Facility ID: 9809752
Facility Name: IDEA COMPASS
 
02/28/2025 Editable Letter Activity McNeil, Anthony P
Activity Title: Warning Letter Activity Status: Closed
Events:
Event Type: Activity/Document has been approved Date: 03/03/2025
Comment: Approved by Jennifer Paul: WL25-042 2/28/2025
Events:
Event Type: Activity has been finished Date: 03/04/2025
Comment: Finished
Events:
Event Type: Activity has been submitted for approval Date: 02/28/2025
Comment: Submitted for approval by: Anthony P McNeil
Attachments:
Attachment Date: 02/28/2025 User: MCNEIL_A
Description: Warning Letter No. WL25-042
View Attachment
02/26/2025 Electronic Communication Activity McNeil, Anthony P
Activity Closed Date: 02/26/2025 Activity Status: Closed
Date: 02/26/2025
Recipient: Anthony McNeil
Sender: Robert Farkas
Subject: RE: COMPASS TANK INSPECTION
Message: All- Please find the completed tank inspection for the month of February at the subject property. All remains well. Tony- CATPOWER is in the vendor approval process at IPS. I expect that we can get our annual inspections completed in late March/early April. Please call me with questions. Respectfully- Robert Farkas Client Executive PMSI Phone: 219.406.3163 www.pmsitx.com
Events:
Event Type: Activity has been finished Date: 02/26/2025
Comment: Finished
01/15/2025 Electronic Communication Activity McNeil, Anthony P
Activity Closed Date: 01/15/2025 Activity Status: Closed
Date: 01/15/2025
Recipient: Anthony McNeil
Sender: Robert Farkas
Subject: 30 minute TEAMS Meeting - Purpose of this meeting is to have a brief discussion on path to DEP compliance at IDEA Compass.
Message: I discussed with Bob all open violations and level of significance, in other words which violations should be focused on first (SNC-A, B, and Minors). Also, I sent a cheat sheet with Webpage links/document links to help them through the process.
Events:
Event Type: Activity has been finished Date: 01/15/2025
Comment: Finished
01/07/2025 Enforcement Tracking Activity McNeil, Anthony P
Activity Status: Open
12/31/2024 Violation Closed Villegas Avila, Osman
Significance: SNC-A Status: Closed
Criteria ID: 7010
Rule: 62-762.421(2), 62-762.421(3)(c)
12/31/2024 Enforcement Referral Activity Ames, Janelle
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 01/07/2025
Events:
Event Type: Activity/Document was accepted on this date Date: 01/07/2025
Comment: Accepted by Anthony P McNeil: Accepted
Events:
Event Type: Activity has been finished Date: 01/07/2025
Comment: Finished
Events:
Event Type: Activity has been assigned Date: 01/06/2025
Comment: Assigned to Anthony P McNeil
Events:
Event Type: Activity/Document was acknowledged on this date Date: 01/06/2025
Comment: Acknowledged and Assigned by Jennifer Paul
Events:
Event Type: Activity has been submitted for approval Date: 12/31/2024
Comment: Submitted for approval by: Janelle Ames: SNC-A violation for immediate referral
Comments:
Comment Date: 12/31/2024 User: AMES_J
Description: SNC-A violation for immediate referral
Attachments:
Attachment Date: 12/31/2024 User: AMES_J
Description: 9809752 CRDE Information Sheet 12.31.24
View Attachment
12/31/2024 Editable Letter Activity Villegas Avila, Osman
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been submitted for approval Date: 12/31/2024
Comment: Submitted for approval by: Osman Villegas Avila
Events:
Event Type: Activity has been finished Date: 12/31/2024
Comment: Finished
Events:
Event Type: Activity has been submitted for approval Date: 12/31/2024
Comment: Submitted for approval by: Osman Villegas Avila
Events:
Event Type: Document has been sent Date: 12/31/2024
Comment: Sent
Events:
Event Type: Activity/Document has been approved Date: 12/31/2024
Comment: Approved by Janelle Ames: Letter approved
Events:
Event Type: Activity/Document was rejected on this date Date: 12/31/2024
Comment: Rejected by Janelle Ames: Correct name at top
Attachments:
Attachment Date: 12/31/2024 User: VILLEGASAVILA_OE_1
Description: NCL, 9809752, 12/31/2024
View Attachment
12/31/2024 Violation Open Villegas Avila, Osman
Significance: Minor Status: Open
Criteria ID: 7072
Rule: 62-762.601(7), 62-762.602(7)
12/31/2024 Violation Open Villegas Avila, Osman
Significance: Minor Status: Open
Criteria ID: 7041
