Skip Navigation

Permitting Application with Events Details


This data is current as of: Tuesday, May 21, 2024


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MARTIN
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   DAVID WHITE
  Application Number:   0042736-005-EI
  Site Name:   MONTEREY INN MAINTENANCE DREDGE
  Applicant Name:   LISA JULIANO
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   MONTEREY INN MAINTENANCE DREDGE
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   10/27/2022   10/27/2022
  The Department is reviewing the permit application to determine if it contains all required information.   10/27/2022   11/16/2022
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   10/27/2022   10/29/2022
  The Department is conducting a site investigation, if required   10/27/2022  
  The Department is determining if the activity affects State Lands.   10/27/2022   10/29/2022
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   10/27/2022  
  The Department is waiting for additional information from the permit applicant.   11/16/2022  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MARTIN
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0042993-024-EI
  Site Name:   HUTCHINSON HOUSE CONDOMINIUM
  Applicant Name:  
  Applicant Company:   HUTCHINSON HOUSE CONDOMINIUM, INC.
  Agency Action:   Pending
  Link to Department’s Application File:   HUTCHINSON HOUSE CONDOMINIUM
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/08/2023   05/08/2023
  The Department is reviewing the permit application to determine if it contains all required information.   05/08/2023   06/02/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   05/08/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   05/08/2023  
  The Department is determining if the activity affects State Lands.   05/08/2023  
  The Department is conducting a site investigation, if required   05/08/2023  
  The Department is waiting for additional information from the permit applicant.   06/02/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MARTIN
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0043204-014-EI
  Site Name:   SAILFISH POINT MARINA
  Applicant Name:   EDWARD EWING
  Applicant Company:   SAILFISH POINT PROPERTY OWNERS' & COUNTRY CLUB ASSOCIATION, INC.
  Agency Action:   Pending
  Link to Department’s Application File:   SAILFISH POINT MARINA
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/19/2023   05/19/2023
  The Department is reviewing the permit application to determine if it contains all required information.   05/19/2023   06/13/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   05/19/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   05/19/2023  
  The Department is determining if the activity affects State Lands.   05/19/2023  
  The Department is conducting a site investigation, if required   05/19/2023  
  The Department is waiting for additional information from the permit applicant.   06/13/2023   09/08/2023
  The Department is reviewing the permit application to determine if it contains all required information.   09/08/2023   10/04/2023
  The Department is waiting for additional information from the permit applicant.   10/04/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   DAVID WHITE
  Application Number:   0056057-010-EI
  Site Name:   REUTER RECYCLYING OF FLORIDA INC. (MRF)
  Applicant Name:   JAMES LAMBROS
  Applicant Company:   WASTE MANAGEMENT INC OF FLORIDA
  Agency Action:   Pending
  Link to Department’s Application File:   REUTER RECYCLYING OF FLORIDA INC. (MRF)
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/14/2023   03/14/2023
  The Department is reviewing the permit application to determine if it contains all required information.   03/14/2023   03/31/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   03/14/2023   03/16/2023
  The Department is conducting a site investigation, if required   03/14/2023   04/13/2023
  The Department is determining if the activity affects State Lands.   03/14/2023   03/16/2023
  The Department is providing notice of application to commenting agencies for review.   03/14/2023   03/16/2023
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   03/14/2023   03/28/2023
  The Department is waiting for additional information from the permit applicant.   03/31/2023   11/30/2023
  The Department is reviewing the permit application to determine if it contains all required information.   11/30/2023   12/27/2023
  The Department is waiting for additional information from the permit applicant.   12/27/2023   01/30/2024
  The Department is reviewing the permit application to determine if it contains all required information.   01/30/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   DAVID MALDONADO
  Application Number:   0059524-058-EI
  Site Name:   PORT OF MIAMI
  Applicant Name:   HELGA SOMMER
  Applicant Company:   PORT OF MIAMI
  Agency Action:   Pending
  Link to Department’s Application File:   PORT OF MIAMI
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/25/2024   04/25/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/25/2024  
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/25/2024   04/27/2024
  The Department is conducting a site investigation, if required   04/25/2024  
  The Department is determining if the activity affects State Lands.   04/25/2024  
  The Department is providing notice of application to commenting agencies for review.   04/25/2024   04/29/2024
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/25/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MONROE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   BAILEY HARDING
  Application Number:   0062938-024-EI
  Site Name:   NWCL LLC FKA CHEECA LLC DBA CHEECA LODGE 440022185 / ATL (R)
  Applicant Name:   BRYAN CORDIS
  Applicant Company:   NWCL LLC
  Agency Action:   Pending
  Link to Department’s Application File:   NWCL LLC FKA CHEECA LLC DBA CHEECA LODGE 440022185 / ATL (R)
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   12/01/2022   12/01/2022
  The Department is reviewing the permit application to determine if it contains all required information.   12/01/2022   12/29/2022
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   12/01/2022   12/02/2022
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   12/01/2022   12/15/2022
  The Department is determining if the activity affects State Lands.   12/01/2022   03/31/2023
  The Department is conducting a site investigation, if required   12/01/2022  
  The Department is waiting for additional information from the permit applicant.   12/29/2022   09/19/2023
  The Department is reviewing the permit application to determine if it contains all required information.   09/19/2023   10/18/2023
  The Department is waiting for additional information from the permit applicant.   10/18/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   PALM BEACH
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   HANNAH E BLUM
  Application Number:   0079397-017-EI
  Site Name:   NORTH PALM BEACH MARINA
  Applicant Name:   PETER CLARK
  Applicant Company:   SHM HARBORTOWN LLC
  Agency Action:   Pending
  Link to Department’s Application File:   NORTH PALM BEACH MARINA
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/04/2024   03/04/2024
  The Department is reviewing the permit application to determine if it contains all required information.   03/04/2024   04/02/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   03/04/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   03/04/2024  
  The Department is determining if the activity affects State Lands.   03/04/2024  
  The Department is conducting a site investigation, if required   03/04/2024  
