Permitting Application Under Review
|
  FDEP Office: |
  PHOSPHATE MANAGEMENT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Industrial Wastewater Group 1, Surface Water Discharge Permit |
  Permit Processor: |
  DIEGO GRAVE DE PERALTA |
  Application Number: |
  FL0178527-009-IW1S |
  Site Name: |
  Mosaic Fertilizer, LLC - New Wales Gyp Stack Closure |
  Applicant Name: |
  Kristi Farrell |
  Applicant Company: |
  Mosaic Fertilizer LLC |
  Agency Action: |
  Issue: Pending Final Action |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  04/03/2023 |
  04/03/2023 |
  The permit processor is verifying the permit application fee submitted is correct. |
  04/03/2023 |
  04/03/2023 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  04/03/2023 |
  05/02/2023 |
  The Department is making an outcome determination regarding the permit application. |
  04/03/2023 |
  05/02/2023 |
  The Department is preparing the permit documents. |
  04/03/2023 |
  12/19/2024 |
  The Department published the Notice of Intent to Issue the permit. |
  12/19/2024 |
  12/26/2024 |
  The Department mailed the draft permit to the Federal Environmental Protection Agency for their review. |
  12/19/2024 |
  12/19/2024 |
  The Department is waiting the required period of time for public comment prior to continuing to process the permit application. |
  12/19/2024 |
  |
  The Federal Environmental Protection Agency is reviewing the permit. |
  12/19/2024 |
  01/21/2025 |
|
Permitting Application Under Review
|
  FDEP Office: |
  PHOSPHATE MANAGEMENT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Industrial Wastewater Group 1, Surface Water Discharge Permit |
  Permit Processor: |
  JESSICA M PEIN |
  Application Number: |
  FL0334944-008-IW1S |
  Site Name: |
  Mulberry Phosphogypsum Stack System Closure |
  Applicant Name: |
  Kristi Farrell |
  Applicant Company: |
  Mosaic Fertilizer LLC |
  Agency Action: |
  Issue: Pending Final Action |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  10/31/2023 |
  10/31/2023 |
  The permit processor is verifying the permit application fee submitted is correct. |
  10/31/2023 |
  11/01/2023 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  10/31/2023 |
  12/06/2023 |
  The Department is making an outcome determination regarding the permit application. |
  10/31/2023 |
  11/08/2024 |
  The Department is preparing the permit documents. |
  10/31/2023 |
  11/08/2024 |
  The Department published the Notice of Intent to Issue the permit. |
  11/08/2024 |
  11/12/2024 |
  The Department mailed the draft permit to the Federal Environmental Protection Agency for their review. |
  11/08/2024 |
  11/08/2024 |
  The Department is waiting the required period of time for public comment prior to continuing to process the permit application. |
  11/08/2024 |
  |
  The Federal Environmental Protection Agency is reviewing the permit. |
  11/08/2024 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  PHOSPHATE MANAGEMENT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Industrial Wastewater Facility Permit |
  Permit Processor: |
  DENNIS PIERSON |
  Application Number: |
  FL0757471-005-IWF |
  Site Name: |
  Novaphos Development, LLC |
  Applicant Name: |
  Mark Vignovic |
  Applicant Company: |
  JDC Development LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  07/18/2019 |
  07/18/2019 |
  The permit processor is verifying the permit application fee submitted is correct. |
  07/18/2019 |
  07/19/2019 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  07/18/2019 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  PHOSPHATE MANAGEMENT |
  Florida County: |
  Polk |
  Permit Type: |
  Stormwater - Individual Stormwater Permit |
  Permit Processor: |
  DIEGO GRAVE DE PERALTA |
  Application Number: |
  FL0757471-006-ISW |
  Site Name: |
  Novaphos Development, LLC |
  Applicant Name: |
  Mark Vignovic |
  Applicant Company: |
  JDC Development LLC |
  Agency Action: |
  Issue: Pending Final Action |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  10/31/2022 |
  10/31/2022 |
  The permit processor is verifying the permit application fee submitted is correct. |
  10/31/2022 |
  10/31/2022 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  10/31/2022 |
  12/01/2022 |
  The Department is waiting for additional information from the permit applicant. |
  12/01/2022 |
  12/20/2022 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  12/20/2022 |
