Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  OSCEOLA |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  CHARLES LEGROS |
  Application Number: |
  0383558-012-DWC |
  Site Name: |
  THE VILLAGES AT HARMONY (DW) |
  Applicant Name: |
  CHRIS TYREE |
  Applicant Company: |
  FORESTAR (USA) REAL ESTATE GROUP, INC. |
  Agency Action: |
  Issue: Pending Final Action |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  03/16/2023 |
  03/16/2023 |
  The permit processor is verifying the permit application fee submitted is correct. |
  03/16/2023 |
  03/20/2023 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  03/20/2023 |
  03/27/2023 |
  The permit processor is verifying the permit application fee submitted is correct. |
  03/27/2023 |
  03/27/2023 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  03/27/2023 |
  03/30/2023 |
  The Department is waiting for additional information from the permit applicant. |
  03/30/2023 |
  04/07/2023 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  04/07/2023 |
  04/07/2023 |
  The Department is making an outcome determination regarding the permit application. |
  04/07/2023 |
  04/24/2023 |
  The permit was issued. |
  04/07/2023 |
  04/25/2023 |
  The Department issued the permit and filed the related permit information about the site and the applicant. |
  04/25/2023 |
  04/25/2023 |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  ORANGE |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  DAVID FLORES |
  Application Number: |
  0384209-012-DWC |
  Site Name: |
  MERIDIAN PARKS (DW) |
  Applicant Name: |
  KASEY BIENKNOWSKI |
  Applicant Company: |
  BEACHLINE SOUTH RESIDENTIAL, LLC. |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  03/27/2025 |
  03/27/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  03/27/2025 |
  03/27/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  03/27/2025 |
  03/28/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  03/28/2025 |
  03/28/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  03/28/2025 |
  03/31/2025 |
  The Department is waiting for additional information from the permit applicant. |
  03/31/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  LAKE |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  DAVID FLORES |
  Application Number: |
  0410882-006-DWC |
  Site Name: |
  DEL WEBB HILLS OF MINNEOLA (DW) |
  Applicant Name: |
  AARON STRUCKMEYER |
  Applicant Company: |
  PULTE HOME COMPANY, LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  05/09/2025 |
  05/09/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/09/2025 |
  05/09/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  05/09/2025 |
  05/13/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/13/2025 |
  05/13/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  05/13/2025 |
  05/15/2025 |
  The Department is waiting for additional information from the permit applicant. |
  05/15/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  LAKE |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  SYLVIA VELLIOS |
  Application Number: |
  0449958-002-DWC |
  Site Name: |
  BOULEVARD OAKS (DW) |
  Applicant Name: |
  AMILCAR VELAZQUEZ |
  Applicant Company: |
  BO DEVELOPMENT, LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  05/13/2025 |
  05/13/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/13/2025 |
  05/15/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  05/15/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  ORANGE |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  MARGARITA A HERNANDEZ |
  Application Number: |
  0450587-003-DWC |
  Site Name: |
  THE GROW MASTER INFRASTRUCTURE (DW) |
  Applicant Name: |
  CHRISTOPHER WRENN |
  Applicant Company: |
  PULTE HOME COMPANY, LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  03/20/2025 |
  03/20/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  03/20/2025 |
  03/20/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  03/20/2025 |
  03/27/2025 |
  The Department is waiting for additional information from the permit applicant. |
  03/27/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  ORANGE |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  SYLVIA VELLIOS |
  Application Number: |
  0450587-004-DWC |
  Site Name: |
  THE GROW MASTER INFRASTRUCTURE (DW) |
  Applicant Name: |
  CHRISTOPHER WRENN |
  Applicant Company: |
  PULTE HOME COMPANY, LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  03/20/2025 |
  03/20/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  03/20/2025 |
  03/20/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  03/20/2025 |
  03/27/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  03/27/2025 |
  03/27/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  03/27/2025 |
  03/27/2025 |
  The Department is waiting for additional information from the permit applicant. |
  03/27/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  LAKE |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  SYLVIA VELLIOS |
  Application Number: |
  0452250-001-DWC |
  Site Name: |
  TURTLE COVE S/D (DW) |
  Applicant Name: |
  BRENT HOWELLS |
  Applicant Company: |
  CORAL BAY DEVELOPMENT & INVESTMENT, LLC. |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  08/20/2024 |
  08/20/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  08/20/2024 |
  08/22/2024 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  08/22/2024 |
  08/22/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  08/22/2024 |
  08/23/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  08/22/2024 |
  08/29/2024 |
  The Department is waiting for additional information from the permit applicant. |
  08/29/2024 |
  12/02/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  12/02/2024 |
  12/06/2024 |
  The Department is waiting for additional information from the permit applicant. |
