12/20/2024 Enforcement Tracking Activity Sterling, Chase
Activity Status: Open
Comments:
Comment Date: 03/25/2025 User: STERLING_C
Description: first warning letter sent under activity ID 1369224
12/09/2024 Electronic Communication Activity Ames, Janelle
Activity Closed Date: 12/09/2024 Activity Status: Closed
Date: 12/09/2024
Recipient: Janelle Ames
Sender: Brad Weinischke
Subject: Class C
Message: Facility has provided Class C certifications
Events:
Event Type: Activity has been finished Date: 12/09/2024
Comment: Finished
12/06/2024 Enforcement Referral Activity Ames, Janelle
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 12/20/2024
Events:
Event Type: Activity/Document was acknowledged on this date Date: 12/10/2024
Comment: Acknowledged and Assigned by Jennifer Paul
Events:
Event Type: Activity has been assigned Date: 12/10/2024
Comment: Assigned to Chase Sterling
Events:
Event Type: Activity/Document was accepted on this date Date: 12/20/2024
Comment: Accepted by Chase Sterling: accepted
Events:
Event Type: Activity has been finished Date: 12/20/2024
Comment: Finished
Events:
Event Type: Activity has been submitted for approval Date: 12/06/2024
Comment: Submitted for approval by: Janelle Ames: Violations cited during compliance inspection.
Comments:
Comment Date: 12/06/2024 User: AMES_J
Description: Violations cited during compliance inspection.
Attachments:
Attachment Date: 12/06/2024 User: AMES_J
Description: 9807718 CRDE Information Sheet 12.06.24
View Attachment
12/06/2024 Electronic Communication Activity Ames, Janelle
Activity Closed Date: 12/06/2024 Activity Status: Closed
Date: 12/06/2024
Recipient: Janelle Ames
Sender: Brad Weinischke
Subject: Resolving Violations
Message: See Attachment
Events:
Event Type: Activity has been finished Date: 12/06/2024
Comment: Finished
11/13/2024 Electronic Communication Activity Ames, Janelle
Activity Closed Date: 11/13/2024 Activity Status: Closed
Date: 11/13/2024
Recipient: Brad Weinischke
Sender: Janelle Ames
Subject: Violation Response, additional information needed
Message: See Attachment
Events:
Event Type: Activity has been finished Date: 11/13/2024
Comment: Finished
11/06/2024 Electronic Communication Activity Ames, Janelle
Activity Closed Date: 11/06/2024 Activity Status: Closed
Date: 11/06/2024
Recipient: Brad Weinischke, Amanda Boshears, Krystal Terrell
Sender: Janelle Ames
Subject: Violation Reminders
Message: See Attachment
Events:
Event Type: Activity has been finished Date: 11/06/2024
Comment: Finished
10/14/2024 Electronic Communication Activity Ames, Janelle
Activity Closed Date: 10/14/2024 Activity Status: Closed
Date: 10/14/2024
Recipient: Brad Weinischke, Amanda Boshears
Sender: Janelle Ames
Subject: Compliance Assistance
Message: See Attachment
Events:
Event Type: Activity has been finished Date: 10/14/2024
Comment: Finished
09/09/2024 Editable Letter Activity Soriano, Jianna
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Events:
Event Type: Activity has been submitted for approval Date: 09/09/2024
Comment: Submitted for approval by: Jianna Soriano
Events:
Event Type: Document has been sent Date: 09/09/2024
Comment: Sent
Events:
Event Type: Activity/Document has been approved Date: 09/09/2024
Comment: Approved by Haley McArtor: a
Events:
Event Type: Activity has been finished Date: 09/09/2024
Comment: Finished
Attachments:
Attachment Date: 09/09/2024 User: SORIANO_JC_1
Description: 9807718 MURPHY 7144 CAO
View Attachment
09/05/2024 Incident Activity Soriano, Jianna
Activity Status: Open
09/04/2024 Violation Closed Soriano, Jianna
Significance: Minor Status: Closed
Criteria ID: 6073
Rule: 62-761.700(3)(b), 62-761.700(3)(b)1, 62-761.700(3)(b)2
09/04/2024 Site Inspection Activity Closed Soriano, Jianna
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 09/04/2024
Activity Closed Date: 09/09/2024 Activity Closed By: SORIANO_JC_1
Events:
Event Type: Activity has been submitted for approval Date: 09/09/2024
Comment: Submitted for approval by: Jianna Soriano
Events:
Event Type: Activity has been finished Date: 09/09/2024
Comment: Finished
Events:
Event Type: Activity has been submitted for approval Date: 09/09/2024
Comment: Submitted for approval by: Jianna Soriano
Events:
Event Type: Activity has not been approved Date: 09/09/2024
Comment: Not approved by Haley McArtor: VIOLATIONS: Delete 6014. Delete 6056 cited 9/4/2024.
