financial responsibility mechanism in place; closed violations for no leak detector and line testing, and damage to dispenser liner pending permanent closure or upgrading and placing back in-service
02/17/2010 Editable Letter Activity Strauss, Randall
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 02/17/2010
Comment: Finished
Events:
Event Type: Document has been sent Date: 02/17/2010
Comment: Sent on Wed Feb 17 00:00:00 EST 2010
Attachments:
Attachment Date: 02/17/2010 User: STRAUSS_RH_1
Description: NCL 2.17.10
View Attachment
12/29/2009 Violation Closed Strauss, Randall
Significance: SNC-B Status: Closed
Criteria ID: 1004
Rule: 62-761.400(3)(a)1.
Comments: There are various financial responsibility mechanisms available: Risk Retention Group (RRG) Endorsements Certificate of Insurance Guarantee Letter of Credit Fully Funded Trust Fund Self-Insurance with letter from CFO Stand-by Trust Fund Bond Rating Test (Local Governments) Local Government Financial Test Local Government Guarantee Local Government Fund For detailed information, refer to the DEP's Financial Responsibility Handbook pages 2-1, 2-2. Verify which mechanism(s) are used by the facility. State and federal facilities are exempt from financial responsibility, being considered a type of self insurance. They are always in compliance for this category. Document state or federal as appropriate. Financial responsibility must be maintained on out-of-service tanks. Note: Mark the absence of/or the lack of complete info in the certification of financial responsibility under Rule 62-761.710(2).
12/29/2009 Editable Letter Activity Strauss, Randall
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 12/29/2009
Comment: Sent on Tue Dec 29 00:00:00 EST 2009
Events:
Event Type: Activity has been finished Date: 12/29/2009
Comment: Finished
Attachments:
Attachment Date: 12/29/2009 User: STRAUSS_RH_1
Description: NCL 12.29.09
View Attachment
12/29/2009 Site Inspection Activity Closed Strauss, Randall
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 12/23/2009
Activity Closed Date: 12/29/2009 Activity Closed By: STRAUSS_RH_1
Events:
Event Type: Activity has been finished Date: 12/29/2009
Comment: Finished
Comments:
Comment Date: 12/29/2009 User: STRAUSS_RH_1
Description: 2009dec23_rhs Annual inspection with Bernie Hefner, Gen Mgr Fills marked, single-wall spills OK, straight drop tubes - tanks registered with ball check valves - could not access 6000-gal tank as fill was covered with parked vehicle, will check during 2010 SW site visit Earthen STP sumps with mechanical line leak detectors and piping booted Poured in place type dispenser liners cracked around piping penetrations in Dispensers #1 & #3, others appear OK; shears anchored, all hoses OK Checked 3 monitoring wells with bailer - no odor, no sheen; could not access NW well as it was covered by parked vehicle Bernie Hefner said that there are no plans to upgrade the tanks and he is working on arranging getting the tanks pumped down to less than one inch and taking them out-of-service by 12/31/2009.
12/29/2009 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Criteria ID: 1059
Rule: 62-761.600(1)(a)2.
Comments: Mark this as out of compliance if release detection systems are not functioning or not maintained properly. The inspector will have to know what release detection components have been installed at the facility. Furthermore, develop a library of installation and system operation specifications. These documents will assist you in determining calibration/maintenance as required by the manufacturer. Additional guidance can be found in the Appendix sections of the USEPA "List of Leak Detection Evaluations for Underground Storage Tank Systems" and the DEP Master Equipment List. Installations - have the release detection components been function tested? Just because a piece of equipment is new out of the box does not mean it is fully functional. Have it demonstrated! Calibration/Maintenance - the facility must provide documentation attesting to these operability tests. Operation - The RDRL must be developed, and the facility personnel must be knowledgeable of all the components of the release detection system. Theoretically, they should be able to demonstrate to you how they monitor the release detection system. See rule 62-761.700(1)(c)3
12/29/2009 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Criteria ID: 1115
Rule: 62-761.700(1)(c)1.
Comments: Facility equipment shall be maintained to a degree to allow you access. Water in spill containment units, especially above the fill cap shall be removed. Water in any sumps and dispenser liners above the piping opening/penetration (invert) shall be removed. All regulated substance shall be removed from any of the specified system components. Regulated substances: sheen, free product, mixed product water. Petroleum contact water shall be disposed of in accordance with the Department Hazardous Waste Section's Ch. 62-740 F.A.C., "Petroleum Contact Water".
Comments:
Comment Date: 10/04/2018 User: MULLIGAN_PC_1
Description: EQ LIST Fidelity Manufacturing LLC Double-Wall Generator Base Tank EQ-497 FPI Sensors International Generic Leak Detection System EQ-817 Clay and Bailey Mfg Co Solo Overfill Protection Valve #1228 EQ-257
12/29/2009 Violation Closed Strauss, Randall
Significance: SNC-B Status: Closed
Criteria ID: 1073
Rule: 62-761.610(1)(a)
Comments: Mark this as out of compliance if the storage tank system has a method of release detection available, but the method is improper. Some examples are: monitoring wells used without a site suitability determination; interstitial sensors improperly located, or no sensor at all; SIR contract signed but not performed; inventory control with annual tightness test listed as method, but no test results available or inventory records are incomplete, incorrect or missing; etc.
12/29/2009 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Criteria ID: 1103
Rule: 62-761.640(4)(a)1., 62-761.640(4)(a)2., 62-761.640(4)(a)3., 62-761.640(4)(a)4.
Comments: Installation - verify that the line leak detector has been installed during the final installation inspection. Compliance - check to see that the unit is present. Examine the annual function test data - a pass alone is not sufficient. The tester must demonstrate 3.0 gph discharge detection for the mechanical (flow restrictor). Note that the electronic (auto shut off) line leak detector does not need an annual test, but must still be able to detect a 0.2 gph leak after it has been tripped at 150% line operating pressure. Replacements - unit must be tested out of the box - function must be proven. 3.0 gph = 185.4 ml/min (To convert milliliters/minute to gallons/hour, multiple the milliliters by 0.0162162; or, 1 gph equals 61.8 ml/min). Values greater than 186 ml/min fail. Values less than 185 ml/min mean that the line leak detector will activate at a more restrictive rate.
12/29/2009 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Criteria ID: 1105
Rule: 62-761.700(1)(a)1.a., 62-761.700(1)(a)1.b., 62-761.700(1)(a)1.c., 62-761.700(1)(a)1.d.
Comments: Mark this as out of compliance if you observe a needed repair that hasn't been completed, and the potential for a release exists. Examples of components that would need repair include (but are not limited to) leaking dispensers, cracked spill containment, improperly anchored shear valves, or any compromised containment component. Upon the detection of one of the above conditions, has the facility initiated and completed repairs?