  01/24/2023 |
  The Department is making an outcome determination regarding the permit application. |
  12/20/2022 |
  12/19/2024 |
  The Department is preparing the permit documents. |
  12/20/2022 |
  12/19/2024 |
  The Department published the Notice of Intent to Issue the permit. |
  12/19/2024 |
  |
  The Department mailed the draft permit to the Federal Environmental Protection Agency for their review. |
  12/19/2024 |
  12/19/2024 |
  The Federal Environmental Protection Agency is reviewing the permit. |
  12/19/2024 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  PHOSPHATE MANAGEMENT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Industrial Wastewater Group 1, Surface Water Discharge Permit |
  Permit Processor: |
  SCOTT ROSE |
  Application Number: |
  FL0757501-004-IW1S |
  Site Name: |
  Mosaic Fertilizer LLC - TMDL Aggregate TN |
  Applicant Name: |
  Kristi Farrell |
  Applicant Company: |
  Mosaic Fertilizer LLC |
  Agency Action: |
  Issue: Pending Final Action |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  10/11/2022 |
  10/11/2022 |
  The permit processor is verifying the permit application fee submitted is correct. |
  10/11/2022 |
  10/11/2022 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  10/11/2022 |
  11/14/2022 |
  The Department is making an outcome determination regarding the permit application. |
  10/11/2022 |
  11/01/2024 |
  The Department is preparing the permit documents. |
  10/11/2022 |
  11/01/2024 |
  The Department is waiting the required period of time for public comment prior to continuing to process the permit application. |
  11/01/2024 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit |
  Permit Processor: |
  BELINDA B OLIVER |
  Application Number: |
  FLA011038-011-DW3P |
  Site Name: |
  Village of La Casa Del Sol WWTF |
  Applicant Name: |
  Lewis Jones |
  Applicant Company: |
  Village of La Casa Del Sol Management Corporation |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  12/30/2024 |
  12/30/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  12/30/2024 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit |
  Permit Processor: |
  NOAH S CUMMINGS |
  Application Number: |
  FLA011042-006-DW3P |
  Site Name: |
  Lake Kissimmee MHP WWTF |
  Applicant Name: |
  Larry McVay |
  Applicant Company: |
  Lake Kissimmee MHP |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  11/13/2024 |
  11/13/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  11/13/2024 |
  11/15/2024 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  11/15/2024 |
  12/02/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  12/02/2024 |
  12/04/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  12/02/2024 |
  01/03/2025 |
  The Department is waiting for additional information from the permit applicant. |
  01/03/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit |
  Permit Processor: |
  CHLOE N ALLEN |
  Application Number: |
  FLA011045-008-DW3P |
  Site Name: |
  Rosalie Oaks WWTF |
  Applicant Name: |
  Samuel Cain |
  Applicant Company: |
  Florida Governmental Utility Authority |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  12/09/2024 |
  12/09/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  12/09/2024 |
  12/11/2024 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  12/11/2024 |
  12/18/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  12/18/2024 |
  12/19/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  12/18/2024 |
  01/02/2025 |
  The Department is waiting for additional information from the permit applicant. |
  01/02/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit |
  Permit Processor: |
  CHLOE N ALLEN |
  Application Number: |
  FLA011046-009-DW3P |
  Site Name: |
  Kissimmee River Park WWTP |
  Applicant Name: |
  Isaac King |
  Applicant Company: |
  King, King & King Investments, LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  02/03/2025 |
  02/03/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  02/03/2025 |
  02/05/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  02/03/2025 |
  02/11/2025 |
  The Department is waiting for additional information from the permit applicant. |
  02/11/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Domestic Wastewater Type I Wastewater Treatment Plant Permit |
  Permit Processor: |
  BELINDA B OLIVER |
  Application Number: |
  FLA012949-013-DW1P |
  Site Name: |
  Sun Ray WWTP |
  Applicant Name: |
