DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Journal Report
Report Run Date: 04/20/2025        Last Data Refresh: 04/19/2025        Report Generated from DOPPLER
 
Facility ID: 9808093
Facility Name: MURHPY USA #7336
 
12/20/2024 Enforcement Tracking Activity Sterling, Chase
Activity Status: Open
Comments:
Comment Date: 03/25/2025 User: STERLING_C
Description: Warning letter sent under Activity ID: 1369210
12/09/2024 Enforcement Referral Activity Ames, Janelle
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 12/20/2024
Events:
Event Type: Activity has been submitted for approval Date: 12/09/2024
Comment: Submitted for approval by: Janelle Ames: Violations cited during compliance inspection.
Events:
Event Type: Activity has been assigned Date: 12/10/2024
Comment: Assigned to Chase Sterling
Events:
Event Type: Activity/Document was acknowledged on this date Date: 12/10/2024
Comment: Acknowledged and Assigned by Jennifer Paul
Events:
Event Type: Activity/Document was accepted on this date Date: 12/20/2024
Comment: Accepted by Chase Sterling: accepted
Events:
Event Type: Activity has been finished Date: 12/20/2024
Comment: Finished
Comments:
Comment Date: 12/09/2024 User: AMES_J
Description: Violations cited during compliance inspection.
Attachments:
Attachment Date: 12/09/2024 User: AMES_J
Description: 9808093 CRDE Information Sheet 12.09.24
View Attachment
12/09/2024 Electronic Communication Activity Ames, Janelle
Activity Closed Date: 12/09/2024 Activity Status: Closed
Date: 12/09/2024
Recipient: Janelle Ames
Sender: Brad Weinischke
Subject: Class C
Message: Facility provided Class C certifications.
Events:
Event Type: Activity has been finished Date: 12/09/2024
Comment: Finished
11/06/2024 Electronic Communication Activity Ames, Janelle
Activity Closed Date: 11/06/2024 Activity Status: Closed
Date: 11/06/2024
Recipient: Brad Weinischke, Amanda Boshears, Krystal Terrell
Sender: Janelle Ames
Subject: Violation Reminders
Message: See Attachment
Events:
Event Type: Activity has been finished Date: 11/06/2024
Comment: Finished
10/14/2024 Electronic Communication Activity Ames, Janelle
Activity Closed Date: 10/14/2024 Activity Status: Closed
Date: 10/14/2024
Recipient: Brad Weinischke, Amanda Boshears
Sender: Janelle Ames
Subject: Compliance Assistance
Message: See Attachment
Events:
Event Type: Activity has been finished Date: 10/14/2024
Comment: Finished
09/10/2024 Editable Letter Activity Soriano, Jianna
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Events:
Event Type: Activity has been submitted for approval Date: 09/10/2024
Comment: Submitted for approval by: Jianna Soriano
Events:
Event Type: Document has been sent Date: 09/10/2024
Comment: Sent
Events:
Event Type: Activity has been finished Date: 09/10/2024
Comment: Finished
Events:
Event Type: Activity/Document has been approved Date: 09/10/2024
Comment: Approved by Haley McArtor: a
Attachments:
Attachment Date: 09/10/2024 User: SORIANO_JC_1
Description: 9808093 MURPHY 7336 CAO
View Attachment
09/09/2024 Incident Activity Soriano, Jianna
Activity Status: Open
09/09/2024 Incident Activity Soriano, Jianna
Activity Status: Open
09/06/2024 Violation Closed Soriano, Jianna
Significance: Minor Status: Closed
Criteria ID: 6073
Rule: 62-761.700(3)(b), 62-761.700(3)(b)1, 62-761.700(3)(b)2
09/06/2024 Site Inspection Activity Closed Soriano, Jianna
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 09/06/2024
Activity Closed Date: 09/10/2024 Activity Closed By: SORIANO_JC_1
Events:
Event Type: Activity has been finished Date: 09/10/2024
Comment: Finished
Events:
Event Type: Activity has been submitted for approval Date: 09/09/2024
Comment: Submitted for approval by: Jianna Soriano
Events:
Event Type: Activity has not been approved Date: 09/09/2024
Comment: Not approved by Haley McArtor: For 6063 corrective action change to "Facility must repair/replace deficient components in the Regular SW Spill Bucket. Responsible Party must determine if a discharge to the environment occurred or not. Incident investigation and resolution documentation must be provided. Post Spill Bucket repair/replacement testing is required. Proper notification to EQD must be provided if concrete will be broken to conduct installation/closure activities. Sampling may be required." SITE VISIT COMMENTS: Change TO "Spill Bucket(s) - Monthly Visual Inspections. Dispenser Sump(s) – Electronic Monitoring & Monthly Visual Inspections.
Events:
Event Type: Activity has been submitted for approval Date: 09/09/2024
Comment: Submitted for approval by: Jianna Soriano
Events:
Event Type: Activity has not been approved Date: 09/09/2024
Comment: Not approved by Haley McArtor: Open incident activity due to "Tank 1 Regular STP sump contained greater than one inch of liquid in the sump which brough the sensor into alarm." also open Incident Activity due to "Reg. SW Spill bucket failed testing on 4/5/2024". SITE VISIT COMMENTS: Change to "SPILL CONTAINMENT: single walled spill bucket(s). The spill buckets containers were dry and in satisfactory condition." Change to "RELEASE DETECTION: ... "Dispenser Sump(s) - Electronic monitoring & Monthly visual inspections." VIOLATIONS: Cite 6063 as Reg. SW Spill bucket failed testing on 4/5/2024 (incident violation).
Events:
Event Type: Activity has been submitted for approval Date: 09/09/2024
Comment: Submitted for approval by: Jianna Soriano
Events:
Event Type: Activity/Document has been approved Date: 09/09/2024
Comment: Approved by Haley McArtor: a
09/06/2024 Violation Closed Soriano, Jianna
Significance: SNC-B Status: Closed
Criteria ID: 6063
Rule: 62-761.700(1), 62-761.700(1)(a), 62-761.700(1)(a)1, 62-761.700(1)(a)2
Comments:
Comment Date: 12/09/2024 User: AMES_J
Description: Spill bucket passed testing on 05/17/2024. Awaiting information on incident investigation and what repairs were made to the spill bucket.
Comments:
Comment Date: 12/09/2024 User: AMES_J
Description: Test form lists spill bucket as double-walled. Awaiting additional information before entering test results.