  The Department is waiting for additional information from the permit applicant.   04/02/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0081749-014-EI
  Site Name:   KEY BISCAYNE YACHT CLUB
  Applicant Name:  
  Applicant Company:   KEY BISCATNE YACHT CLUB , INC
  Agency Action:   Pending
  Link to Department’s Application File:   KEY BISCAYNE YACHT CLUB
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   11/03/2022   11/03/2022
  The Department is reviewing the permit application to determine if it contains all required information.   11/03/2022   11/30/2022
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   11/03/2022  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   11/03/2022  
  The Department is determining if the activity affects State Lands.   11/03/2022  
  The Department is conducting a site investigation, if required   11/03/2022  
  The Department is waiting for additional information from the permit applicant.   11/30/2022   05/26/2023
  The Department is reviewing the permit application to determine if it contains all required information.   05/26/2023   06/16/2023
  The Department is waiting for additional information from the permit applicant.   06/16/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   GENEVA ALPERT
  Application Number:   0082330-005-EI
  Site Name:   BLACK POINT MARINA
  Applicant Name:   DONALD BUTLER
  Applicant Company:   ELS
  Agency Action:   Pending
  Link to Department’s Application File:   BLACK POINT MARINA
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   02/19/2024   02/19/2024
  The Department is reviewing the permit application to determine if it contains all required information.   02/19/2024   02/20/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   02/19/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   02/19/2024  
  The Department is determining if the activity affects State Lands.   02/19/2024   02/21/2024
  The Department is conducting a site investigation, if required   02/19/2024  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   02/21/2024  
  The Department is waiting for additional information from the permit applicant.   02/20/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   HALEY E OSBORNE
  Application Number:   0082374-012-EI
  Site Name:   PIER 66 MARINA
  Applicant Name:   NICK BEUCHER
  Applicant Company:   P66 LAND TRUST, LLC
  Agency Action:   Pending
  Link to Department’s Application File:   PIER 66 MARINA
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/02/2024   04/02/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/02/2024   04/30/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/02/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/02/2024  
  The Department is determining if the activity affects State Lands.   04/02/2024   04/08/2024
  The Department is providing notice of application to commenting agencies for review.   04/02/2024   04/08/2024
  The Department is conducting a site investigation, if required   04/02/2024  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   04/08/2024   04/11/2024
  The Department is waiting for additional information from the permit applicant.   04/30/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MONROE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   BAILEY HARDING
  Application Number:   0102583-019-EI
  Site Name:   CWI KEYS HOTEL LLC AKA HAWKS CAY PROP / 440004545 (R)
  Applicant Name:   AMY LANCASTER
  Applicant Company:   CWI KEYS HOTEL, LLC
  Agency Action:   Pending
  Link to Department’s Application File:   CWI KEYS HOTEL LLC AKA HAWKS CAY PROP / 440004545 (R)
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/21/2024   03/21/2024
  The Department is reviewing the permit application to determine if it contains all required information.   03/21/2024   04/17/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   03/21/2024   03/23/2024
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   03/21/2024   04/04/2024
  The Department is determining if the activity affects State Lands.   03/21/2024  
  The Department is providing notice of application to commenting agencies for review.   03/21/2024   03/23/2024
  The Department is conducting a site investigation, if required   03/21/2024   04/26/2024
  The Department is waiting for additional information from the permit applicant.   04/17/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MARTIN
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   GABRIELA MUNOZ
  Application Number:   0125822-013-EI
  Site Name:   3180 NE CAUSEWAY BLVD (FKA ADAMS, RICK)
  Applicant Name:   EDWARD KOLOS
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   3180 NE CAUSEWAY BLVD (FKA ADAMS, RICK)
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   02/07/2023   02/07/2023
  The Department is reviewing the permit application to determine if it contains all required information.   02/07/2023   02/09/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   02/07/2023  
  The Department is conducting a site investigation, if required   02/07/2023  
  The Department is determining if the activity affects State Lands.   02/07/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   02/07/2023  
  The Department is waiting for additional information from the permit applicant.   02/09/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0127045-016-EI
  Site Name:   YACHTING PROMOTIONS, INC.-FT. LAUDERDALE INT. BOAT SHOW
  Applicant Name:   ANDREW DOOLE
  Applicant Company:   YACHTING PROMOTIONS, INC
  Agency Action:   Pending
  Link to Department’s Application File:   YACHTING PROMOTIONS, INC.-FT. LAUDERDALE INT. BOAT SHOW
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   02/15/2024   02/15/2024
  The Department is reviewing the permit application to determine if it contains all required information.   02/15/2024   03/15/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   02/15/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   02/15/2024  
  The Department is determining if the activity affects State Lands.   02/15/2024   02/29/2024
  The Department is conducting a site investigation, if required   02/15/2024  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   02/29/2024   03/05/2024
  The Department is waiting for additional information from the permit applicant.   03/15/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MONROE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   BAILEY HARDING
  Application Number:   0128966-005-EI
  Site Name:   PACIFICA MARATHON LLC /RAINBOW BEND RESORT / 00373740 000000
  Applicant Name:   JASON RAO
  Applicant Company:   PACIFICA MARATHON LLC
  Agency Action:   Pending
  Link to Department’s Application File:   PACIFICA MARATHON LLC /RAINBOW BEND RESORT / 00373740 000000
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   08/16/2023   08/16/2023
  The Department is reviewing the permit application to determine if it contains all required information.   08/16/2023   09/12/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   08/16/2023   08/18/2023
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   08/16/2023   08/28/2023
  The Department is determining if the activity affects State Lands.   08/16/2023   08/18/2023
  The Department is conducting a site investigation, if required   08/16/2023  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   08/18/2023   08/29/2023
  The Department is waiting for additional information from the permit applicant.   09/12/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MARTIN
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   SWERP ONLINE PERMIT PROCESSOR
  Application Number:   0137911-007-EI
  Site Name:   3481 SE KUBIN AVE
  Applicant Name:   JOSEPH HERTZ
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   3481 SE KUBIN AVE