Events:
Event Type: Activity/Document has been approved Date: 09/09/2024
Comment: Approved by Haley McArtor: a
09/04/2024 Violation Closed Soriano, Jianna
Significance: Minor Status: Closed
Criteria ID: 6002
Rule: 62-761.350(1), 62-761.350(1)(c), 62-761.350(1)(d), 62-761.350(3)(b)2, 62-761.350(5)(a), 62-761.350(5)(b), 62-761.350(5)(c), 62-761.350(7)
08/08/2024 Electronic Communication Activity Soriano, Jianna
Activity Closed Date: 08/08/2024 Activity Status: Closed
Date: 08/08/2024
Recipient: Amanda Boshears
Sender: Jianna Soriano
Subject: CA Email
Message: See email attached
Events:
Event Type: Activity has been finished Date: 08/08/2024
Comment: Finished
08/07/2024 Electronic Communication Activity Sterling, Chase
Activity Closed Date: 08/07/2024 Activity Status: Closed
Date: 08/07/2024
Recipient: Brad Weinischke
Sender: Chase Sterling
Subject: Murphy USA #7144
Message: (Summary; email was too long) Murphy 7144 date of needed monthlies and reason for registration. I explained we need the last 3 months of monthlies/or 3 months going forward from August and that the registration form is for Point of Contact updates. Krystal Terrell is not the POC any longer (promotion), Brad Weinischke and Amanda Boshears are now in the position that Krystal held for Murphy stores in the Northeast District. Updating the POC will benefit COJ EQD, Alachua EPD and FLDEP going forward for all Murphy locations if we can get all of them updated.
Events:
Event Type: Activity has been finished Date: 08/07/2024
Comment: Finished
08/07/2024 Editable Letter Activity Sterling, Chase
Activity Title: Warning Letter Activity Status: Closed
Events:
Event Type: Activity has been submitted for approval Date: 08/07/2024
Comment: Submitted for approval by: Chase Sterling
Events:
Event Type: Activity/Document has been approved Date: 08/08/2024
Comment: Approved by Jennifer Paul: WL24-114 7/29/24
Events:
Event Type: Activity has been finished Date: 08/08/2024
Comment: Finished
Attachments:
Attachment Date: 08/07/2024 User: STERLING_C
Description: WL24-114
View Attachment
06/12/2024 Comment Sterling, Chase
Description: Per Krystal Terrell (6/6/2024), new contacts regarding compliance issues/questions are Brad.Weinischke@murphyusa.com and Amanda.Boshears@murphyusa.com
11/28/2023 Enforcement Tracking Activity Paul, Jennifer
Activity Status: Closed
Activity Result: Closed Without Enforcement Activity Closed Date: 03/25/2025
Events:
Event Type: Activity has been finished Date: 03/25/2025
Comment: Finished
04/24/2023 Electronic Communication Activity McArtor, Haley
Activity Closed Date: 04/24/2023 Activity Status: Closed
Date: 04/24/2023
Recipient: Haley McArtor
Sender: Brad Weinischke
Subject: Resolving violations
Message: resolving violations
Events:
Event Type: Activity has been finished Date: 04/24/2023
Comment: Finished
03/13/2023 Enforcement Referral Activity Gainey, Helen
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 11/28/2023
Events:
Event Type: Activity has been finished Date: 11/28/2023
Comment: Finished
Events:
Event Type: Activity/Document was accepted on this date Date: 11/28/2023
Comment: Accepted by Jennifer Paul: Accepted
Events:
Event Type: Activity has been submitted for approval Date: 11/08/2023
Comment: Submitted for approval by: Helen Gainey: to reassign to J Paul
Events:
Event Type: Activity has been submitted for approval Date: 11/08/2023
Comment: Submitted for approval by: Helen Gainey: to reassign to J Paul
Events:
Event Type: Activity has been withdrawn from submission by the requestor Date: 11/08/2023
Comment: Withdrawn by Helen Gainey: to reassign to J Paul
Events:
Event Type: Activity has been withdrawn from submission by the requestor Date: 11/08/2023
Comment: Withdrawn by Helen Gainey: to reassign to J Paul
Events:
Event Type: Activity has been submitted for approval Date: 03/13/2023
Comment: Submitted for approval by: Helen Gainey: Violations cited during routine compliance inspection.
Events:
Event Type: Activity has been assigned Date: 11/13/2023
Comment: Assigned to Jennifer Paul
Events:
Event Type: Activity/Document was acknowledged on this date Date: 11/13/2023
Comment: Acknowledged and Assigned by Jennifer Paul
Comments:
Comment Date: 03/13/2023 User: GAINEY_H_1
Description: Violations cited during routine compliance inspection.