09/06/2024 Violation Closed Soriano, Jianna
Significance: SNC-B Status: Closed
Criteria ID: 6063
Rule: 62-761.700(1), 62-761.700(1)(a), 62-761.700(1)(a)1, 62-761.700(1)(a)2
Comments:
Comment Date: 12/09/2024 User: AMES_J
Description: Spill bucket passed testing on 05/17/2024. Awaiting information on incident investigation and what repairs were made to the spill bucket.
Comments:
Comment Date: 12/09/2024 User: AMES_J
Description: Test form lists spill bucket as double-walled. Awaiting additional information before entering test results.
09/06/2024 Violation Closed Soriano, Jianna
Significance: SNC-B Status: Closed
Criteria ID: 6056
Rule: 62-761.600(1)(d), 62-761.600(1)(e), 62-761.600(1)(g)
09/06/2024 Violation Closed Soriano, Jianna
Significance: Minor Status: Closed
Criteria ID: 6002
Rule: 62-761.350(1), 62-761.350(1)(c), 62-761.350(1)(d), 62-761.350(3)(b)2, 62-761.350(5)(a), 62-761.350(5)(b), 62-761.350(5)(c), 62-761.350(7)
09/06/2024 Violation Open Soriano, Jianna
Significance: SNC-B Status: Open
Criteria ID: 6063
Rule: 62-761.700(1), 62-761.700(1)(a), 62-761.700(1)(a)1, 62-761.700(1)(a)2
08/08/2024 Electronic Communication Activity Soriano, Jianna
Activity Closed Date: 08/08/2024 Activity Status: Closed
Date: 08/08/2024
Recipient: Amanda Boshears
Sender: Jianna Soriano
Subject: Ca Email
Message: See email attached
Events:
Event Type: Activity has been finished Date: 08/08/2024
Comment: Finished
08/07/2024 Editable Letter Activity Sterling, Chase
Activity Title: Warning Letter Activity Status: Closed
Events:
Event Type: Activity has been submitted for approval Date: 08/07/2024
Comment: Submitted for approval by: Chase Sterling
Events:
Event Type: Activity/Document has been approved Date: 08/08/2024
Comment: Approved by Jennifer Paul: WL24-100 8/7/24
Events:
Event Type: Activity has been finished Date: 08/08/2024
Comment: Finished
Attachments:
Attachment Date: 08/07/2024 User: STERLING_C
Description: WL24-100
View Attachment
06/12/2024 Comment Sterling, Chase
Description: Per Krystal Terrell (6/6/2024), new contacts regarding compliance issues/questions are Brad.Weinischke@murphyusa.com and Amanda.Boshears@murphyusa.com
11/28/2023 Enforcement Tracking Activity Paul, Jennifer
Activity Status: Closed
Activity Result: Closed Without Enforcement Activity Closed Date: 03/25/2025
Events:
Event Type: Activity has been finished Date: 03/25/2025
Comment: Finished
04/24/2023 Electronic Communication Activity McArtor, Haley
Activity Closed Date: 04/24/2023 Activity Status: Closed
Date: 04/24/2023
Recipient: Haley McArtor
Sender: Brad Weinischke
Subject: resolving violations
Message: resolving violations
Events:
Event Type: Activity has been finished Date: 04/24/2023
Comment: Finished
03/16/2023 Enforcement Referral Activity Gainey, Helen
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 11/28/2023
Events:
Event Type: Activity has been submitted for approval Date: 03/16/2023
Comment: Submitted for approval by: Helen Gainey: Violations cited during routine compliance inspection.
Events:
Event Type: Activity/Document was acknowledged on this date Date: 11/28/2023
Comment: Acknowledged and Assigned by Jennifer Paul
Events:
Event Type: Activity has been submitted for approval Date: 11/08/2023
Comment: Submitted for approval by: Helen Gainey: to reassign to J Paul
Events:
Event Type: Activity has been assigned Date: 11/28/2023
Comment: Assigned to Jennifer Paul
Events:
Event Type: Activity has been finished Date: 11/28/2023
Comment: Finished
Events:
Event Type: Activity/Document was accepted on this date Date: 11/28/2023
Comment: Accepted by Jennifer Paul: Accepted
Events:
Event Type: Activity has been withdrawn from submission by the requestor Date: 11/08/2023
Comment: Withdrawn by Helen Gainey: to reassign to J Paul
Comments:
Comment Date: 03/16/2023 User: GAINEY_H_1
Description: Violations cited during routine compliance inspection.
Attachments:
Attachment Date: 03/16/2023 User: GAINEY_H_1
Description: 9808093_CRDE Information Sheet_03-16-2023
View Attachment
03/15/2023 Electronic Communication Activity McArtor, Haley
Activity Closed Date: 03/15/2023 Activity Status: Closed
Date: 03/15/2023
Recipient: Amanda Boshears
Sender: Haley McArtor
Subject: violations reminder
Message: see attached
Events:
Event Type: Activity has been finished Date: 03/15/2023
Comment: Finished
03/03/2023 Electronic Communication Activity McArtor, Haley
Activity Closed Date: 03/03/2023 Activity Status: Closed
Date: 03/03/2023
Recipient: Amanda Boshears
Sender: Haley McArtor
Subject: violation reminder
Message: attached
Events:
Event Type: Activity has been finished Date: 03/03/2023
Comment: Finished
12/30/2022 Editable Letter Activity Jordan, Shane
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Description: Email to RP: Inspection Report and IC Letter
Events:
Event Type: Document has been sent Date: 12/30/2022
Comment: Sent
Events:
Event Type: Activity has been finished Date: 12/30/2022
Comment: Finished
Events:
Event Type: Activity/Document has been approved Date: 12/30/2022
Comment: Approved by Jean Richards: Approved
Events:
Event Type: Activity has been submitted for approval Date: 12/30/2022
Comment: Submitted for approval by: Shane Jordan
Events:
Event Type: Activity has been submitted for approval Date: 12/30/2022
Comment: Submitted for approval by: Shane Jordan
Events:
Event Type: Activity/Document was rejected on this date Date: 12/30/2022
Comment: Rejected by Jean Richards: Facility name in FIRST is Murphy USA #7336.