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/19/2024   05/19/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/19/2024  
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   05/19/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   05/19/2024  
  The Department is determining if the activity affects State Lands.   05/19/2024  
  The Department is conducting a site investigation, if required   05/19/2024  
  The Department is providing notice of application to commenting agencies for review.   05/19/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   KATHRYN MALINOWSKI
  Application Number:   0138355-005-EI
  Site Name:   ROGER ABBOUD, LLC / EASTON, ED
  Applicant Name:   ROGER ABBOUD
  Applicant Company:   ROGER ABBOUD, LLC
  Agency Action:   Pending
  Link to Department’s Application File:   ROGER ABBOUD, LLC / EASTON, ED
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   07/18/2023   07/18/2023
  The Department is reviewing the permit application to determine if it contains all required information.   07/18/2023   08/04/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   07/18/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   07/18/2023  
  The Department is determining if the activity affects State Lands.   07/18/2023  
  The Department is conducting a site investigation, if required   07/18/2023  
  The Department is waiting for additional information from the permit applicant.   08/04/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0138363-007-EI
  Site Name:   WENNERSTROM, STIG
  Applicant Name:  
  Applicant Company:   28 HARBOR POINT LLC
  Agency Action:   Pending
  Link to Department’s Application File:   WENNERSTROM, STIG
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   08/19/2022   08/19/2022
  The Department is reviewing the permit application to determine if it contains all required information.   08/19/2022   09/16/2022
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   08/19/2022   08/21/2022
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   08/19/2022   08/31/2022
  The Department is determining if the activity affects State Lands.   08/19/2022   08/21/2022
  The Department is conducting a site investigation, if required   08/19/2022   10/18/2022
  The Department is waiting for additional information from the permit applicant.   09/16/2022   03/14/2024
  The Department is reviewing the permit application to determine if it contains all required information.   03/14/2024   04/12/2024
  The Department is waiting for additional information from the permit applicant.   04/12/2024   05/08/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/08/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   ST. LUCIE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0141946-021-EI
  Site Name:   HARBOUR RIDGE POA, INC.
  Applicant Name:   MICHAEL SALERNO
  Applicant Company:   HARBOUR RIDGE PROPERTY OWNERS ASSOCIATION, INC.
  Agency Action:   Pending
  Link to Department’s Application File:   HARBOUR RIDGE POA, INC.
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   09/30/2022   09/30/2022
  The Department is reviewing the permit application to determine if it contains all required information.   09/30/2022   10/28/2022
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   09/30/2022  
  The Department is conducting a site investigation, if required   09/30/2022  
  The Department is determining if the activity affects State Lands.   09/30/2022  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   09/30/2022  
  The Department is waiting for additional information from the permit applicant.   10/28/2022   03/23/2023
  The Department is reviewing the permit application to determine if it contains all required information.   03/23/2023   04/18/2023
  The Department is waiting for additional information from the permit applicant.   04/18/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JONATHAN GUINN
  Application Number:   0147281-003-EI
  Site Name:   DEJ HOTELS, LLC / 504201BL0010 / BAY (R)
  Applicant Name:   PATRICIA TENNIES
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   DEJ HOTELS, LLC / 504201BL0010 / BAY (R)
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   10/30/2023   10/30/2023
  The Department is reviewing the permit application to determine if it contains all required information.   10/30/2023   10/30/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   10/30/2023   11/01/2023
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   10/30/2023   11/02/2023
  The Department is determining if the activity affects State Lands.   10/30/2023   11/01/2023
  The Department is conducting a site investigation, if required   10/30/2023   11/15/2023
  The Department is waiting for additional information from the permit applicant.   10/30/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0148696-005-EI
  Site Name:   NOMAD LIDO LLC
  Applicant Name:  
  Applicant Company:   NOMADE LIDO, LLC
  Agency Action:   Pending
  Link to Department’s Application File:   NOMAD LIDO LLC
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   08/24/2022   08/24/2022
  The Department is reviewing the permit application to determine if it contains all required information.   08/24/2022   09/15/2022
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   08/24/2022  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   08/24/2022  
  The Department is determining if the activity affects State Lands.   08/24/2022  
  The Department is conducting a site investigation, if required   08/24/2022  
  The Department is waiting for additional information from the permit applicant.   09/15/2022  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   PALM BEACH
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   DAVID MALDONADO
  Application Number:   0151573-035-EI
  Site Name:   PORT OF PALM BEACH
  Applicant Name:   KEITH LEGGETT
  Applicant Company:   PORT OF PALM BEACH
  Agency Action:   Pending
  Link to Department’s Application File:   PORT OF PALM BEACH
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/03/2024   05/03/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/03/2024  
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   05/03/2024  
  The Department is conducting a site investigation, if required   05/03/2024  
  The Department is determining if the activity affects State Lands.   05/03/2024  
  The Department is providing notice of application to commenting agencies for review.   05/03/2024   05/05/2024
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   05/03/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   PALM BEACH
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   HALEY E OSBORNE
  Application Number:   0159091-010-EI
  Site Name:   INLET BEACH CLUB & MARINA / SEASPORT MARINA / SE MARINE DEV
  Applicant Name:   PATRICK KOENIG
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   INLET BEACH CLUB & MARINA / SEASPORT MARINA / SE MARINE DEV
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/13/2024   03/13/2024
  The Department is reviewing the permit application to determine if it contains all required information.   03/13/2024   04/12/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   03/13/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   03/13/2024  
  The Department is determining if the activity affects State Lands.   03/13/2024  
  The Department is providing notice of application to commenting agencies for review.   03/13/2024  
  The Department is conducting a site investigation, if required   03/13/2024  
  The Department is waiting for additional information from the permit applicant.   04/12/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0163180-004-EI
  Site Name:   TERESI, JOSEPH
  Applicant Name:  
  Applicant Company:   ARROWHEAD HILL COUNTRY INVESTMENTS, LLC.
