Facility ID: | 9803926 | ||||||||||
Facility Name: | DESOTO CNTY-SOUTH CNTY FIRE STAT #2 | ||||||||||
12/18/2024 | Enforcement Tracking Activity | Snyder, Ryan B | |||||||||
Activity Status: | Open | ||||||||||
08/01/2022 | Violation Open | Parks, Jeff S | |||||||||
Significance: | Minor | Status: | Open | ||||||||
Criteria ID: | 7030 | ||||||||||
Rule: | 62-762.501(1)(f), 62-762.502(1)(f) | ||||||||||
08/01/2022 | Enforcement Referral Activity | Parks, Jeff S | |||||||||
Activity Result: | Accepted | Activity Status: | Closed | ||||||||
Activity Closed Date: | 12/18/2024 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been submitted for approval | Date: | 08/01/2022 | ||||||||
Comment: | Submitted for approval by: Jeff S Parks: No CFR >180 days | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was acknowledged on this date | Date: | 08/01/2022 | ||||||||
Comment: | Acknowledged and Assigned by Rick R Roudebush | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been assigned | Date: | 08/01/2022 | ||||||||
Comment: | Assigned to Ryan B Snyder | ||||||||||
Events: | |||||||||||
Event Type: | Activity/Document was accepted on this date | Date: | 12/18/2024 | ||||||||
Comment: | Accepted by Ryan B Snyder: accept | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 12/18/2024 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 08/01/2022 | User: | PARKS_J_4 | ||||||||
Description: | No CFR >180 days | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 08/01/2022 | User: | PARKS_J_4 | ||||||||
Description: | Enforcement Memo | ||||||||||
View Attachment | |||||||||||
Attachments: | |||||||||||
Attachment Date: | 08/12/2022 | User: | PARKS_J_4 | ||||||||
Description: | Referral letter | ||||||||||
View Attachment | |||||||||||
08/01/2022 | Phone Conversation Activity | Parks, Jeff S | |||||||||
Call Type: | Outgoing | Activity Status: | Closed | ||||||||
Phone Number: | (863) 491-5377 | Activity Closed Date: | 08/01/2022 | ||||||||
Subject: | County staff called to schedule the inspection. | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/01/2022 | ||||||||
Comment: | Finished | ||||||||||
08/01/2022 | Violation Open | Parks, Jeff S | |||||||||
Significance: | SNC-A | Status: | Open | ||||||||
Criteria ID: | 7010 | ||||||||||
Rule: | 62-762.421(2), 62-762.421(3)(c) | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 08/01/2022 | User: | PARKS_J_4 | ||||||||
Description: | Tank with Corrosion | ||||||||||
View Attachment | |||||||||||
07/27/2022 | Site Inspection Activity Closed | Parks, Jeff S | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 07/27/2022 | ||||||||||
Activity Closed Date: | 08/01/2022 | Activity Closed By: | PARKS_J_4 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 08/01/2022 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 08/01/2022 | User: | PARKS_J_4 | ||||||||
Description: |
Jeff Parks from Lee County met with your facility representative to conduct the Compliance Inspection of a marine fueling facility/retail gas station/non-retail, etc.
TANKS: Consists of one (1) `1,000-gallon diesel double walled, aboveground tank. Tank coating appears to be in satisfactory condition. No dripping/leaking issues were observed during the inspection.. The tank interstice is manually stick in a monthly basis and documented. Verified to be dry at time of inspection.
SPILL CONTAINMENT: - Tight fill, single-walled (SW) spill bucket mounted on top of the tank, with a drain valve that goes directly into the tank. No evidence of cracking or product/liquid observed during the inspection. The system is properly labeled.
OVERFILL PROTECTION: – Equipped with an overfill prevention valve), Krueger Fuel Level. The vents are present and observed to be in satisfactory condition. The alarm was tested and found to be functional.
PIPING – Consists of a suction, steel/galvanized aboveground piping system with no contact with the soil. Except for minor corrosion, the aboveground piping was observed to be satisfactory condition. The piping is also equipped with solenoid/anti-siphon and manual isolation valves. Corrosion to metal components must be minimized by periodic maintenance. The facility conducts monthly visual inspections of visible/exposed tank components.