Attachments:
Attachment Date: 03/13/2023 User: GAINEY_H_1
Description: 9807718_CRDE Information Sheet_03-13-2023
View Attachment
03/03/2023 Electronic Communication Activity McArtor, Haley
Activity Closed Date: 03/03/2023 Activity Status: Closed
Date: 03/03/2023
Recipient: Amanda Boshears
Sender: Haley McArtor
Subject: violation reminder
Message: attached
Events:
Event Type: Activity has been finished Date: 03/03/2023
Comment: Finished
12/22/2022 Editable Letter Activity Jordan, Shane
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Events:
Event Type: Activity has been submitted for approval Date: 12/22/2022
Comment: Submitted for approval by: Shane Jordan
Events:
Event Type: Activity/Document has been approved Date: 12/22/2022
Comment: Approved by Jean Richards: Approved
Events:
Event Type: Activity/Document was rejected on this date Date: 12/22/2022
Comment: Rejected by Jean Richards: Letterhead to Krystal Terrell but addressed to Max Burmeister.
Events:
Event Type: Activity has been submitted for approval Date: 12/22/2022
Comment: Submitted for approval by: Shane Jordan
Events:
Event Type: Document has been sent Date: 12/22/2022
Comment: Sent
Events:
Event Type: Activity has been finished Date: 12/27/2022
Comment: Finished
Attachments:
Attachment Date: 12/22/2022 User: JORDAN_SL_1
Description: CAO letter
View Attachment
12/21/2022 Attachment Jordan, Shane
12/13/2022 Violation Closed Jordan, Shane
Significance: Minor Status: Closed
Criteria ID: 6003
Rule: 62-761.400(1)(b), 62-761.400(2), 62-761.400(2)(a), 62-761.400(3), 62-761.400(3)(a), 62-761.400(3)(b), 62-761.400(3)(c)
12/13/2022 Site Inspection Activity Closed Jordan, Shane
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 12/13/2022
Activity Closed Date: 12/22/2022 Activity Closed By: JORDAN_SL_1
Events:
Event Type: Activity has been finished Date: 12/22/2022
Comment: Finished
Events:
Event Type: Activity/Document has been approved Date: 12/21/2022
Comment: Approved by Jean Richards: Approved
Events:
Event Type: Activity has been submitted for approval Date: 12/21/2022
Comment: Submitted for approval by: Shane Jordan
Events:
Event Type: Activity has been submitted for approval Date: 12/21/2022
Comment: Submitted for approval by: Shane Jordan
Events:
Event Type: Activity has not been approved Date: 12/21/2022
Comment: Not approved by Jean Richards: See corrections provided.
12/13/2022 Violation Open Jordan, Shane
Significance: SNC-B Status: Open
Criteria ID: 6056
Rule: 62-761.600(1)(d), 62-761.600(1)(e), 62-761.600(1)(g)
Comments:
Comment Date: 09/09/2024 User: MCARTOR_H_1
Description: Monthly inspections for facility from 2022-2024 was not provided during inspection on 9/4/2024
12/01/2022 Electronic Communication Activity Jordan, Shane
Activity Closed Date: 12/01/2022 Activity Status: Closed
Date: 12/01/2022
Recipient: Amanda Boshears
Sender: Shane Jordan
Subject: Initial Outreach email for routine compliance inspection
Message: See attached
Events:
Event Type: Activity has been finished Date: 12/01/2022
Comment: Finished
12/22/2020 Electronic Communication Activity Austin, Jesse h
Activity Closed Date: 12/22/2020 Activity Status: Closed
Date: 12/22/2020
Recipient: Amanda Boshears
Sender: Jesse Austin
Subject: Compliance Assistance Offer Email
Message: See attachment.
Events:
Event Type: Activity has been finished Date: 12/22/2020
Comment: Finished
Attachments:
Attachment Date: 12/22/2020 User: AUSTIN_JH_1
Description: Compliance Assistance Offer Email
View Attachment
12/11/2020 Editable Letter Activity Austin, Jesse h
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 12/11/2020
Comment: Finished
Attachments:
Attachment Date: 12/11/2020 User: AUSTIN_JH_1
Description: 9807718 Murphy USA #7144 CAO
View Attachment
12/09/2020 Violation Closed Austin, Jesse h
Significance: Minor Status: Closed
Criteria ID: 4079
Rule: 62-761.710(2), 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d)
12/09/2020 Electronic Communication Activity Austin, Jesse h
Activity Closed Date: 12/09/2020 Activity Status: Closed
Date: 12/09/2020
Recipient: Amanda Boshears
Sender: Jesse Austin
Subject: 9807718 Murphy USA #7144 Routine Inspection
Message: Good Afternoon, I am contacting you to inform you of several upcoming FDEP routine compliance inspections for seven (7) of your sites. Please refer to the list below. Inspecting several of your sites per day, I would like to begin your inspections starting on November 30, 2020. Please let me know what your preferred dates and times are. Prior to these inspections, please provide the following documentation for these sites via email: 9808093 Murphy USA #7336 9805833 Murphy USA #6941 9806858 Murphy USA #7129 9807718 Murphy USA # 7144 9813604 Murphy Express #8701 9813565 Murphy Express #8659 9810798 Murphy USA #7411 Here is a breakdown of the paperwork we would like to review prior to or during the inspection. New regulatory rules stated: Any documentation produced on January 11, 2017 and going forward will need to be kept for three years. Records to be reviewed: Due to current circumstance and social distancing protocols, all records will be requested prior to the inspection. Please send all records below via email or fax (904-630-3637). All records will be reviewed off site. 1. Storage Tank Liability Insurance Policy: 2018-2019, 2019-2020, and 2020-2021. 