  Agency Action:   Pending
  Link to Department’s Application File:   TERESI, JOSEPH
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   11/22/2022   11/22/2022
  The Department is reviewing the permit application to determine if it contains all required information.   11/22/2022   12/13/2022
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   11/22/2022  
  The Department is conducting a site investigation, if required   11/22/2022  
  The Department is determining if the activity affects State Lands.   11/22/2022  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   11/22/2022  
  The Department is waiting for additional information from the permit applicant.   12/13/2022  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   DAVID WHITE
  Application Number:   0163638-007-EI
  Site Name:   HALL OF FAME MARINA, INC.
  Applicant Name:   BRYAN REDMOND
  Applicant Company:   HALL OF FAME SMI WESTREC, LLC
  Agency Action:   Pending
  Link to Department’s Application File:   HALL OF FAME MARINA, INC.
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   09/15/2023   09/15/2023
  The Department is reviewing the permit application to determine if it contains all required information.   09/15/2023   10/11/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   09/15/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   09/15/2023  
  The Department is determining if the activity affects State Lands.   09/15/2023   09/18/2023
  The Department is conducting a site investigation, if required   09/15/2023  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   09/18/2023   09/18/2023
  The Department is waiting for additional information from the permit applicant.   10/11/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   HANNAH E BLUM
  Application Number:   0163820-002-EI
  Site Name:   4101 PINETREE DRIVE
  Applicant Name:   PHILIP KLEIN
  Applicant Company:   TOWER FORTY ONE ASSOCIATION, INC
  Agency Action:   Pending
  Link to Department’s Application File:   4101 PINETREE DRIVE
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   01/05/2024   01/05/2024
  The Department is reviewing the permit application to determine if it contains all required information.   01/05/2024   02/02/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   01/05/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   01/05/2024  
  The Department is determining if the activity affects State Lands.   01/05/2024   01/12/2024
  The Department is conducting a site investigation, if required   01/05/2024  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   01/12/2024  
  The Department is waiting for additional information from the permit applicant.   02/02/2024   04/29/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/29/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0165663-008-EI
  Site Name:   MIAMI MARINA VENTURES LLLP
  Applicant Name:   VICTOR BALLESTAS
  Applicant Company:   INTEGRA SOLUTIONS LLC
  Agency Action:   Pending
  Link to Department’s Application File:   MIAMI MARINA VENTURES LLLP
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   06/06/2023   06/06/2023
  The Department is reviewing the permit application to determine if it contains all required information.   06/06/2023   07/06/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   06/06/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   06/06/2023  
  The Department is determining if the activity affects State Lands.   06/06/2023  
  The Department is conducting a site investigation, if required   06/06/2023  
  The Department is waiting for additional information from the permit applicant.   07/06/2023   10/04/2023
  The Department is reviewing the permit application to determine if it contains all required information.   10/04/2023   11/03/2023
  The Department is waiting for additional information from the permit applicant.   11/03/2023   01/05/2024
  The Department is reviewing the permit application to determine if it contains all required information.   01/05/2024   02/05/2024
  The Department is waiting for additional information from the permit applicant.   02/05/2024   05/07/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/07/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MARTIN
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0166994-005-EI
  Site Name:   RENEE, LENNE R. DBA SEVEN SEAS YACHT CLUB
  Applicant Name:   GREG TERRAGLIO
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   RENEE, LENNE R. DBA SEVEN SEAS YACHT CLUB
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/10/2023   05/10/2023
  The Department is reviewing the permit application to determine if it contains all required information.   05/10/2023   06/07/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   05/10/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   05/10/2023  
  The Department is determining if the activity affects State Lands.   05/10/2023  
  The Department is conducting a site investigation, if required   05/10/2023  
  The Department is waiting for additional information from the permit applicant.   06/07/2023   03/11/2024
  The Department is reviewing the permit application to determine if it contains all required information.   03/11/2024   04/05/2024
  The Department is waiting for additional information from the permit applicant.   04/05/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   PALM BEACH
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JILLIAN KENNEDY
  Application Number:   0167445-002-EI
  Site Name:   EDWARDS, HUNT & KATHERINE
  Applicant Name:   RICK FORTENBURY
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   EDWARDS, HUNT & KATHERINE
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   06/22/2023   06/22/2023
  The Department is reviewing the permit application to determine if it contains all required information.   06/22/2023   07/19/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   06/22/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   06/22/2023  
  The Department is determining if the activity affects State Lands.   06/22/2023   06/27/2023
  The Department is conducting a site investigation, if required   06/22/2023  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   06/27/2023   07/06/2023
  The Department is waiting for additional information from the permit applicant.   07/19/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   PALM BEACH
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   HANNAH E BLUM
  Application Number:   0168954-012-EI
  Site Name:   SUNFEST OF PALM BEACH COUNTY, INC
  Applicant Name:   DAN GOODE
  Applicant Company:   SUNFEST OF PBC, INC.
