Permitting Application Under Review
|
  FDEP Office: |
  MINING AND MINERALS REGULATION |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  CHRIS SUAREZ |
  Application Number: |
  0140610-064-EI |
  Site Name: |
  AGRIFOS - NICHOLS MINE |
  Applicant Name: |
  RUSSELL SCHWEISS |
  Applicant Company: |
  MOSAIC FERTLIZER, LLC |
  Agency Action: |
  Pending |
  Link to Department’s Application File: |
  AGRIFOS - NICHOLS MINE |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  01/22/2025 |
  01/22/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  01/22/2025 |
  |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  01/22/2025 |
  |
  The Department is conducting a site investigation, if required |
  01/22/2025 |
  |
  The Department is determining if the activity affects State Lands. |
  01/22/2025 |
  |
  The Department is providing notice of application to commenting agencies for review. |
  01/22/2025 |
  01/24/2025 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  01/22/2025 |
  |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  AMY NORNIN |
  Application Number: |
  0295301-007-EI |
  Site Name: |
  HAINES CITY WWTF PARK ROAD EAST AND PRYOR ROAD, |
  Applicant Name: |
  JAMES KEENE |
  Applicant Company: |
  CITY OF HAINES CITY |
  Agency Action: |
  Pending |
  Link to Department’s Application File: |
  HAINES CITY WWTF PARK ROAD EAST AND PRYOR ROAD, |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  05/23/2024 |
  05/23/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  05/23/2024 |
  06/18/2024 |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  05/23/2024 |
  05/25/2024 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  05/23/2024 |
  05/29/2024 |
  The Department is determining if the activity affects State Lands. |
  05/23/2024 |
  05/25/2024 |
  The Department is providing notice of application to commenting agencies for review. |
  05/23/2024 |
  05/29/2024 |
  The Department is conducting a site investigation, if required |
  05/23/2024 |
  05/29/2024 |
  The Department is waiting for additional information from the permit applicant. |
  06/18/2024 |
  09/20/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  09/20/2024 |
  09/30/2024 |
  The Department is waiting for additional information from the permit applicant. |
  09/30/2024 |
  01/10/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  01/10/2025 |
  01/10/2025 |
  The Department is making an outcome determination regarding the permit application. |
  01/10/2025 |
  |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  MIA POAGE |
  Application Number: |
  0354985-004-EI |
  Site Name: |
  926 MANGHAM ROAD, BABSON PARK |
  Applicant Name: |
  TIM LOPEZ SR |
  Applicant Company: |
  |
  Agency Action: |
  Pending |
  Link to Department’s Application File: |
  926 MANGHAM ROAD, BABSON PARK |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  07/18/2024 |
  07/18/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  07/18/2024 |
  08/13/2024 |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  07/18/2024 |
  07/20/2024 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  07/18/2024 |
  07/22/2024 |
  The Department is determining if the activity affects State Lands. |
  07/18/2024 |
  07/20/2024 |
  The Department is conducting a site investigation, if required |
  07/18/2024 |
  |
  The Department is providing notice of application to commenting agencies for review. |
  07/18/2024 |
  07/20/2024 |
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands. |
  07/20/2024 |
  07/30/2024 |
  The Department is waiting for additional information from the permit applicant. |
  08/13/2024 |
  |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  OLIVIA OREILLY |
  Application Number: |
  0358287-002-EI |
  Site Name: |
  LUIS MONTANEZ |
  Applicant Name: |
  LUIS MONTANEZ |
  Applicant Company: |
  |
  Agency Action: |
  Pending |
  Link to Department’s Application File: |
  LUIS MONTANEZ |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  08/15/2024 |
  08/15/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  08/15/2024 |
  09/06/2024 |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  08/15/2024 |
  08/17/2024 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  08/15/2024 |
  08/20/2024 |
  The Department is determining if the activity affects State Lands. |
  08/15/2024 |
  08/17/2024 |
  The Department is providing notice of application to commenting agencies for review. |
  08/15/2024 |
  08/17/2024 |