  Mark Addison |
  Applicant Company: |
  Polk County Utilities Department |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  01/19/2024 |
  01/19/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  01/19/2024 |
  01/21/2024 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  01/21/2024 |
  03/15/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  03/15/2024 |
  03/17/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  03/15/2024 |
  03/18/2024 |
  The Department is waiting for additional information from the permit applicant. |
  03/18/2024 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit |
  Permit Processor: |
  ASTRID FLORES - THIEBAUD |
  Application Number: |
  FLA012999-008-DW3P |
  Site Name: |
  Briarwood Estates MHP WWTF |
  Applicant Name: |
  Bryan Guillot |
  Applicant Company: |
  Thomas Lee Group Acquisitions, LLC |
  Agency Action: |
  Deny: Pending Final Action |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  12/21/2018 |
  12/21/2018 |
  The permit processor is verifying the permit application fee submitted is correct. |
  12/21/2018 |
  12/23/2018 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  12/21/2018 |
  01/11/2019 |
  The Department is waiting for additional information from the permit applicant. |
  01/11/2019 |
  04/22/2019 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  04/22/2019 |
  05/21/2019 |
  The Department is waiting for additional information from the permit applicant. |
  05/21/2019 |
  08/14/2019 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  08/14/2019 |
  08/14/2019 |
  The Department is making an outcome determination regarding the permit application. |
  08/14/2019 |
  09/19/2019 |
  The permit application was denied by the Department. |
  08/14/2019 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit |
  Permit Processor: |
  NOAH S CUMMINGS |
  Application Number: |
  FLA013011-006-DW3P |
  Site Name: |
  Polk City Bp WWTP |
  Applicant Name: |
  Pete Elgers |
  Applicant Company: |
  Automated Petroleum and Energy Company, Inc. |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  02/13/2025 |
  02/13/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  02/13/2025 |
  02/15/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  02/15/2025 |
  02/19/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  02/19/2025 |
  02/21/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  02/19/2025 |
  03/11/2025 |
  The Department is waiting for additional information from the permit applicant. |
  03/11/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Domestic Wastewater Type III (less than 10,000 gpd) Wastewater Treatment Plant Permit |
  Permit Processor: |
  NOAH S CUMMINGS |
  Application Number: |
  FLA013023-006-DW4P |
  Site Name: |
  Shady Oaks MHP |
  Applicant Name: |
  Shane Proctor |
  Applicant Company: |
  Shady Oaks Mobile Home Park |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  03/13/2025 |
  03/13/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  03/13/2025 |
  03/15/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  03/13/2025 |
  03/25/2025 |
  The Department is waiting for additional information from the permit applicant. |
  03/25/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit |
  Permit Processor: |
  NOAH S CUMMINGS |
  Application Number: |
  FLA013027-005-DW3P |
  Site Name: |
  Lakeside Ranch Estates WWTP |
  Applicant Name: |
  Joyce Osenbaugh |
  Applicant Company: |
  Lakeside Ranch Investment Corporation |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  03/13/2025 |
  03/13/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  03/13/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Domestic Wastewater Type III (less than 10,000 gpd) Wastewater Treatment Plant Permit |
  Permit Processor: |
  EMILY CONATY |
  Application Number: |
  FLA013070-007-DW4P |
  Site Name: |
  Mosaic Fertilizer LLC South Fort Meade Mine |
  Applicant Name: |
  Bethany Niec |
  Applicant Company: |
  Mosaic Fertilizer LLC - South Fort Meade |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  01/06/2025 |
  01/06/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  01/06/2025 |
  01/08/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  01/06/2025 |
  01/08/2025 |
  The Department is waiting for additional information from the permit applicant. |
  01/08/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit |
  Permit Processor: |