  Agency Action:   Pending
  Link to Department’s Application File:   SUNFEST OF PALM BEACH COUNTY, INC
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   02/12/2024   02/12/2024
  The Department is reviewing the permit application to determine if it contains all required information.   02/12/2024   03/13/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   02/12/2024   02/14/2024
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   02/12/2024  
  The Department is determining if the activity affects State Lands.   02/12/2024   02/14/2024
  The Department is conducting a site investigation, if required   02/12/2024  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   02/14/2024  
  The Department is waiting for additional information from the permit applicant.   03/13/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   ANTONELLA ROCCO
  Application Number:   0168969-003-EI
  Site Name:   GLADSTONE GROUP,LLC AKA SHOOTERS RESTAURANT
  Applicant Name:   WILLIAM MCINTYRE
  Applicant Company:   GLADSTONE GROUP LLC
  Agency Action:   Pending
  Link to Department’s Application File:   GLADSTONE GROUP,LLC AKA SHOOTERS RESTAURANT
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   10/28/2022   10/28/2022
  The Department is reviewing the permit application to determine if it contains all required information.   10/28/2022   11/16/2022
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   10/28/2022   10/30/2022
  The Department is conducting a site investigation, if required   10/28/2022   11/27/2022
  The Department is determining if the activity affects State Lands.   10/28/2022   10/30/2022
  The Department is providing notice of application to commenting agencies for review.   10/28/2022   10/30/2022
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   10/28/2022   11/11/2022
  The Department is waiting for additional information from the permit applicant.   11/16/2022   09/28/2023
  The Department is reviewing the permit application to determine if it contains all required information.   09/28/2023   10/20/2023
  The Department is waiting for additional information from the permit applicant.   10/20/2023   05/13/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/13/2024   05/13/2024
  The Department is making an outcome determination regarding the permit application.   05/13/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0170424-005-EI
  Site Name:   CP VENTURES LIMITED / MCCARTY, GRIMDITCH, MILOT
  Applicant Name:   CHRIS PEYERK
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   CP VENTURES LIMITED / MCCARTY, GRIMDITCH, MILOT
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/09/2023   05/09/2023
  The Department is reviewing the permit application to determine if it contains all required information.   05/09/2023   06/01/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   05/09/2023  
  The Department is conducting a site investigation, if required   05/09/2023  
  The Department is determining if the activity affects State Lands.   05/09/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   05/09/2023  
  The Department is waiting for additional information from the permit applicant.   06/01/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   HALEY E OSBORNE
  Application Number:   0171369-007-EI
  Site Name:   10 PALM AVENUE
  Applicant Name:  
  Applicant Company:   MARKERT FAMILY 2010 IRREVOCABLE TRUST
  Agency Action:   Pending
  Link to Department’s Application File:   10 PALM AVENUE
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/04/2024   04/04/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/04/2024   04/29/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/04/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/04/2024  
  The Department is determining if the activity affects State Lands.   04/04/2024  
  The Department is providing notice of application to commenting agencies for review.   04/04/2024  
  The Department is conducting a site investigation, if required   04/04/2024  
  The Department is waiting for additional information from the permit applicant.   04/29/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   ANTONELLA ROCCO
  Application Number:   0171911-005-EI
  Site Name:   BOURBEAU, JOHN / CAVALIERE, JOSEPH
  Applicant Name:   LARRY DUVALL
  Applicant Company:   LARRY THOMAS DUVALL TRUST
  Agency Action:   Pending
  Link to Department’s Application File:   BOURBEAU, JOHN / CAVALIERE, JOSEPH
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   02/21/2024   02/21/2024
  The Department is reviewing the permit application to determine if it contains all required information.   02/21/2024   03/21/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   02/21/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   02/21/2024  
  The Department is determining if the activity affects State Lands.   02/21/2024   02/23/2024
  The Department is conducting a site investigation, if required   02/21/2024  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   02/23/2024   02/26/2024
  The Department is waiting for additional information from the permit applicant.   03/21/2024   05/07/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/07/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   ST. LUCIE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0173825-005-EI
  Site Name:   RIVERWATCH POA
  Applicant Name:   SCOTT FLORENCE
  Applicant Company:   AQUA RA
  Agency Action:   Pending
  Link to Department’s Application File:   RIVERWATCH POA
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   11/21/2023   11/21/2023
  The Department is reviewing the permit application to determine if it contains all required information.   11/21/2023   01/19/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   11/21/2023  
  The Department is conducting a site investigation, if required   11/21/2023  
  The Department is determining if the activity affects State Lands.   11/21/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   11/21/2023  
  The Department is waiting for additional information from the permit applicant.   01/19/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   GENEVA ALPERT
  Application Number:   0173966-011-EI
  Site Name:   CONGRESS BHE LLC (FKA: BEAU RIVAGE LCC)
  Applicant Name:  
  Applicant Company:   9781 BAY HARBOR DEVELOPMENT, LLC
  Agency Action:   Pending
  Link to Department’s Application File:   CONGRESS BHE LLC (FKA: BEAU RIVAGE LCC)
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/25/2024   03/25/2024
  The Department is reviewing the permit application to determine if it contains all required information.   03/25/2024   04/11/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   03/25/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   03/25/2024  
  The Department is determining if the activity affects State Lands.   03/25/2024  
  The Department is providing notice of application to commenting agencies for review.   03/25/2024  
  The Department is conducting a site investigation, if required   03/25/2024  
  The Department is waiting for additional information from the permit applicant.   04/11/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   GENEVA ALPERT
  Application Number:   0176020-003-EI
  Site Name:   ROBLES, LOUIS
  Applicant Name:  
  Applicant Company:   KB OFFSHORE HOLDINGS LLC
  Agency Action:   Pending
  Link to Department’s Application File:   ROBLES, LOUIS
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/01/2024   03/01/2024
  The Department is reviewing the permit application to determine if it contains all required information.   03/01/2024   03/21/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   03/01/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   03/01/2024  
  The Department is determining if the activity affects State Lands.   03/01/2024  
  The Department is conducting a site investigation, if required   03/01/2024  
  The Department is waiting for additional information from the permit applicant.   03/21/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MARTIN
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0178646-004-EI
  Site Name:   SPINNAKER POINT OWNERS ASSOCIATION, INC.
  Applicant Name:   SCOTT KONOPKA
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   SPINNAKER POINT OWNERS ASSOCIATION, INC.
