Permitting Application Under Review
  FDEP Office:   CENTRAL DISTRICT
  Florida County:   SUMTER
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   ZOEY C CARR
  Application Number:   0124518-003-EI
  Site Name:   LAKE PAN RV PARK (BOT600005053)
  Applicant Name:   CHRISTOPHER MCVETY
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   LAKE PAN RV PARK (BOT600005053)
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/22/2024   04/22/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/22/2024   05/01/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/22/2024   04/24/2024
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/22/2024   05/01/2024
  The Department is determining if the activity affects State Lands.   04/22/2024   04/24/2024
  The Department is providing notice of application to commenting agencies for review.   04/22/2024   04/24/2024
  The Department is conducting a site investigation, if required   04/22/2024   04/22/2024
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   04/24/2024   04/29/2024
  The Department is waiting for additional information from the permit applicant.   05/01/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   SUMTER
  Permit Type:   Waste - Solid Waste Operation Permit
  Permit Processor:   SARAH B BABCHUCK
  Application Number:   0172478-020-SO
  Site Name:   CR 466-A C&D (SW)
  Applicant Name:   STEVE PECE
  Applicant Company:  
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/27/2025   03/27/2025
  The permit processor is verifying the permit application fee submitted is correct.   03/27/2025   03/29/2025
  The Department is reviewing the permit application to determine if it contains all required information.   03/27/2025  


Permitting Application Under Review
  FDEP Office:   MINING AND MINERALS REGULATION
  Florida County:   SUMTER
  Permit Type:   Water - ERP Modifications
  Permit Processor:   ADAM SILVER
  Application Number:   0211510-019-EM
  Site Name:   CEMEX CONSTRUCTION MATERIALS FLORIDA LLC - CENTER HILL MINE
  Applicant Name:   TRAVIS WELLMAN
  Applicant Company:   CEMEX CONSTRUCTION MATERIALS FLORIDA, LLC.
  Agency Action:   Pending
  Link to Department’s Application File:   CEMEX CONSTRUCTION MATERIALS FLORIDA LLC - CENTER HILL MINE
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   01/27/2025   01/27/2025
  The Department is reviewing the permit application to determine if it contains all required information.   01/27/2025   02/11/2025
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   01/27/2025   01/29/2025
  The Department is conducting a site investigation, if required   01/27/2025  
  The Department is determining if the activity affects State Lands.   01/27/2025   01/29/2025
  The Department is providing notice of application to commenting agencies for review.   01/27/2025   01/29/2025
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   01/27/2025   02/10/2025
  The Department is waiting for additional information from the permit applicant.   02/11/2025  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   CENTRAL DISTRICT
  Florida County:   SUMTER
  Permit Type:   Water - Domestic Wastewater Collection/Transmission System
  Permit Processor:   GABRIEL KNOBELOCH
  Application Number:   0356164-086-DWC
  Site Name:   VOSO (DW)
  Applicant Name:   THOMAS MCDONOUGH
  Applicant Company:   GIBSON PLACE UTILITY COMPANY, LLC; BY: VDC MANAGER, LLC, ITS MANAGER
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/25/2025   03/25/2025
  The permit processor is verifying the permit application fee submitted is correct.   03/25/2025   03/25/2025
  The Department is waiting for the applicant to submit the requested additional fees.   03/25/2025   03/26/2025
  The permit processor is verifying the permit application fee submitted is correct.   03/26/2025   03/26/2025
  The Department is reviewing the permit application to determine if it contains all required information.   03/26/2025   03/28/2025
  The Department is waiting for additional information from the permit applicant.   03/28/2025  


Permitting Application Under Review
  FDEP Office:   CENTRAL DISTRICT
  Florida County:   SUMTER
  Permit Type:   Water - Domestic Wastewater Collection/Transmission System
  Permit Processor:   GABRIEL KNOBELOCH
  Application Number:   0356164-088-DWC
  Site Name:   VOSO (DW)
  Applicant Name:   ROBERT CHANDLER IV
  Applicant Company:   GIBSON PLACE UTILITY COMPANY, LLC.
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/27/2025   03/27/2025
  The permit processor is verifying the permit application fee submitted is correct.   03/27/2025   03/27/2025
  The Department is waiting for the applicant to submit the requested additional fees.   03/27/2025   03/28/2025
  The permit processor is verifying the permit application fee submitted is correct.   03/28/2025   03/28/2025
  The Department is reviewing the permit application to determine if it contains all required information.   03/28/2025   03/31/2025
  The Department is waiting for additional information from the permit applicant.   03/31/2025  