Attachments:
Attachment Date: 12/30/2022 User: JORDAN_SL_1
Description: CAO letter
View Attachment
12/20/2022 Violation Closed Jordan, Shane
Significance: SNC-B Status: Closed
Criteria ID: 6056
Rule: 62-761.600(1)(d), 62-761.600(1)(e), 62-761.600(1)(g)
Comments:
Comment Date: 10/01/2024 User: STERLING_C
Description: docs submitted and uploaded to SCN-B
12/20/2022 Site Inspection Activity Closed Jordan, Shane
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 12/20/2022
Activity Closed Date: 12/30/2022 Activity Closed By: JORDAN_SL_1
Events:
Event Type: Activity has been submitted for approval Date: 12/30/2022
Comment: Submitted for approval by: Shane Jordan
Events:
Event Type: Activity has been submitted for approval Date: 12/30/2022
Comment: Submitted for approval by: Shane Jordan
Events:
Event Type: Activity has not been approved Date: 12/30/2022
Comment: Not approved by Jean Richards: Make it clear on the EQ list that the spill buckets are single walled. The entry states that an insert was installed 03/12/2010 which could also apply to a double walled. Deactivate the Integrity Test - Double-walled Spill Bucket testing on 07/16/2020. While there are testing records to support this, the inspection indicates that the spill buckets are single walled, so this testing is invalid. Good job overall.
Events:
Event Type: Activity/Document has been approved Date: 12/30/2022
Comment: Approved by Jean Richards: Approved
Events:
Event Type: Activity has been finished Date: 12/30/2022
Comment: Finished
12/20/2022 Violation Closed Jordan, Shane
Significance: Minor Status: Closed
Criteria ID: 6053
Rule: 62-761.500(7)(c), 62-761.500(7)(c)1, 62-761.500(7)(c)2, 62-761.500(7)(d)
12/20/2022 Violation Closed Jordan, Shane
Significance: Minor Status: Closed
Criteria ID: 6074
Rule: 62-761.710(1), 62-761.710(2), 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d), 62-761.710(3), 62-761.710(3)(a), 62-761.710(3)(b), 62-761.710(3)(c), 62-761.710(3)(d), 62-761.710(3)(e), 62-761.710(3)(f), 62-761.710(3)(g), 62-761.710(3)(h), 62-761.710(3)(i)
12/01/2022 Electronic Communication Activity Jordan, Shane
Activity Closed Date: 12/01/2022 Activity Status: Closed
Date: 12/01/2022
Recipient: Amanda Boshears
Sender: Shane Jordan
Subject: Initial outreach email for routine compliance inspection
Message: see attached
Events:
Event Type: Activity has been finished Date: 12/01/2022
Comment: Finished
05/26/2021 Editable Letter Activity Cole, Kajani
Activity Title: Return to Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 05/26/2021
Comment: Finished
Attachments:
Attachment Date: 05/26/2021 User: COLE_K
Description: Return to Compliance
View Attachment
04/08/2021 Editable Letter Activity Cole, Kajani
Activity Title: Warning Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 04/08/2021
Comment: Finished
Attachments:
Attachment Date: 04/08/2021 User: COLE_K
Description: Warning Letter
View Attachment
03/12/2021 Enforcement Tracking Activity Cole, Kajani
Activity Status: Closed
Activity Result: Closed Without Enforcement Activity Closed Date: 05/26/2021
Events:
Event Type: Activity has been finished Date: 05/26/2021
Comment: Finished
03/10/2021 Enforcement Referral Activity Gainey, Helen
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 03/12/2021
Events:
Event Type: Activity has been finished Date: 03/12/2021
Comment: Finished
Events:
Event Type: Activity/Document was accepted on this date Date: 03/12/2021
Comment: Accepted by Kajani Cole: Accepted
Events:
Event Type: Activity/Document was acknowledged on this date Date: 03/11/2021
Comment: Acknowledged and Assigned by Matthew J Harris
Events:
Event Type: Activity has been assigned Date: 03/11/2021
Comment: Assigned to Kajani Cole
Events:
Event Type: Activity has been submitted for approval Date: 03/10/2021
Comment: Submitted for approval by: Helen Gainey: Violation cited during 11/30/2020 compliance inspection.
Comments:
Comment Date: 03/10/2021 User: GAINEY_H_1
Description: Violation cited during 11/30/2020 compliance inspection.
Attachments:
Attachment Date: 03/10/2021 User: GAINEY_H_1
Description: 9808093_CRDE Information Sheet_03-10-2021
View Attachment
02/25/2021 Electronic Communication Activity Austin, Jesse h
Activity Closed Date: 02/25/2021 Activity Status: Closed
Date: 02/25/2021
Recipient: Jesse Austin
Sender: Brad Weinischke
Subject: Overfill testing
Message: Overfill testing provided for Diesel 2019 and 2020.
Events:
Event Type: Activity has been finished Date: 02/25/2021
Comment: Finished
02/25/2021 Electronic Communication Activity Austin, Jesse h
Activity Closed Date: 02/25/2021 Activity Status: Closed
Date: 02/25/2021
Recipient: Jesse Austin
Sender: Brad Weinischke
Subject: Double-wall spill-bucket testing provided for 10/16/2017.
Message: Double-wall spill-bucket testing provided for 10/16/2017.
Events:
Event Type: Activity has been finished Date: 02/25/2021
Comment: Finished
02/24/2021 Electronic Communication Activity Austin, Jesse h
Activity Closed Date: 02/24/2021 Activity Status: Closed
Date: 02/24/2021
Recipient: Amanda Boshears
Sender: Jesse Austin
Subject: February 24, 2021 Outreach Email
Message: See attachment
Events:
Event Type: Activity has been finished Date: 02/24/2021
Comment: Finished
Attachments:
Attachment Date: 02/24/2021 User: AUSTIN_JH_1
Description: February 24, 2021 Outreach
View Attachment
01/21/2021 Electronic Communication Activity Austin, Jesse h
Activity Closed Date: 01/21/2021 Activity Status: Closed
Date: 01/21/2021
Recipient: Amanda Boshears
Sender: Jesse Austin
Subject: January 4, 2021 Outreach Email
Message: See attached file.
Events:
Event Type: Activity has been finished Date: 01/21/2021
Comment: Finished
Attachments:
Attachment Date: 01/21/2021 User: AUSTIN_JH_1
Description: January 4, 2021 Outreach Email
View Attachment
01/21/2021 Phone Conversation Activity Austin, Jesse h
Call Type: Outgoing Activity Status: Closed
Phone Number: (870) 725-5891 Activity Closed Date: 01/21/2021
Subject: Spoke with Amanda Boshears and she confirmed that she been receiving all my emails. She doesn't have any status updates on the facility violations.