Comments:
Comment Date: 11/05/2018 User: RAUENZAHN_RA_1
Description: 619-gal Hennig steel double wall genset AST, FDEP EQ #749 Rochester fuel level gauge, FDEP EQ #901 Need EQ#'s for spill bucket, leak sensor and overfill protection
12/29/2009 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Criteria ID: 1123
Rule: 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d), 62-761.710(2)(e), 62-761.710(2)(f), 62-761.710(2)(g), 62-761.710(2)(h)
Comments: If the problem involves failure to perform according to the standards in each of the following areas, then note these items in addition to the paperwork for this rule: a. and g. Inventory - rules 62-761.640(3)(b)1-2, 62-761.640(3)(c) & 62-761.700(1)(c)5 b. Repair, operation, and maintenance - rules 62-761.700(1)(a)1, 62-761.700(1)(a)5, 62-761.700(1)(a)6 & 62-761.700(1)(c)3 c. Release detection - rules 62-761.600(1)(e), 62-761.610(3)(b), 62-761.640(2)(c)4, 62-761.640(2)(e), 62-761.640(3)(d), 62-761.640(3)(e)1-5 & 62-761.640(3)(e)9 d. Release detection response level descriptions - rules 62-761.600(1)(b) & 62-761.640(1)(c) e. Tightness, pressure, and breach of integrity tests - rules 62-761.610(3)(a)1, 62-761.640(1)(a) & 62-761.640(4)(a) f. Financial responsibility - rule 62-761.400(3) g. Repairs and replacements - rule 62-761.700(1)(a)6 The following are not this rule's issues: Rules 62-761.450(1)(a)1, 62-761.450(1)(a)2, 62-761.450(1)(a)3 & 62-761.450(1)(a)4 are verbal notices of activities that may also be written Rule 62-761.450(1)(b) is a registration issue Rules 62-761.450(2), 62-761.450(3)(a) & 62-761.450(3)(b) are INF/DRF reporting issues Rules 62-761.600(1)(a)3 & 62-761.600(1)(f) are covered by rule 62-761.710(3) Anything with cathodic protection is covered by rule 62-761.710(3)
12/29/2009 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Criteria ID: 1002
Rule: 62-761.400(2)(a)
Comments: Does STCM accurately reflect the tanks at the facility? This question concerns the registration process and payment of fees only - it is not about accurate registration. Check the number of tanks listed on the registration placard. Can the facility owner/operator produce a registration form to document submittal to DEP? Does STCM show that all DEP fees are paid? At the time of tank closure, a registration form should be submitted showing the change in tank codes.
12/29/2009 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Criteria ID: 1122
Rule: 62-761.710(1)
Comments: Was reasonable access to the facility granted? If not, document the circumstances. Were the records available within the specified time frame? If five day pre-inspection notice was not given by the inspector, this item can not be marked as a discrepancy. Make note of the missing documents, and arrange a review period.
Comments:
Comment Date: 11/27/2019 User: ARLINE_JD_1
Description: EQs TANK: Fabricated by Lannon Tank Co. LLC (dba Lannon Tank Corp.; UL 142 Single-Walled Aboveground Storage Tanks, ((EQ-911), double walled tanks included in EQ file) PRODUCT PIPING: NA OVERSPILL PROTECTION: Clay & Bailey Mfg. Co.; AST spill containment (EQ-874) OVERFILL PROTECTION: Krueger Sentry At-A-Glance (Type D) fuel Level Gauge Krueger (EQ-730) LEAK DETECTION: Krueger Sentry Gauge Co. Inc., AT-A-GLANCE Leak Gauge (EQ-675)
12/29/2009 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Criteria ID: 1117
Rule: 62-761.700(1)(c)3.
Comments: Facility must prove that all release detection devices, such as in line leak detectors, sump and liner sensors, ATGs, etc. function properly. Sensing devices may be optical, vapor, float activated, discriminating, non-discriminating, or tied into electrical circuits. ATG probes inside of tanks require calibration testing, if used for release detection as well as inventory measurements.
12/29/2009 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Criteria ID: 1003
Rule: 62-761.400(2)(f)
Comments: All federal facilities with USTs will have a placard. Per FS 376.3077, "It is unlawful for any owner, operator, or supplier to pump or otherwise deposit any motor fuel into a tank required to be registered under section 376.303 FS, unless proof of valid registration is displayed on such tank itself or the dispensing or measuring device connected thereto or, where appropriate, in the office or kiosk of the facility where the tank is located." Penalties can be assessed to the facility owner for failure to properly register tank systems. Note that penalties can be assessed to the supplier that delivers motor fuel to an unregistered facility. Check the details on the placard. Do they agree with the location you are inspecting? Owners of multiple facilities may switch placards by mistake. Placards are not always issued or received in a timely manner at the change of year period (June and July). Provide the DEP Tallahassee phone number to the facility so they may resolve problems (850) 245-8850; (850) 245-8840. Check STCM in the registration/placard section for the date that the payment was made and the date that the placard was issued. The location of the placard in plain view can be subjective in interpretation: a. For vehicular fuel facilities, plain view is meant to allow the transport delivery driver to view the placard prior to delivering fuel. b. A legal definition is an exception to the general requirement of a valid search warrant to legitimize a search or seizure; a search implies prying into hidden places, and it is not a search to observe what is open to view.
07/07/2008 Site Inspection Activity Closed Barnett, James
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 07/07/2008
Activity Closed Date: 07/07/2008 Activity Closed By: BARNETT_JX
Comments:
Comment Date: 07/07/2008 User: BARNETT_JX
Description: Monthly Release Detection Reocrds: -Monthly visual inspection records: sumps, dispensers, spill containment. 1/08-7/08.-ok -Monthly monitoring well inspections including depth of well and depth of water. 1/08-7/08.-ok -Inventory reconcialliation records. 1/08-7/08.-ok
Comments:
Comment Date: 07/07/2008 User: BARNETT_JX
Description: Inspected on 7.7.08. JB -2008-2009 placard.-ok -RDRL.-ok -FR: Illinois Union +CoFR. 7/8/07-7/8/08.-ok -Earthen sumps, SW piping wrapped.-ok -SW spill containment units, Fills with registered ball float overfill.-ok -Dispenser liners dry, shear valves, hoses in good condition.-ok -Emergency shut off switch, Annual spill response training, SWS contracted.-ok -DPRC #101126 issued 7/7/08.-ok
07/07/2008 Site Inspection Activity Closed Barnett, James
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 07/07/2008
Activity Closed Date: 07/07/2008 Activity Closed By: BARNETT_JX
Comments:
Comment Date: 07/07/2008 User: BARNETT_JX
Description: Monthly Release Detection Reocrds: -Monthly visual inspection records: sumps, dispensers, spill containment. 1/08-7/08.-ok -Monthly monitoring well inspections including depth of well and depth of water. 1/08-7/08.-ok -Inventory reconcialliation records. 1/08-7/08.-ok
Comments:
Comment Date: 07/07/2008 User: BARNETT_JX
Description: Inspected on 7.7.08. JB -2008-2009 placard.-ok -RDRL.-ok -FR: Illinois Union +CoFR. 7/8/07-7/8/08.-ok -Earthen sumps, SW piping wrapped.-ok -SW spill containment units, Fills with registered ball float overfill.-ok -Dispenser liners dry, shear valves, hoses in good condition.-ok -Emergency shut off switch, Annual spill response training, SWS contracted.-ok -DPRC #101126 issued 7/7/08.-ok
01/22/2008 Site Inspection Activity Closed Longen, Julie L.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 01/22/2008
Activity Closed Date: 01/23/2008 Activity Closed By: LONGEN_JL_1
Comments:
Comment Date: 01/23/2008 User: LONGEN_JL_1
Description: Placard ok. RDRL ok. FR & CoFR ok 7-8-07 to 7-8-08, ACE. Monthly visual inspection records reviewed from 4-3-07 to 1-5-08. Visual inspections include monitoring wells, spill buckets, STP sumps, and dispensers. Inventory Reconciliation records reviewed from 4-07 to 12-07, ok. Test results: Line tightness tests on 4-12-07 by Discovery, passed. Line leak detectors annual operability testing on 4-12-07 by Discovery, passed. Tank tighness testing on 4-12-07 by Discovery (RQ0066479) , all passed. At inspection on 1-22-08 with Bernie (notified 1-9-08) Fills: Tight fills, registered ball float overfill prevention, marked, ok. Spill containment clean and dry. MUL tank contains 5" product, not in use currently (not due to disrepair) STP sumps: Earthen sumps, SW piping is wrapped, unable to determine type. Diesel VMI MLLD, MUL RJ MLLD (x2) Dispensers: Shears, hoses and liners ok. Emergency shut-off ok. Annual spill response training 1-1-08. SWS contracted. DPRC issued.