  12/06/2024 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  OSCEOLA |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  MARGARITA A HERNANDEZ |
  Application Number: |
  0452619-001-DWC |
  Site Name: |
  OAK SHORE LANDINGS (DW) |
  Applicant Name: |
  ISAIAH COTTLE |
  Applicant Company: |
  GSL HOLDINGS I LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  08/29/2024 |
  08/29/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  08/29/2024 |
  08/29/2024 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  08/29/2024 |
  09/11/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  09/11/2024 |
  09/11/2024 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  09/11/2024 |
  09/23/2024 |
  The Department is waiting for additional information from the permit applicant. |
  09/23/2024 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  SEMINOLE |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  MARGARITA A HERNANDEZ |
  Application Number: |
  0456192-001-DWC |
  Site Name: |
  2830 MIDWAY DR. IMPROVEMENTS (DW) |
  Applicant Name: |
  SAMANTHA TANNER |
  Applicant Company: |
  SAMANTHA TANNER |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  12/30/2024 |
  12/30/2024 |
  The permit processor is verifying the permit application fee submitted is correct. |
  12/30/2024 |
  12/30/2024 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  12/30/2024 |
  02/24/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  02/24/2025 |
  02/24/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  02/24/2025 |
  02/26/2025 |
  The Department is waiting for additional information from the permit applicant. |
  02/26/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  BREVARD |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  WILLIAM R GILLETT |
  Application Number: |
  0457461-001-DWC |
  Site Name: |
  CORAL WAY CONDOS (DW) |
  Applicant Name: |
  DOUG ENGLE |
  Applicant Company: |
  124 ECW, LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  02/06/2025 |
  02/06/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  02/06/2025 |
  02/12/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  02/12/2025 |
  03/06/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  03/06/2025 |
  03/06/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  03/06/2025 |
  03/12/2025 |
  The Department is waiting for additional information from the permit applicant. |
  03/12/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  LAKE |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  DAVID FLORES |
  Application Number: |
  0457734-001-DWC |
  Site Name: |
  GROVELAND SITE (DW) |
  Applicant Name: |
  BOBIR MAMADALIEV |
  Applicant Company: |
  BLACK STONE WHITE, LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  02/17/2025 |
  02/17/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  02/17/2025 |
  02/19/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  02/19/2025 |
  03/04/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  03/04/2025 |
  03/04/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  03/04/2025 |
  03/05/2025 |
  The Department is waiting for additional information from the permit applicant. |
  03/05/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  ORANGE |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  DAVID FLORES |
  Application Number: |
  0458517-001-DWC |
  Site Name: |
  KALIDAS OFFICE BUILDING (DW) |
  Applicant Name: |
  ANITA KALIDAS |
  Applicant Company: |
  KALI HOLDINGS, LLC. |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  04/22/2025 |
  04/22/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  04/22/2025 |
  04/22/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  04/22/2025 |
  04/28/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  04/28/2025 |
  04/28/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  04/28/2025 |
  04/30/2025 |
  The Department is waiting for additional information from the permit applicant. |
  04/30/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  VOLUSIA |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  WILLIAM R GILLETT |
  Application Number: |
  0458909-001-DWC |
  Site Name: |
  ROLLING HILLS (DW) |
  Applicant Name: |
  CHARLES NEWMAN |
  Applicant Company: |
  SUGAR MILL PARTNER, INC. |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  03/20/2025 |
  03/20/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  03/20/2025 |
  03/22/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  03/22/2025 |
  04/14/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  04/14/2025 |
  04/16/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  04/14/2025 |
  04/17/2025 |
  The Department is waiting for additional information from the permit applicant. |
  04/17/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  BREVARD |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  DAVID FLORES |
  Application Number: |
  0459277-001-DWC |
  Site Name: |
  TROPICAL CONDOMINIUMS (DW) |
  Applicant Name: |
  JASON GRIFFIS |
  Applicant Company: |
  TROPIC APARTMENTS LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  03/31/2025 |
  03/31/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  03/31/2025 |
  03/31/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  03/31/2025 |
  04/01/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  04/01/2025 |
  04/01/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  04/01/2025 |
  04/02/2025 |
  The Department is waiting for additional information from the permit applicant. |
  04/02/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  LAKE |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  CHARLES LEGROS |
  Application Number: |
  0459765-001-DWC |
  Site Name: |
  PROSE CLERMONT (DW) |
  Applicant Name: |
  ANDREW DUBILL |
  Applicant Company: |
  PLAZA COLLINA (ORLANDO) ASLI VI, LLLP. |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  04/11/2025 |