Rule: 62-762.501(2)(e)3, 62-762.501(2)(e)3.a, 62-762.501(2)(e)3.b, 62-762.501(2)(e)4, 62-762.502(2)(e)4, 62-762.502(2)(e)4.a, 62-762.502(2)(e)4.b, 62-762.502(2)(e)5
12/31/2024 Violation Closed Villegas Avila, Osman
Significance: SNC-B Status: Closed
Criteria ID: 7065
Rule: 62-762.601(1)(e), 62-762.602(1)(e)
12/31/2024 Violation Open Villegas Avila, Osman
Significance: Minor Status: Open
Criteria ID: 7004
Rule: 62-762.401(5)
12/18/2024 Site Inspection Activity Closed Villegas Avila, Osman
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 12/18/2024
Activity Closed Date: 12/31/2024 Activity Closed By: VILLEGASAVILA_OE_1
Events:
Event Type: Activity has not been approved Date: 12/31/2024
Comment: Not approved by Janelle Ames: See email
Events:
Event Type: Activity has been submitted for approval Date: 12/31/2024
Comment: Submitted for approval by: Osman Villegas Avila
Events:
Event Type: Activity has been finished Date: 12/31/2024
Comment: Finished
Events:
Event Type: Activity/Document has been approved Date: 12/31/2024
Comment: Approved by Janelle Ames: Report approved
Events:
Event Type: Activity has been submitted for approval Date: 12/31/2024
Comment: Submitted for approval by: Osman Villegas Avila
12/02/2024 Electronic Communication Activity Villegas Avila, Osman
Activity Closed Date: 12/02/2024 Activity Status: Closed
Date: 12/02/2024
Recipient: Nelva Leal
Sender: Osman Villegas-Avila
Subject: Pre-Inspection Information
Message: See document attached
Events:
Event Type: Activity has been finished Date: 12/02/2024
Comment: Finished
02/10/2021 Editable Letter Activity McKinley, Donielle Nicole
Activity Title: In Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 02/10/2021
Comment: Finished
Events:
Event Type: Document has been sent Date: 02/10/2021
Comment: Sent
Attachments:
Attachment Date: 02/10/2021 User: MCKINLEY_DN_1
Description: In Compliance Letter
View Attachment
02/08/2021 Site Inspection Activity Closed McKinley, Donielle Nicole
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 02/08/2021
Activity Closed Date: 02/10/2021 Activity Closed By: MCKINLEY_DN_1
Events:
Event Type: Activity has been finished Date: 02/10/2021
Comment: Finished
04/02/2018 Editable Letter Activity Mondo, Patrick W
Activity Title: Compliance Assistance Offer Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 04/02/2018
Comment: Sent
Events:
Event Type: Activity has been finished Date: 04/02/2018
Comment: Finished
Attachments:
Attachment Date: 04/02/2018 User: MONDO_PW_1
Description: 9809752_CAO Letter_04-02-2018
View Attachment
04/02/2018 Electronic Communication Activity Mondo, Patrick W
Activity Closed Date: 04/02/2018 Activity Status: Closed
Date: 04/02/2018
Recipient: Daniel Hicks
Sender: EQD
Subject: Compliance Inspection report provided via email with CAO Letter.
Message: See attached.
Events:
Event Type: Activity has been finished Date: 04/02/2018
Comment: Finished
04/02/2018 Electronic Communication Activity Mondo, Patrick W
Activity Closed Date: 04/02/2018 Activity Status: Closed
Date: 04/02/2018
Recipient: Daniel Hicks
Sender: EQD
Subject: Return to Compliance Letter provided via email.
Message: See attached.
Events:
Event Type: Activity has been finished Date: 04/02/2018
Comment: Finished
04/02/2018 Editable Letter Activity Mondo, Patrick W
Activity Title: Return to Compliance Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 04/02/2018
Comment: Sent
Events:
Event Type: Activity has been finished Date: 04/02/2018
Comment: Finished
Attachments:
Attachment Date: 04/02/2018 User: MONDO_PW_1
Description: 9809752_Return To Compliance Letter_04-02-2018
View Attachment
04/02/2018 Electronic Communication Activity Mondo, Patrick W
Activity Closed Date: 04/02/2018 Activity Status: Closed
Date: 04/02/2018
Recipient: EQD
Sender: Daniel Hicks
Subject: Testing documentation provided to resolve violations.
Message: See attached.
Events:
Event Type: Activity has been finished Date: 04/02/2018
Comment: Finished
03/20/2018 Violation Closed Mondo, Patrick W
Significance: SNC-B Status: Closed
Criteria ID: 5042
Rule: 62-762.501(2)(e), 62-762.501(2)(e)1., 62-762.501(2)(e)2., 62-762.501(2)(e)2.a., 62-762.501(2)(e)2.b., 62-762.501(2)(e)2.c., 62-762.501(2)(e)2.d., 62-762.501(2)(e)3.