07/03/2007 Issue Document Activity Meetze, Alison
Activity Status: Closed
Contact Name: DEP/SWD Activity Closed Date: 07/05/2007
07/03/2007 Enforcement Tracking Activity Culbreth, Laurel
Activity Status: Closed
Activity Result: Closed With Enforcement Activity Closed Date: 07/05/2007
06/11/2007 Enforcement Referral Activity - OLD Activity Sowers, Joseph A.
No data found!
06/11/2007 Enforcement Referral Activity Sowers, Joseph A.
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 07/03/2007
Events:
Event Type: Activity/Document was accepted on this date Date: 07/03/2007
Comment: Previously referred enforcement case.
Events:
Event Type: Activity/Document was acknowledged on this date Date: 07/03/2007
Comment: Previously referred enforcement case. Received by SWD 9/19/2005.
Events:
Event Type: Activity has been submitted for approval Date: 06/11/2007
Comment: Facility previously referred for enforcement
Comments:
Comment Date: 07/03/2007 User: CULBRETH_L
Description: Previously referred enforcement case.
Comments:
Comment Date: 07/03/2007 User: CULBRETH_L
Description: Previously referred enforcement case. Received by SWD 9/19/2005.
Comments:
Comment Date: 06/11/2007 User: UNKNOWN
Description: Facility previously referred for enforcement
06/11/2007 Enforcement Referral Activity Sowers, Joseph A.
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 07/03/2007
Events:
Event Type: Activity/Document was accepted on this date Date: 07/03/2007
Comment: Previously referred enforcement case.
Events:
Event Type: Activity/Document was acknowledged on this date Date: 07/03/2007
Comment: Previously referred enforcement case. Received by SWD 9/19/2005.
Events:
Event Type: Activity has been submitted for approval Date: 06/11/2007
Comment: Facility previously referred for enforcement
Comments:
Comment Date: 07/03/2007 User: CULBRETH_L
Description: Previously referred enforcement case.
Comments:
Comment Date: 07/03/2007 User: CULBRETH_L
Description: Previously referred enforcement case. Received by SWD 9/19/2005.
Comments:
Comment Date: 06/11/2007 User: UNKNOWN
Description: Facility previously referred for enforcement
06/11/2007 Enforcement Referral Activity Sowers, Joseph A.
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 07/03/2007
Events:
Event Type: Activity/Document was accepted on this date Date: 07/03/2007
Comment: Previously referred enforcement case.
Events:
Event Type: Activity/Document was acknowledged on this date Date: 07/03/2007
Comment: Previously referred enforcement case. Received by SWD 9/19/2005.
Events:
Event Type: Activity has been submitted for approval Date: 06/11/2007
Comment: Facility previously referred for enforcement
Comments:
Comment Date: 07/03/2007 User: CULBRETH_L
Description: Previously referred enforcement case.
Comments:
Comment Date: 07/03/2007 User: CULBRETH_L
Description: Previously referred enforcement case. Received by SWD 9/19/2005.
Comments:
Comment Date: 06/11/2007 User: UNKNOWN
Description: Facility previously referred for enforcement
05/01/2007 Issue Document Activity Strauss, Randall
Activity Status: Closed
Contact Name: Bernie Hefner Activity Closed Date: 05/01/2007
05/01/2007 Editable Letter Activity Strauss, Randall
Activity Title: District Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 05/01/2007
Comment: Sent on Tue May 01 00:00:00 EST 2007
Comments:
Comment Date: 06/19/2007 User: STRAUSS_RH_1
Description: Violations resolved with DEP SFCO 6.07
Attachments:
Attachment Date: 05/01/2007 User: STRAUSS_RH_1
Description: NCL Report
View Attachment
04/26/2007 Site Inspection Activity Closed Strauss, Randall
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 04/26/2007
Activity Closed Date: 05/01/2007 Activity Closed By: STRAUSS_RH_1
Comments:
Comment Date: 04/26/2007 User: STRAUSS_RH_1
Description: 2007_apr_26_rhs: Monitoring well covers painted, MW cap replaced, Dispenser 1B hose repaired Monthly inspection and MWs checked 4.3.07, inventory being kept beginning April 2007 6K former Premium was filled with Mid-Grade for recent tank tightness test; after test, product was pumped into 10K Mid-Grade and tank is not being used Reviewed newly updated spill contingency plan and training sign-off April 1, 2007 - OK SWS spill response agreement 3.22.07 Found old inventory records for 1/04-4/04 Service records available past two years
04/11/2007 Attachment Strauss, Randall
04/10/2007 Violation Closed Strauss, Randall
Significance: SNC-B Status: Closed
Criteria ID: 1062
Rule: 62-761.600(1)(d)
Comments: Mark this as out of compliance if any release detection method has not been monitored as required. Look for evidence that the release detection system is not being properly monitored. Examples include: blocked access to monitoring wells; ATG in alarm; ATG panel hidden from view; ATG tape spool empty; buried or submerged sampling ports; corroded locks; or no dispenser keys. Be aware that manual tank gauging requires weekly sampling. Electronic line leak detectors may be wired into an ATG with a memory of test cycles. Facilities with static/periodic ATG systems are required to provide one passing test per product per month. This method has a minimum fuel capacity requirement. Facilities with continuous electronic leak detection ATG systems (e.g., Veeder-Root CSLD) are required to provide one passing test per product per month, although the system must be in daily operation with monthly summary logs. This method has no minimum fuel requirement. If there is a record keeping problem, see rule 62-761.710(2).