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/05/2022   05/05/2022
  The Department is reviewing the permit application to determine if it contains all required information.   05/05/2022   06/01/2022
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   05/05/2022  
  The Department is determining if the activity affects State Lands.   05/05/2022  
  The Department is waiting for additional information from the permit applicant.   06/01/2022   07/25/2022
  The Department is reviewing the permit application to determine if it contains all required information.   07/25/2022   08/17/2022
  The Department is waiting for additional information from the permit applicant.   08/17/2022  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JULIANA HALL
  Application Number:   0180939-006-EI
  Site Name:   RSND INVESTMENTS III LLC / 484305050020 / WATERWAY (R)
  Applicant Name:   RONALD SALAMEH
  Applicant Company:   RSND INVESTMENTS III, LLC
  Agency Action:   Pending
  Link to Department’s Application File:   RSND INVESTMENTS III LLC / 484305050020 / WATERWAY (R)
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/02/2024   05/02/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/02/2024  
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   05/02/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   05/02/2024  
  The Department is determining if the activity affects State Lands.   05/02/2024  
  The Department is providing notice of application to commenting agencies for review.   05/02/2024  
  The Department is conducting a site investigation, if required   05/02/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   GABRIELA MUNOZ
  Application Number:   0183963-006-EI
  Site Name:   NINE ISLAND AVENUE CONDO ASSN
  Applicant Name:   GLENN DIFFENDERFER DIFFENDERFER
  Applicant Company:   9 ISLAND AVENUE CONDO ASSOCIATION
  Agency Action:   Pending
  Link to Department’s Application File:   NINE ISLAND AVENUE CONDO ASSN
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   08/27/2023   08/27/2023
  The Department is reviewing the permit application to determine if it contains all required information.   08/27/2023   09/22/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   08/27/2023  
  The Department is conducting a site investigation, if required   08/27/2023  
  The Department is determining if the activity affects State Lands.   08/27/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   08/27/2023  
  The Department is waiting for additional information from the permit applicant.   09/22/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   ST. LUCIE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0184743-004-EI
  Site Name:   LA ENTRADA DEL MAR ASSOCIATION, INC.
  Applicant Name:   HENRY ASHBURN
  Applicant Company:   LA ENTRADA DEL MAR ASSOCIATION , INC
  Agency Action:   Pending
  Link to Department’s Application File:   LA ENTRADA DEL MAR ASSOCIATION, INC.
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/27/2022   05/27/2022
  The Department is reviewing the permit application to determine if it contains all required information.   05/27/2022   06/20/2022
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   05/27/2022  
  The Department is conducting a site investigation, if required   05/27/2022  
  The Department is determining if the activity affects State Lands.   05/27/2022  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   05/27/2022  
  The Department is waiting for additional information from the permit applicant.   06/20/2022   09/16/2022
  The Department is reviewing the permit application to determine if it contains all required information.   09/16/2022   10/07/2022
  The Department is waiting for additional information from the permit applicant.   10/07/2022  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   ST. LUCIE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   ANTONELLA ROCCO
  Application Number:   0185216-008-EI
  Site Name:   ST. LUCIE COUNTY BCC/RIVER PARK
  Applicant Name:   WILLIAM JONES
  Applicant Company:   CITY OF PORT ST. LUCIE
  Agency Action:   Pending
  Link to Department’s Application File:   ST. LUCIE COUNTY BCC/RIVER PARK
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   07/13/2023   07/13/2023
  The Department is reviewing the permit application to determine if it contains all required information.   07/13/2023   08/08/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   07/13/2023   07/15/2023
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   07/13/2023   07/27/2023
  The Department is determining if the activity affects State Lands.   07/13/2023   07/15/2023
  The Department is conducting a site investigation, if required   07/13/2023   08/22/2023
  The Department is waiting for additional information from the permit applicant.   08/08/2023   04/24/2024
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   02/14/2024   03/10/2024
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   07/15/2023   08/09/2023
  The Department is reviewing the permit application to determine if it contains all required information.   04/24/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0194211-008-EI
  Site Name:   BISCAYNE TOWING & SALVAGE II, INC.
  Applicant Name:   HARRY OFFUT IV
  Applicant Company:   BISCAYNE TOWING & SALVAGE II
  Agency Action:   Pending
  Link to Department’s Application File:   BISCAYNE TOWING & SALVAGE II, INC.
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   11/04/2022   11/04/2022
  The Department is reviewing the permit application to determine if it contains all required information.   11/04/2022   11/28/2022
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   11/04/2022  
  The Department is conducting a site investigation, if required   11/04/2022  
  The Department is determining if the activity affects State Lands.   11/04/2022  
  The Department is providing notice of application to commenting agencies for review.   11/04/2022  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   11/04/2022  
  The Department is waiting for additional information from the permit applicant.   11/28/2022  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MARTIN
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   ANTONELLA ROCCO
  Application Number:   0199397-004-EI
  Site Name:   FDOT - ERNEST LYONS BOAT RAMP / STUART CAUSEWAY
  Applicant Name:   KEVIN KIRWIN
  Applicant Company:   MARTIN COUNTY PARKS AND RECREATION DEPARTMENT
  Agency Action:   Pending
  Link to Department’s Application File:   FDOT - ERNEST LYONS BOAT RAMP / STUART CAUSEWAY
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   02/29/2024   02/29/2024
  The Department is reviewing the permit application to determine if it contains all required information.   02/29/2024   03/29/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   02/29/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   02/29/2024  
  The Department is determining if the activity affects State Lands.   02/29/2024   03/02/2024
  The Department is conducting a site investigation, if required   02/29/2024  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   03/02/2024  
  The Department is waiting for additional information from the permit applicant.   03/29/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MONROE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   HALEY KILGOUR
  Application Number:   0201372-003-EI
  Site Name:   ARNOLD, JOSHUA / BARTLETT, R / 00219680 0000000 / CANAL
  Applicant Name:   JOSHUA ARNOLD
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   ARNOLD, JOSHUA / BARTLETT, R / 00219680 0000000 / CANAL
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/16/2024   04/16/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/16/2024   04/30/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/16/2024   04/18/2024
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/16/2024   04/24/2024
  The Department is determining if the activity affects State Lands.   04/16/2024   04/18/2024
  The Department is providing notice of application to commenting agencies for review.   04/16/2024   04/18/2024
  The Department is conducting a site investigation, if required   04/16/2024  
  The Department is waiting for additional information from the permit applicant.   04/30/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JILLIAN KENNEDY
  Application Number:   0207721-002-EI
  Site Name:   NE 20 AVE. PROPERTIES, LLC
  Applicant Name:   ALEJANDRA GIRALDO
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   NE 20 AVE. PROPERTIES, LLC
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   07/07/2023   07/07/2023
  The Department is reviewing the permit application to determine if it contains all required information.   07/07/2023   08/04/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   07/07/2023  
  The Department is conducting a site investigation, if required   07/07/2023  
  The Department is determining if the activity affects State Lands.   07/07/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   07/07/2023  
  The Department is waiting for additional information from the permit applicant.   08/04/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   GENEVA ALPERT
  Application Number:   0214130-001-EI
  Site Name:   AQUASOL CONDO ASSOC., INC.
  Applicant Name:   IVELIS RODRIGUEZ
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   AQUASOL CONDO ASSOC., INC.
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   10/26/2021   10/26/2021
  The Department is reviewing the permit application to determine if it contains all required information.   10/26/2021   11/22/2021
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   10/26/2021   10/28/2021
  The Department is conducting a site investigation, if required   10/26/2021  
  The Department is determining if the activity affects State Lands.   10/26/2021   10/28/2021
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   10/26/2021  
  The Department is waiting for additional information from the permit applicant.   11/22/2021   02/18/2022
  The Department is reviewing the permit application to determine if it contains all required information.   02/18/2022   04/27/2023
  The Department is waiting for additional information from the permit applicant.   04/27/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   ANTONELLA ROCCO
  Application Number:   0219570-002-EI
  Site Name:   MANDARIN HOTEL
  Applicant Name:   HENRY BOTT
  Applicant Company:   SWIRE PROPERTIES, INC
  Agency Action:   Pending
  Link to Department’s Application File:   MANDARIN HOTEL
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/09/2024   04/09/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/09/2024   05/09/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/09/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/09/2024  
  The Department is determining if the activity affects State Lands.   04/09/2024   04/11/2024
  The Department is providing notice of application to commenting agencies for review.   04/09/2024  
  The Department is conducting a site investigation, if required   04/09/2024  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   04/11/2024  
  The Department is waiting for additional information from the permit applicant.   05/09/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   PALM BEACH
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   GENEVA ALPERT
  Application Number:   0220311-004-EI
  Site Name:   LAKE PARK, TOWN OF MARINA
  Applicant Name:   JOHN D'AGOSTINO
  Applicant Company:   TOWN OF LAKE PARK
  Agency Action:   Pending
  Link to Department’s Application File:   LAKE PARK, TOWN OF MARINA
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/08/2024   04/08/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/08/2024   05/07/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/08/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/08/2024  
  The Department is determining if the activity affects State Lands.   04/08/2024   04/10/2024
  The Department is conducting a site investigation, if required   04/08/2024  
  The Department is providing notice of application to commenting agencies for review.   04/08/2024  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   04/10/2024  
  The Department is waiting for additional information from the permit applicant.   05/07/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   PALM BEACH
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0232055-003-EI
  Site Name:   3116 PROPERTY, INC.
  Applicant Name:   DANIEL MOSS
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   3116 PROPERTY, INC.
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   09/17/2023   09/17/2023
  The Department is reviewing the permit application to determine if it contains all required information.   09/17/2023   10/12/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   09/17/2023  
  The Department is conducting a site investigation, if required   09/17/2023  
  The Department is determining if the activity affects State Lands.   09/17/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   09/17/2023  
  The Department is waiting for additional information from the permit applicant.   10/12/2023   11/13/2023
  The Department is reviewing the permit application to determine if it contains all required information.   11/13/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MONROE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   BAILEY HARDING
  Application Number:   0232698-004-EI
  Site Name:   KEY LARGO BAPTIST CHURCH INC / 00085190 000000 & 00085180
  Applicant Name:   STEVEN VETTER
  Applicant Company:   KEY LARGO BAPTIST CHURCH INC
  Agency Action:   Pending
  Link to Department’s Application File:   KEY LARGO BAPTIST CHURCH INC / 00085190 000000 & 00085180
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   01/30/2023   01/30/2023
  The Department is reviewing the permit application to determine if it contains all required information.   01/30/2023   02/23/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   01/30/2023   02/01/2023
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   01/30/2023   02/13/2023
  The Department is determining if the activity affects State Lands.   01/30/2023   02/01/2023
  The Department is conducting a site investigation, if required   01/30/2023   08/11/2023
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   02/01/2023   02/07/2023
  The Department is waiting for additional information from the permit applicant.   02/23/2023   01/16/2024
  The Department is reviewing the permit application to determine if it contains all required information.   01/16/2024   02/12/2024
  The Department is waiting for additional information from the permit applicant.   02/12/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JILLIAN KENNEDY
  Application Number:   0234665-006-EI
  Site Name:   GUENNI HOLDINGS/BERK, ARTHUR
  Applicant Name:   ALBERTO POLANCO
  Applicant Company:   PBS ENGINEERING PROCUREMENT & CONSTRUCTION LLC
  Agency Action:   Pending
  Link to Department’s Application File:   GUENNI HOLDINGS/BERK, ARTHUR
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/22/2023   05/22/2023
  The Department is reviewing the permit application to determine if it contains all required information.   05/22/2023   06/20/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   05/22/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   05/22/2023  
  The Department is determining if the activity affects State Lands.   05/22/2023  
  The Department is conducting a site investigation, if required   05/22/2023  
  The Department is waiting for additional information from the permit applicant.   06/20/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   PALM BEACH
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   HALEY E OSBORNE
  Application Number:   0235471-007-EI
  Site Name:   11265 OLD HARBOUR RD
  Applicant Name:   DAVID NORRIS
  Applicant Company:   LOST TREE 2021 LLC
  Agency Action:   Pending
  Link to Department’s Application File:   11265 OLD HARBOUR RD
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   09/13/2022   09/13/2022
  The Department is reviewing the permit application to determine if it contains all required information.   09/13/2022   10/03/2022
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   09/13/2022  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   09/13/2022  
  The Department is determining if the activity affects State Lands.   09/13/2022  
  The Department is conducting a site investigation, if required   09/13/2022  
  The Department is waiting for additional information from the permit applicant.   10/03/2022  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   HANNAH E BLUM
  Application Number:   0235758-008-EI
  Site Name:   TAHA MARINE CENTER
  Applicant Name:   NADER TAHA
  Applicant Company:   TAHA FAMILY, LLC
  Agency Action:   Pending
  Link to Department’s Application File:   TAHA MARINE CENTER