Permitting Application Under Review
  FDEP Office:   CENTRAL DISTRICT
  Florida County:   SUMTER
  Permit Type:   Water - Domestic Wastewater Collection/Transmission System
  Permit Processor:   GABRIEL KNOBELOCH
  Application Number:   0356164-090-DWC
  Site Name:   VOSO (DW)
  Applicant Name:   THOMAS MCDONOUGH
  Applicant Company:   GIBSON PLACE UTILITY COMPANY, LLC; BY: VDC MANAGER, LLC, ITS MANAGER
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/28/2025   03/28/2025
  The permit processor is verifying the permit application fee submitted is correct.   03/28/2025   03/28/2025
  The Department is waiting for the applicant to submit the requested additional fees.   03/28/2025   03/31/2025
  The permit processor is verifying the permit application fee submitted is correct.   03/31/2025   03/31/2025
  The Department is reviewing the permit application to determine if it contains all required information.   03/31/2025   04/01/2025
  The Department is waiting for additional information from the permit applicant.   04/01/2025  


Permitting Application Under Review
  FDEP Office:   CENTRAL DISTRICT
  Florida County:   SUMTER
  Permit Type:   Water - Drinking Water Distribution System Permit
  Permit Processor:   DRAKE BROWN
  Application Number:   0392641-014-DS
  Site Name:   GIBSON PLACE UTILITIES PWS NO. 3600015
  Applicant Name:   MARTIN DZURO
  Applicant Company:   GIBSON PLACE UTILITY COMPANY
  Agency Action:   Issue: Pending Final Action
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   06/24/2022   06/24/2022
  The Department is reviewing the permit application to determine if it contains all required information.   06/24/2022   06/28/2022
  The Department is making an outcome determination regarding the permit application.   06/24/2022   06/29/2022
  The final permit application status was determined by the Department.   06/29/2022   06/29/2022
  The Department issued the permit and filed the related permit information about the site and the applicant.   06/29/2022   06/29/2022


Permitting Application Under Review
  FDEP Office:   CENTRAL DISTRICT
  Florida County:   SUMTER
  Permit Type:   Water - Drinking Water Distribution System Permit
  Permit Processor:   SYLVIA VELLIOS
  Application Number:   0392641-066-DS
  Site Name:   GIBSON PLACE UTILITIES PWS NO. 3600015
  Applicant Name:   MARTIN DZURO
  Applicant Company:   GIBSON PLACE UTILITY CO.
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/28/2025   03/28/2025
  The Department is reviewing the permit application to determine if it contains all required information.   03/28/2025  