04/10/2007 Editable Letter Activity Strauss, Randall
Activity Title: District Non-Compliance Letter Activity Status: Closed
Description: NCL Report
Events:
Event Type: Document has been sent Date: 04/10/2007
Comment: Sent on Tue Apr 10 00:00:00 EST 2007
Comments:
Comment Date: 05/01/2007 User: STRAUSS_RH_1
Description: See NCL 5.1.07
Attachments:
Attachment Date: 04/10/2007 User: STRAUSS_RH_1
Description: NCL Report
View Attachment
04/10/2007 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Criteria ID: 1105
Rule: 62-761.700(1)(a)1.a., 62-761.700(1)(a)1.b., 62-761.700(1)(a)1.c., 62-761.700(1)(a)1.d.
Comments: Mark this as out of compliance if you observe a needed repair that hasn't been completed, and the potential for a release exists. Examples of components that would need repair include (but are not limited to) leaking dispensers, cracked spill containment, improperly anchored shear valves, or any compromised containment component. Upon the detection of one of the above conditions, has the facility initiated and completed repairs?
04/10/2007 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Criteria ID: 1123
Rule: 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d), 62-761.710(2)(e), 62-761.710(2)(f), 62-761.710(2)(g), 62-761.710(2)(h)
Comments: If the problem involves failure to perform according to the standards in each of the following areas, then note these items in addition to the paperwork for this rule: a. and g. Inventory - rules 62-761.640(3)(b)1-2, 62-761.640(3)(c) & 62-761.700(1)(c)5 b. Repair, operation, and maintenance - rules 62-761.700(1)(a)1, 62-761.700(1)(a)5, 62-761.700(1)(a)6 & 62-761.700(1)(c)3 c. Release detection - rules 62-761.600(1)(e), 62-761.610(3)(b), 62-761.640(2)(c)4, 62-761.640(2)(e), 62-761.640(3)(d), 62-761.640(3)(e)1-5 & 62-761.640(3)(e)9 d. Release detection response level descriptions - rules 62-761.600(1)(b) & 62-761.640(1)(c) e. Tightness, pressure, and breach of integrity tests - rules 62-761.610(3)(a)1, 62-761.640(1)(a) & 62-761.640(4)(a) f. Financial responsibility - rule 62-761.400(3) g. Repairs and replacements - rule 62-761.700(1)(a)6 The following are not this rule's issues: Rules 62-761.450(1)(a)1, 62-761.450(1)(a)2, 62-761.450(1)(a)3 & 62-761.450(1)(a)4 are verbal notices of activities that may also be written Rule 62-761.450(1)(b) is a registration issue Rules 62-761.450(2), 62-761.450(3)(a) & 62-761.450(3)(b) are INF/DRF reporting issues Rules 62-761.600(1)(a)3 & 62-761.600(1)(f) are covered by rule 62-761.710(3) Anything with cathodic protection is covered by rule 62-761.710(3)
04/10/2007 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Criteria ID: 1122
Rule: 62-761.710(1)
Comments: Was reasonable access to the facility granted? If not, document the circumstances. Were the records available within the specified time frame? If five day pre-inspection notice was not given by the inspector, this item can not be marked as a discrepancy. Make note of the missing documents, and arrange a review period.
04/10/2007 Violation Closed Strauss, Randall
Significance: SNC-B Status: Closed
Criteria ID: 1077
Rule: 62-761.610(3)(a)2.a., 62-761.610(3)(a)2.b.
Comments: There are two types of piping leak detectors. 1. Mechanical (flow restrictive), 2. Electronic (automatic shutoff). Mark this as out of compliance if single-walled pressurized small diameter piping in contact with the soil does not have a line leak detector, isn't conducting an annual tightness test, or doesn't have an external release detection method. Rule 62-761.610(1)(b) covers release detection for Category-C UST systems. Rule 62-761.610(2) deals with release detection for Category-A and B UST systems. Rules 62-761.610(3)(a)1, 62-761.610(3)(a)2, 62-761.610(3)(b) & 62-761.610(3)(c) deal with all piping release detection.
04/10/2007 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Criteria ID: 1117
Rule: 62-761.700(1)(c)3.
Comments: Facility must prove that all release detection devices, such as in line leak detectors, sump and liner sensors, ATGs, etc. function properly. Sensing devices may be optical, vapor, float activated, discriminating, non-discriminating, or tied into electrical circuits. ATG probes inside of tanks require calibration testing, if used for release detection as well as inventory measurements.
04/10/2007 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Criteria ID: 1103
Rule: 62-761.640(4)(a)1., 62-761.640(4)(a)2., 62-761.640(4)(a)3., 62-761.640(4)(a)4.
Comments: Installation - verify that the line leak detector has been installed during the final installation inspection. Compliance - check to see that the unit is present. Examine the annual function test data - a pass alone is not sufficient. The tester must demonstrate 3.0 gph discharge detection for the mechanical (flow restrictor). Note that the electronic (auto shut off) line leak detector does not need an annual test, but must still be able to detect a 0.2 gph leak after it has been tripped at 150% line operating pressure. Replacements - unit must be tested out of the box - function must be proven. 3.0 gph = 185.4 ml/min (To convert milliliters/minute to gallons/hour, multiple the milliliters by 0.0162162; or, 1 gph equals 61.8 ml/min). Values greater than 186 ml/min fail. Values less than 185 ml/min mean that the line leak detector will activate at a more restrictive rate.
04/10/2007 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Criteria ID: 1059
Rule: 62-761.600(1)(a)2.
Comments: Mark this as out of compliance if release detection systems are not functioning or not maintained properly. The inspector will have to know what release detection components have been installed at the facility. Furthermore, develop a library of installation and system operation specifications. These documents will assist you in determining calibration/maintenance as required by the manufacturer. Additional guidance can be found in the Appendix sections of the USEPA "List of Leak Detection Evaluations for Underground Storage Tank Systems" and the DEP Master Equipment List. Installations - have the release detection components been function tested? Just because a piece of equipment is new out of the box does not mean it is fully functional. Have it demonstrated! Calibration/Maintenance - the facility must provide documentation attesting to these operability tests. Operation - The RDRL must be developed, and the facility personnel must be knowledgeable of all the components of the release detection system. Theoretically, they should be able to demonstrate to you how they monitor the release detection system. See rule 62-761.700(1)(c)3
04/10/2007 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Criteria ID: 1095
Rule: 62-761.640(3)(b)1.a., 62-761.640(3)(b)1.b., 62-761.640(3)(b)2.a., 62-761.640(3)(b)2.b., 62-761.640(3)(b)2.c., 62-761.640(3)(b)2.d., 62-761.640(3)(b)2.e.
