Select a Permit Type to View Specific Information |
Permit Type |
Total Under Review |
IW Dewatering Operations |
1 |
Water - Domestic Wastewater Collection/Transmission System |
9 |
Water - Domestic Wastewater Facility Permit |
1 |
Water - Domestic Wastewater Type I Facility Permit |
1 |
Water - Domestic Wastewater Type I Wastewater Treatment Plant Permit |
9 |
Water - Domestic Wastewater Type II Wastewater Treatment Plant Permit |
5 |
Water - Domestic Wastewater Type III (less than 10,000 gpd) Wastewater Treatment Plant Permit |
4 |
Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit |
11 |
Water - Drinking Water Distribution System General Permit |
1 |
Water - ERP Conceptual Approval Permit |
1 |
Water - ERP Exemption Permit |
296 |
Water - ERP Formal Determination |
14 |
Water - ERP Modifications |
21 |
Water - ERP Noticed General Permit |
39 |
Water - Individual With No Conceptual Approval Permit |
231 |
Water - Industrial Wastewater Concrete Batch Plant Permit |
4 |
Water - Industrial Wastewater Group 1, Non-surface Water Discharge Permit |
1 |
Water - Industrial Wastewater Group 3, Non-surface Water Discharge Permit |
1 |
Water - Industrial Wastewater Group 4C, Egg Production, Major Permit |
1 |
Water - Industrial Wastewater Group 5A, Design Daily Discharge >500,000 GPD Permit |
1 |
Water - Industrial Wastewater Group 6C, >1 Million BTU/HR Heat Loss Up to 20 Million Permit |
1 |
Water - Industrial Wastewater Group 7C, Design Daily Flow >50,000 Up to 100,000 GPD Permit |
1 |
Water - Industrial Wastewater Group 7D, Design Daily Flow 50,000 or Less GPD Permit |
1 |
Water - Industrial Wastewater Group 8D, Design Daily Flow of 50,000 or Less GPD Permit |
1 |
Water - Injection Well Construction Permit |
44 |
Water - Injection Well Operation Permit |
20 |
Water - Injection Well Plug and Abandonment Permit |
4 |
Water - Mangrove Alterations Permit |
13 |
Water - Mangrove Exemptions |
2 |
Water - State 404 General Permit |
24 |
Water - State 404 Individual Permit |
63 |
Water - State 404 No Permit Required |
51 |
Water - Underground Injection Control - Construction/Operation Permit |
1 |
Water - WOTUS Determination with WMD Formal |
5 |