  COLE NOLAN |
  Application Number: |
  FLA013082-011-DW3P |
  Site Name: |
  Sweetwater Golf & Tennis Club WWTP |
  Applicant Name: |
  Jeanette DeLisi |
  Applicant Company: |
  Sweetwater Community, Inc. |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  06/21/2024 |
  06/21/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  06/21/2024 |
  06/23/2024 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  06/23/2024 |
  07/03/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  07/03/2024 |
  07/05/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  07/03/2024 |
  08/30/2024 |
  The Department is waiting for additional information from the permit applicant. |
  08/30/2024 |
  04/01/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  04/01/2025 |
  04/01/2025 |
  The Department is making an outcome determination regarding the permit application. |
  04/01/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Domestic Wastewater Type II Wastewater Treatment Plant Permit |
  Permit Processor: |
  NOAH S CUMMINGS |
  Application Number: |
  FLA013103-010-DW2P |
  Site Name: |
  Swiss Golf Club |
  Applicant Name: |
  BRIAN ALTMAN |
  Applicant Company: |
  CENTURY PROPERTIES MHP, LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  12/30/2024 |
  12/30/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  12/30/2024 |
  01/01/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  01/01/2025 |
  01/22/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  01/22/2025 |
  01/24/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  01/22/2025 |
  02/17/2025 |
  The Department is waiting for additional information from the permit applicant. |
  02/17/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit |
  Permit Processor: |
  COLE NOLAN |
  Application Number: |
  FLA013125-008-DW3P |
  Site Name: |
  Midway RV Park WWTP |
  Applicant Name: |
  Harold Myers |
  Applicant Company: |
  MHP Operations Inc |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  02/27/2025 |
  02/27/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  02/27/2025 |
  03/01/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  03/01/2025 |
  03/06/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  03/06/2025 |
  03/08/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  03/06/2025 |
  03/06/2025 |
  The Department is waiting for additional information from the permit applicant. |
  03/06/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Industrial Wastewater Group 8D, Design Daily Flow of 50,000 or Less GPD Permit |
  Permit Processor: |
  SARAH WEST |
  Application Number: |
  FLA016056-008-IW8D |
  Site Name: |
  Ringling Bros. Center for Elephant Conservation |
  Applicant Name: |
  Robert Fedoris |
  Applicant Company: |
  White Oak Conservation Holdings, LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  01/23/2024 |
  01/23/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  01/23/2024 |
  01/25/2024 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  01/25/2024 |
  05/28/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/28/2024 |
  05/30/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  05/28/2024 |
  06/14/2024 |
  The Department is waiting for additional information from the permit applicant. |
  06/14/2024 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  PHOSPHATE MANAGEMENT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Industrial Wastewater Group 1, Non-surface Water Discharge Permit |
  Permit Processor: |
  DIEGO GRAVE DE PERALTA |
  Application Number: |
  FLA131512-007-IW1N |
  Site Name: |
  ExxonMobil Refining & Supply Co - ElectroPhos Site |
  Applicant Name: |
  Kristin Swanson |
  Applicant Company: |
  ExxonMobil Oil Corp |
  Agency Action: |
  Issue: Pending Final Action |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  10/19/2023 |
  10/19/2023 |
  The permit processor is verifying the permit application fee submitted is correct. |
  10/19/2023 |
  10/20/2023 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  10/20/2023 |
  10/20/2023 |
  The permit processor is verifying the permit application fee submitted is correct. |
  10/20/2023 |
  10/20/2023 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  10/20/2023 |
  11/20/2023 |
  The Department is making an outcome determination regarding the permit application. |
  10/20/2023 |
  01/06/2025 |
  The Department is preparing the permit documents. |
  10/20/2023 |