Comments: Mark this as out of compliance if inventory records are not properly performed. For inventory reconciliation, list the type of product on the top of the form along with tank volume. Volume measurements of product in tank, amount used or sold and amount delivered are to be in gallons. ATGs can be used to collect tank volume/water level data. (It is recommended that the facility compare ATG volume to actual stick measurements on a routine basis; this can also be done by dispensing a measured amount of fuel.) If the facility does not use an ATG to collect water volume, do they have the appropriate gauging stick and paste? What is the condition of their stick? .700(1)(c)5 methods of inventory control includes: inventory reconciliation, SIR, ATG, and MTG. (See rule 62-761.700(1)(c)5). Inventory control is not required for non-vehicular fuels single-walled tanks, e.g. waste oil.
04/10/2007 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Criteria ID: 1072
Rule: 62-761.600(5)
Comments: Wells must meet standards by 12/31/98: well construction requirements are met, site suitability has been determined, and either a groundwater or vapor monitoring method has been implemented. Wells must be closed by 12/31/98 if the wells do not meet these criteria.
04/10/2007 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Criteria ID: 1063
Rule: 62-761.600(1)(e)
Comments: The electronic monitoring unit is a system consisting of a sensor, wiring, and a panel. The sensor and the component that it monitors are exempt from the visual inspection process. However, the proper operation of the remainder of the electronic system must be verified on a monthly basis. One way to test is to activate the panel alarm switch. Depending on the system in place this test may check the alarm light, alarm horn, or the circuit continuity between the panel and the remote sensor. This test procedure must be documented by the facility, as required in rule 62-761.710(2). The remote verification feature meets this requirement, such as the Veeder-Root Simplicity system.
03/22/2007 Site Inspection Activity Closed Strauss, Randall
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 03/22/2007
Activity Closed Date: 04/10/2007 Activity Closed By: STRAUSS_RH_1
Comments:
Comment Date: 04/10/2007 User: STRAUSS_RH_1
Description: 2007_mar_22_rhs: Performed annual compliance inspection with Alison Meetze, DEP-SWD, and Joe Zwissler, PCHD. Fills marked, spills OK, straight drop tubes, registered ball float overfill protection Earthen STP sumps with Red Jacket and Vaporless MLLDs, piping wrapped, type can not be seen Mid-grade unleaded STP appears to be running continuously; pump ran throughout inspection, but no dispensers were activated Dispenser liners are Unit Liner, shear valves OK, hoses OK except Dispenser 1B reel hose excessively worn Demonstrated how to check monitoring wells to manager, Bernie Heffner, all no sheen, no petroleum odor; SW MW has no sealing cap and all covers need re-marked Record Review: COFR provided at inspection with instruction to complete RDRL completed with monitoring wells, inventory, mech line leak detectors, annual line tightness test and visual inspections of sumps, liners and spills Monthly visual inspection records 5/30/05 through 3/31/06; none available after 3/06; do not include checking monitoring wells No monitoring well check records available No inventory reconciliation records available No current line tightness test or MLLD function test available; most recent tests available from 2005 noted on Records tab Diesel and Plus tanks were tightness tested by Discovery Tank Testing RQ0066479 6/28/05 both PASS; no results available for Premium Placard posted Spill response agreement with SWS Environmental; no Spill Response Plan or training records available; will send Plan Template with inspection report; DPRC to be renewed once requirements are in place
08/08/2005 Legacy Activity Strauss, Randall
Activity Name: NON-COMPLIANCE LETTER ISSUED Activity Status: Closed
08/08/2005 Legacy Activity Strauss, Randall
Activity Name: LETTER Activity Status: Closed
Completion Notes: CERT ISSUED EFFECTIVE 8.3.05
08/08/2005 Legacy Activity Strauss, Randall
Activity Name: DISCHARGE PREVENTION & RESPONSE INSPECTION Activity Status: Closed
08/03/2005 Violation Closed Unknown, User
Significance: SNC-B Status: Closed
Criteria ID: 1062
Rule: 62-761.600(1)(d)
Comments: Mark this as out of compliance if any release detection method has not been monitored as required. Look for evidence that the release detection system is not being properly monitored. Examples include: blocked access to monitoring wells; ATG in alarm; ATG panel hidden from view; ATG tape spool empty; buried or submerged sampling ports; corroded locks; or no dispenser keys. Be aware that manual tank gauging requires weekly sampling. Electronic line leak detectors may be wired into an ATG with a memory of test cycles. Facilities with static/periodic ATG systems are required to provide one passing test per product per month. This method has a minimum fuel capacity requirement. Facilities with continuous electronic leak detection ATG systems (e.g., Veeder-Root CSLD) are required to provide one passing test per product per month, although the system must be in daily operation with monthly summary logs. This method has no minimum fuel requirement. If there is a record keeping problem, see rule 62-761.710(2).
08/03/2005 Legacy Activity Strauss, Randall
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
08/03/2005 Violation Closed Unknown, User
Significance: Minor Status: Closed
Criteria ID: 1123
Rule: 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d), 62-761.710(2)(e), 62-761.710(2)(f), 62-761.710(2)(g), 62-761.710(2)(h)
Comments: If the problem involves failure to perform according to the standards in each of the following areas, then note these items in addition to the paperwork for this rule: a. and g. Inventory - rules 62-761.640(3)(b)1-2, 62-761.640(3)(c) & 62-761.700(1)(c)5 b. Repair, operation, and maintenance - rules 62-761.700(1)(a)1, 62-761.700(1)(a)5, 62-761.700(1)(a)6 & 62-761.700(1)(c)3 c. Release detection - rules 62-761.600(1)(e), 62-761.610(3)(b), 62-761.640(2)(c)4, 62-761.640(2)(e), 62-761.640(3)(d), 62-761.640(3)(e)1-5 & 62-761.640(3)(e)9 d. Release detection response level descriptions - rules 62-761.600(1)(b) & 62-761.640(1)(c) e. Tightness, pressure, and breach of integrity tests - rules 62-761.610(3)(a)1, 62-761.640(1)(a) & 62-761.640(4)(a) f. Financial responsibility - rule 62-761.400(3) g. Repairs and replacements - rule 62-761.700(1)(a)6 The following are not this rule's issues: Rules 62-761.450(1)(a)1, 62-761.450(1)(a)2, 62-761.450(1)(a)3 & 62-761.450(1)(a)4 are verbal notices of activities that may also be written Rule 62-761.450(1)(b) is a registration issue Rules 62-761.450(2), 62-761.450(3)(a) & 62-761.450(3)(b) are INF/DRF reporting issues Rules 62-761.600(1)(a)3 & 62-761.600(1)(f) are covered by rule 62-761.710(3) Anything with cathodic protection is covered by rule 62-761.710(3)
08/03/2005 Violation Closed Unknown, User
Significance: Minor Status: Closed
Criteria ID: 1086
Rule: 62-761.640(2)(c)4.a., 62-761.640(2)(c)4.b., 62-761.640(2)(c)4.c., 62-761.640(2)(c)4.d., 62-761.640(2)(c)4.e.
Comments: The monthly sampling record must contain this information. The depth of well should to be recorded at least yearly to ensure that the screening intersects the groundwater.