HOSES/NOZZLES: The hoses and nozzles appear to be in satisfactory condition.
RELEASE DETECTION: The tank interstice is manually stick in a monthly basis and documented. The tank interstitial was verified to be dry at time of inspection
DOCUMENTS REVIEW: we can have all the system tests at the end of the report or just those that were not mentioned before. Your choice.
PLACARD: The Placard expiration date is: June 30, 2023. Storage tank registration fees are due to the Department each year by July 1. Ensure that your contact information is up-to-date with the Department in order to receive updates concerning your annual registration fees. Once fees are paid, you must print a copy of your placard from the Department's website: http://www.fldepportal.com/go/submit-registration/.
RECORDS SHALL BE KEPT FOR THREE YEARS IN ACCORDANCE WITH RULE 62-761.710, F.A.C.
Inspection Report sent by e-mail to: Golden Faircloth |
||||||||||
10/29/2020 | Editable Letter Activity | Kleinmann, Keith | |||||||||
Activity Title: | Compliance Assistance Offer Letter | Activity Status: | Closed | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 07/01/2021 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 01/08/2021 | User: | KLEINMANN_K_1 | ||||||||
Description: | cao | ||||||||||
View Attachment | |||||||||||
10/28/2020 | Violation Closed | Kleinmann, Keith | |||||||||
Significance: | SNC-B | Status: | Closed | ||||||||
Criteria ID: | 5094 | ||||||||||
Rule: | 62-762.601(1)(d), 62-762.601(1)(e) | ||||||||||
10/28/2020 | Electronic Communication Activity | Kleinmann, Keith | |||||||||
Activity Closed Date: | 10/28/2020 | Activity Status: | Closed | ||||||||
Date: | 10/28/2020 | ||||||||||
Recipient: | golden faircloth | ||||||||||
Sender: | Keith Kleinmann | ||||||||||
Subject: | Compliance inspections | ||||||||||
Message: | Schedule inspections | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 10/28/2020 | ||||||||
Comment: | Finished | ||||||||||
10/28/2020 | Violation Closed | Kleinmann, Keith | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 5143 | ||||||||||
Rule: | 62-762.711(1) | ||||||||||
10/14/2020 | Site Inspection Activity Closed | Kleinmann, Keith | |||||||||
Activity Result: | Major Out of Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 10/14/2020 | ||||||||||
Activity Closed Date: | 10/29/2020 | Activity Closed By: | KLEINMANN_K_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 10/29/2020 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 10/29/2020 | User: | KLEINMANN_K_1 | ||||||||
Description: | Keith Kleinmann from Lee County met with your facility representative to conduct the Compliance Inspection. TANKS: Consists of a 1,000-gallon (compartmented, double-walled, aboveground tank. Tank coating appears to be in satisfactory condition. No dripping/leaking issues were observed during the inspection. SPILL CONTAINMENT: - Tight fill, single-walled (SW) spill bucket mounted on top of the tank, with a drain valve that goes directly into the tank, Less than one inch of petroleum contact water/product in spill bucket. The system is properly labeled. OVERFILL PROTECTION: – Equipped with an overfill prevention valve (name if known), Morrison Clock Gauge. The vents are present and observed to be in satisfactory condition. PIPING – There is no piping associated with the system, HOSES/NOZZLES: The hoses and nozzles appear to be in satisfactory condition. . PLACARD: The Placard expiration date is: June 30, 2021. Storage tank registration fees are due to the Department each year by July 1. Ensure that your contact information is up-to-date with the Department in order to receive updates concerning your annual registration fees. Once fees are paid, you must print a copy of your placard from the Department's website: http://www.fldepportal.com/go/submit-registration/. RECORDS SHALL BE KEPT FOR THREE YEARS IN ACCORDANCE WITH RULE 62-761.710, F.A.C. Inspection Report sent by e-mail to: gfaircloth@desotobocc.com | ||||||||||