2. Financial Mechanism (Part C or D form) or Letter from Chief Financial Officer (Part A): 2018-2019, 2019-2020, and 2020-2021. 3. Certificate of Financial Responsibility (Part P form): 2018-2019, 2019-2020, and 2020-2021 4. Placard issued (Must be POSTED ON SITE): 2020-2021 5. Annual Operability Test (Release Detection-Interstitial Monitor) Results: 2017, 2018, 2019, 2020 6. Annual Operability Test (Primary Registered Overfill Device) Results: 2017, 2018, 2019, 2020 7. Annual Inline Leak Detector Test (pressurized piping): 2017, 2018, 2019, 2020 8. Breach of Integrity (Double wall spill buckets, dispenser sumps, and underground sumps): 2017, 2018, 2019, 2020 9. Breach of Integrity (Single wall spill buckets, dispenser sumps, and underground sumps): 2017, 2018, 2019, 2020 10. Monthly Visual Release Detection Records: 2018, 2019, December 2020 11. Electronic Release Detection Equipment Monthly Checks: 2018, 2019, December 2020 12. Alarm/Incident History: 2018, 2019, December 2020 13. UST Operator Training Certificates Due to current circumstances and social distancing protocols, a representative must be present to provide access to all of the equipment. The components are to be opened by the representative while the inspector will maintain at least a 6’ distance. Once opened, the representative will be asked to move away and the inspector will view the components and take photos to review off site if needed. If there is an alarm inside the facility that is accessible to the inspector while maintaining social distancing, it will be inspected. If this cannot be done, the representative will be asked to perform the inspection and take photos for the inspector. In addition, if you could verify whether any of the below facility information has changed since the last inspection, it would be greatly appreciated: 1. Account Owner/Tank Owner 2. Property Owner 3. Facility Contact Lastly, if you could take some time to please review the following resources: • Videos on DEP’s website at https://youtu.be/tVGkkGcqnNc(UST) or http://youtu.be/rknNKlAjWW4(AST). • Tank Registration Placards must be posted at the facility where the tank is located. Placard will not be mailed to the facility. For payment of Registration fees and to print tank placards, please visit the ESSA Portal at http://www.fldepportal.com/go/submit-registration/. • For further instructions on how to register please visit: https://floridadep.gov/waste/permitting-compliance-assistance/content/storage-tank-facility-registration. • The new Storage Tank rules, associated forms, and closure sampling instructions can be reviewed at the following link: http://www.dep.state.fl.us/waste/categories/shw/pages/announcem
Events:
Event Type: Activity has been finished Date: 12/09/2020
Comment: Finished
12/09/2020 Violation Closed Austin, Jesse h
Significance: SNC-B Status: Closed
Criteria ID: 4014
Rule: 62-761.420(2)
11/30/2020 Site Inspection Activity Closed Austin, Jesse h
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 11/30/2020
Activity Closed Date: 12/11/2020 Activity Closed By: AUSTIN_JH_1
Events:
Event Type: Activity/Document has been approved Date: 12/11/2020
Comment: Approved by Hali M Gregory: not reviewed
Events:
Event Type: Activity has been finished Date: 12/11/2020
Comment: Finished
Events:
Event Type: Activity has been submitted for approval Date: 12/09/2020
Comment: Submitted for approval by: Jesse h Austin
08/27/2018 Site Inspection Activity Closed Westerman, Michael L
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 08/27/2018
Activity Closed Date: 08/27/2018 Activity Closed By: WESTERMAN_ML_1
Events:
Event Type: Activity has been finished Date: 08/27/2018
Comment: Finished
08/27/2018 Editable Letter Activity Westerman, Michael L
Activity Title: In Compliance Letter Activity Status: Closed
Description: ICL
Events:
Event Type: Activity has been finished Date: 08/27/2018
Comment: Finished
Events:
Event Type: Document has been sent Date: 08/27/2018
Comment: Sent
Attachments:
Attachment Date: 08/27/2018 User: WESTERMAN_ML_1
Description: In Compliance Letter
View Attachment
08/20/2018 Electronic Communication Activity Westerman, Michael L
Activity Closed Date: 08/20/2018 Activity Status: Closed
Date: 08/20/2018
Recipient: Murphy USA – Natalee Jerry
Sender: EQD – Michael Westerman
Subject: Outreach was provided by sending FDEP video links and inspection preparation information prior to Compliance Inspection
Message: See attached e-mail
Events:
Event Type: Activity has been finished Date: 08/20/2018
Comment: Finished
09/12/2016 Electronic Communication Activity Mondo, Patrick W
Activity Closed Date: 09/12/2016 Activity Status: Closed
Date: 09/12/2016
Recipient: Matt Malena
Sender: EQD
Subject: Inspection report delivered.