Events:
Event Type: Activity has been finished Date: 01/21/2021
Comment: Finished
01/21/2021 Electronic Communication Activity Austin, Jesse h
Activity Closed Date: 01/21/2021 Activity Status: Closed
Date: 01/21/2021
Recipient: Amanda Boshears
Sender: Jesse Austin
Subject: January 21, 2021 Outreach Email
Message: See attached file.
Events:
Event Type: Activity has been finished Date: 01/21/2021
Comment: Finished
Attachments:
Attachment Date: 01/21/2021 User: AUSTIN_JH_1
Description: January 21, 2021 Outreach Email
View Attachment
12/22/2020 Electronic Communication Activity Austin, Jesse h
Activity Closed Date: 12/22/2020 Activity Status: Closed
Date: 12/22/2020
Recipient: Amanda Boshears
Sender: Jesse Austin
Subject: Compliance Assistance Offer Email
Message: See attachment.
Events:
Event Type: Activity has been finished Date: 12/22/2020
Comment: Finished
Attachments:
Attachment Date: 12/22/2020 User: AUSTIN_JH_1
Description: Compliance Assistance Offer Email
View Attachment
12/11/2020 Editable Letter Activity Austin, Jesse h
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Description: 2019-12-09 SB Vacuum Test Results via E-mail.
Events:
Event Type: Activity has been submitted for approval Date: 12/11/2020
Comment: Submitted for approval by: Jesse h Austin
Events:
Event Type: Activity has been submitted for approval Date: 12/11/2020
Comment: Submitted for approval by: Jesse h Austin
Events:
Event Type: Activity/Document was rejected on this date Date: 12/11/2020
Comment: Rejected by Hali M Gregory: reject
Events:
Event Type: Activity/Document has been approved Date: 12/14/2020
Comment: Approved by Hali M Gregory: not reviewed
Events:
Event Type: Activity has been finished Date: 12/14/2020
Comment: Finished
Attachments:
Attachment Date: 12/11/2020 User: AUSTIN_JH_1
Description: 9808093 Murphy USA #7336 CAO
View Attachment
12/10/2020 Violation Closed Austin, Jesse h
Significance: Minor Status: Closed
Criteria ID: 4076
Rule: 62-761.700(3), 62-761.700(3)(a), 62-761.700(3)(a)1., 62-761.700(3)(a)1.a., 62-761.700(3)(a)1.b., 62-761.700(3)(a)1.c., 62-761.700(3)(a)1.d., 62-761.700(3)(a)1.e., 62-761.700(3)(a)1.f., 62-761.700(3)(a)2.
12/10/2020 Electronic Communication Activity Austin, Jesse h
Activity Closed Date: 12/10/2020 Activity Status: Closed
Date: 12/10/2020
Recipient: Amanda Boshears
Sender: Jesse Austin
Subject: 9808093 Murphy USA #7336 Routine Compliance Inspection
Message: Good Afternoon, I am contacting you to inform you of several upcoming FDEP routine compliance inspections for seven (7) of your sites. Please refer to the list below. Inspecting several of your sites per day, I would like to begin your inspections starting on November 30, 2020. Please let me know what your preferred dates and times are. Prior to these inspections, please provide the following documentation for these sites via email: 9808093 Murphy USA #7336 9805833 Murphy USA #6941 9806858 Murphy USA #7129 9807718 Murphy USA # 7144 9813604 Murphy Express #8701 9813565 Murphy Express #8659 9810798 Murphy USA #7411 Here is a breakdown of the paperwork we would like to review prior to or during the inspection. New regulatory rules stated: Any documentation produced on January 11, 2017 and going forward will need to be kept for three years. Records to be reviewed: Due to current circumstance and social distancing protocols, all records will be requested prior to the inspection. Please send all records below via email or fax (904-630-3637). All records will be reviewed off site. 1. Storage Tank Liability Insurance Policy: 2018-2019, 2019-2020, and 2020-2021. 2. Financial Mechanism (Part C or D form) or Letter from Chief Financial Officer (Part A): 2018-2019, 2019-2020, and 2020-2021. 3. Certificate of Financial Responsibility (Part P form): 2018-2019, 2019-2020, and 2020-2021 4. Placard issued (Must be POSTED ON SITE): 2020-2021 5. Annual Operability Test (Release Detection-Interstitial Monitor) Results: 2017, 2018, 2019, 2020 6. Annual Operability Test (Primary Registered Overfill Device) Results: 2017, 2018, 2019, 2020 7. Annual Inline Leak Detector Test (pressurized piping): 2017, 2018, 2019, 2020 8. Breach of Integrity (Double wall spill buckets, dispenser sumps, and underground sumps): 2017, 2018, 2019, 2020 9. Breach of Integrity (Single wall spill buckets, dispenser sumps, and underground sumps): 2017, 2018, 2019, 2020 10. Monthly Visual Release Detection Records: 2018, 2019, December 2020 11. Electronic Release Detection Equipment Monthly Checks: 2018, 2019, December 2020 12. Alarm/Incident History: 2018, 2019, December 2020 13. UST Operator Training Certificates Due to current circumstances and social distancing protocols, a representative must be present to provide access to all of the equipment. The components are to be opened by the representative while the inspector will maintain at least a 6’ distance. Once opened, the representative will be asked to move away and the inspector will view the components and take photos to review off site if needed. If there is an alarm inside the facility that is accessible to the inspector while maintaining social distancing, it will be inspected. If this cannot be done, the representative will be asked to perform the inspection and take photos for the inspector. In addition, if you could verify whether any of the below facility information has changed since the last inspection, it would be greatly appreciated: 1. Account Owner/Tank Owner 2. Property Owner 3. Facility Contact Lastly, if you could take some time to please review the following resources: • Videos on DEP’s website at https://youtu.be/tVGkkGcqnNc(UST) or http://youtu.be/rknNKlAjWW4(AST). • Tank Registration Placards must be posted at the facility where the tank is located. Placard will not be mailed to the facility. For payment of Registration fees and to print tank placards, please visit the ESSA Portal at http://www.fldepportal.com/go/submit-registration/. • For further instructions on how to register please visit: https://floridadep.gov/waste/permitting-compliance-assistance/content/storage-tank-facility-registration. • The new Storage Tank rules, associated forms, and closure sampling instructions can be reviewed at the following link: http://www.dep.state.fl.us/waste/categories/shw/pages/announcem
Events:
Event Type: Activity has been finished Date: 12/10/2020
Comment: Finished
12/10/2020 Violation Closed Austin, Jesse h
Significance: Minor Status: Closed
Criteria ID: 4079
Rule: 62-761.710(2), 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d)
12/10/2020 Violation Closed Austin, Jesse h
Significance: SNC-B Status: Closed
Criteria ID: 4014
Rule: 62-761.420(2)
12/10/2020 Violation Closed Austin, Jesse h
Significance: SNC-B Status: Closed
Criteria ID: 4066
Rule: 62-761.600(3), 62-761.600(3)(a), 62-761.600(3)(b), 62-761.600(3)(b)1., 62-761.600(3)(b)2., 62-761.600(3)(b)3.