11/01/2018 | Editable Letter Activity | Zimmerman, Chris A. | |||||||||
Activity Title: | In Compliance Letter | Activity Status: | Closed | ||||||||
Description: | 508 Stp Sumps test pp 1-4 | ||||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 11/01/2018 | ||||||||
Comment: | Finished | ||||||||||
Attachments: | |||||||||||
Attachment Date: | 11/01/2018 | User: | ZIMMERMAN_CA_1 | ||||||||
Description: | ICL for inspection dated 10/16/2018 | ||||||||||
View Attachment | |||||||||||
10/16/2018 | Site Inspection Activity Closed | Zimmerman, Chris A. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 10/16/2018 | ||||||||||
Activity Closed Date: | 10/31/2018 | Activity Closed By: | ZIMMERMAN_CA_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 10/31/2018 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 10/16/2018 | User: | ZIMMERMAN_CA_1 | ||||||||
Description: | Checked required documentation (Visuals, insurance, maintenance records, etc..) along with required storage tank components (Tanks, lines, spill buckets, hoses, etc...) Updated registration info as needed. Alarm/Maintenance History: Nothing significant to note. | ||||||||||
10/10/2016 | Site Inspection Activity Closed | Zimmerman, Chris A. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 10/10/2016 | ||||||||||
Activity Closed Date: | 10/18/2016 | Activity Closed By: | ZIMMERMAN_CA_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 10/18/2016 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 10/10/2016 | User: | ZIMMERMAN_CA_1 | ||||||||
Description: | Checked required documentation (RDRL, Visuals, insurance, maintenance records, etc..) along with required storage tank components (Tanks, lines, spill buckets, hoses, etc...) Updated registration info as needed. Alarm/Maintenance History: Nothing significant to note. | ||||||||||
09/04/2014 | Site Inspection Activity Closed | Zimmerman, Chris A. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 09/04/2014 | ||||||||||
Activity Closed Date: | 09/04/2014 | Activity Closed By: | ZIMMERMAN_CA_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 09/04/2014 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 09/04/2014 | User: | ZIMMERMAN_CA_1 | ||||||||
Description: | Checked required documentation (RDRL, Visuals, insurance, maintenance records, etc..) along with required storage tank components (Tanks, lines, spill buckets, hoses, etc...) Updated registration info as needed. Alarm/Maintenance History: Nothing significant to note. | ||||||||||
12/12/2013 | Site Inspection Activity Closed | Johnson, Stephen G. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 12/12/2013 | ||||||||||
Activity Closed Date: | 12/12/2013 | Activity Closed By: | JOHNSON_SG_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 12/12/2013 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 12/12/2013 | User: | JOHNSON_SG_1 | ||||||||
Description: | Alarm/Maintenance History -Nothing significant to note | ||||||||||
Comments: | |||||||||||
Comment Date: | 12/12/2013 | User: | JOHNSON_SG_1 | ||||||||
Description: | Checked all required paperwork(Placard, monthly release detection documentation, insurance, maintenance records, etc) along with storage tank components(Tank, dispensers, spill buckets, lines, valves, gauges, interstitial space, etc) | ||||||||||
12/12/2013 | Site Inspection Activity Closed | Johnson, Stephen G. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 12/12/2013 | ||||||||||
Activity Closed Date: | 12/12/2013 | Activity Closed By: | JOHNSON_SG_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 12/12/2013 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 12/12/2013 | User: | JOHNSON_SG_1 | ||||||||
Description: | Alarm/Maintenance History -Nothing significant to note | ||||||||||
Comments: | |||||||||||
Comment Date: | 12/12/2013 | User: | JOHNSON_SG_1 | ||||||||