Message: See attached.
Events:
Event Type: Activity has been finished Date: 09/12/2016
Comment: Finished
08/18/2016 Violation Closed Mondo, Patrick W
Significance: Minor Status: Closed
Criteria ID: 1103
Rule: 62-761.640(4)(a)1., 62-761.640(4)(a)2., 62-761.640(4)(a)3., 62-761.640(4)(a)4.
Comments: Installation - verify that the line leak detector has been installed during the final installation inspection. Compliance - check to see that the unit is present. Examine the annual function test data - a pass alone is not sufficient. The tester must demonstrate 3.0 gph discharge detection for the mechanical (flow restrictor). Note that the electronic (auto shut off) line leak detector does not need an annual test, but must still be able to detect a 0.2 gph leak after it has been tripped at 150% line operating pressure. Replacements - unit must be tested out of the box - function must be proven. 3.0 gph = 185.4 ml/min (To convert milliliters/minute to gallons/hour, multiple the milliliters by 0.0162162; or, 1 gph equals 61.8 ml/min). Values greater than 186 ml/min fail. Values less than 185 ml/min mean that the line leak detector will activate at a more restrictive rate.
08/18/2016 Site Inspection Activity Closed Mondo, Patrick W
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 08/18/2016
Activity Closed Date: 09/12/2016 Activity Closed By: MONDO_PW_1
Events:
Event Type: Activity has been submitted for approval Date: 09/06/2016
Comment: Submitted for approval by: Patrick W Mondo
Events:
Event Type: Activity has been finished Date: 09/12/2016
Comment: Finished
Events:
Event Type: Activity has been submitted for approval Date: 09/12/2016
Comment: Submitted for approval by: Patrick W Mondo
Events:
Event Type: Activity has not been approved Date: 09/10/2016
Comment: Not approved by Jean Richards: Report comments list ball check valves but EQ lists have flow shut off.
Events:
Event Type: Activity/Document has been approved Date: 09/12/2016
Comment: Approved by Jean Richards: Approved
08/18/2016 Violation Closed Mondo, Patrick W
Significance: Minor Status: Closed
Criteria ID: 1123
Rule: 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d), 62-761.710(2)(e), 62-761.710(2)(f), 62-761.710(2)(g), 62-761.710(2)(h)
Comments: If the problem involves failure to perform according to the standards in each of the following areas, then note these items in addition to the paperwork for this rule: a. and g. Inventory - rules 62-761.640(3)(b)1-2, 62-761.640(3)(c) & 62-761.700(1)(c)5 b. Repair, operation, and maintenance - rules 62-761.700(1)(a)1, 62-761.700(1)(a)5, 62-761.700(1)(a)6 & 62-761.700(1)(c)3 c. Release detection - rules 62-761.600(1)(e), 62-761.610(3)(b), 62-761.640(2)(c)4, 62-761.640(2)(e), 62-761.640(3)(d), 62-761.640(3)(e)1-5 & 62-761.640(3)(e)9 d. Release detection response level descriptions - rules 62-761.600(1)(b) & 62-761.640(1)(c) e. Tightness, pressure, and breach of integrity tests - rules 62-761.610(3)(a)1, 62-761.640(1)(a) & 62-761.640(4)(a) f. Financial responsibility - rule 62-761.400(3) g. Repairs and replacements - rule 62-761.700(1)(a)6 The following are not this rule's issues: Rules 62-761.450(1)(a)1, 62-761.450(1)(a)2, 62-761.450(1)(a)3 & 62-761.450(1)(a)4 are verbal notices of activities that may also be written Rule 62-761.450(1)(b) is a registration issue Rules 62-761.450(2), 62-761.450(3)(a) & 62-761.450(3)(b) are INF/DRF reporting issues Rules 62-761.600(1)(a)3 & 62-761.600(1)(f) are covered by rule 62-761.710(3) Anything with cathodic protection is covered by rule 62-761.710(3)
08/18/2016 Violation Closed Mondo, Patrick W
Significance: Minor Status: Closed
Criteria ID: 1117
Rule: 62-761.700(1)(c)3.
Comments: Facility must prove that all release detection devices, such as in line leak detectors, sump and liner sensors, ATGs, etc. function properly. Sensing devices may be optical, vapor, float activated, discriminating, non-discriminating, or tied into electrical circuits. ATG probes inside of tanks require calibration testing, if used for release detection as well as inventory measurements.
08/11/2016 Electronic Communication Activity Mondo, Patrick W
Activity Closed Date: 08/11/2016 Activity Status: Closed
Date: 08/11/2016
Recipient: Matt Malena
Sender: EQD
Subject: Pre Inspection Notification emailed.
Message: See attached.
Events:
Event Type: Activity has been finished Date: 08/11/2016
Comment: Finished
09/12/2014 Electronic Communication Activity Williams, April K.