12/10/2020 Violation Closed Austin, Jesse h
Significance: Minor Status: Closed
Criteria ID: 4067
Rule: 62-761.600(4)
12/10/2020 Violation Closed Austin, Jesse h
Significance: SNC-B Status: Closed
Criteria ID: 4059
Rule: 62-761.600(1)(d), 62-761.600(1)(e)
12/10/2020 Violation Closed Austin, Jesse h
Significance: Minor Status: Closed
Criteria ID: 4079
Rule: 62-761.710(2), 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d)
12/10/2020 Violation Closed Austin, Jesse h
Significance: Minor Status: Closed
Criteria ID: 4057
Rule: 62-761.500(7)(e)
11/30/2020 Site Inspection Activity Closed Austin, Jesse h
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 11/30/2020
Activity Closed Date: 12/11/2020 Activity Closed By: AUSTIN_JH_1
Events:
Event Type: Activity has been finished Date: 12/11/2020
Comment: Finished
Events:
Event Type: Activity has been submitted for approval Date: 12/10/2020
Comment: Submitted for approval by: Jesse h Austin
Events:
Event Type: Activity/Document has been approved Date: 12/11/2020
Comment: Approved by Hali M Gregory: not reviewed
08/28/2018 Editable Letter Activity Westerman, Michael L
Activity Title: In Compliance Letter Activity Status: Closed
Description: CRDE SHEET 6-3-2019
Events:
Event Type: Document has been sent Date: 08/28/2018
Comment: Sent
Events:
Event Type: Activity has been finished Date: 08/28/2018
Comment: Finished
Attachments:
Attachment Date: 08/28/2018 User: WESTERMAN_ML_1
Description: In Compliance Letter
View Attachment
08/27/2018 Site Inspection Activity Closed Westerman, Michael L
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 08/27/2018
Activity Closed Date: 08/28/2018 Activity Closed By: WESTERMAN_ML_1
Events:
Event Type: Activity has been finished Date: 08/28/2018
Comment: Finished
08/20/2018 Electronic Communication Activity Westerman, Michael L
Activity Closed Date: 08/20/2018 Activity Status: Closed
Date: 08/20/2018
Recipient: Murphy USA – Natalee Jerry
Sender: EQD – Michael Westerman
Subject: Outreach was provided by sending FDEP video links and inspection preparation information prior to Compliance Inspection
Message: See attached e-mail
Events:
Event Type: Activity has been finished Date: 08/20/2018
Comment: Finished
09/12/2016 Electronic Communication Activity Mondo, Patrick W
Activity Closed Date: 09/12/2016 Activity Status: Closed
Date: 09/12/2016
Recipient: Matt Malena
Sender: EQD
Subject: Inspection report delivered.
Message: See attached.
Events:
Event Type: Activity has been finished Date: 09/12/2016
Comment: Finished
08/18/2016 Violation Closed Mondo, Patrick W
Significance: Minor Status: Closed
Criteria ID: 1117
Rule: 62-761.700(1)(c)3.
Comments: Facility must prove that all release detection devices, such as in line leak detectors, sump and liner sensors, ATGs, etc. function properly. Sensing devices may be optical, vapor, float activated, discriminating, non-discriminating, or tied into electrical circuits. ATG probes inside of tanks require calibration testing, if used for release detection as well as inventory measurements.
08/18/2016 Site Inspection Activity Closed Mondo, Patrick W
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 08/18/2016
Activity Closed Date: 09/12/2016 Activity Closed By: MONDO_PW_1
Events:
Event Type: Activity has been submitted for approval Date: 09/06/2016
Comment: Submitted for approval by: Patrick W Mondo
Events:
Event Type: Activity/Document has been approved Date: 09/12/2016
Comment: Approved by Jean Richards: Approved
Events:
Event Type: Activity has not been approved Date: 09/10/2016
Comment: Not approved by Jean Richards: Report comments list ball check valves for overfill protection but EQ lists have flow shut off.
Events:
Event Type: Activity has been finished Date: 09/12/2016
Comment: Finished
Events:
Event Type: Activity has been submitted for approval Date: 09/12/2016
Comment: Submitted for approval by: Patrick W Mondo
08/18/2016 Violation Closed Mondo, Patrick W
Significance: Minor Status: Closed
Criteria ID: 1103
Rule: 62-761.640(4)(a)1., 62-761.640(4)(a)2., 62-761.640(4)(a)3., 62-761.640(4)(a)4.
Comments: Installation - verify that the line leak detector has been installed during the final installation inspection. Compliance - check to see that the unit is present. Examine the annual function test data - a pass alone is not sufficient. The tester must demonstrate 3.0 gph discharge detection for the mechanical (flow restrictor). Note that the electronic (auto shut off) line leak detector does not need an annual test, but must still be able to detect a 0.2 gph leak after it has been tripped at 150% line operating pressure. Replacements - unit must be tested out of the box - function must be proven. 3.0 gph = 185.4 ml/min (To convert milliliters/minute to gallons/hour, multiple the milliliters by 0.0162162; or, 1 gph equals 61.8 ml/min). Values greater than 186 ml/min fail. Values less than 185 ml/min mean that the line leak detector will activate at a more restrictive rate.