Description: | Checked all required paperwork(Placard, monthly release detection documentation, insurance, maintenance records, etc) along with storage tank components(Tank, dispensers, spill buckets, lines, valves, gauges, interstitial space, etc) | ||||||||||
06/04/2012 | Site Inspection Activity Closed | Meetze, Alison | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 06/07/2012 | ||||||||||
Activity Closed Date: | 06/11/2012 | Activity Closed By: | MEETZE_A | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 06/11/2012 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 06/07/2012 | User: | MEETZE_A | ||||||||
Description: | Inspection performed 6/7/12 by Alison Meetze & Steve Jarrett. Tammy Baker provided records during the inspection. The facility consists of 1 double-wall, compartmented AST with 2 spill buckets, and 2 tank-top mounted dispensers. Records Review: The registration placard, proof of Financial Responsibility, Certificate of Financial Responsibility, and visual release detection records were available for review. Physical Inspection: The AST was in good repair and labeled as to its contents. The small amount of piping had spots of rust. The spill buckets were clean and dry. Overfill prevention is provided by manual gauging; Morrison clock valves are installed, but appear to not be in use. The interstice was manually gauged during the inspection and was dry. No evidence of leaking was observed. The compliance letter as mailed is attached in FIRST. | ||||||||||
01/24/2012 | Site Inspection Activity Closed | Durrance, William K. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 01/24/2012 | ||||||||||
Activity Closed Date: | 01/24/2012 | Activity Closed By: | DURRANCE_WK_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 01/24/2012 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 01/24/2012 | User: | DURRANCE_WK_1 | ||||||||
Description: | 1-1,000 gal double walled AST. Using spill bucket, manual stick for overfill protection Using monthly visual inspection and interstitial monitoring for release detection. CFR+FR-satisfactory Monthly inspections-satisfactory Placard-satisfactory RDRL-satisfactory Tank-satisfactory Interstitial space-dry -satisfactory Spill bucket-satisfactory Hoses and gauges, and valves-satisfactory No evidence of discharge. | ||||||||||
01/25/2011 | Site Inspection Activity Closed | Durrance, William K. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 01/25/2011 | ||||||||||
Activity Closed Date: | 01/25/2011 | Activity Closed By: | DURRANCE_WK_1 | ||||||||
Events: | |||||||||||
Event Type: | Activity has been finished | Date: | 01/25/2011 | ||||||||
Comment: | Finished | ||||||||||
Comments: | |||||||||||
Comment Date: | 01/25/2011 | User: | DURRANCE_WK_1 | ||||||||
Description: | 1-1,000 gal double walled AST. Using spill bucket, manual stick for overfill protection Using monthly visual inspection and interstitial monitoring for release detection. CFR+FR-satisfactory New CFR needs to be at facility showing period of insurance coverage 1/21/2011 to 1/21/2012 Monthly inspections-satisfactory the inspection period between 11/2010 and December 2010 was 39 days please ensure that inspection are completed before 35 days between inspections. Placard-satisfactory RDRL-satisfactory Tank-satisfactory Interstitial space-dry -satisfactory Spill bucket-satisfactory Hoses and gauges, and valves-satisfactory No evidence of discharge. | ||||||||||
09/21/2009 | Site Inspection Activity Closed | Durrance, William K. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 09/21/2009 | ||||||||||
Activity Closed Date: | 09/21/2009 | Activity Closed By: | DURRANCE_WK_1 | ||||||||
Comments: | |||||||||||
Comment Date: | 09/21/2009 | User: | DURRANCE_WK_1 | ||||||||
Description: | 1-1,000 gal double walled AST. Using spill bucket, manual stick for overfill protection Using monthly visual inspection and interstitial monitoring for release detection. CFR+FR-satisfactory Monthly inspections-satisfactory Placard-satisfactory RDRL-satisfactory Tank-satisfactory Interstitial space-satisfactory Spill bucket-satisfactory Hoses and valves-satisfactory No evidence of discharge. | ||||||||||