  01/06/2025 |
  The Department is mailing the permit applicant and other affected or interested parties a certified copy of the Department's intended actions. |
  01/06/2025 |
  01/06/2025 |
  The Department's intent regarding the permit application was published. |
  01/16/2024 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Domestic Wastewater Biosolids |
  Permit Processor: |
  BELINDA B OLIVER |
  Application Number: |
  FLA286958-007-DWB |
  Site Name: |
  Buck Mann Ranch |
  Applicant Name: |
  Steve Hacht |
  Applicant Company: |
  H & H Liquid Sludge Disposal, Inc |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  06/28/2023 |
  06/28/2023 |
  The permit processor is verifying the permit application fee submitted is correct. |
  06/28/2023 |
  06/30/2023 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  06/30/2023 |
  07/31/2023 |
  The permit processor is verifying the permit application fee submitted is correct. |
  07/31/2023 |
  08/01/2023 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  07/31/2023 |
  08/25/2023 |
  The Department is waiting for additional information from the permit applicant. |
  08/25/2023 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Domestic Wastewater Biosolids |
  Permit Processor: |
  COLE NOLAN |
  Application Number: |
  FLA289914-006-DWB |
  Site Name: |
  5r Ranch |
  Applicant Name: |
  Steve Hacht |
  Applicant Company: |
  H & H Liquid Sludge Disposal, Inc |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  06/15/2023 |
  06/15/2023 |
  The permit processor is verifying the permit application fee submitted is correct. |
  06/15/2023 |
  06/17/2023 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  06/17/2023 |
  06/29/2023 |
  The permit processor is verifying the permit application fee submitted is correct. |
  06/29/2023 |
  07/01/2023 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  06/29/2023 |
  07/27/2023 |
  The Department is waiting for additional information from the permit applicant. |
  07/27/2023 |
  01/07/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  01/07/2025 |
  02/05/2025 |
  The Department is waiting for additional information from the permit applicant. |
  02/05/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Domestic Wastewater Biosolids |
  Permit Processor: |
  BELINDA B OLIVER |
  Application Number: |
  FLA290131-006-DWB |
  Site Name: |
  Carter 7C Ranch |
  Applicant Name: |
  Bernie Thompson |
  Applicant Company: |
  Appalachian Material Service, Inc. |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  03/10/2023 |
  03/10/2023 |
  The permit processor is verifying the permit application fee submitted is correct. |
  03/10/2023 |
  03/12/2023 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  03/10/2023 |
  03/29/2023 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  03/12/2023 |
  |
  The Department is waiting for additional information from the permit applicant. |
  03/29/2023 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Domestic Wastewater Biosolids |
  Permit Processor: |
  BELINDA B OLIVER |
  Application Number: |
  FLA290386-004-DWB |
  Site Name: |
  JMC Ranch BLAS |
  Applicant Name: |
  Bernie Thompson |
  Applicant Company: |
  Appalachian Material Service, Inc. |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  12/29/2022 |
  12/29/2022 |
  The permit processor is verifying the permit application fee submitted is correct. |
  12/29/2022 |
  12/29/2022 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  12/29/2022 |
  01/19/2023 |
  The Department is waiting for additional information from the permit applicant. |
  01/19/2023 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Domestic Wastewater Biosolids |
  Permit Processor: |
  COLE NOLAN |
  Application Number: |
  FLA311898-007-DWB |
  Site Name: |
  Circle Cross |
  Applicant Name: |
  Steve Hacht |
  Applicant Company: |
  H & H Liquid Sludge Disposal, Inc |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  07/14/2023 |
  07/14/2023 |
  The permit processor is verifying the permit application fee submitted is correct. |
  07/14/2023 |
  07/14/2023 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  07/14/2023 |
  07/31/2023 |
  The permit processor is verifying the permit application fee submitted is correct. |
  07/31/2023 |
  07/31/2023 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  07/31/2023 |
  08/25/2023 |