Comments:
Comment Date: 02/01/2012 User: PUCCI_SA_1
Description: tank (EQ # 497) Spill Containment ( EQ # 226) High and Low level switch alarm ( EQ # 161) Rupture basin sensor (EQ # 161)
08/03/2005 Violation Closed Unknown, User
Significance: Minor Status: Closed
Criteria ID: 1063
Rule: 62-761.600(1)(e)
Comments: The electronic monitoring unit is a system consisting of a sensor, wiring, and a panel. The sensor and the component that it monitors are exempt from the visual inspection process. However, the proper operation of the remainder of the electronic system must be verified on a monthly basis. One way to test is to activate the panel alarm switch. Depending on the system in place this test may check the alarm light, alarm horn, or the circuit continuity between the panel and the remote sensor. This test procedure must be documented by the facility, as required in rule 62-761.710(2). The remote verification feature meets this requirement, such as the Veeder-Root Simplicity system.
Comments:
Comment Date: 02/03/2012 User: MORRISON_CY_1
Description: 1000 Gallon Jrs Double Wall Steel Emergency Generator Base Tank (Eq # 497) Spill Containment (Eq # 226), (Krueger Sanatry Gauge) And Electronic High And Low Fuel Level Switch Alarm (Eq # 161), Rupture Basin Sensor For Leak Detection In The Containment Area Bottom (Eq # 161)
06/24/2005 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Rule: 62N-16, 62N-16
06/24/2005 Legacy Activity Strauss, Randall
Activity Name: DISCHARGE PREVENTION & RESPONSE INSPECTION Activity Status: Closed
05/19/2005 Legacy Activity Strauss, Randall
Activity Name: NON-COMPLIANCE LETTER ISSUED Activity Status: Closed
05/18/2005 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Rule: 62N-16, 62N-16
05/18/2005 Legacy Activity Strauss, Randall
Activity Name: DISCHARGE PREVENTION & RESPONSE INSPECTION Activity Status: Closed
Completion Notes: CERTIFICATE NOT ISSUED - NO REQUIRMENTS IN PLACE
05/18/2005 Legacy Activity Strauss, Randall
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
05/18/2005 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Rule: 761.400(2)(f)
05/18/2005 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Rule: 761.700(1)(c)3
05/18/2005 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Rule: 761.640(4)(a)
Comments:
Comment Date: 03/23/2012 User: ARLINE_JD_1
Description: EQ#s: Tank: Modern Welding Steel Double Walled (EQ-352), Piping: NA/ only Gasboy and hose. Overfill Protection: BJ Enterprises Black Knight (EQ-???), Spill Bucket: OPW unknown model (EQ-???).
05/18/2005 Violation Closed Strauss, Randall
Significance: Minor Status: Closed
Rule: 761.600(1)(a)2
05/18/2005 Violation Closed Strauss, Randall
Significance: SNC-B Status: Closed
Rule: 761.610(3)(a)2
05/18/2005 Violation Closed Unknown, User
Significance: Minor Status: Closed
Criteria ID: 1123
Rule: 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d), 62-761.710(2)(e), 62-761.710(2)(f), 62-761.710(2)(g), 62-761.710(2)(h)
Comments: If the problem involves failure to perform according to the standards in each of the following areas, then note these items in addition to the paperwork for this rule: a. and g. Inventory - rules 62-761.640(3)(b)1-2, 62-761.640(3)(c) & 62-761.700(1)(c)5 b. Repair, operation, and maintenance - rules 62-761.700(1)(a)1, 62-761.700(1)(a)5, 62-761.700(1)(a)6 & 62-761.700(1)(c)3 c. Release detection - rules 62-761.600(1)(e), 62-761.610(3)(b), 62-761.640(2)(c)4, 62-761.640(2)(e), 62-761.640(3)(d), 62-761.640(3)(e)1-5 & 62-761.640(3)(e)9 d. Release detection response level descriptions - rules 62-761.600(1)(b) & 62-761.640(1)(c) e. Tightness, pressure, and breach of integrity tests - rules 62-761.610(3)(a)1, 62-761.640(1)(a) & 62-761.640(4)(a) f. Financial responsibility - rule 62-761.400(3) g. Repairs and replacements - rule 62-761.700(1)(a)6 The following are not this rule's issues: Rules 62-761.450(1)(a)1, 62-761.450(1)(a)2, 62-761.450(1)(a)3 & 62-761.450(1)(a)4 are verbal notices of activities that may also be written Rule 62-761.450(1)(b) is a registration issue Rules 62-761.450(2), 62-761.450(3)(a) & 62-761.450(3)(b) are INF/DRF reporting issues Rules 62-761.600(1)(a)3 & 62-761.600(1)(f) are covered by rule 62-761.710(3) Anything with cathodic protection is covered by rule 62-761.710(3)
05/18/2005 Violation Closed Unknown, User
Significance: Minor Status: Closed
Criteria ID: 1122
Rule: 62-761.710(1)
Comments: Was reasonable access to the facility granted? If not, document the circumstances. Were the records available within the specified time frame? If five day pre-inspection notice was not given by the inspector, this item can not be marked as a discrepancy. Make note of the missing documents, and arrange a review period.
05/18/2005 Violation Closed Unknown, User
Significance: Minor Status: Closed
Criteria ID: 1086
Rule: 62-761.640(2)(c)4.a., 62-761.640(2)(c)4.b., 62-761.640(2)(c)4.c., 62-761.640(2)(c)4.d., 62-761.640(2)(c)4.e.
Comments: The monthly sampling record must contain this information. The depth of well should to be recorded at least yearly to ensure that the screening intersects the groundwater.
05/18/2005 Violation Closed Unknown, User
Significance: Minor Status: Closed
Criteria ID: 1063
Rule: 62-761.600(1)(e)
Comments: The electronic monitoring unit is a system consisting of a sensor, wiring, and a panel. The sensor and the component that it monitors are exempt from the visual inspection process. However, the proper operation of the remainder of the electronic system must be verified on a monthly basis. One way to test is to activate the panel alarm switch. Depending on the system in place this test may check the alarm light, alarm horn, or the circuit continuity between the panel and the remote sensor. This test procedure must be documented by the facility, as required in rule 62-761.710(2). The remote verification feature meets this requirement, such as the Veeder-Root Simplicity system.
05/18/2005 Violation Closed Unknown, User
Significance: SNC-B Status: Closed
Criteria ID: 1062
Rule: 62-761.600(1)(d)
Comments: Mark this as out of compliance if any release detection method has not been monitored as required. Look for evidence that the release detection system is not being properly monitored. Examples include: blocked access to monitoring wells; ATG in alarm; ATG panel hidden from view; ATG tape spool empty; buried or submerged sampling ports; corroded locks; or no dispenser keys. Be aware that manual tank gauging requires weekly sampling. Electronic line leak detectors may be wired into an ATG with a memory of test cycles. Facilities with static/periodic ATG systems are required to provide one passing test per product per month. This method has a minimum fuel capacity requirement. Facilities with continuous electronic leak detection ATG systems (e.g., Veeder-Root CSLD) are required to provide one passing test per product per month, although the system must be in daily operation with monthly summary logs. This method has no minimum fuel requirement. If there is a record keeping problem, see rule 62-761.710(2).