08/26/2008 | Site Inspection Activity Closed | Durrance, William K. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 08/26/2008 | ||||||||||
Activity Closed Date: | 08/26/2008 | Activity Closed By: | DURRANCE_WK_1 | ||||||||
Comments: | |||||||||||
Comment Date: | 08/26/2008 | User: | DURRANCE_WK_1 | ||||||||
Description: | 1-1,000 gal double walled AST. Using spill bucket, manual stick for overfill protection Using monthly visual inspection and interstitial monitoring for release detection. CFR+FR-satisfactory exp. 1/21/09 Monthly inspections-satisfactory Placard-satisfactory-exp. 6/30/09 RDRL-satisfactory Tank-satisfactory Interstitial space-satisfactory Spill bucket-satisfactory Hoses and valves-satisfactory No evidence of discharge. | ||||||||||
08/30/2007 | Site Inspection Activity Closed | Durrance, William K. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 08/30/2007 | ||||||||||
Activity Closed Date: | 08/30/2007 | Activity Closed By: | DURRANCE_WK_1 | ||||||||
Comments: | |||||||||||
Comment Date: | 08/30/2007 | User: | DURRANCE_WK_1 | ||||||||
Description: | 1-1,000 gal. double walled AST. Using spill bucket for overfill protection. Using monthly inspection of interstitiak space for release detection. CFR+FR-OK exp. 1/21/08 RDRL-on site Placard displayed. exp 6/30/08 Monthly inspections reviewed from 1/15/03-8/17/07-satisfactory Tank-satisfactory interstice-dry Valves,pumps,and piping satisfactory Spill bucket satisfactory. No evidence of discharge. | ||||||||||
08/30/2006 | Attachment | Durrance, William K. | |||||||||
08/18/2006 | Attachment | Durrance, William K. | |||||||||
08/18/2006 | Site Inspection Activity Closed | Durrance, William K. | |||||||||
Activity Result: | In Compliance | Activity Status: | Closed | ||||||||
On-Site Start Date: | 08/18/2006 | ||||||||||
Activity Closed Date: | 08/18/2006 | Activity Closed By: | DURRANCE_WK_1 | ||||||||
Comments: | |||||||||||
Comment Date: | 08/18/2006 | User: | DURRANCE_WK_1 | ||||||||
Description: | 1000 gal. dbl walled tank, using manual stick, gauge, and spill bucket for overfill protection. Using monthly visual of interstice and tank for release detection. CFR + FR, RDRL,Monthly inspections-OK. Tank, spill buckets,hoses and nozzles-OK Placard has been issued. Facility has not yet received current placard.Last years placard affixed to tank. | ||||||||||
10/11/2005 | Legacy Activity | Durrance, William K. | |||||||||
Activity Name: | RESPONSE RECEIVED BY DEPARTMENT | Activity Status: | Closed | ||||||||
09/26/2005 | Violation Closed | Durrance, William K. | |||||||||
Significance: | SNC-B | Status: | Closed | ||||||||
Rule: | 762.401(3) | ||||||||||
09/26/2005 | Legacy Activity | Durrance, William K. | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
09/26/2005 | Violation Closed | Unknown, User | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 2100 | ||||||||||
Rule: | 62-762.601(1)(b), 62-762.641(1)(c) | ||||||||||
Comments: | Mark this as out of compliance if the RDRL hasn't been written, or if the RDRL presented doesn't match the release detection methods used. Is reality different from their plan? Note that an SPCC or groundwater monitoring plan will suffice as an RDRL. See following sample form: RELEASE DETECTION RESPONSE LEVELS --------------------------------- FACILITY NAME: FACILITY #: In accordance with 62-762.601(1)(b), Florida Administrative Code (F.A.C.) the following Release Detection Response Level (RDRL) has been established for the checked method(s) of Release Detection: RELEASE DETECTION METHOD: Statistical Inventory Reconciliation (SIR) with a tank tightness test every three years -- RDRL: One failed SIR report or two consecutive inconclusive SIR reports. A failed tank tightness test. RELEASE DETECTION METHOD: Continuous Automatic Tank Gauge System -- RDRL: A failed 0.2 gph leak test