  The Department is waiting for additional information from the permit applicant. |
  08/25/2023 |
  01/07/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  01/07/2025 |
  02/05/2025 |
  The Department is waiting for additional information from the permit applicant. |
  02/05/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Domestic Wastewater Type II Wastewater Treatment Plant Permit |
  Permit Processor: |
  COLE NOLAN |
  Application Number: |
  FLA489093-009-DW2P |
  Site Name: |
  Cardinal Hill WWTF |
  Applicant Name: |
  Patricia Jackson |
  Applicant Company: |
  CITY OF POLK CITY |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  04/03/2025 |
  04/03/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  04/03/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Domestic Wastewater Biosolids |
  Permit Processor: |
  COLE NOLAN |
  Application Number: |
  FLA690392-004-DWB |
  Site Name: |
  CHRIS WALKER RANCH |
  Applicant Name: |
  Steve Hacht |
  Applicant Company: |
  H & H Liquid Sludge Disposal, Inc |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  08/07/2023 |
  08/07/2023 |
  The permit processor is verifying the permit application fee submitted is correct. |
  08/07/2023 |
  08/07/2023 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  08/07/2023 |
  10/16/2023 |
  The permit processor is verifying the permit application fee submitted is correct. |
  10/16/2023 |
  10/16/2023 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  10/16/2023 |
  10/27/2023 |
  The Department is waiting for additional information from the permit applicant. |
  10/27/2023 |
  01/07/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  01/07/2025 |
  02/05/2025 |
  The Department is waiting for additional information from the permit applicant. |
  02/05/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Industrial Wastewater Group 9A, Recycling >10,000 GPD Permit |
  Permit Processor: |
  LARISA OREKHOVA |
  Application Number: |
  FLA866202-005-IW9A |
  Site Name: |
  BS Ranch and Farm |
  Applicant Name: |
  Brandy Stanton |
  Applicant Company: |
  BS Ranch and Farm |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  08/06/2024 |
  08/06/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  08/06/2024 |
  08/06/2024 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  08/06/2024 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  Water - Domestic Wastewater Type II Wastewater Treatment Plant Permit |
  Permit Processor: |
  NOAH S CUMMINGS |
  Application Number: |
  FLAB07111-003-DW2P |
  Site Name: |
  Resort at Canopy Oaks WWTF |
  Applicant Name: |
  Tristan Farrell |
  Applicant Company: |
  Resort at Canopy Oaks LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  11/18/2024 |
  11/18/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  11/18/2024 |
  11/20/2024 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  11/20/2024 |
  11/21/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  11/21/2024 |
  11/23/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  11/21/2024 |
  11/21/2024 |
  The Department is waiting for additional information from the permit applicant. |
  11/21/2024 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  Polk |
  Permit Type: |
  IW Dewatering Operations |
  Permit Processor: |
  KATE REDMAN |
  Application Number: |
  FLG074364-001-IWDE |
  Site Name: |
  Lift Station 38 |
  Applicant Name: |
  Ethan Bailey |
  Applicant Company: |
  |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  02/26/2025 |
  02/26/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  02/26/2025 |
  02/26/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  02/26/2025 |
  02/26/2025 |
  The Department is waiting for additional information from the permit applicant. |
  02/26/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  TALLAHASSEE NPDES STORMWATER |
  Florida County: |
  Polk |
  Permit Type: |
  MSE, < OR = 10K or Other |
  Permit Processor: |
  KRISTIE BEEMAN |
  Application Number: |
  FLR04E048-005-MS2C |
  Site Name: |
  FDOT D1 - Charlotte |
  Applicant Name: |
  Amarilys Alfonso-Perez |
  Applicant Company: |
  Florida Department of Transportation |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  12/06/2024 |
  12/06/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  12/06/2024 |
  02/03/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  12/06/2024 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  TALLAHASSEE NPDES STORMWATER |