03/20/2018 Site Inspection Activity Closed Mondo, Patrick W
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 03/20/2018
Activity Closed Date: 04/02/2018 Activity Closed By: MONDO_PW_1
Events:
Event Type: Activity has been finished Date: 04/02/2018
Comment: Finished
03/20/2018 Violation Closed Mondo, Patrick W
Significance: Minor Status: Closed
Criteria ID: 5102
Rule: 62-762.601(7)
03/08/2018 Electronic Communication Activity Mondo, Patrick W
Activity Closed Date: 03/08/2018 Activity Status: Closed
Date: 03/08/2018
Recipient: Daniel Hicks, Ken Hicks, and Arlene Wilson
Sender: EQD
Subject: Outreach email provided prior to inspection.
Message: See attached.
Events:
Event Type: Activity has been finished Date: 03/08/2018
Comment: Finished
10/26/2015 Violation Closed Lunn, Raynald
Significance: Minor Status: Closed
Criteria ID: 2122
Rule: 62-762.701(1)(c)3.
Comments: Facility must prove that all release detection devices, such as in line leak detectors, sump and liner sensors, etc. function properly. Sensing devices may be optical, vapor, float activated, discriminating, non discriminating, or tied into electrical circuits.
10/26/2015 Editable Letter Activity Lunn, Raynald
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 10/27/2015
Comment: Finished
Attachments:
Attachment Date: 10/27/2015 User: RICHARDS_JE_1
Description: 9809752_In Compliance Letter Viol 2122_10-27-2015.pdf
View Attachment
10/26/2015 Electronic Communication Activity Lunn, Raynald
Activity Closed Date: 10/26/2015 Activity Status: Closed
Date: 10/26/2015
Recipient: Tracy Saunders
Sender: EQD
Subject: E-mailed inspection
Message: See attached
Events:
Event Type: Activity has been finished Date: 10/26/2015
Comment: Finished
10/22/2015 Site Inspection Activity Closed Lunn, Raynald
Activity Result: Minor Out of Compliance Activity Status: Closed
On-Site Start Date: 10/22/2015
Activity Closed Date: 10/26/2015 Activity Closed By: LUNN_RJ_1
Events:
Event Type: Activity has been finished Date: 10/26/2015
Comment: Finished
10/07/2015 Electronic Communication Activity Lunn, Raynald
Activity Closed Date: 10/07/2015 Activity Status: Closed
Date: 10/07/2015
Recipient: Tracy Saunders
Sender: EQD
Subject: E-mailed pre-inspection information
Message: See attached
Events:
Event Type: Activity has been finished Date: 10/07/2015
Comment: Finished
11/12/2013 Electronic Communication Activity Williams, April K.
Activity Closed Date: 11/12/2013 Activity Status: Closed
Date: 11/12/2013
Recipient: Forrest Wright, VyStar CU
Sender: EQD
Subject: Emailed - Annual Compliance Repo
Message: See Attachment
Events:
Event Type: Activity has been finished Date: 11/12/2013
Comment: Finished
11/08/2013 Site Inspection Activity Closed Williams, April K.
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 11/08/2013
Activity Closed Date: 11/12/2013 Activity Closed By: WILLIAMS_AK_1
Events:
Event Type: Activity has been finished Date: 11/12/2013
Comment: Finished
02/09/2012 Electronic Communication Activity Korous, Eva
Activity Closed Date: 02/09/2012 Activity Status: Closed
Date: 02/09/2012
Recipient: Forest Wright
Sender: EQD
Subject: Report Email
Message: See attachment
Events:
Event Type: Activity has been finished Date: 02/09/2012
Comment: Finished
02/08/2012 Site Inspection Activity Closed Korous, Eva
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 02/08/2012
Activity Closed Date: 02/09/2012 Activity Closed By: KOROUS_E_1
Events:
Event Type: Activity has been finished Date: 02/09/2012
Comment: Finished
12/03/2010 Site Inspection Activity Closed Holloway, Randall
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 12/06/2010
Activity Closed Date: 12/06/2010 Activity Closed By: HOLLOWAY_RW_1
Events:
Event Type: Activity has been finished Date: 12/06/2010
Comment: Finished
Comments:
Comment Date: 12/03/2010 User: HOLLOWAY_RW_1
Description: Proper notification given to Mr. Forest Wright prior to conducting annual compliance inspection. Paperwork inspection conducted on 12-6-10. Verified cover page information. Placard is current. This facility has one 2.8K (tank #1) and one 7.5K (tank #2) emergency generator tank. Tanks 1 & 2 contain diesel. Both of these tanks are base tank systems and have no associated sumps, piping or dispensers. Tanks use interstitial monitoring by an ATG and visual inspections for release detection. Spill buckets use visual inspections for release detection.
12/03/2010 Phone Conversation Activity Holloway, Randall
Call Type: Outgoing Activity Status: Closed
Phone Number: (904) 908-2297 Activity Closed Date: 12/03/2010
Subject: I spoke with Mr. Forest Wright on 12-2-10 and scheduled to inspect this facility on 12-6-10.
Events:
Event Type: Activity has been finished Date: 12/03/2010
Comment: Finished
10/14/2009 Attachment Holloway, Randall
10/14/2009 Attachment Holloway, Randall
10/14/2009 Attachment Holloway, Randall
10/14/2009 Attachment Holloway, Randall
10/14/2009 Attachment Holloway, Randall
10/12/2009 Site Inspection Activity Closed Holloway, Randall
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 10/12/2009
Activity Closed Date: 10/14/2009 Activity Closed By: HOLLOWAY_RW_1
Comments:
Comment Date: 10/12/2009 User: HOLLOWAY_RW_1
Description: Proper notification given to Mr. Forest Wright prior to inspection. Paperwork inspection conducted on 10-12-09 and 10-14-09. Verified cover page information. Placard is current. These are base tank systems for emergency generators. Tanks use interstitial monitoring by a Pneumercator and monthly visual inspections for release detection. No piping, sumps or dispenser liners associated with these tanks. Spill buckets use monthly visual inspections for release detection.
03/19/2009 Site Inspection Activity Closed Holloway, Randall
Activity Result: In Compliance Activity Status: Closed
On-Site Start Date: 03/19/2009
Activity Closed Date: 03/23/2009 Activity Closed By: HOLLOWAY_RW_1
Comments:
Comment Date: 03/19/2009 User: HOLLOWAY_RW_1
Description: Proper notification given to Mr. Forest Wright prior to inspection. Paperwork inspection conducted on 3-19-09 and 3-23-09. Verified and updated cover page information. No registration form filed. Placard is current. Tank #1 This is a base tank system for an emergency generator and has no associated piping, sumps or dispenser liners. Tank uses interstitial monitoring by a Pneumercator for release detection. Spill bucket uses monthly visual inspections for release detection. Tank #2 This is a base tank system for an emergency generator and has no associated piping, sumps or dispenser liners. Tank uses interstitial monitoring by a Pneumercator TMS 2000 for release detection. Spill bucket uses monthly visual inspections for release detection.
08/11/2008 Record Document Activity Defalco, Lynal
Activity Status: Closed
Contact Name: defalco Activity Closed Date: 08/11/2008
Comments:
Comment Date: 08/11/2008 User: DEFALCO_L
Description: district received response to WL dated 5/27/08. still need FR update sheet indicating tanks that are covered. requested by phone with Forest Wright and Frank Riner. they will provide. also received documentation that RD is now being performed.
08/11/2008 Record Document Activity Defalco, Lynal
Activity Status: Closed
Contact Name: defalco Activity Closed Date: 08/11/2008
Comments:
Comment Date: 08/11/2008 User: DEFALCO_L
Description: district received FR update sheet indicating tanks that are covered. from Forest Wright. vios closed and sfco issued. Frank Riner will sign CO for both enforcement sites 9809752 and 9809724.
05/16/2008 Enforcement Tracking Activity Defalco, Lynal
Activity Status: Closed
Activity Result: Closed With Enforcement Activity Closed Date: 09/03/2008
10/31/2007 Attachment Griffin, Tom
10/31/2007 Enforcement Referral Activity Griffin, Tom
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 05/16/2008
Events:
Event Type: Activity/Document was accepted on this date Date: 05/16/2008
Comment: dist accepts referral
Events:
Event Type: Activity/Document was acknowledged on this date Date: 05/16/2008
Comment: dist accepts referral
Events:
Event Type: Activity has been submitted for approval Date: 10/31/2007
Comment: Referred on 10-31-2007
Comments:
Comment Date: 05/16/2008 User: DEFALCO_L
Description: dist accepts referral
Comments:
Comment Date: 05/16/2008 User: DEFALCO_L
Description: dist accepts referral
Comments:
Comment Date: 10/31/2007 User: GRIFFIN_TW_1
Description: Referred on 10-31-2007
10/31/2007 Enforcement Referral Activity Griffin, Tom
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 05/16/2008
Events:
Event Type: Activity/Document was accepted on this date Date: 05/16/2008
Comment: dist accepts referral
Events:
Event Type: Activity/Document was acknowledged on this date Date: 05/16/2008
Comment: dist accepts referral
Events:
Event Type: Activity has been submitted for approval Date: 10/31/2007
Comment: Referred on 10-31-2007
Comments:
Comment Date: 05/16/2008 User: DEFALCO_L
Description: dist accepts referral
Comments:
Comment Date: 05/16/2008 User: DEFALCO_L
Description: dist accepts referral
Comments:
Comment Date: 10/31/2007 User: GRIFFIN_TW_1
Description: Referred on 10-31-2007
10/31/2007 Enforcement Referral Activity Griffin, Tom
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 05/16/2008
Events:
Event Type: Activity/Document was accepted on this date Date: 05/16/2008
Comment: dist accepts referral
Events:
Event Type: Activity/Document was acknowledged on this date Date: 05/16/2008
Comment: dist accepts referral
Events:
Event Type: Activity has been submitted for approval Date: 10/31/2007
Comment: Referred on 10-31-2007
Comments:
Comment Date: 05/16/2008 User: DEFALCO_L
Description: dist accepts referral
Comments:
Comment Date: 05/16/2008 User: DEFALCO_L
Description: dist accepts referral
Comments:
Comment Date: 10/31/2007 User: GRIFFIN_TW_1
Description: Referred on 10-31-2007
10/25/2007 Attachment Griffin, Tom
10/25/2007 Editable Letter Activity Griffin, Tom
Activity Title: County Subsequent Non-Compliance Letter Activity Status: Closed
10/25/2007 Attachment Griffin, Tom
10/24/2007 Violation Closed Griffin, Tom
Significance: SNC-B Status: Closed
Criteria ID: 2004
Rule: 62-762.401(3)(a)1.
Comments: There are various financial responsibility mechanisms available: Risk Retention Group (RRG) Endorsements Certificate of Insurance Guarantee Letter of Credit Fully Funded Trust Fund Self-Insurance with letter from CFO Stand-by Trust Fund Bond Rating Test (Local Governments) Local Government Financial Test Local Government Guarantee Local Government Fund For detailed information, refer to the DEP's Financial Responsibility Handbook pages 2-1, 2-2. Verify which mechanism(s) are used by the facility. State and federal facilities are exempt from financial responsibility, being considered a type of self insurance. They are always in compliance for this category. Document state or federal as appropriate. Financial responsibility must be maintained on out-of-service tanks. Note: Mark the absence of/or the lack of complete info in the certification of financial responsibility under Rule 62-762.401(3).
10/23/2007 Attachment Griffin, Tom
10/23/2007 Attachment Griffin, Tom
10/23/2007 Attachment Griffin, Tom
10/23/2007 Attachment Griffin, Tom
10/22/2007 Attachment Griffin, Tom
10/22/2007 Site Inspection Activity Closed Griffin, Tom
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 10/22/2007
Activity Closed Date: 10/24/2007 Activity Closed By: GRIFFIN_TW_1
10/22/2007 Violation Closed Griffin, Tom
Significance: SNC-B Status: Closed
Criteria ID: 2069
Rule: 62-762.601(1)(d)
Comments: Mark this as out of compliance if any release detection method has not been monitored as required. Look for evidence that the release detection system is not being properly monitored. Examples include: blocked access to monitoring wells, buried or submerged sampling ports; corroded locks; or no dispenser keys. Be aware that manual tank gauging requires weekly sampling. Electronic line leak detectors may be wired into an ATG with a memory of test cycles. Facilities with static/periodic ATG systems are required to provide one passing test per product per month. This method has a minimum fuel capacity requirement. If there is a record keeping problem, see rule 62-762.711(2).
10/22/2007 Violation Closed Griffin, Tom
Significance: Minor Status: Closed
Criteria ID: 2007
Rule: 62-762.451(1)(a)3.a., 62-762.451(1)(a)3.b., 62-762.451(1)(a)3.c.
Comments: A good working relationship with the contractors should minimize scheduling problems. Notice can be accepted in these formats: Verbal Written Fax Email
10/22/2007 Violation Closed Griffin, Tom
Significance: Minor Status: Closed
Criteria ID: 2005
Rule: 62-762.451(1)(a)1.
Comments: The local program should receive notice of upgrade, replacement, and installation tasks prior to the initiation of the work. Local program may accept less notice and still consider this item in compliance. This rule citation is not a requirement to submit construction plans. Notice can be accepted in these formats: Verbal Written Fax Email
10/22/2007 Attachment Griffin, Tom