report/printout. RELEASE DETECTION METHOD: Automatic Tank Gauge System with a tank tightness test every three years -- RDRL: A failed 0.2 gph leak test report/printout. A failed tank tightness test. RELEASE DETECTION METHOD: Vacuum Monitoring -- RDRL: A sudden loss of vacuum or a 20% loss of the original vacuum. RELEASE DETECTION METHOD: Electronic Monitoring of tank interstice -- RDRL: Alarm conditions, audible or visible. RELEASE DETECTION METHOD: Visual Monitoring of tank interstice -- RDRL: Presence of free product or water. RELEASE DETECTION METHOD: Annual Tank and Line Tightness Tests used with daily inventory reconciliation (available until 10 yrs. after last tank upgrade) -- RDRL: Failed tank and/or line tightness test, unexplained water fluctuations exceeding one inch; significant loss or gain. RELEASE DETECTION METHOD: Groundwater Monitoring Wells -- RDRL: Presence of free product or sheen. Discharge Report Form must be submitted within 24 hours. RELEASE DETECTION METHOD: Vapor Monitoring Wells -- RDRL: Vapor concentrations >= 500 ppm for gasoline, Vapor concentrations >= 50 ppm for diesel RELEASE DETECTION METHOD: Manual Tank Gauging (Only valid for tanks up to 2000 gals) -- RDRL: Readings exceeding the standards described in 62-761.640 Table MTG, F.A.C. RELEASE DETECTION METHOD: Electronic Monitoring of sumps and/or dispenser liners -- RDRL: Alarm conditions, audible or visible. RELEASE DETECTION METHOD: Visual Monitoring of sumps and/or dispenser liners -- RDRL: Water above the entrance of double-wall piping or presence of free product. RELEASE DETECTION METHOD: Line Leak Detector -- RDRL: Tripping/Activation of leak detector. RELEASE DETECTION METHOD: Annual Line Tightness Test -- RDRL: Failed tightness test As required by 62-762.201(69), F.A.C., if the RDRL is measured or observed, we will initiate activities to determine if an incident, release, or discharge has occurred. If within 24 hours we can not determine if a discharge occurred, an Incident Notification Form will be submitted. | ||||||||||
Comments: | |||||||||||
Comment Date: | 11/27/2007 | User: | JARRETT_SE | ||||||||
Description: | 11/20/2007 Underground piping is Ameron Dualoy LCX, double-walled, fiberglass piping (DEP EQ # 291) for the Diesel compartment of the new UST and ) and is single-walled, OPW Pisces SP 1.5 inch, flexible piping contained in OPW Pisces 3 inch, corrugated piping (DEP EQ # 285) for the Premium compartment of the new UST. Tank: Double-walled Plasteel Elutron UST (EQ #333) Sumps: Metal Products (EQ #333) Dispenser sumps: OPW Pisces fiberglass(EQ #368) for #5/6 Diesel dispenser. Dispenser liners #1/2 and #3/4 unknwon EQ. Spill buckets: OPW 2100 single-walled. (EQ #145) Overfill: OPW flow shut-off valves (EQ #223) Red Jacket Mechanical STP (EQ #373) | ||||||||||
09/26/2005 | Violation Closed | Unknown, User | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 2110 | ||||||||||
Rule: | 62-762.701(1)(a)1.a., 62-762.701(1)(a)1.b., 62-762.701(1)(a)1.c., 62-762.701(1)(a)1.d. | ||||||||||
Comments: | |||||||||||
Comment Date: | 02/18/2012 | User: | BRAZILE_DO_1 | ||||||||
Description: | Tank #1R1 - 15K GL. Modern Welding, Double Wall, Underground Storage Tank ( EQ#156). Tank #2R1 - 15K GL. Modern Welding, Double Wall, Underground Storage Tank ( EQ#156). Piping - OPW Pisces, Double Wall, Pressurized, piping (EQ#648)/Environ despenser liners EQ#439/ OPW Double Wall, Spill buckets (EQ 224)/ OPW Sumps EQ#318. Release Detection - Interstitial Space Double Wall Tank/Interstitial Space Double Wall Piping/Mechanical Line Leak Detectors/Sensors in the Tank Sumps & Dispenser Liners/Monthly Visual Inspections/Veeder Root TLS 350 (EQ 033)CSLD. Overfill Protection - Veeder Root TLS 350 (EQ 033)/Ball Valves. | ||||||||||
Comments: | |||||||||||
Comment Date: | 08/27/2019 | User: | PANGAHAS_RL_1 | ||||||||