Activity Closed Date: 09/15/2014 Activity Status: Closed
Date: 09/12/2014
Recipient: Matt Malena, MURPHY USA
Sender: EQD
Subject: Email - Compliance Report
Message: See Attachment
Events:
Event Type: Activity has been finished Date: 09/15/2014
Comment: Finished
08/29/2014 Emergency Preparedness Information Activity Williams, April K.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 08/29/2014
Events:
Event Type: Activity has been finished Date: 08/29/2014
Comment: Finished
08/28/2014 Site Inspection Activity Closed Williams, April K.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 08/28/2014
Activity Closed Date: 09/12/2014 Activity Closed By: WILLIAMS_AK_1
Events:
Event Type: Activity has been finished Date: 09/12/2014
Comment: Finished
01/30/2013 Document Management Activity Richards, Jean
Activity Title: Incident Notification Form Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 01/30/2013
Comment: Finished
Attachments:
Attachment Date: 01/30/2013 User: RICHARDS_JE_1
Description: 9807718_INF for water in premium stp sump_12-04-2012
View Attachment
12/05/2012 Incident Activity Richards, Jean
Activity Result: Has not led to Discharge Activity Status: Closed
Activity Closed Date: 01/30/2013
Events:
Event Type: Activity has been finished Date: 01/30/2013
Comment: Finished
Comments:
Comment Date: 01/30/2013 User: RICHARDS_JE_1
Description: No discharge has occurred.
08/30/2012 Document Management Activity Korous, Eva
Activity Title: Operator Training Certification Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 08/30/2012
Comment: Finished
Attachments:
Attachment Date: 08/30/2012 User: KOROUS_E_1
Description: A/B Operator Certificates
View Attachment
08/22/2012 Attachment Korous, Eva
08/22/2012 Document Management Activity Richards, Jean
Activity Title: Incident Notification Form Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 08/22/2012
Comment: Finished
Attachments:
Attachment Date: 08/22/2012 User: RICHARDS_JE_1
Description: 9807718_INF for reg 2 sump in alarm_08-21-2012.pdf
View Attachment
08/22/2012 Incident Activity Richards, Jean
Activity Result: Has not led to Discharge Activity Status: Closed
Activity Closed Date: 08/29/2012
Events:
Event Type: Activity has been finished Date: 08/29/2012
Comment: Finished
Comments:
Comment Date: 08/29/2012 User: RICHARDS_JE_1
Description: No liquid found in sump. Sensor is bad and will be replaced. See attached work order.
08/22/2012 Emergency Preparedness Information Activity Korous, Eva
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 08/22/2012
Events:
Event Type: Activity has been finished Date: 08/22/2012
Comment: Finished
08/22/2012 Electronic Communication Activity Korous, Eva
Activity Closed Date: 08/22/2012 Activity Status: Closed
Date: 08/22/2012
Recipient: Cindy House
Sender: EQD
Subject: Report Email
Message: See attachment
Events:
Event Type: Activity has been finished Date: 08/22/2012
Comment: Finished
08/13/2012 Site Inspection Activity Closed Korous, Eva
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 08/13/2012
Activity Closed Date: 08/22/2012 Activity Closed By: KOROUS_E_1
Events:
Event Type: Activity has been finished Date: 08/22/2012
Comment: Finished
06/28/2012 Incident Activity Richards, Jean
Activity Result: Has not led to Discharge Activity Status: Closed
Activity Closed Date: 08/29/2012
Events:
Event Type: Activity has been finished Date: 08/29/2012
Comment: Finished
Comments:
Comment Date: 07/17/2012 User: RICHARDS_JE_1
Description: Jean Richards spoke with Brad Weinischke on 07/17/2012 to check on status of this issue. He is to e-mail documentation.
Comments:
Comment Date: 08/29/2012 User: RICHARDS_JE_1
Description: No liquid found in sump. Alarm was reset. See attached work order.
06/28/2012 Document Management Activity Richards, Jean
Activity Title: Incident Notification Form Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 06/28/2012
Comment: Finished
Attachments:
Attachment Date: 06/28/2012 User: RICHARDS_JE_1
Description: 9807718_INF for water in reg-2 stp sump_06-27-2012.pdf
View Attachment
06/28/2012 Incident Activity Richards, Jean
Activity Result: Has not led to Discharge Activity Status: Closed
Activity Closed Date: 08/29/2012
Events:
Event Type: Activity has been finished Date: 08/29/2012
Comment: Finished
Comments:
Comment Date: 07/17/2012 User: RICHARDS_JE_1
Description: Jean Richards spoke with Brad Weinischke on 07/17/2012 to check on status of this issue. He is to e-mail documentation.
Comments:
Comment Date: 08/29/2012 User: RICHARDS_JE_1
Description: No liquid found in sump. Alarm was reset. See attached work order.
