Permitting Application with Events Details


This data is current as of: Monday, May 19, 2025


Permitting Application Under Review
  FDEP Office:   NORTHWEST DISTRICT
  Florida County:   BAY
  Permit Type:   Water - ERP Modifications
  Permit Processor:   WHITNEY BRETANA
  Application Number:   0128713-011-EM
  Site Name:   RAINBOW RESTAURANTS, INC.
  Applicant Name:   ADRIS PENDER
  Applicant Company:   RAINBOW RESTAURANTS, INC
  Agency Action:   Pending
  Link to Department’s Application File:   RAINBOW RESTAURANTS, INC.
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   10/12/2023   10/12/2023
  The Department is reviewing the permit application to determine if it contains all required information.   10/12/2023   11/09/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   10/12/2023   10/14/2023
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   10/12/2023   10/26/2023
  The Department is determining if the activity affects State Lands.   10/12/2023   10/14/2023
  The Department is conducting a site investigation, if required   10/12/2023   10/27/2023
  The Department is waiting for additional information from the permit applicant.   11/09/2023   05/14/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/14/2024   06/13/2024
  The Department is waiting for additional information from the permit applicant.   06/13/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   NORTHWEST DISTRICT
  Florida County:   GULF
  Permit Type:   Water - ERP Modifications
  Permit Processor:   MANDY CELIS
  Application Number:   0274349-041-EM
  Site Name:   PORT ST. JOE PORT AUTHORITY
  Applicant Name:   GUERRY MAGIDSON
  Applicant Company:   PORT ST. JOE PORT AUTHORITY
  Agency Action:   Pending
  Link to Department’s Application File:   PORT ST. JOE PORT AUTHORITY
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/28/2025   04/28/2025
  The Department is reviewing the permit application to determine if it contains all required information.   04/28/2025   05/09/2025
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/28/2025  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/28/2025  
  The Department is determining if the activity affects State Lands.   04/28/2025  
  The Department is providing notice of application to commenting agencies for review.   04/28/2025  
  The Department is conducting a site investigation, if required   04/28/2025  
  The Department is waiting for additional information from the permit applicant.   05/09/2025  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   NORTHWEST DISTRICT
  Florida County:   GULF
  Permit Type:   Water - ERP Modifications
  Permit Processor:   MANDY CELIS
  Application Number:   0274349-042-EM
  Site Name:   PORT ST. JOE PORT AUTHORITY
  Applicant Name:   GUERRY MAGIDSON
  Applicant Company:   PORT ST. JOE PORT AUTHORITY
  Agency Action:   Pending
  Link to Department’s Application File:   PORT ST. JOE PORT AUTHORITY
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/28/2025   04/28/2025
  The Department is reviewing the permit application to determine if it contains all required information.   04/28/2025   05/09/2025
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/28/2025  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/28/2025  
  The Department is determining if the activity affects State Lands.   04/28/2025  
  The Department is providing notice of application to commenting agencies for review.   04/28/2025  
  The Department is conducting a site investigation, if required   04/28/2025  
  The Department is waiting for additional information from the permit applicant.   05/09/2025  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   NORTHWEST DISTRICT
  Florida County:   BAY
  Permit Type:   Water - ERP Modifications
  Permit Processor:   MARTHA U JOHNSON
  Application Number:   0298649-030-EM
  Site Name:   ST. ANDREW BAY LAND COMPANY - SWEETBAY
  Applicant Name:   WILL RANDLE
  Applicant Company:   ST. ANDREW BAY LAND COMPANY
  Agency Action:   Pending
  Link to Department’s Application File:   ST. ANDREW BAY LAND COMPANY - SWEETBAY
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   08/05/2024   08/05/2024
  The Department is reviewing the permit application to determine if it contains all required information.   08/05/2024   08/30/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   08/05/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   08/05/2024  
  The Department is determining if the activity affects State Lands.   08/05/2024  
  The Department is providing notice of application to commenting agencies for review.   08/05/2024   08/12/2024
  The Department is conducting a site investigation, if required   08/05/2024  
  The Department is waiting for additional information from the permit applicant.   08/30/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   NORTHWEST DISTRICT
  Florida County:   ESCAMBIA
  Permit Type:   Water - ERP Modifications
  Permit Processor:   ALEXIS LYONS
  Application Number:   0305068-003-EM
  Site Name:   ESC CO BOCC-GALVEZ BOAT RAMP - OCULUS
  Applicant Name:   KEITH JOHNSON
  Applicant Company:   WETLAND SCIENCES, INC.