05/18/2005 Violation Closed Unknown, User
Significance: SNC-B Status: Closed
Criteria ID: 1004
Rule: 62-761.400(3)(a)1.
Comments: There are various financial responsibility mechanisms available: Risk Retention Group (RRG) Endorsements Certificate of Insurance Guarantee Letter of Credit Fully Funded Trust Fund Self-Insurance with letter from CFO Stand-by Trust Fund Bond Rating Test (Local Governments) Local Government Financial Test Local Government Guarantee Local Government Fund For detailed information, refer to the DEP's Financial Responsibility Handbook pages 2-1, 2-2. Verify which mechanism(s) are used by the facility. State and federal facilities are exempt from financial responsibility, being considered a type of self insurance. They are always in compliance for this category. Document state or federal as appropriate. Financial responsibility must be maintained on out-of-service tanks. Note: Mark the absence of/or the lack of complete info in the certification of financial responsibility under Rule 62-761.710(2).
Comments:
Comment Date: 05/12/2011 User: HATCHER_JD_1
Description: Xerses DW Fiberglass UST. OPW Pisces sumps and dispensers. OPW flex piping in blue chase pipe. Smith Fibercast Vapor Recovery lines. Photo's of tank install in paper file on CD.
Comments:
Comment Date: 04/09/2008 User: HATCHER_JD_1
Description: DW UST. Pisces Sumps and dispenser liners. OPW flex piping in blue chase pipe. OPW EECO Tank Monitor w/interstitial and sump sensors. Monthly visuals of dispenser liners and spill buckets.
05/18/2005 Violation Closed Unknown, User
Significance: SNC-B Status: Closed
Criteria ID: 1004
Rule: 62-761.400(3)(a)1.
Comments: There are various financial responsibility mechanisms available: Risk Retention Group (RRG) Endorsements Certificate of Insurance Guarantee Letter of Credit Fully Funded Trust Fund Self-Insurance with letter from CFO Stand-by Trust Fund Bond Rating Test (Local Governments) Local Government Financial Test Local Government Guarantee Local Government Fund For detailed information, refer to the DEP's Financial Responsibility Handbook pages 2-1, 2-2. Verify which mechanism(s) are used by the facility. State and federal facilities are exempt from financial responsibility, being considered a type of self insurance. They are always in compliance for this category. Document state or federal as appropriate. Financial responsibility must be maintained on out-of-service tanks. Note: Mark the absence of/or the lack of complete info in the certification of financial responsibility under Rule 62-761.710(2).
Comments:
Comment Date: 05/12/2011 User: HATCHER_JD_1
Description: Xerses DW Fiberglass UST. OPW Pisces sumps and dispensers. OPW flex piping in blue chase pipe. Smith Fibercast Vapor Recovery lines. Photo's of tank install in paper file on CD.
Comments:
Comment Date: 04/09/2008 User: HATCHER_JD_1
Description: DW UST. Pisces Sumps and dispenser liners. OPW flex piping in blue chase pipe. OPW EECO Tank Monitor w/interstitial and sump sensors. Monthly visuals of dispenser liners and spill buckets.
04/23/2004 Legacy Activity Strauss, Randall
Activity Name: DISCHARGE PREVENTION & RESPONSE INSPECTION Activity Status: Closed
04/23/2004 Legacy Activity Strauss, Randall
Activity Name: LETTER Activity Status: Closed
04/23/2004 Legacy Activity Strauss, Randall
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
Completion Notes: PIPING TYPE NOT VISIBLE
05/12/2003 Legacy Activity Sowers, Joseph A.
Activity Name: RESPONSE RECEIVED BY DEPARTMENT Activity Status: Closed
04/30/2003 Legacy Activity Sowers, Joseph A.
Activity Name: NON-COMPLIANCE LETTER ISSUED Activity Status: Closed
04/25/2003 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 700(1)(c)3
04/25/2003 Legacy Activity Sowers, Joseph A.
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
Completion Notes: PIPE NOT VISIBLE
04/25/2003 Legacy Activity Sowers, Joseph A.
Activity Name: DISCHARGE PREVENTION & RESPONSE INSPECTION Activity Status: Closed
04/25/2003 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 640(3)(d)
04/25/2003 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 710(1)
04/25/2003 Violation Closed Sowers, Joseph A.
Significance: SNC-B Status: Closed
Rule: 610(4)(a)2
05/08/2002 Legacy Activity Roggelin, Ernest M.
Activity Name: RESPONSE RECEIVED BY DEPARTMENT Activity Status: Closed
04/22/2002 Legacy Activity Roggelin, Ernest M.
Activity Name: NON-COMPLIANCE LETTER ISSUED Activity Status: Closed
04/18/2002 Legacy Activity Sowers, Joseph A.
Activity Name: DISCHARGE PREVENTION & RESPONSE INSPECTION Activity Status: Closed
04/17/2002 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 710(1)
04/17/2002 Legacy Activity Roggelin, Ernest M.
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
04/17/2002 Violation Closed Roggelin, Ernest M.
Significance: Minor Status: Closed
Rule: 600(2)(d)
04/17/2002 Violation Closed Roggelin, Ernest M.
Significance: Minor Status: Closed
Rule: 450(1)b
04/17/2002 Violation Closed Roggelin, Ernest M.
Significance: Minor Status: Closed
Rule: 700(1)(c)3
04/17/2002 Violation Closed Roggelin, Ernest M.
Significance: Minor Status: Closed
Rule: 640(3)(d)
04/17/2002 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 640(2)(a)
04/17/2002 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 700(1)(c)1
Comments:
Comment Date: 09/16/2013 User: PAYNE_CL_1
Description: See attachments for current insurance policy 08/30/2013 to 08/30/2014.
04/17/2002 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 640(2)(e)
04/17/2002 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 640(2)(c)4
04/17/2002 Violation Closed Roggelin, Ernest M.
Significance: Minor Status: Closed
Rule: 600(2)(b)
04/17/2002 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 710(3)
04/17/2002 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 710(2)
01/09/2001 Legacy Activity Sowers, Joseph A.
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
05/04/2000 Legacy Activity Roggelin, Ernest M.
Activity Name: RESPONSE RECEIVED BY DEPARTMENT Activity Status: Closed
03/28/2000 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 510(1)(b)3
03/28/2000 Legacy Activity Sowers, Joseph A.
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
03/28/2000 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 600(1)(e)
Comments:
Comment Date: 01/27/2025 User: HAMILTON_TP
Description: Site diagram and photos updated
03/28/2000 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 640(2)(e)
03/28/2000 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 640(3)(c)4
03/28/2000 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 640(3)(d)
03/28/2000 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 700(1)(b)2a
03/28/2000 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 700(1)(c)3
03/28/2000 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 710(2)
03/28/2000 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 710(3)
07/07/1999 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 600(1)(b); 640(1)(c)
07/07/1999 Legacy Activity Sowers, Joseph A.