08/18/2016 Violation Closed Mondo, Patrick W
Significance: Minor Status: Closed
Criteria ID: 1123
Rule: 62-761.710(2)(a), 62-761.710(2)(b), 62-761.710(2)(c), 62-761.710(2)(d), 62-761.710(2)(e), 62-761.710(2)(f), 62-761.710(2)(g), 62-761.710(2)(h)
Comments: If the problem involves failure to perform according to the standards in each of the following areas, then note these items in addition to the paperwork for this rule: a. and g. Inventory - rules 62-761.640(3)(b)1-2, 62-761.640(3)(c) & 62-761.700(1)(c)5 b. Repair, operation, and maintenance - rules 62-761.700(1)(a)1, 62-761.700(1)(a)5, 62-761.700(1)(a)6 & 62-761.700(1)(c)3 c. Release detection - rules 62-761.600(1)(e), 62-761.610(3)(b), 62-761.640(2)(c)4, 62-761.640(2)(e), 62-761.640(3)(d), 62-761.640(3)(e)1-5 & 62-761.640(3)(e)9 d. Release detection response level descriptions - rules 62-761.600(1)(b) & 62-761.640(1)(c) e. Tightness, pressure, and breach of integrity tests - rules 62-761.610(3)(a)1, 62-761.640(1)(a) & 62-761.640(4)(a) f. Financial responsibility - rule 62-761.400(3) g. Repairs and replacements - rule 62-761.700(1)(a)6 The following are not this rule's issues: Rules 62-761.450(1)(a)1, 62-761.450(1)(a)2, 62-761.450(1)(a)3 & 62-761.450(1)(a)4 are verbal notices of activities that may also be written Rule 62-761.450(1)(b) is a registration issue Rules 62-761.450(2), 62-761.450(3)(a) & 62-761.450(3)(b) are INF/DRF reporting issues Rules 62-761.600(1)(a)3 & 62-761.600(1)(f) are covered by rule 62-761.710(3) Anything with cathodic protection is covered by rule 62-761.710(3)
08/11/2016 Electronic Communication Activity Mondo, Patrick W
Activity Closed Date: 08/11/2016 Activity Status: Closed
Date: 08/11/2016
Recipient: Matt Malena
Sender: EQD
Subject: Pre Inspection Notification emailed.
Message: See attached.
Events:
Event Type: Activity has been finished Date: 08/11/2016
Comment: Finished
09/12/2014 Electronic Communication Activity Williams, April K.
Activity Closed Date: 09/15/2014 Activity Status: Closed
Date: 09/12/2014
Recipient: Matt Malena, Murphy USA
Sender: EQD
Subject: Email - Compliance Report
Message: See Attachment
Events:
Event Type: Activity has been finished Date: 09/15/2014
Comment: Finished
08/29/2014 Emergency Preparedness Information Activity Williams, April K.
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 08/29/2014
Events:
Event Type: Activity has been finished Date: 08/29/2014
Comment: Finished
08/28/2014 Site Inspection Activity Closed Williams, April K.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 08/28/2014
Activity Closed Date: 09/12/2014 Activity Closed By: WILLIAMS_AK_1
Events:
Event Type: Activity has been finished Date: 09/12/2014
Comment: Finished
07/31/2013 Document Management Activity Richards, Jean
Activity Title: Incident Notification Form Activity Status: Closed
Description: Email
Events:
Event Type: Activity has been finished Date: 07/31/2013
Comment: Finished
Attachments:
Attachment Date: 07/31/2013 User: RICHARDS_JE_1
Description: 9808093_INF for STP sump alarm_07-29-2013.pdf
View Attachment
07/31/2013 Incident Activity Richards, Jean
Activity Result: Has not led to Discharge Activity Status: Closed
Activity Closed Date: 09/05/2013
Events:
Event Type: Activity has been finished Date: 09/05/2013
Comment: Finished
Comments:
Comment Date: 09/05/2013 User: RICHARDS_JE_1
Description: Water removed and alarm tested.
08/30/2012 Document Management Activity Korous, Eva
Activity Title: Operator Training Certification Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 08/30/2012
Comment: Finished
Attachments:
Attachment Date: 08/30/2012 User: KOROUS_E_1
Description: A/B Operator Certificates
View Attachment
08/22/2012 Attachment Korous, Eva
08/22/2012 Electronic Communication Activity Korous, Eva
Activity Closed Date: 08/22/2012 Activity Status: Closed
Date: 08/22/2012
Recipient: Cindy House
Sender: EQD
Subject: Report Email
Message: See attachment
Events:
Event Type: Activity has been finished Date: 08/22/2012
Comment: Finished
08/22/2012 Emergency Preparedness Information Activity Korous, Eva
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 08/22/2012
Events:
Event Type: Activity has been finished Date: 08/22/2012
Comment: Finished
08/13/2012 Site Inspection Activity Closed Korous, Eva
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 08/13/2012
Activity Closed Date: 08/22/2012 Activity Closed By: KOROUS_E_1
Events:
Event Type: Activity has been finished Date: 08/22/2012
Comment: Finished
02/22/2011 Site Inspection Activity Closed Holloway, Randall
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 02/23/2011
Activity Closed Date: 02/23/2011 Activity Closed By: HOLLOWAY_RW_1
Events:
Event Type: Activity has been finished Date: 02/23/2011
Comment: Finished
Comments:
Comment Date: 02/22/2011 User: HOLLOWAY_RW_1
Description: Proper notification given to Ms. Cindy House prior to conducting annual compliance inspection. Paperwork inspection conducted on 2-22-11 and 2-23-11. Verified cover page information. Placard is current. This facility is a retail station and has two 20K USTs. Tank 1 contains regular unleaded. Tank 2 is compartmented into 12K diesel and 8K regular unleaded Tanks use interstitial monitoring by an ATG for release detection. Piping uses interstitial monitoring by the ATG for release detection. Dispenser liners and STP sumps have electronic sensors for release detection. Spill buckets use visual inspections for release detection.
02/25/2010 Attachment Holloway, Randall
02/25/2010 Attachment Holloway, Randall
02/25/2010 Attachment Holloway, Randall
02/25/2010 Attachment Holloway, Randall
02/25/2010 Attachment Holloway, Randall
02/24/2010 Site Inspection Activity Closed Holloway, Randall
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 02/25/2010
Activity Closed Date: 02/25/2010 Activity Closed By: HOLLOWAY_RW_1
Events:
Event Type: Activity has been finished Date: 02/25/2010
Comment: Finished
Comments:
Comment Date: 02/24/2010 User: HOLLOWAY_RW_1
Description: Proper notification given to Mr. Wayne Young prior to inspection. Paperwork inspection conducted on 2-24-10 and 2-25-10. Verified cover page information. Placard is current. Tanks and piping use interstitial monitoring by a Veeder Root TLS 350 for release detection. Sumps and dispenser liners have electronic sensors for release detection. Spill buckets use visual inspections for release detection. Tank#2 is compartmented into 12K premium and 8K diesel.