  Agency Action:   Pending
  Link to Department’s Application File:   ESC CO BOCC-GALVEZ BOAT RAMP - OCULUS
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/14/2025   05/14/2025
  The Department is reviewing the permit application to determine if it contains all required information.   05/14/2025  
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   05/14/2025   05/14/2025
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   05/14/2025   05/14/2025
  The Department is determining if the activity affects State Lands.   05/14/2025   05/14/2025
  The Department is providing notice of application to commenting agencies for review.   05/14/2025  
  The Department is conducting a site investigation, if required   05/14/2025   05/14/2025
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   NORTHWEST DISTRICT
  Florida County:   ESCAMBIA
  Permit Type:   Water - ERP Modifications
  Permit Processor:   WHITNEY BRETANA
  Application Number:   0330489-006-EM
  Site Name:   16333 TARPON DRIVE
  Applicant Name:   NORM RYAN
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   16333 TARPON DRIVE
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   02/20/2025   02/20/2025
  The Department is reviewing the permit application to determine if it contains all required information.   02/20/2025   02/26/2025
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   02/20/2025   02/22/2025
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   02/20/2025   02/24/2025
  The Department is determining if the activity affects State Lands.   02/20/2025   02/22/2025
  The Department is conducting a site investigation, if required   02/20/2025  
  The Department is providing notice of application to commenting agencies for review.   02/20/2025   02/20/2025
  The Department is waiting for additional information from the permit applicant.   02/26/2025  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   NORTHWEST DISTRICT
  Florida County:   ESCAMBIA
  Permit Type:   Water - ERP Modifications
  Permit Processor:   MICHAEL GARRETT
  Application Number:   0338152-002-EM
  Site Name:   SANTA ROSA ISALND AUTHORITY - SHARP POINT/BABY BEACH NOURISH
  Applicant Name:   LEIGH DAVIS
  Applicant Company:   SANTA ROSA ISLAND AUTHORITY
  Agency Action:   Pending
  Link to Department’s Application File:   SANTA ROSA ISALND AUTHORITY - SHARP POINT/BABY BEACH NOURISH
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   09/06/2023   09/06/2023
  The Department is reviewing the permit application to determine if it contains all required information.   09/06/2023   10/06/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   09/06/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   09/06/2023  
  The Department is determining if the activity affects State Lands.   09/06/2023  
  The Department is conducting a site investigation, if required   09/06/2023  
  The Department is waiting for additional information from the permit applicant.   10/06/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   NORTHWEST DISTRICT
  Florida County:   GULF
  Permit Type:   Water - ERP Modifications
  Permit Processor:   LEAH WILKINS
  Application Number:   0355743-004-EM
  Site Name:   HAMLIN WILSON - MAIN SAIL LN - 06345-028R - 32456
  Applicant Name:   KELLY WILSON
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   HAMLIN WILSON - MAIN SAIL LN - 06345-028R - 32456
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/07/2025   03/07/2025
  The Department is reviewing the permit application to determine if it contains all required information.   03/07/2025   03/27/2025
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   03/07/2025  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   03/07/2025  
  The Department is determining if the activity affects State Lands.   03/07/2025  
  The Department is providing notice of application to commenting agencies for review.   03/07/2025   03/07/2025
  The Department is conducting a site investigation, if required   03/07/2025  
  The Department is waiting for additional information from the permit applicant.   03/27/2025  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   NORTHWEST DISTRICT
  Florida County:   CALHOUN
  Permit Type:   Water - ERP Modifications
  Permit Processor:   BLAKE CHAPMAN
  Application Number:   0367574-003-EM
  Site Name:   CLEARWATER LAND & MINERAL - CHOLLA - PAD 2 - CENTER ROAD
  Applicant Name:   EDWARD MURAWSKI
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   CLEARWATER LAND & MINERAL - CHOLLA - PAD 2 - CENTER ROAD
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   10/22/2024   10/22/2024
  The Department is reviewing the permit application to determine if it contains all required information.   10/22/2024   10/30/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   10/22/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   10/22/2024  
  The Department is determining if the activity affects State Lands.   10/22/2024  
  The Department is providing notice of application to commenting agencies for review.   10/22/2024  
  The Department is conducting a site investigation, if required   10/22/2024  
  The Department is waiting for additional information from the permit applicant.   10/30/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   NORTHWEST DISTRICT
  Florida County:   SANTA ROSA
  Permit Type:   Water - ERP Modifications
  Permit Processor:   MANDY CELIS
  Application Number:   0408476-003-EM
  Site Name:   HAMMAC/ FLYNN BUILDING SPECIALISTS, LLC.
  Applicant Name:   ASHLEY HAMMAC
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   HAMMAC/ FLYNN BUILDING SPECIALISTS, LLC.