Activity Name: TANK COMPLIANCE RE-INSPECTION Activity Status: Closed
05/26/1999 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 600(1)(b); 640(1)(c)
Comments:
Comment Date: 08/30/2007 User: CONDOLEON_GJ_1
Description: This facility consists of 1-15,000 and 1-10,000 gallon double wall fiberglass UST's. The piping is double wall flex.
Comments:
Comment Date: 08/30/2005 User: UNKNOWN
Description: REGISTRATION: ADDRESS CHANGE PER KATHY MCCANEY WITH SUNOCO AT 215-246-8513 SEE REGIS FILE. /AWM
05/26/1999 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 600(1)(b); 640(1)(c)
Comments:
Comment Date: 08/30/2007 User: CONDOLEON_GJ_1
Description: This facility consists of 1-15,000 and 1-10,000 gallon double wall fiberglass UST's. The piping is double wall flex.
Comments:
Comment Date: 08/30/2005 User: UNKNOWN
Description: REGISTRATION: ADDRESS CHANGE PER KATHY MCCANEY WITH SUNOCO AT 215-246-8513 SEE REGIS FILE. /AWM
05/26/1999 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 640(2)(a)
Comments:
Comment Date: 08/31/2005 User: UNKNOWN
Description: GENERAL: PIPING: ABOVEGROUND SW PAINTED STEEL EXITING SECONDARY CONTAINMENT & BECOMES UNDERGROUND DW GREEN ENVIRON VERY SMALL DIAMETER & REAPPEARS AS SW STEEL ABOVEGROUND.
05/26/1999 Violation Closed Sowers, Joseph A.
Significance: SNC-B Status: Closed
Rule: 600(1)(f)
Comments:
Comment Date: 02/14/2006 User: UNKNOWN
Description: COMMUNICATION: TO: HEINTZ_C, SITE MANAGER Email: heintz@epchc.org Email Date: 02/14/2006 ACTIVITY ID: 11691943 - TANK CLOSURE INSPECTION WAS PERFORMED AT FACILITY ID: 9100062 ON 02/08/2006 BY LUZEY_F. EVALUATION RESULT = IN-COMPLIANCE. ACTIVITY RECORDED ON 02/14/2006 USER: MICHAEL MCDANIEL OF HILLSBOROUGH ENVIRONMENTAL PROTECTION COMMISSION
Comments:
Comment Date: 02/09/2004 User: UNKNOWN
Description: REGISTRATION: VERIFIED WITH MICHAEL MCDANIEL TANK A-7 SENT IN ON REGISTRATION IS ALREADY EXISTING IN DATABASE
Attachments:
Attachment Date: 11/14/2024 User: MOSELEY_AJ_1
Description: Email about 570 Inspection Requirements
View Attachment
05/26/1999 Violation Closed Sowers, Joseph A.
Significance: SNC-B Status: Closed
Rule: 600(1)(f)
Comments:
Comment Date: 02/14/2006 User: UNKNOWN
Description: COMMUNICATION: TO: HEINTZ_C, SITE MANAGER Email: heintz@epchc.org Email Date: 02/14/2006 ACTIVITY ID: 11691943 - TANK CLOSURE INSPECTION WAS PERFORMED AT FACILITY ID: 9100062 ON 02/08/2006 BY LUZEY_F. EVALUATION RESULT = IN-COMPLIANCE. ACTIVITY RECORDED ON 02/14/2006 USER: MICHAEL MCDANIEL OF HILLSBOROUGH ENVIRONMENTAL PROTECTION COMMISSION
Comments:
Comment Date: 02/09/2004 User: UNKNOWN
Description: REGISTRATION: VERIFIED WITH MICHAEL MCDANIEL TANK A-7 SENT IN ON REGISTRATION IS ALREADY EXISTING IN DATABASE
Attachments:
Attachment Date: 11/14/2024 User: MOSELEY_AJ_1
Description: Email about 570 Inspection Requirements
View Attachment
05/26/1999 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 640(2)(e)
Comments:
Comment Date: 03/28/2007 User: CONDOLEON_GJ_1
Description: Facility consists of 1-22,000 (compartmented) and 1-20,000 gallon double wall steel clad U S T' s. (Modern Welding Glassteel II, EQ-156. The piping is Ameron Dualoy EQ-378. Veeder Root EQ-197, 596) Other EQ#'s not known.
05/26/1999 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 640(3)(b)
05/26/1999 Violation Closed Sowers, Joseph A.
Significance: SNC-B Status: Closed
Rule: 600(2)(d)
Comments:
Comment Date: 02/09/2006 User: UNKNOWN
Description: COMMUNICATION: TO: VIERA_R, SITE MANAGER Email: rviera@wrsie.com Email Date: 02/09/2006 ACTIVITY ID: 11689974 - TANK ANNUAL COMPLIANCE INSPECTION WAS PERFORMED AT FACILITY ID: 8623714 ON 02/02/2006 BY FRAZIER. EVALUATION RESULT = MINOR OUT-OF-COMPLIANCE. ACTIVITY RECORDED ON 02/09/2006 USER: LISA FRAZIER OF PINELLAS COUNTY HEALTH DEPARTMENT
05/26/1999 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 700(1)(c)1
Comments:
Comment Date: 05/07/2003 User: UNKNOWN
Description: GENERAL: PIPING: ENVIRON COAXIAL GEOFLEX PIPING (GREEN)
05/26/1999 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 700(1)(c)6
Comments:
Comment Date: 02/27/2006 User: UNKNOWN
Description: COMMUNICATION: TO: ECKERT_TJ, SITE MANAGER Email: eckertt@epchc.org Email Date: 02/27/2006 ACTIVITY ID: 11696270 - TANK ANNUAL COMPLIANCE INSPECTION WAS PERFORMED AT FACILITY ID: 8625030 ON 02/06/2006 BY MURLEY_A. EVALUATION RESULT = SIGNIFICANT OUT-OF-COMPLIANCE. ACTIVITY RECORDED ON 02/27/2006 USER: MONICA SYLVAIN OF HILLSBOROUGH ENVIRONMENTAL PROTECTION COMMISSION
Attachments:
Attachment Date: 11/21/2014 User: WHITE_JA_1
Description: CURRENT - 2014-10-24 - Site Map
View Attachment
Attachments:
Attachment Date: 09/21/2020 User: ROJAS_Y_1
Description: 2020-09-09 Site photo
View Attachment
05/26/1999 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 710(1)
05/26/1999 Violation Closed Sowers, Joseph A.
Significance: Minor Status: Closed
Rule: 710(2)
Attachments:
Attachment Date: 03/13/2008 User: JARRETT_SE
Description: 2008-03-05 Republic National Distributing Co Facility Photo (ASTs & dispensers).
View Attachment
Attachments:
Attachment Date: 04/07/2011 User: MURLEY_A_1
Description: Site Drawing
View Attachment
Attachments:
Attachment Date: 04/11/2012 User: MURLEY_A_1
Description: STRF 03/30/12
View Attachment
05/26/1999 Legacy Activity Sowers, Joseph A.
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed