Skip Navigation

Number of Permits by Office


This data is current as of: Monday, January 20, 2025

Select a Permit Type to View Specific Information
Permit Type Total Under Review
Air - Construction Permit 5
Air - Operation Permit 4
Air - Title V Operation Permit 1
Domestic Wastewater Biosolids 2
Ecosystems Management Agreement 4
IW Dewatering Operations 1
Waste - Solid Waste Operation Permit 4
Water - Domestic Wastewater Collection/Transmission System 22
Water - Domestic Wastewater Facility Permit 1
Water - Domestic Wastewater Type I Facility Permit 3
Water - Domestic Wastewater Type I Wastewater Treatment Plant Permit 21
Water - Domestic Wastewater Type II Satellite Treatment System Permit 1
Water - Domestic Wastewater Type II Wastewater Treatment Plant Permit 4
Water - Domestic Wastewater Type III (less than 10,000 gpd) Wastewater Treatment Plant Permit 1
Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit 14
Water - Drinking Water Distribution System General Permit 3
Water - Drinking Water Distribution System Permit 1
Water - Drinking Water Treatment Construction Permit 6
Water - ERP Exemption Permit 116
Water - ERP Modifications 13
Water - ERP Noticed General Permit 37
Water - ERP Variance 1
Water - Individual With No Conceptual Approval Permit 123
Water - Industrial Wastewater Concrete Batch Plant Permit 1
Water - Industrial Wastewater Facility Permit 1
Water - Industrial Wastewater Group 1, Non-surface Water Discharge Permit 2
Water - Industrial Wastewater Group 1, Surface Water Discharge Permit 3
Water - Industrial Wastewater Group 3, Surface Water Discharge Permit 3
Water - Industrial Wastewater Group 4A, Feedlots W/> Than Number Of Listed Animals Permit 1
Water - Industrial Wastewater Group 7A, Design Daily Flow >500,000 GPD Permit 1
Water - Industrial Wastewater Group 7B, Design Daily Flow >100,000 Up to 500,000 GPD Permit 1
Water - Industrial Wastewater Group 7D, Design Daily Flow 50,000 or Less GPD Permit 1
Water - Industrial Wastewater Group 8C, Design Daily Flow >50,000 to 100,000 GPD Permit 1
Water - Industrial Wastewater Group 8D, Design Daily Flow of 50,000 or Less GPD Permit 1
Water - State 404 Exemption 2
Water - State 404 General Permit 63
Water - State 404 Individual Permit 58
Water - State 404 No Permit Required 35
Water - State 404 Permit Modification 3
Water - State 404 Regional General Permit 4
Water - Underground Injection Control - Construction/Operation Permit 1