  The Department is conducting a site investigation, if required |
  08/15/2024 |
  12/05/2024 |
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands. |
  08/17/2024 |
  08/21/2024 |
  The Department is waiting for additional information from the permit applicant. |
  09/06/2024 |
  |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|
Permitting Application Under Review
|
  FDEP Office: |
  MINING AND MINERALS REGULATION |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  ROBERT MCCLELLAND |
  Application Number: |
  0368162-007-EI |
  Site Name: |
  NEW WALES GYPSTACK |
  Applicant Name: |
  RUSSELL SCHWEISS |
  Applicant Company: |
  MOSAIC FERTILIZER, LLC |
  Agency Action: |
  Pending |
  Link to Department’s Application File: |
  NEW WALES GYPSTACK |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  04/19/2024 |
  04/19/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  04/19/2024 |
  05/13/2024 |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  04/19/2024 |
  04/21/2024 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  04/19/2024 |
  04/30/2024 |
  The Department is determining if the activity affects State Lands. |
  04/19/2024 |
  04/21/2024 |
  The Department is providing notice of application to commenting agencies for review. |
  04/19/2024 |
  04/30/2024 |
  The Department is conducting a site investigation, if required |
  04/19/2024 |
  05/16/2024 |
  The Department is waiting for additional information from the permit applicant. |
  05/13/2024 |
  06/10/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  06/10/2024 |
  07/10/2024 |
  The Department is waiting for additional information from the permit applicant. |
  07/10/2024 |
  11/15/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  11/15/2024 |
  12/16/2024 |
  The Department is making an outcome determination regarding the permit application. |
  11/15/2024 |
  |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  OLIVIA OREILLY |
  Application Number: |
  0424812-001-EI |
  Site Name: |
  SATTERFIELD [OGC 23-0263] |
  Applicant Name: |
  DEAN SATTERFIELD |
  Applicant Company: |
  |
  Agency Action: |
  Pending |
  Link to Department’s Application File: |
  SATTERFIELD [OGC 23-0263] |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  11/25/2024 |
  11/25/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  11/25/2024 |
  12/18/2024 |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  11/25/2024 |
  11/27/2024 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  11/25/2024 |
  11/26/2024 |
  The Department is determining if the activity affects State Lands. |
  11/25/2024 |
  11/26/2024 |
  The Department is providing notice of application to commenting agencies for review. |
  11/25/2024 |
  11/26/2024 |
  The Department is conducting a site investigation, if required |
  11/25/2024 |
  01/15/2025 |
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands. |
  11/26/2024 |
  12/09/2024 |
  The Department is waiting for additional information from the permit applicant. |
  12/18/2024 |
  02/07/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  02/07/2025 |
  02/07/2025 |
  The Department is making an outcome determination regarding the permit application. |
  01/24/2025 |
  |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  HEATHER MCCLURG |
  Application Number: |
  0428663-001-EI |
  Site Name: |
  SPIRIT RAMP |
  Applicant Name: |
  JASON SEELS |
  Applicant Company: |
  |
  Agency Action: |
  Delegated |
  Link to Department’s Application File: |
  SPIRIT RAMP |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  11/22/2022 |
  11/22/2022 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  11/22/2022 |
  12/16/2022 |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  11/22/2022 |
  11/24/2022 |
  The Department is conducting a site investigation, if required |
  11/22/2022 |
  12/22/2022 |
  The Department is determining if the activity affects State Lands. |
  11/22/2022 |
  11/24/2022 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  11/22/2022 |
  11/30/2022 |
  The Department is waiting for additional information from the permit applicant. |
  12/16/2022 |
  03/07/2023 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  03/07/2023 |
  03/07/2023 |
  The Department is making an outcome determination regarding the permit application. |
  03/07/2023 |
  05/04/2023 |
  The Environmental Resource Program decision regarding the permit application was made. |
  03/07/2023 |
  05/04/2023 |
  The Department is awaiting proof of publication from the applicant following the issuance of a Notice of Intent to Issue a permit. |
  05/04/2023 |
  06/08/2023 |
  The final permit application status was determined by the Department. |
  06/08/2023 |
  |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  ALLANA G CRAWFORD |
  Application Number: |
  0433589-001-EI |
  Site Name: |
  ARIANA SHORES HOA |
  Applicant Name: |
  JEFFERY MAGIERA |
  Applicant Company: |
  ARIANA SHORES HOA |
  Agency Action: |
  Pending |
  Link to Department’s Application File: |
  ARIANA SHORES HOA |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  12/13/2024 |
  12/13/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  12/13/2024 |
  01/09/2025 |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  12/13/2024 |
  12/15/2024 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  12/13/2024 |
  12/19/2024 |
  The Department is determining if the activity affects State Lands. |
  12/13/2024 |
  01/07/2025 |
  The Department is providing notice of application to commenting agencies for review. |
  12/13/2024 |
  12/19/2024 |
  The Department is conducting a site investigation, if required |
  12/13/2024 |
  |
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands. |
  01/07/2025 |
  01/27/2025 |
  The Department is waiting for additional information from the permit applicant. |
  01/09/2025 |
  |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  PATRICK KLINE |
  Application Number: |
  0436816-002-EI |
  Site Name: |
  25-26-09-000000-043080, COMMONWEALTH AVE N, POLK CITY |
  Applicant Name: |
  STEVE GERSTNER |
  Applicant Company: |
  |
  Agency Action: |
  Pending |
  Link to Department’s Application File: |
  25-26-09-000000-043080, COMMONWEALTH AVE N, POLK CITY |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  01/28/2025 |
  01/28/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  01/28/2025 |
  |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  01/28/2025 |
  01/31/2025 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  01/28/2025 |
  01/31/2025 |
  The Department is determining if the activity affects State Lands. |
  01/28/2025 |
  01/31/2025 |
  The Department is conducting a site investigation, if required |
  01/28/2025 |
  |
  The Department is providing notice of application to commenting agencies for review. |
  01/28/2025 |
  01/31/2025 |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  MIA POAGE |
  Application Number: |
  0445087-001-EI |
  Site Name: |
  RELOCATED CFPL POINCIANA PARKWAY EASEMENT |
  Applicant Name: |
  GINA DORSEY |
  Applicant Company: |
  CENTRAL FLORIDA PIPELINE COMPANY, LLC |
  Agency Action: |
  Pending |
  Link to Department’s Application File: |
  RELOCATED CFPL POINCIANA PARKWAY EASEMENT |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  02/09/2024 |
  02/09/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  02/09/2024 |
  03/05/2024 |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  02/09/2024 |
  02/29/2024 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  02/09/2024 |
  02/15/2024 |
  The Department is determining if the activity affects State Lands. |
  02/09/2024 |
  02/29/2024 |
  The Department is conducting a site investigation, if required |
  02/09/2024 |
  06/04/2024 |
  The Department is waiting for additional information from the permit applicant. |
  03/05/2024 |
  |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  AMY NORNIN |
  Application Number: |
  0449631-002-EI |
  Site Name: |
  POLK COUNTY |
  Applicant Name: |
  GREGORY KNOTHE |
  Applicant Company: |
  POLK COUNTY |
  Agency Action: |
  Pending |
  Link to Department’s Application File: |
  POLK COUNTY |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  09/10/2024 |
  09/10/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  09/10/2024 |
  10/07/2024 |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  09/10/2024 |
  09/12/2024 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  09/10/2024 |
  09/16/2024 |
  The Department is determining if the activity affects State Lands. |
  09/10/2024 |
  09/12/2024 |
  The Department is conducting a site investigation, if required |
  09/10/2024 |
  12/03/2024 |
  The Department is providing notice of application to commenting agencies for review. |
  09/10/2024 |
  09/16/2024 |
  The Department is waiting for additional information from the permit applicant. |
  10/07/2024 |
  01/13/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  01/13/2025 |
  01/15/2025 |
  The Department is making an outcome determination regarding the permit application. |