  04/11/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  04/11/2025 |
  04/13/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  04/13/2025 |
  04/18/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  04/18/2025 |
  04/20/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  04/18/2025 |
  05/01/2025 |
  The Department is waiting for additional information from the permit applicant. |
  05/01/2025 |
  05/06/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  05/06/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  LAKE |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  DAVID FLORES |
  Application Number: |
  0459800-001-DWC |
  Site Name: |
  URICK FLATS (DW) |
  Applicant Name: |
  HUNTER NELSON |
  Applicant Company: |
  BIRCH ENTERPRISE LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  04/14/2025 |
  04/14/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  04/14/2025 |
  04/14/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  04/14/2025 |
  04/23/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  04/23/2025 |
  04/23/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  04/23/2025 |
  04/23/2025 |
  The Department is waiting for additional information from the permit applicant. |
  04/23/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  LAKE |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  WILLIAM R GILLETT |
  Application Number: |
  0460172-001-DWC |
  Site Name: |
  LUMBERYARD MF APARTMENTS |
  Applicant Name: |
  BRIAN METZLER |
  Applicant Company: |
  PENLER CLERMONT LAKEFRONT OWNER, LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  04/23/2025 |
  04/23/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  04/23/2025 |
  04/28/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  04/28/2025 |
  05/15/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/15/2025 |
  05/16/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  05/15/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  LAKE |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  WILLIAM R GILLETT |
  Application Number: |
  0460395-001-DWC |
  Site Name: |
  THE VUE LOT 5 MULTIFAMILY (DW) |
  Applicant Name: |
  Chad Hagler |
  Applicant Company: |
  |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  04/30/2025 |
  04/30/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  04/30/2025 |
  04/30/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  04/30/2025 |
  05/12/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/12/2025 |
  05/12/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  05/12/2025 |
  05/12/2025 |
  The Department is waiting for additional information from the permit applicant. |
  05/12/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  ORANGE |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  DAVID FLORES |
  Application Number: |
  0460426-001-DWC |
  Site Name: |
  WILLAMAR COUNTRY ESTATES (DW) |
  Applicant Name: |
  AUDREY ARNOLD |
  Applicant Company: |
  WILLAMAR, LLC. |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  05/01/2025 |
  05/01/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/01/2025 |
  05/01/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  05/01/2025 |
  05/12/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/12/2025 |
  05/12/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  05/12/2025 |
  05/12/2025 |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  VOLUSIA |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  DAVID FLORES |
  Application Number: |
  0460504-001-DWC |
  Site Name: |
  A & M FROZEN (DW) |
  Applicant Name: |
  MONTY ANDERSON |
  Applicant Company: |
  1899 US HWY 1, LLC. |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  05/02/2025 |
  05/02/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/02/2025 |
  05/02/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  05/02/2025 |
  05/14/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/14/2025 |
  05/14/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  05/14/2025 |
  05/15/2025 |
  The Department is waiting for additional information from the permit applicant. |
  05/15/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  OSCEOLA |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  GABRIEL KNOBELOCH |
  Application Number: |
  0460517-001-DWC |
  Site Name: |
  MARSH RD CCSS (DW) |
  Applicant Name: |
  DEAN FAIRWEATHER |
  Applicant Company: |
  MV COMMERCIAL CONSTRUCTION LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  05/05/2025 |
  05/05/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/05/2025 |
  05/05/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  05/05/2025 |
  05/08/2025 |
  The Department is waiting for additional information from the permit applicant. |
  05/08/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  OSCEOLA |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  HILLARY DALEY |
  Application Number: |
  0460555-001-DWC |
  Site Name: |
  BLUE OSCEOLA APARTMENTS (DW) |
  Applicant Name: |
  MAURICIO BELLO |
  Applicant Company: |
  BLUE OSCEOLA APARTMENTS, LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  05/05/2025 |
  05/05/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/05/2025 |
  05/07/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  05/07/2025 |
  05/15/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/15/2025 |
  05/15/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  05/15/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  OSCEOLA |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  MARGARITA A HERNANDEZ |
  Application Number: |
  0460560-001-DWC |
  Site Name: |
  GATEWAY @ 429 (DW) |
  Applicant Name: |
  EDDY SANTAMARINA |
  Applicant Company: |
  LIT BLV OLD LAKE WILSON RD PH 1 VENTURE, LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  05/06/2025 |
  05/06/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/06/2025 |