Description: | Tank #1R1: 15,000 gallon, Modern Welding, double-walled, underground storage tank (EQ #156). Piping: OPW Pisces, double-walled, pressurized piping (EQ#648); Environ dispenser sumps (EQ #439); OPW double-walled; spill buckets (EQ #224); OPW Sumps (EQ #318). Release Detection: Mechanical line leak detectors; sensors; Veeder Root TLS 350 (EQ #033) CSLD. Overfill Protection: Veeder Root TLS 350 (EQ 033); ball valves. Tank #2R1: 15,000 gallon, Modern Welding, double-walled, underground storage tank (EQ #156). Piping: OPW Pisces, double-walled, pressurized piping (EQ#648); Environ dispenser sumps (EQ #439); OPW double-walled; spill buckets (EQ #224); OPW Sumps (EQ #318). Release Detection: Mechanical line leak detectors; sensors; Veeder Root TLS 350 (EQ #033) CSLD. Overfill Protection: Veeder Root TLS 350 (EQ 033); ball valves. | ||||||||||
09/26/2005 | Violation Closed | Unknown, User | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Criteria ID: | 2110 | ||||||||||
Rule: | 62-762.701(1)(a)1.a., 62-762.701(1)(a)1.b., 62-762.701(1)(a)1.c., 62-762.701(1)(a)1.d. | ||||||||||
Comments: | |||||||||||
Comment Date: | 02/18/2012 | User: | BRAZILE_DO_1 | ||||||||
Description: | Tank #1R1 - 15K GL. Modern Welding, Double Wall, Underground Storage Tank ( EQ#156). Tank #2R1 - 15K GL. Modern Welding, Double Wall, Underground Storage Tank ( EQ#156). Piping - OPW Pisces, Double Wall, Pressurized, piping (EQ#648)/Environ despenser liners EQ#439/ OPW Double Wall, Spill buckets (EQ 224)/ OPW Sumps EQ#318. Release Detection - Interstitial Space Double Wall Tank/Interstitial Space Double Wall Piping/Mechanical Line Leak Detectors/Sensors in the Tank Sumps & Dispenser Liners/Monthly Visual Inspections/Veeder Root TLS 350 (EQ 033)CSLD. Overfill Protection - Veeder Root TLS 350 (EQ 033)/Ball Valves. | ||||||||||
Comments: | |||||||||||
Comment Date: | 08/27/2019 | User: | PANGAHAS_RL_1 | ||||||||
Description: | Tank #1R1: 15,000 gallon, Modern Welding, double-walled, underground storage tank (EQ #156). Piping: OPW Pisces, double-walled, pressurized piping (EQ#648); Environ dispenser sumps (EQ #439); OPW double-walled; spill buckets (EQ #224); OPW Sumps (EQ #318). Release Detection: Mechanical line leak detectors; sensors; Veeder Root TLS 350 (EQ #033) CSLD. Overfill Protection: Veeder Root TLS 350 (EQ 033); ball valves. Tank #2R1: 15,000 gallon, Modern Welding, double-walled, underground storage tank (EQ #156). Piping: OPW Pisces, double-walled, pressurized piping (EQ#648); Environ dispenser sumps (EQ #439); OPW double-walled; spill buckets (EQ #224); OPW Sumps (EQ #318). Release Detection: Mechanical line leak detectors; sensors; Veeder Root TLS 350 (EQ #033) CSLD. Overfill Protection: Veeder Root TLS 350 (EQ 033); ball valves. | ||||||||||
05/11/2005 | Legacy Activity | Keene, Keith K. | |||||||||
Activity Name: | TANK COMPLIANCE RE-INSPECTION | Activity Status: | Closed | ||||||||
10/04/2004 | Violation Closed | Keene, Keith K. | |||||||||
Significance: | SNC-B | Status: | Closed | ||||||||
Rule: | 761.610(3)(b) | ||||||||||
10/04/2004 | Legacy Activity | Unknown, User | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
01/13/2004 | Legacy Activity | Keene, Keith K. | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
04/10/2003 | Legacy Activity | Keene, Keith K. | |||||||||
Activity Name: | TANK COMPLIANCE RE-INSPECTION | Activity Status: | Closed | ||||||||
12/19/2002 | Violation Closed | Keene, Keith K. | |||||||||
Significance: | SNC-B | Status: | Closed | ||||||||
Rule: | 610(3)(b) | ||||||||||
12/19/2002 | Violation Closed | Keene, Keith K. | |||||||||
Significance: | Minor | Status: | Closed | ||||||||
Rule: | 700(1)(a)1 | ||||||||||
12/19/2002 | Legacy Activity | Keene, Keith K. | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
01/29/2002 | Legacy Activity | Keene, Keith K. | |||||||||
Activity Name: | TANK ANNUAL COMPLIANCE INSPECTION | Activity Status: | Closed | ||||||||
06/05/2001 | Legacy Activity | Keene, Keith K. | |||||||||
Activity Name: | TANK INSTALLATION - FINAL INSPECTION | Activity Status: | Closed | ||||||||