03/22/2009 Site Inspection Activity Closed Holloway, Randall
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 03/22/2009
Activity Closed Date: 03/25/2009 Activity Closed By: HOLLOWAY_RW_1
Comments:
Comment Date: 03/22/2009 User: HOLLOWAY_RW_1
Description: Proper notification given to Ms. Cindy House prior to inspection. Paperwork inspection conducted on 3-22-09 and 2-25-09. Updated cover page information. Filed registration form. Placard is current. Tanks and piping use interstitial monitoring by a Veeder Root TLS 350 for release detection. Sumps and dispenser liners have electronic sensors for release detection. Spill buckets use monthly visual inspections for release detection.
03/10/2009 Attachment Allen, Eleanor
03/10/2009 Attachment Holloway, Randall
10/25/2007 Attachment Holloway, Randall
10/25/2007 Attachment Holloway, Randall
10/25/2007 Attachment Holloway, Randall
10/25/2007 Attachment Holloway, Randall
10/24/2007 Emergency Preparedness Information Activity Holloway, Randall
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 10/24/2007
Comments:
Comment Date: 03/22/2009 User: HOLLOWAY_RW_1
Description: There are 8 double sided dispensers on site. 6 Dispensers are unleaded and 2 dispensers are diesel. Each diesel dispenser is located too close to a unleaded dispenser to use both at the same time. There are a total of 12 fueling positions available at any one time.
10/23/2007 Site Inspection Activity Closed Holloway, Randall
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 10/23/2007
Activity Closed Date: 10/24/2007 Activity Closed By: HOLLOWAY_RW_1
10/17/2007 Attachment Holloway, Randall
05/23/2007 Emergency Preparedness Information Activity Griffin, Tom
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 05/23/2007
02/15/2007 Emergency Preparedness Information Activity Griffin, Tom
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 02/15/2007
10/23/2006 Emergency Preparedness Information Activity Griffin, Tom
Activity Result: Satisfied Activity Status: Closed
Activity Closed Date: 10/23/2006
10/13/2006 Attachment Lunn, Raynald
09/15/2006 Attachment Lunn, Raynald
09/13/2006 Site Inspection Activity Closed Lunn, Raynald
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 09/13/2006
Activity Closed Date: 09/15/2006 Activity Closed By: LUNN_RJ_1
Comments:
Comment Date: 09/13/2006 User: LUNN_RJ_1
Description: T I N 9-13-06 Facility now open. All required documentation recieved.
Comments:
Comment Date: 05/22/2006 User: LUNN_RJ_1
Description: 5-24-06 T I V Entry to sumps redone correctly. Contractor put air on piping and readings noted after regulated time. 50 psi for regular primary 5 psi reguar secondary, 50 for diesel primary, 5psi diesel secondary, and 50 psi for premium primary, 5 premium secondary. Water in sumps. No boubles seen or drop in levels.
Comments:
Comment Date: 05/19/2006 User: LUNN_RJ_1
Description: T I V 5-19-06 Tank sumps, dispenser liners, and piping installed. A C Carroll observed that piping was installed at an angle at sumps and this would not allow a consistant fusing around the entry.
Comments:
Comment Date: 06/12/2006 User: LUNN_RJ_1
Description: T I V 6-12-06 All work completed. Facility not ready to open.
Comments:
Comment Date: 04/25/2006 User: LUNN_RJ_1
Description: T 1 1 4-25-06 Contractor: Universal Petroleum 10142 103rd st Jacksonville, Fl 32210 Pcc #052627. Environmental: None. New site. 30 Day Notification Recieved 4-4-06. 48 Hour Notification Recieved 4-21-06. Installation report started by A C Carroll and completed by R. Lunn. Tanks arrived on flat bed trailor from factory. Tanks set in tank excavation that is lined with filter mech and pea graval. 20,000 gallon tank for regular gas Ul #65925 set with vacume of 16 inches had 16 inches from factory. 20,000 gallon compartmented tank, 12,000 gallons for diesel and 8,000 gallons for reguler Ul #659204, set with 9 inches of vacume from factory 9 inches. Tanks were then tied to deadmen with six straps each the ballist with water and backfilled with pea graval to top on the 26th.
09/13/2006 Site Inspection Activity Closed Lunn, Raynald
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 09/13/2006
Activity Closed Date: 09/15/2006 Activity Closed By: LUNN_RJ_1
Comments:
Comment Date: 09/13/2006 User: LUNN_RJ_1
Description: T I N 9-13-06 Facility now open. All required documentation recieved.
Comments:
Comment Date: 05/22/2006 User: LUNN_RJ_1
Description: 5-24-06 T I V Entry to sumps redone correctly. Contractor put air on piping and readings noted after regulated time. 50 psi for regular primary 5 psi reguar secondary, 50 for diesel primary, 5psi diesel secondary, and 50 psi for premium primary, 5 premium secondary. Water in sumps. No boubles seen or drop in levels.
Comments:
Comment Date: 05/19/2006 User: LUNN_RJ_1
Description: T I V 5-19-06 Tank sumps, dispenser liners, and piping installed. A C Carroll observed that piping was installed at an angle at sumps and this would not allow a consistant fusing around the entry.
Comments:
Comment Date: 06/12/2006 User: LUNN_RJ_1
Description: T I V 6-12-06 All work completed. Facility not ready to open.
Comments:
Comment Date: 04/25/2006 User: LUNN_RJ_1
Description: T 1 1 4-25-06 Contractor: Universal Petroleum 10142 103rd st Jacksonville, Fl 32210 Pcc #052627. Environmental: None. New site. 30 Day Notification Recieved 4-4-06. 48 Hour Notification Recieved 4-21-06. Installation report started by A C Carroll and completed by R. Lunn. Tanks arrived on flat bed trailor from factory. Tanks set in tank excavation that is lined with filter mech and pea graval. 20,000 gallon tank for regular gas Ul #65925 set with vacume of 16 inches had 16 inches from factory. 20,000 gallon compartmented tank, 12,000 gallons for diesel and 8,000 gallons for reguler Ul #659204, set with 9 inches of vacume from factory 9 inches. Tanks were then tied to deadmen with six straps each the ballist with water and backfilled with pea graval to top on the 26th.