  Florida County: |
  Polk |
  Permit Type: |
  MSE, < OR = 10K or Other |
  Permit Processor: |
  KRISTIE BEEMAN |
  Application Number: |
  FLR04E147-003-MS2C |
  Site Name: |
  FDOT D1 - Highlands County |
  Applicant Name: |
  Amarilys Alfonso-Perez |
  Applicant Company: |
  Florida Department of Transportation |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  12/06/2024 |
  12/06/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  12/06/2024 |
  02/03/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  12/06/2024 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  TALLAHASSEE NPDES STORMWATER |
  Florida County: |
  Polk |
  Permit Type: |
  Stormwater - Large Construction (>= 5 AC) |
  Permit Processor: |
  CODY R BELL |
  Application Number: |
  FLR10XM82-001-CGPL |
  Site Name: |
  Hamilton Bluff |
  Applicant Name: |
  Jeff Friedrich |
  Applicant Company: |
  DRB Group |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  03/10/2025 |
  03/10/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  03/10/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  TALLAHASSEE NPDES STORMWATER |
  Florida County: |
  Polk |
  Permit Type: |
  Stormwater - Large Construction (>= 5 AC) |
  Permit Processor: |
  AMANDA J DYER |
  Application Number: |
  FLR10XN42-001-CGPL |
  Site Name: |
  Hamilton Bluff |
  Applicant Name: |
  Jeff Friedrich |
  Applicant Company: |
  DRB Group |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  02/19/2025 |
  02/19/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  02/19/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  TALLAHASSEE NPDES STORMWATER |
  Florida County: |
  Polk |
  Permit Type: |
  Stormwater - Small Construction (1-5 AC) |
  Permit Processor: |
  AMANDA J DYER |
  Application Number: |
  FLR10XN76-001-CGPS |
  Site Name: |
  Modwash Davenport FL |
  Applicant Name: |
  Karen Hutton |
  Applicant Company: |
  Modwash, LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  02/24/2025 |
  02/24/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  02/24/2025 |
  02/24/2025 |
  The Department is waiting for additional information from the permit applicant. |
  02/24/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  TALLAHASSEE NPDES STORMWATER |
  Florida County: |
  Polk |
  Permit Type: |
  Construction Generic Dewatering Large |
  Permit Processor: |
  NPDES ONLINE PERMIT PROCESSOR |
  Application Number: |
  FLR20IC49-001-CGDL |
  Site Name: |
  Bartow Municipal Airport |
  Applicant Name: |
  Richard Straily |
  Applicant Company: |
  CWR Contracting INC |
  Agency Action: |
  Issue: Pending Final Action |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  04/02/2025 |
  04/02/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  04/02/2025 |
  04/02/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  04/02/2025 |
  04/02/2025 |
  The Department is making an outcome determination regarding the permit application. |
  04/02/2025 |
  04/02/2025 |
  The permit is effective. |
  04/02/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  TALLAHASSEE NPDES STORMWATER |
  Florida County: |
  Polk |
  Permit Type: |
  Construction Generic Dewatering Large |
  Permit Processor: |
  NPDES ONLINE PERMIT PROCESSOR |
  Application Number: |
  FLR20IC75-001-CGDL |
  Site Name: |
  Lakeland Highlands MOB |
  Applicant Name: |
  JOSEPH BLUMER |
  Applicant Company: |
  Cypress Gulf Development Corporation |
  Agency Action: |
  Issue: Pending Final Action |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  04/03/2025 |
  04/03/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  04/03/2025 |
  04/03/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  04/03/2025 |
  04/03/2025 |
  The Department is making an outcome determination regarding the permit application. |
  04/03/2025 |
  04/03/2025 |
  The permit is effective. |
  04/03/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  TALLAHASSEE NPDES STORMWATER |
  Florida County: |
  Polk |
  Permit Type: |
  Stormwater - Municipal Separate Storm Sewer Systems |
  Permit Processor: |
  MATT IRWIN |
  Application Number: |
  FLS000015-005-MS4 |
  Site Name: |
  Polk Co & Co App - MS4 |
  Applicant Name: |
  Gaye Sharpe |
  Applicant Company: |
  Polk County |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  04/12/2021 |
  04/12/2021 |
  The permit processor is verifying the permit application fee submitted is correct. |
  04/12/2021 |
  |
|