  01/13/2025 |
  |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  STEFANEY N POVER |
  Application Number: |
  0450128-002-EI |
  Site Name: |
  DANIEL HOULE |
  Applicant Name: |
  DANIEL HOULE |
  Applicant Company: |
  |
  Agency Action: |
  Pending |
  Link to Department’s Application File: |
  DANIEL HOULE |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  09/09/2024 |
  09/09/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  09/09/2024 |
  10/07/2024 |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  09/09/2024 |
  09/11/2024 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  09/09/2024 |
  09/23/2024 |
  The Department is determining if the activity affects State Lands. |
  09/09/2024 |
  09/11/2024 |
  The Department is providing notice of application to commenting agencies for review. |
  09/09/2024 |
  09/16/2024 |
  The Department is conducting a site investigation, if required |
  09/09/2024 |
  11/13/2024 |
  The Department is waiting for additional information from the permit applicant. |
  10/07/2024 |
  |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  LYNZI E BAXTER |
  Application Number: |
  0453187-001-EI |
  Site Name: |
  PRWC CONSTRUCTION PACKAGE 1 |
  Applicant Name: |
  ERIC DEHAVEN |
  Applicant Company: |
  POLK REGIONAL WATER COOPERATIVE (PRWC) |
  Agency Action: |
  Pending |
  Link to Department’s Application File: |
  PRWC CONSTRUCTION PACKAGE 1 |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  09/16/2024 |
  09/16/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  09/16/2024 |
  10/15/2024 |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  09/16/2024 |
  09/16/2024 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  09/16/2024 |
  09/16/2024 |
  The Department is determining if the activity affects State Lands. |
  09/16/2024 |
  09/16/2024 |
  The Department is providing notice of application to commenting agencies for review. |
  09/16/2024 |
  09/16/2024 |
  The Department is conducting a site investigation, if required |
  09/16/2024 |
  11/13/2024 |
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands. |
  09/16/2024 |
  09/19/2024 |
  The Department is waiting for additional information from the permit applicant. |
  10/15/2024 |
  01/15/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  01/15/2025 |
  01/15/2025 |
  The Department is making an outcome determination regarding the permit application. |
  01/15/2025 |
  |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  JESSICA HAMILTON |
  Application Number: |
  0453526-001-EI |
  Site Name: |
  231128-1020 GNGS AC MITIGATION DUKE 230KV OSPREY TO KATHLEEN |
  Applicant Name: |
  JESS MCCLEAN |
  Applicant Company: |
  WILLIAMS |
  Agency Action: |
  No State Lands |
  Link to Department’s Application File: |
  231128-1020 GNGS AC MITIGATION DUKE 230KV OSPREY TO KATHLEEN |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  09/24/2024 |
  09/24/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  09/24/2024 |
  10/22/2024 |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  09/24/2024 |
  09/26/2024 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  09/24/2024 |
  10/07/2024 |
  The Department is determining if the activity affects State Lands. |
  09/24/2024 |
  10/21/2024 |
  The Department is conducting a site investigation, if required |
  09/24/2024 |
  11/13/2024 |
  The Department is providing notice of application to commenting agencies for review. |
  09/24/2024 |
  10/02/2024 |
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands. |
  10/21/2024 |
  10/23/2024 |
  The Department is waiting for additional information from the permit applicant. |
  10/22/2024 |
  12/02/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  12/02/2024 |
  12/20/2024 |
  The Department is making an outcome determination regarding the permit application. |
  12/02/2024 |
  01/28/2025 |
  The Environmental Resource Program decision regarding the permit application was made. |
  12/02/2024 |
  01/29/2025 |
  The final permit application status was determined by the Department. |
  01/29/2025 |
  01/29/2025 |
  The Department issued the permit and filed the related permit information about the site and the applicant. |
  01/29/2025 |
  01/29/2025 |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  MIA POAGE |
  Application Number: |
  0454600-001-EI |
  Site Name: |
  POLK REGIONAL WATER COOPERATIVE SITE |
  Applicant Name: |
  ERIC DEHAVEN |
  Applicant Company: |
  POLK REGIONAL WATER COOPERATIVE (PRWC) |
  Agency Action: |
  Pending |
  Link to Department’s Application File: |
  POLK REGIONAL WATER COOPERATIVE SITE |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  11/01/2024 |
  11/01/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  11/01/2024 |
  11/21/2024 |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  11/01/2024 |
  11/03/2024 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  11/01/2024 |
  11/05/2024 |
  The Department is determining if the activity affects State Lands. |
  11/01/2024 |
  11/03/2024 |
  The Department is providing notice of application to commenting agencies for review. |
  11/01/2024 |
  11/03/2024 |
  The Department is conducting a site investigation, if required |
  11/01/2024 |
  01/14/2025 |
  The Department is waiting for additional information from the permit applicant. |
  11/21/2024 |
  |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  LYNZI E BAXTER |
  Application Number: |
  0454716-001-EI |
  Site Name: |
  CITY OF LAKE ALFRED WTP NO. 2 |
  Applicant Name: |
  CLIFTON BERNARD |
  Applicant Company: |
  CITY OF LAKE ALFRED |
  Agency Action: |
  Pending |
  Link to Department’s Application File: |
  CITY OF LAKE ALFRED WTP NO. 2 |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  11/07/2024 |
  11/07/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  11/07/2024 |
  12/03/2024 |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  11/07/2024 |
  11/08/2024 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  11/07/2024 |
  11/08/2024 |
  The Department is determining if the activity affects State Lands. |
  11/07/2024 |
  11/08/2024 |
  The Department is providing notice of application to commenting agencies for review. |
  11/07/2024 |
  11/08/2024 |
  The Department is conducting a site investigation, if required |
  11/07/2024 |
  |
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands. |
  11/08/2024 |
  11/14/2024 |
  The Department is waiting for additional information from the permit applicant. |
  12/03/2024 |
  |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  OLIVIA OREILLY |
  Application Number: |
  0455024-001-EI |
  Site Name: |
  ROBINSON DRIVE & SOUTH 30TH STREET, HAINES CITY |
  Applicant Name: |
  JAMES KEENE |
  Applicant Company: |
  CITY OF HAINES CITY |
  Agency Action: |
  Pending |
  Link to Department’s Application File: |
  ROBINSON DRIVE & SOUTH 30TH STREET, HAINES CITY |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  11/18/2024 |
  11/18/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  11/18/2024 |
  12/09/2024 |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  11/18/2024 |
  11/20/2024 |
  The Department is conducting a site investigation, if required |
  11/18/2024 |
  |
  The Department is determining if the activity affects State Lands. |
  11/18/2024 |
  11/20/2024 |
  The Department is providing notice of application to commenting agencies for review. |
  11/18/2024 |
  11/20/2024 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  11/18/2024 |
  11/21/2024 |
  The Department is waiting for additional information from the permit applicant. |
  12/09/2024 |
  |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  LYNZI E BAXTER |
  Application Number: |
  0455521-001-EI |
  Site Name: |
  BRENNEMAN SEAWALL |
  Applicant Name: |
  TINA BRENNEMAN |
  Applicant Company: |
  |
  Agency Action: |
  Pending |
  Link to Department’s Application File: |
  BRENNEMAN SEAWALL |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  12/04/2024 |
  12/04/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  12/04/2024 |
  12/20/2024 |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  12/04/2024 |
  12/05/2024 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  12/04/2024 |
  12/05/2024 |
  The Department is determining if the activity affects State Lands. |
  12/04/2024 |
  12/05/2024 |
  The Department is providing notice of application to commenting agencies for review. |
  12/04/2024 |
  12/05/2024 |
  The Department is conducting a site investigation, if required |
  12/04/2024 |
  |
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands. |
  12/05/2024 |
  12/16/2024 |
  The Department is waiting for additional information from the permit applicant. |
  12/20/2024 |
  |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  OLIVIA OREILLY |
  Application Number: |
  0455942-001-EI |
  Site Name: |
  PRWC CONSTRUCTION PACKAGE 11 |
  Applicant Name: |
  ERIC DEHAVEN |
  Applicant Company: |
  POLK REGIONAL WATER COOPERATIVE (PRWC) |