Permitting Application Under Review
  FDEP Office:   CENTRAL DISTRICT
  Florida County:   SUMTER
  Permit Type:   Water - State 404 General Permit
  Permit Processor:   MELANIE A WHARTON
  Application Number:   0399615-002-SFG
  Site Name:   Roadway Reconstruction
  Applicant Name:   DEBORAH SNYDER
  Applicant Company:   SUMTER COUNTY BOARD OF COUNTY COMMISSIONERS
  Agency Action:   Pending
  Link to Department’s Application File:   Roadway Reconstruction
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   12/07/2022   12/07/2022
  The Department is reviewing the permit application to determine if it contains all required information.   12/07/2022   12/28/2022
  The Department is conducting a site investigation, if required   12/07/2022  
  The Department is waiting for additional information from the permit applicant.   12/28/2022  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   CENTRAL DISTRICT
  Florida County:   SUMTER
  Permit Type:   Water - State 404 Individual Permit
  Permit Processor:   JOHANNA PACKER
  Application Number:   0409372-003-SFI
  Site Name:   VILLAGES MARLENE O'TOOLE INDUSTRIAL PARK (404)
  Applicant Name:   MARTIN DZURO
  Applicant Company:   THE VILLAGES DEVELOPMENT COMPANY, LLC
  Agency Action:   Issue: Pending Final Action
  Link to Department’s Application File:   VILLAGES MARLENE O'TOOLE INDUSTRIAL PARK (404)
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   08/05/2022   08/05/2022
  The Department is conducting a site investigation, if required   08/05/2022   12/14/2022
  The Department is reviewing the permit application to determine if it contains all required information.   08/05/2022   09/02/2022
  The Department is waiting for additional information from the permit applicant.   09/02/2022   07/05/2023
  The Department is reviewing the permit application to determine if it contains all required information.   07/05/2023   07/20/2023
  The Department published the public notice of the application after determining it contained all required items.   07/20/2023   07/25/2023
  The Department is waiting for the completion of the required comment period prior to continuing the permit application process.   07/25/2023   08/24/2023
  The Department is making an outcome determination regarding the permit application.   08/24/2023   09/29/2023
  Awaiting issuance of Permit   09/29/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   CENTRAL DISTRICT
  Florida County:   SUMTER
  Permit Type:   Water - State 404 No Permit Required
  Permit Processor:   KATRINA SCHULTZ
  Application Number:   0424647-001-NPR
  Site Name:   NEW HORIZON PLAZA
  Applicant Name:   KEITH RIDDLE
  Applicant Company:   RIDDLE NEWMAN ENGINEERING
  Agency Action:   Pending
  Link to Department’s Application File:   NEW HORIZON PLAZA
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   08/02/2022   08/02/2022
  The Department is conducting a site investigation, if required   08/02/2022  
  The Department is reviewing the permit application to determine if it contains all required information.   08/02/2022   09/02/2022
  The Department is waiting for additional information from the permit applicant.   09/02/2022  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   CENTRAL DISTRICT
  Florida County:   SUMTER
  Permit Type:   Water - State 404 Individual Permit
  Permit Processor:   ALICIA H LOWENSTEIN
  Application Number:   0430543-001-SFI
  Site Name:   BLOUNT GROUP WILDWOOD NORTH LLC EDEN AT OXFORD VILLAGE
  Applicant Name:   JAY JACOBSON
  Applicant Company:   EDEN ACQUISITIONS LLC
  Agency Action:   Pending
  Link to Department’s Application File:   BLOUNT GROUP WILDWOOD NORTH LLC EDEN AT OXFORD VILLAGE
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   01/13/2023   01/13/2023
  The Department is reviewing the permit application to determine if it contains all required information.   01/13/2023   02/07/2023
  The Department is conducting a site investigation, if required   01/13/2023   03/27/2023
  The Department is waiting for additional information from the permit applicant.   02/07/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   CENTRAL DISTRICT
  Florida County:   SUMTER
  Permit Type:   Water - State 404 General Permit
  Permit Processor:   BILAL ANSARI
  Application Number:   0432915-001-SFG
  Site Name:   GINGERICH CONSTRUCTION - WAREHOUSE EXPANSION
  Applicant Name:   PHIL GINGERICH
  Applicant Company:   GINGERICH HOLDINGS
  Agency Action:   Pending
  Link to Department’s Application File:   GINGERICH CONSTRUCTION - WAREHOUSE EXPANSION
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/20/2023   03/20/2023
  The Department is reviewing the permit application to determine if it contains all required information.   03/20/2023   04/18/2023
  The Department is conducting a site investigation, if required   03/20/2023  
  The Department is waiting for additional information from the permit applicant.   04/18/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   SUMTER
  Permit Type:   Waste - Solid Waste Operation Permit
  Permit Processor:   ANDREW M SMITH
  Application Number:   0435535-002-SO
  Site Name:   SUMTER ANAEROBIC DIGESTER FACILITY
  Applicant Name:   ROY BROWN
  Applicant Company:   RND ORGANIC RECYCLING INC.
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/26/2025   03/26/2025
  The permit processor is verifying the permit application fee submitted is correct.   03/26/2025   03/27/2025
  The Department is reviewing the permit application to determine if it contains all required information.   03/26/2025  


Permitting Application Under Review
  FDEP Office:   CENTRAL DISTRICT
  Florida County:   SUMTER
  Permit Type:   Water - State 404 Individual Permit
  Permit Processor:   ZOEY C CARR
  Application Number:   0447699-001-SFI
  Site Name:   WEBSTER SUBDIVISION
  Applicant Name:   DUSTIN CULVER
  Applicant Company:   CULVER ENGINEERING LLC
  Agency Action:   Pending
  Link to Department’s Application File:   WEBSTER SUBDIVISION
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/16/2024   04/16/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/16/2024  
  The Department is conducting a site investigation, if required   04/16/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   CENTRAL DISTRICT
  Florida County:   SUMTER
  Permit Type:   Water - Drinking Water Treatment Construction Permit
  Permit Processor:   DRAKE BROWN
  Application Number:   0448734-001-WC
  Site Name:   FLOWERWOOD NURSERY ( PWS)
  Applicant Name:   GLENN PONDER
  Applicant Company:   FLOWERWOOD
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/13/2024   05/13/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/13/2024   05/23/2024
  The Department is waiting for additional information from the permit applicant.   05/23/2024  