02/22/2011 Site Inspection Activity Closed Holloway, Randall
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 02/23/2011
Activity Closed Date: 02/23/2011 Activity Closed By: HOLLOWAY_RW_1
Events:
Event Type: Activity has been finished Date: 02/23/2011
Comment: Finished
Comments:
Comment Date: 02/22/2011 User: HOLLOWAY_RW_1
Description: Proper notification given to Ms. Cindy House prior to conducting annual compliance inspection. Paperwork inspection conducted on 2-22-11 and 2-23-11. Verified cover page information. Placard is current. This facility is a retail station and has two 20K USTs. Tank 1 contains regular unleaded. Tank 2 is compartmented into 10K premium and 10K diesel Tanks use interstitial monitoring by an ATG for release detection. Piping uses interstitial monitoring by the ATG for release detection. Dispenser liners and STP sumps have electronic sensors for release detection. Spill buckets use visual inspections for release detection.
02/25/2010 Attachment Holloway, Randall
02/25/2010 Attachment Holloway, Randall
02/25/2010 Attachment Holloway, Randall
02/25/2010 Attachment Holloway, Randall
02/25/2010 Attachment Holloway, Randall
02/24/2010 Site Inspection Activity Closed Holloway, Randall
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 02/25/2010
Activity Closed Date: 02/25/2010 Activity Closed By: HOLLOWAY_RW_1
Events:
Event Type: Activity has been finished Date: 02/25/2010
Comment: Finished
Comments:
Comment Date: 02/24/2010 User: HOLLOWAY_RW_1
Description: Proper notification given to Mr. Wayne Young prior to inspection. Paperwork inspection conducted on 2-24-10 and 2-25-10. Verified cover page information. Placard is current. Tanks and piping use interstitial monitoring by a Veeder Root TLS 350 for release detection. Sumps and dispenser liners have electronic sensors for release detection. Spill buckets use visual inspections for release detection.
03/27/2009 Site Inspection Activity Closed Holloway, Randall
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 03/27/2009
Activity Closed Date: 03/27/2009 Activity Closed By: HOLLOWAY_RW_1
Comments:
Comment Date: 03/27/2009 User: HOLLOWAY_RW_1
Description: Received Line LeaK Detectors and ATG test from Ms. Cindy House of Murphy Oil on 3-27-09. Line leak detectors and the ATG were tested on 3-2-09 and all psssed. The line leak detectors and the ATG are due to be retested by 3-2-2010. Facility is now in compliance.
03/25/2009 Violation Closed Holloway, Randall
Significance: Minor Status: Closed
Criteria ID: 1103
Rule: 62-761.640(4)(a)1., 62-761.640(4)(a)2., 62-761.640(4)(a)3., 62-761.640(4)(a)4.
Comments: Installation - verify that the line leak detector has been installed during the final installation inspection. Compliance - check to see that the unit is present. Examine the annual function test data - a pass alone is not sufficient. The tester must demonstrate 3.0 gph discharge detection for the mechanical (flow restrictor). Note that the electronic (auto shut off) line leak detector does not need an annual test, but must still be able to detect a 0.2 gph leak after it has been tripped at 150% line operating pressure. Replacements - unit must be tested out of the box - function must be proven. 3.0 gph = 185.4 ml/min (To convert milliliters/minute to gallons/hour, multiple the milliliters by 0.0162162; or, 1 gph equals 61.8 ml/min). Values greater than 186 ml/min fail. Values less than 185 ml/min mean that the line leak detector will activate at a more restrictive rate.
03/25/2009 Editable Letter Activity Holloway, Randall
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
03/25/2009 Violation Closed Holloway, Randall
Significance: Minor Status: Closed
Criteria ID: 1117
Rule: 62-761.700(1)(c)3.
Comments: Facility must prove that all release detection devices, such as in line leak detectors, sump and liner sensors, ATGs, etc. function properly. Sensing devices may be optical, vapor, float activated, discriminating, non-discriminating, or tied into electrical circuits. ATG probes inside of tanks require calibration testing, if used for release detection as well as inventory measurements.
03/23/2009 Attachment Holloway, Randall
03/22/2009 Site Inspection Activity Closed Holloway, Randall
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 03/22/2009
Activity Closed Date: 03/25/2009 Activity Closed By: HOLLOWAY_RW_1
Comments:
Comment Date: 03/22/2009 User: HOLLOWAY_RW_1
Description: Proper notification given to Ms. Cindy House prior to inspection. Paperwork inspection conducted on 3-22-09 and 3-25-09. Updated cover page information. Registration form filed. Placard is current. Tanks and piping use interstitial monitoring by the Veeder Root TLS 350 for release detection. Sumps and dispenser liners have electronic sensors for release detection. Spill buckets use monthly visual inspections for release detection. The line leak detectors nor the ATG has documentation showing they have been tested within the last 12 months. The line leak detectors and ATG need to be tested as soon as possible and documentation of passing tests provided to the inspector for review.