09/13/2006 Site Inspection Activity Closed Lunn, Raynald
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 09/13/2006
Activity Closed Date: 09/15/2006 Activity Closed By: LUNN_RJ_1
Comments:
Comment Date: 09/13/2006 User: LUNN_RJ_1
Description: T I N 9-13-06 Facility now open. All required documentation recieved.
Comments:
Comment Date: 05/22/2006 User: LUNN_RJ_1
Description: 5-24-06 T I V Entry to sumps redone correctly. Contractor put air on piping and readings noted after regulated time. 50 psi for regular primary 5 psi reguar secondary, 50 for diesel primary, 5psi diesel secondary, and 50 psi for premium primary, 5 premium secondary. Water in sumps. No boubles seen or drop in levels.
Comments:
Comment Date: 05/19/2006 User: LUNN_RJ_1
Description: T I V 5-19-06 Tank sumps, dispenser liners, and piping installed. A C Carroll observed that piping was installed at an angle at sumps and this would not allow a consistant fusing around the entry.
Comments:
Comment Date: 06/12/2006 User: LUNN_RJ_1
Description: T I V 6-12-06 All work completed. Facility not ready to open.
Comments:
Comment Date: 04/25/2006 User: LUNN_RJ_1
Description: T 1 1 4-25-06 Contractor: Universal Petroleum 10142 103rd st Jacksonville, Fl 32210 Pcc #052627. Environmental: None. New site. 30 Day Notification Recieved 4-4-06. 48 Hour Notification Recieved 4-21-06. Installation report started by A C Carroll and completed by R. Lunn. Tanks arrived on flat bed trailor from factory. Tanks set in tank excavation that is lined with filter mech and pea graval. 20,000 gallon tank for regular gas Ul #65925 set with vacume of 16 inches had 16 inches from factory. 20,000 gallon compartmented tank, 12,000 gallons for diesel and 8,000 gallons for reguler Ul #659204, set with 9 inches of vacume from factory 9 inches. Tanks were then tied to deadmen with six straps each the ballist with water and backfilled with pea graval to top on the 26th.
09/13/2006 Site Inspection Activity Closed Lunn, Raynald
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 09/13/2006
Activity Closed Date: 09/15/2006 Activity Closed By: LUNN_RJ_1
Comments:
Comment Date: 09/13/2006 User: LUNN_RJ_1
Description: T I N 9-13-06 Facility now open. All required documentation recieved.
Comments:
Comment Date: 05/22/2006 User: LUNN_RJ_1
Description: 5-24-06 T I V Entry to sumps redone correctly. Contractor put air on piping and readings noted after regulated time. 50 psi for regular primary 5 psi reguar secondary, 50 for diesel primary, 5psi diesel secondary, and 50 psi for premium primary, 5 premium secondary. Water in sumps. No boubles seen or drop in levels.
Comments:
Comment Date: 05/19/2006 User: LUNN_RJ_1
Description: T I V 5-19-06 Tank sumps, dispenser liners, and piping installed. A C Carroll observed that piping was installed at an angle at sumps and this would not allow a consistant fusing around the entry.
Comments:
Comment Date: 06/12/2006 User: LUNN_RJ_1
Description: T I V 6-12-06 All work completed. Facility not ready to open.
Comments:
Comment Date: 04/25/2006 User: LUNN_RJ_1
Description: T 1 1 4-25-06 Contractor: Universal Petroleum 10142 103rd st Jacksonville, Fl 32210 Pcc #052627. Environmental: None. New site. 30 Day Notification Recieved 4-4-06. 48 Hour Notification Recieved 4-21-06. Installation report started by A C Carroll and completed by R. Lunn. Tanks arrived on flat bed trailor from factory. Tanks set in tank excavation that is lined with filter mech and pea graval. 20,000 gallon tank for regular gas Ul #65925 set with vacume of 16 inches had 16 inches from factory. 20,000 gallon compartmented tank, 12,000 gallons for diesel and 8,000 gallons for reguler Ul #659204, set with 9 inches of vacume from factory 9 inches. Tanks were then tied to deadmen with six straps each the ballist with water and backfilled with pea graval to top on the 26th.
09/13/2006 Site Inspection Activity Closed Lunn, Raynald
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 09/13/2006
Activity Closed Date: 09/15/2006 Activity Closed By: LUNN_RJ_1
Comments:
Comment Date: 09/13/2006 User: LUNN_RJ_1
Description: T I N 9-13-06 Facility now open. All required documentation recieved.
Comments:
Comment Date: 05/22/2006 User: LUNN_RJ_1
Description: 5-24-06 T I V Entry to sumps redone correctly. Contractor put air on piping and readings noted after regulated time. 50 psi for regular primary 5 psi reguar secondary, 50 for diesel primary, 5psi diesel secondary, and 50 psi for premium primary, 5 premium secondary. Water in sumps. No boubles seen or drop in levels.
Comments:
Comment Date: 05/19/2006 User: LUNN_RJ_1
Description: T I V 5-19-06 Tank sumps, dispenser liners, and piping installed. A C Carroll observed that piping was installed at an angle at sumps and this would not allow a consistant fusing around the entry.
Comments:
Comment Date: 06/12/2006 User: LUNN_RJ_1
Description: T I V 6-12-06 All work completed. Facility not ready to open.
Comments:
Comment Date: 04/25/2006 User: LUNN_RJ_1
Description: T 1 1 4-25-06 Contractor: Universal Petroleum 10142 103rd st Jacksonville, Fl 32210 Pcc #052627. Environmental: None. New site. 30 Day Notification Recieved 4-4-06. 48 Hour Notification Recieved 4-21-06. Installation report started by A C Carroll and completed by R. Lunn. Tanks arrived on flat bed trailor from factory. Tanks set in tank excavation that is lined with filter mech and pea graval. 20,000 gallon tank for regular gas Ul #65925 set with vacume of 16 inches had 16 inches from factory. 20,000 gallon compartmented tank, 12,000 gallons for diesel and 8,000 gallons for reguler Ul #659204, set with 9 inches of vacume from factory 9 inches. Tanks were then tied to deadmen with six straps each the ballist with water and backfilled with pea graval to top on the 26th.