  Agency Action: |
  Pending |
  Link to Department’s Application File: |
  PRWC CONSTRUCTION PACKAGE 11 |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  12/18/2024 |
  12/18/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  12/18/2024 |
  01/08/2025 |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  12/18/2024 |
  12/20/2024 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  12/18/2024 |
  12/26/2024 |
  The Department is determining if the activity affects State Lands. |
  12/18/2024 |
  12/20/2024 |
  The Department is conducting a site investigation, if required |
  12/18/2024 |
  |
  The Department is providing notice of application to commenting agencies for review. |
  12/18/2024 |
  12/20/2024 |
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands. |
  12/20/2024 |
  01/06/2025 |
  The Department is waiting for additional information from the permit applicant. |
  01/08/2025 |
  |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  OLIVIA OREILLY |
  Application Number: |
  0456432-001-EI |
  Site Name: |
  COTTAGE HILL ROAD |
  Applicant Name: |
  OLGA VIERA |
  Applicant Company: |
  |
  Agency Action: |
  Pending |
  Link to Department’s Application File: |
  COTTAGE HILL ROAD |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  01/08/2025 |
  01/08/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  01/08/2025 |
  02/04/2025 |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  01/08/2025 |
  |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  01/08/2025 |
  01/22/2025 |
  The Department is determining if the activity affects State Lands. |
  01/08/2025 |
  01/10/2025 |
  The Department is conducting a site investigation, if required |
  01/08/2025 |
  |
  The Department is providing notice of application to commenting agencies for review. |
  01/08/2025 |
  01/10/2025 |
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands. |
  01/10/2025 |
  01/27/2025 |
  The Department is waiting for additional information from the permit applicant. |
  02/04/2025 |
  |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  PATRICK KLINE |
  Application Number: |
  0456874-001-EI |
  Site Name: |
  4136 LAKE BUFFUM RD, LAKE WALES |
  Applicant Name: |
  SANTIAGO ADAME |
  Applicant Company: |
  |
  Agency Action: |
  Pending |
  Link to Department’s Application File: |
  4136 LAKE BUFFUM RD, LAKE WALES |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  01/17/2025 |
  01/17/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  01/17/2025 |
  02/06/2025 |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  01/17/2025 |
  01/24/2025 |
  The Department is conducting a site investigation, if required |
  01/17/2025 |
  |
  The Department is determining if the activity affects State Lands. |
  01/17/2025 |
  01/24/2025 |
  The Department is providing notice of application to commenting agencies for review. |
  01/17/2025 |
  01/24/2025 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  01/17/2025 |
  01/24/2025 |
  The Department is waiting for additional information from the permit applicant. |
  02/06/2025 |
  |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|
Permitting Application Under Review
|
  FDEP Office: |
  SOUTHWEST DISTRICT |
  Florida County: |
  POLK |
  Permit Type: |
  Water - Individual With No Conceptual Approval Permit |
  Permit Processor: |
  LYNZI E BAXTER |
  Application Number: |
  0457479-001-EI |
  Site Name: |
  LAKE CLINCH PUBLIC BOAT RAMP, FROSTPROOF |
  Applicant Name: |
  NICOLE MCDOWELL |
  Applicant Company: |
  CITY OF FROSTPROOF |
  Agency Action: |
  Pending |
  Link to Department’s Application File: |
  LAKE CLINCH PUBLIC BOAT RAMP, FROSTPROOF |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  02/06/2025 |
  02/06/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  02/06/2025 |
  |
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP). |
  02/06/2025 |
  02/10/2025 |
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department. |
  02/06/2025 |
  02/10/2025 |
  The Department is determining if the activity affects State Lands. |
  02/06/2025 |
  02/10/2025 |
  The Department is providing notice of application to commenting agencies for review. |
  02/06/2025 |
  02/10/2025 |
  The Department is conducting a site investigation, if required |
  02/06/2025 |
  |
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands. |
  02/10/2025 |
  |
If you would like to comment on the pending application, please go here:
Public Comment | DEP Business Portal (fldepportal.com)
|