Permitting Application Under Review
  FDEP Office:   CENTRAL DISTRICT
  Florida County:   SUMTER
  Permit Type:   Water - State 404 General Permit
  Permit Processor:   ZOEY C CARR
  Application Number:   0449915-001-SFG
  Site Name:   SOLIV AT WILDWOOD
  Applicant Name:   DAVID ROACH
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   SOLIV AT WILDWOOD
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/29/2024   05/29/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/29/2024  
  The Department is conducting a site investigation, if required   05/29/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   SUMTER
  Permit Type:   Air - Construction Permit
  Permit Processor:   PAWAN SUBRAMANIAM
  Application Number:   1190042-029-AC
  Site Name:   SUMTERVILLE CEMENT PLANT
  Applicant Name:   DIRK COX
  Applicant Company:   SUWANNEE AMERICAN CEMENT COMPANY, LLC
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   02/13/2025   02/13/2025
  The permit processor is verifying the permit application fee submitted is correct.   02/13/2025   02/14/2025
  The Department is reviewing the permit application to determine if it contains all required information.   02/13/2025   03/16/2025
  The Department is making an outcome determination regarding the permit application.   02/13/2025  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   SUMTER
  Permit Type:   Air - Construction Permit
  Permit Processor:   TAMMY MCWADE
  Application Number:   7776271-002-AC
  Site Name:   PLANT #11 - COLEMAN FACILITY
  Applicant Name:   ROBERT FLOWERS
  Applicant Company:   C.W. ROBERTS CONTRACTING, INC.
  Agency Action:   Issue: Pending Final Action
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   09/10/2024   09/10/2024
  The permit processor is verifying the permit application fee submitted is correct.   09/10/2024   09/10/2024
  The Department is reviewing the permit application to determine if it contains all required information.   09/10/2024   10/02/2024
  The Department is waiting for additional information from the permit applicant.   10/02/2024   01/29/2025
  The Department is reviewing the permit application to determine if it contains all required information.   01/29/2025   01/29/2025
  The Department is making an outcome determination regarding the permit application.   01/29/2025   02/07/2025
  The Department is mailing the permit applicant and other affected or interested parties a certified copy of the Department's intended actions.   02/07/2025   02/07/2025
  The Department's intent regarding the permit application was published.   02/07/2025  


Permitting Application Under Review
  FDEP Office:   CENTRAL DISTRICT
  Florida County:   Sumter
  Permit Type:   Water - Domestic Wastewater Type I Wastewater Treatment Plant Permit
  Permit Processor:   WILLIAM R GILLETT
  Application Number:   FLA013497-017-DW1P
  Site Name:   Wildwood, City of WWTP
  Applicant Name:   Jason Martin
  Applicant Company:   Wildwood, City of
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   02/06/2025   02/06/2025
  The permit processor is verifying the permit application fee submitted is correct.   02/06/2025   02/08/2025
  The Department is waiting for the applicant to submit the requested additional fees.   02/08/2025   02/11/2025
  The permit processor is verifying the permit application fee submitted is correct.   02/11/2025   02/11/2025
  The Department is reviewing the permit application to determine if it contains all required information.   02/11/2025   02/28/2025
  The Department is waiting for additional information from the permit applicant.   02/28/2025  


Permitting Application Under Review
  FDEP Office:   CENTRAL DISTRICT
  Florida County:   Sumter
  Permit Type:   Water - Domestic Wastewater Type I Wastewater Treatment Plant Permit
  Permit Processor:   MARGARITA A HERNANDEZ
  Application Number:   FLA017133-012-DW1P
  Site Name:   Little Sumter Utility Co WWTF
  Applicant Name:   BRUCE BROWN
  Applicant Company:   VILLAGE CENTER COMMUNITY DEVELOPMENT DISTRICT
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/10/2025   03/10/2025
  The permit processor is verifying the permit application fee submitted is correct.   03/10/2025   03/10/2025
  The Department is waiting for the applicant to submit the requested additional fees.   03/10/2025   03/11/2025
  The permit processor is verifying the permit application fee submitted is correct.   03/11/2025   03/11/2025
  The Department is reviewing the permit application to determine if it contains all required information.   03/11/2025  


Permitting Application Under Review
  FDEP Office:   CENTRAL DISTRICT
  Florida County:   Sumter
  Permit Type:   Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit
  Permit Processor:   WILLIAM R GILLETT
  Application Number:   FLA358134-006-DW3P
  Site Name:   Orange Blossom Utilities
  Applicant Name:   Jonathan Dean
  Applicant Company:   Orange Blossom Utilities Inc
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   01/16/2025   01/16/2025
  The permit processor is verifying the permit application fee submitted is correct.   01/16/2025   01/16/2025
  The Department is reviewing the permit application to determine if it contains all required information.   01/16/2025   01/31/2025
  The Department is waiting for additional information from the permit applicant.   01/31/2025  


Permitting Application Under Review
  FDEP Office:   CENTRAL DISTRICT
  Florida County:   Sumter
  Permit Type:   Water - Industrial Wastewater Concrete Batch Plant Permit
  Permit Processor:   MARGARITA A HERNANDEZ
  Application Number:   FLG111010-001-IWCB
  Site Name:   DZ Precast Solutions Inc.
  Applicant Name:   Robert Richardson
  Applicant Company:   Dz Precast Solutions Inc.
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   09/05/2024   09/05/2024
  The permit processor is verifying the permit application fee submitted is correct.   09/04/2024   09/04/2024
  The Department is reviewing the permit application to determine if it contains all required information.   09/04/2024   09/23/2024
  The Department is waiting for additional information from the permit applicant.   09/23/2024