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/10/2025   04/10/2025
  The Department is reviewing the permit application to determine if it contains all required information.   04/10/2025   04/30/2025
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/10/2025  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/10/2025  
  The Department is determining if the activity affects State Lands.   04/10/2025  
  The Department is providing notice of application to commenting agencies for review.   04/10/2025  
  The Department is conducting a site investigation, if required   04/10/2025  
  The Department is waiting for additional information from the permit applicant.   04/30/2025  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   NORTHWEST DISTRICT
  Florida County:   FRANKLIN
  Permit Type:   Water - ERP Modifications
  Permit Processor:   EMILY HOTINGER
  Application Number:   0411180-002-EM
  Site Name:   BEN ROGERS
  Applicant Name:   BEN ROGERS
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   BEN ROGERS
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/14/2025   04/14/2025
  The Department is reviewing the permit application to determine if it contains all required information.   04/14/2025   04/14/2025
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/14/2025  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/14/2025  
  The Department is determining if the activity affects State Lands.   04/14/2025  
  The Department is providing notice of application to commenting agencies for review.   04/14/2025  
  The Department is conducting a site investigation, if required   04/14/2025  
  The Department is waiting for additional information from the permit applicant.   04/14/2025  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   NORTHWEST DISTRICT
  Florida County:   FRANKLIN
  Permit Type:   Water - ERP Modifications
  Permit Processor:   RICHARD EARLE
  Application Number:   0414264-002-EM
  Site Name:   1207 E GULF BEACH DRIVE
  Applicant Name:   JOHN HASKINS
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   1207 E GULF BEACH DRIVE
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/24/2025   04/24/2025
  The Department is reviewing the permit application to determine if it contains all required information.   04/24/2025   05/16/2025
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/24/2025   04/26/2025
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/24/2025   05/08/2025
  The Department is determining if the activity affects State Lands.   04/24/2025   04/26/2025
  The Department is conducting a site investigation, if required   04/24/2025   05/02/2025
  The Department is providing notice of application to commenting agencies for review.   04/24/2025   04/24/2025
  The Department is waiting for additional information from the permit applicant.   05/16/2025  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   NORTHWEST DISTRICT
  Florida County:   ESCAMBIA
  Permit Type:   Water - ERP Modifications
  Permit Processor:   WHITNEY BRETANA
  Application Number:   0418961-003-EM
  Site Name:   NAS PENSACOLA BAY LIVING SHORELINE
  Applicant Name:   THOMAS SLOTHER
  Applicant Company:   NAVAL AIR STATION
  Agency Action:   Pending
  Link to Department’s Application File:   NAS PENSACOLA BAY LIVING SHORELINE
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/01/2025   05/01/2025
  The Department is reviewing the permit application to determine if it contains all required information.   05/01/2025  
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   05/01/2025   05/03/2025
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   05/01/2025  
  The Department is determining if the activity affects State Lands.   05/01/2025   05/03/2025
  The Department is providing notice of application to commenting agencies for review.   05/01/2025   05/02/2025
  The Department is conducting a site investigation, if required   05/01/2025   05/05/2025
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   NORTHWEST DISTRICT
  Florida County:   WALTON
  Permit Type:   Water - ERP Modifications
  Permit Processor:   GREGORY LEENIG
  Application Number:   0431340-003-EM
  Site Name:   WALLING - 18TH STREET
  Applicant Name:   KEITH WALLING III
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   WALLING - 18TH STREET
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   02/25/2025   02/25/2025
  The Department is reviewing the permit application to determine if it contains all required information.   02/25/2025   03/20/2025
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   02/25/2025  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   02/25/2025  
  The Department is determining if the activity affects State Lands.   02/25/2025  
  The Department is providing notice of application to commenting agencies for review.   02/25/2025  
  The Department is conducting a site investigation, if required   02/25/2025  
  The Department is waiting for additional information from the permit applicant.   03/20/2025  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   NORTHWEST DISTRICT
  Florida County:   GULF
  Permit Type:   Water - ERP Modifications
  Permit Processor:   MANDY CELIS
  Application Number:   0441188-004-EM
  Site Name:   DEAHEAD LOGGING CHIPOLA RIVER
  Applicant Name:   SHELTON MEREDITH
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   DEAHEAD LOGGING CHIPOLA RIVER
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/10/2025   03/10/2025
  The Department is reviewing the permit application to determine if it contains all required information.   03/10/2025   03/31/2025
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   03/10/2025   03/12/2025
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   03/10/2025   03/24/2025
  The Department is determining if the activity affects State Lands.   03/10/2025   03/12/2025
  The Department is providing notice of application to commenting agencies for review.   03/10/2025   03/12/2025
  The Department is conducting a site investigation, if required   03/10/2025   04/09/2025
  The Department is waiting for additional information from the permit applicant.   03/31/2025  