  05/06/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  05/06/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  MARION |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  SYLVIA VELLIOS |
  Application Number: |
  0460564-001-DWC |
  Site Name: |
  BELLEVIEW WAREHOUSE (DW) |
  Applicant Name: |
  DAVID MITCHELLE |
  Applicant Company: |
  CGCR HOLDINGD, LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  05/06/2025 |
  05/06/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/06/2025 |
  05/07/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  05/07/2025 |
  05/07/2025 |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  ORANGE |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  GABRIEL KNOBELOCH |
  Application Number: |
  0460610-001-DWC |
  Site Name: |
  HANCOCK LONE PALM (DW) |
  Applicant Name: |
  SHAW HUTTO |
  Applicant Company: |
  LPA SOLUTIONS, LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  05/07/2025 |
  05/07/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/07/2025 |
  05/07/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  05/07/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  BREVARD |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  OSAMA MAHMOUD |
  Application Number: |
  0460702-001-DWC |
  Site Name: |
  9075 ELLIS ROAD SITE (DW) |
  Applicant Name: |
  JASON WADSWORTH |
  Applicant Company: |
  MADISON HOLDINGS OF BREVARD, LLC. |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  05/08/2025 |
  05/08/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/08/2025 |
  05/08/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  05/08/2025 |
  05/13/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/13/2025 |
  05/13/2025 |
  The Department is making an outcome determination regarding the permit application. |
  05/13/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  BREVARD |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  DAVID FLORES |
  Application Number: |
  0460706-001-DWC |
  Site Name: |
  GREATER HEIGHTS (DW) |
  Applicant Name: |
  LASHAUNDRA MCGHEE |
  Applicant Company: |
  THE BREVARD NEIGHBORHOOD DEVELOPMENT COALITION, INC. |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  05/08/2025 |
  05/08/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/08/2025 |
  05/08/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  05/08/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  ORANGE |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  OSAMA MAHMOUD |
  Application Number: |
  0460783-001-DWC |
  Site Name: |
  SILVERLEAF SOUTH LOT 1 (DW) |
  Applicant Name: |
  Ken Kupp |
  Applicant Company: |
  |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  05/09/2025 |
  05/09/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/09/2025 |
  05/09/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  05/09/2025 |
  05/15/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/15/2025 |
  05/15/2025 |
  The Department is making an outcome determination regarding the permit application. |
  05/15/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  MARION |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  MARGARITA A HERNANDEZ |
  Application Number: |
  0460786-001-DWC |
  Site Name: |
  ELEMENTARY SCHOOL X (DW) |
  Applicant Name: |
  IVONNE BUMBACH |
  Applicant Company: |
  MARION COUNTY PUBLIC SCHOOLS |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  05/09/2025 |
  05/09/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/09/2025 |
  05/09/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  05/09/2025 |
  05/14/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/14/2025 |
  05/14/2025 |
  The Department is making an outcome determination regarding the permit application. |
  05/14/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  ORANGE |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  SYLVIA VELLIOS |
  Application Number: |
  0460832-001-DWC |
  Site Name: |
  S. GOLDENROD TOWNHOMES (DW) |
  Applicant Name: |
  JORDAN THEIS |
  Applicant Company: |
  PALM PROPERTY PARTNERS, LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  05/12/2025 |
  05/12/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/12/2025 |
  05/14/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  05/14/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  ORANGE |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  DAVID FLORES |
  Application Number: |
  0460853-001-DWC |
  Site Name: |
  THE GROVES - UCP CAMPUS (DW) |
  Applicant Name: |
  LLENE WILKINS |
  Applicant Company: |
  UCP OF CENTRAL FLORIDA, INC. |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  05/12/2025 |
  05/12/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/12/2025 |
  05/12/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  05/12/2025 |
  05/14/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/14/2025 |
  05/14/2025 |
  The Department is reviewing the permit application to determine if it contains all required information. |
  05/14/2025 |
  |
|
Permitting Application Under Review
|
  FDEP Office: |
  CENTRAL DISTRICT |
  Florida County: |
  MARION |
  Permit Type: |
  Water - Domestic Wastewater Collection/Transmission System |
  Permit Processor: |
  GABRIEL KNOBELOCH |
  Application Number: |
  0460869-001-DWC |
  Site Name: |
  DIAMOND A SHOPPING CENTER (DW) |
  Applicant Name: |
  JOHN ALVAREZ |
  Applicant Company: |
  JOHN ALVAREZ INVESTMENT GROUP LLC |
  Agency Action: |
  Pending |
Permitting Application Events to Date
|
  Permitting Event Description |
  Started |
  Completed |
  Permit application was received by the Department. |
  05/14/2025 |
  05/14/2025 |
  The permit processor is verifying the permit application fee submitted is correct. |
  05/14/2025 |
  05/14/2025 |
  The Department is waiting for the applicant to submit the requested additional fees. |
  05/14/2025 |
  |
|