03/10/2009 Attachment Allen, Eleanor
03/10/2009 Attachment Holloway, Randall
10/26/2007 Attachment Holloway, Randall
10/26/2007 Attachment Holloway, Randall
10/26/2007 Attachment Holloway, Randall
10/24/2007 Emergency Preparedness Information Activity Holloway, Randall
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 10/24/2007
Comments:
Comment Date: 03/22/2009 User: HOLLOWAY_RW_1
Description: There are 5 double sided dispensers on site. There is a maximum of 10 fueling positions available at any one time. 4 Dispenser are unleaded. 1 dispenser is unleaded and diesel.
10/23/2007 Site Inspection Activity Closed Holloway, Randall
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 10/23/2007
Activity Closed Date: 10/24/2007 Activity Closed By: HOLLOWAY_RW_1
02/27/2007 Site Inspection Activity Closed Holloway, Randall
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 02/27/2007
Activity Closed Date: 03/01/2007 Activity Closed By: HOLLOWAY_RW_1
Comments:
Comment Date: 02/27/2007 User: HOLLOWAY_RW_1
Description: Proper notification given prior to inspection. Verified cover page information. Updated facility phone number. Lat. / Long. verified in SWAP by office staff. Took photos and scanned into FIRST and added to shared drive. Map in FIRST and shared drive. Placard current and visible. Insurance documentation on the proper form. Self insurance documentation must be updated by 5-3-07. Reviewed RDRL on 3-1-07. Interstitial monitoring by Veeder Root TLS 350 used for release detection on the tanks and piping. Reviewed interstitial monitoring and monthly visual inspection records from 3-23-06 through 2-1-07. The tanks will be due for a Breach Of Integrity test no later than 3-24-2011. The ATG and line leak detectors were tested on 3-24-06. All passed. The ATG and line leak detectors are due to be retested by 3-24-07. Fills painted. Spill containment buckets are dry and no cracks noticed. Dual point vapor recovery. Ball check valve used for overfill protection. Sumps are dry and have electronic sensors. Dispenser liners are dry and shear valves are anchored. Dispenser liners have electronic sensors.
02/07/2007 Emergency Preparedness Information Activity Holloway, Randall
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 02/07/2007
09/26/2006 Emergency Preparedness Information Activity Torsanko, Grace
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 09/26/2006
06/08/2006 Site Inspection Activity Closed Carroll, Albert
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 06/08/2006
Activity Closed Date: 07/03/2006 Activity Closed By: CARROLL_A
Comments:
Comment Date: 07/03/2006 User: CARROLL_A
Description: universal petroleum inc 10142 103 RD STREET , SUITE 101 JACKSONVILLE FL 32210 JACK BUREAU--PCC #052627 TII---10-14-05---INSTALLING WELL POINT SYSTEM TIV---10-16-05--EXCAVATING THE TANK PIT TIV--10-18-05--2 EACH 20000 GALLON CONTAINMENT SOLUTION TYPE II TANKSON SITE . TANK I IS A COMPARTMENTED TANK -12000 GALLON PREMIUM / 8000 GALLON DIESEL UL# 65663 DOUBLE WALL FIBERGLASS .TANK 2 IS 20000 GALLON REGULAR UL # 65664 .THE TANKS CAME WITH A20 INCH VACUUM ON THE TANKS INTERSTITIAL . THE TANKS WERE THEN TESTED WITH A 4PSI PRESSURE ON THE PRIMARY TANK FOR I HOUR THEN THE 4 PSI IS BLEED OVER TO THE INTERSTITIAL OF THE TANK UNTILL THE SECONDARY OF THE TANK READS 4PSI FOR ONE HOUR. TIV--10-19-05 --PEA GRAVEL WAS PUT INTO THE BOTTOM OF THE EXCAVATION AROUND THE DEADMEN .BOTH TANKS WERE SET . TIV--10-20-05--TANKS PLACED INTO THE EXCAVATION AND EACH TIED DOWN WITH 6 STRAPS TO THE DEADMEN . TIV--10-28-05--PEA GRAVEL AS BACK FILL AROUND THE TANKS .INSTALLING STAND PIPES ON THE TANKS . TIV--11-2-05---INSTALLING STP SUMPS AND SPILL BUCKETS FOR THE FILLS . TIV--11-9-05--INSTALLING DISPENSER LINERS--UPP . TIV--11-17-05 --SAME TIV-12-7-05 SAME TIV--1-6-06--FOOTERS FOR CANOPY . TIV--1-17-06--INSTALLING PIPING ( UPP ) AND FITTING ALSO ELECTRICAL . TIV--1-24-06--SAME TIV--2-17-06--BACK FILLING AROUND PIPING . PRIMARY AIR TES OK . TIV--2-16-06--AIR TEST ON TANK , VENT LINES, PIPING SECONDARY AND PRIMARY OK .HYDRO TEST ON SUMPS ,AND DISPENSER LINERS OK . TIV --3-13-06 --PAVING TIV --4-19-06--SAME TIN--5-25-06--STORE OPEN