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   02/05/2024   02/05/2024
  The Department is reviewing the permit application to determine if it contains all required information.   02/05/2024   03/05/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   02/05/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   02/05/2024  
  The Department is determining if the activity affects State Lands.   02/05/2024  
  The Department is conducting a site investigation, if required   02/05/2024  
  The Department is waiting for additional information from the permit applicant.   03/05/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   HALEY E OSBORNE
  Application Number:   0237703-010-EI
  Site Name:   625 LEUCADENDRA LLC
  Applicant Name:  
  Applicant Company:   625 LEUCADENDRA LLC
  Agency Action:   Pending
  Link to Department’s Application File:   625 LEUCADENDRA LLC
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   02/22/2024   02/22/2024
  The Department is reviewing the permit application to determine if it contains all required information.   02/22/2024   03/19/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   02/22/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   02/22/2024  
  The Department is determining if the activity affects State Lands.   02/22/2024  
  The Department is conducting a site investigation, if required   02/22/2024  
  The Department is waiting for additional information from the permit applicant.   03/19/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MONROE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   BAILEY HARDING
  Application Number:   0240788-002-EI
  Site Name:   DUFOUR, STEPHEN / DECLUE / 00246050 000000 /
  Applicant Name:   STEVE DUFOUR
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   DUFOUR, STEPHEN / DECLUE / 00246050 000000 /
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   01/16/2024   01/16/2024
  The Department is reviewing the permit application to determine if it contains all required information.   01/16/2024   02/07/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   01/16/2024   01/18/2024
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   01/16/2024   01/25/2024
  The Department is determining if the activity affects State Lands.   01/16/2024   01/18/2024
  The Department is conducting a site investigation, if required   01/16/2024   03/07/2024
  The Department is waiting for additional information from the permit applicant.   02/07/2024   05/14/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/14/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MONROE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   BAILEY HARDING
  Application Number:   0251058-003-EI
  Site Name:   CITY OF MARATHON /GRAND KEYS LLC / 7 MILE MARINA / 440339675
  Applicant Name:   GEORGE GARRETT
  Applicant Company:   CITY OF MARATHON
  Agency Action:   Pending
  Link to Department’s Application File:   CITY OF MARATHON /GRAND KEYS LLC / 7 MILE MARINA / 440339675
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   02/03/2023   02/03/2023
  The Department is reviewing the permit application to determine if it contains all required information.   02/03/2023   02/27/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   02/03/2023   02/05/2023
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   02/03/2023   02/17/2023
  The Department is determining if the activity affects State Lands.   02/03/2023   02/05/2023
  The Department is conducting a site investigation, if required   02/03/2023   04/24/2023
  The Department is waiting for additional information from the permit applicant.   02/27/2023   06/23/2023
  The permit is being transferred to another Department office for processing.   08/07/2023   08/14/2023
  The permit processor is confirming the application was received by the appropriate Department office.   08/14/2023   08/14/2023
  The Department is reviewing the permit application to determine if it contains all required information.   06/23/2023   08/30/2023
  The Department is waiting for additional information from the permit applicant.   08/30/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   INDIAN RIVER
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   HANNAH E BLUM
  Application Number:   0256136-005-EI
  Site Name:   IRC-UD / SPOONBILL MARSH RESTORATION (ERP)
  Applicant Name:   HOWARD RICHARDS
  Applicant Company:   INDIAN RIVER COUNTY - DEPARTMENT OF UTILITY SERVICES
  Agency Action:   Pending
  Link to Department’s Application File:   IRC-UD / SPOONBILL MARSH RESTORATION (ERP)
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/18/2024   03/18/2024
  The Department is reviewing the permit application to determine if it contains all required information.   03/18/2024   04/17/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   03/18/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   03/18/2024  
  The Department is determining if the activity affects State Lands.   03/18/2024   03/22/2024
  The Department is conducting a site investigation, if required   03/18/2024  
  The Department is providing notice of application to commenting agencies for review.   03/18/2024   03/22/2024
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   03/22/2024   03/28/2024
  The Department is waiting for additional information from the permit applicant.   04/17/2024   04/25/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/25/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   ST. LUCIE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   DAVID WHITE
  Application Number:   0262674-001-EI
  Site Name:   BLUE WATER GROUP LC
  Applicant Name:   MATTHEW MADRAZO
  Applicant Company:   CIVITELLA LLC
  Agency Action:   Pending
  Link to Department’s Application File:   BLUE WATER GROUP LC
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   02/09/2023   02/09/2023
  The Department is reviewing the permit application to determine if it contains all required information.   02/09/2023   03/08/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   02/09/2023  
  The Department is conducting a site investigation, if required   02/09/2023  
  The Department is determining if the activity affects State Lands.   02/09/2023  
  The Department is providing notice of application to commenting agencies for review.   02/09/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   02/09/2023  
  The Department is waiting for additional information from the permit applicant.   03/08/2023   09/27/2023
  The Department is reviewing the permit application to determine if it contains all required information.   09/27/2023   10/20/2023
  The Department is waiting for additional information from the permit applicant.   10/20/2023   04/12/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/12/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   PALM BEACH
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   SWERP ONLINE PERMIT PROCESSOR
  Application Number:   0269693-001-EI
  Site Name:   SHLAMOWITZ, MORRIS
  Applicant Name:   SHERRY MICHAEL
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   SHLAMOWITZ, MORRIS
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/20/2024   05/20/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/20/2024  
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   05/20/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   05/20/2024  
  The Department is determining if the activity affects State Lands.   05/20/2024  
  The Department is providing notice of application to commenting agencies for review.   05/20/2024  
  The Department is conducting a site investigation, if required   05/20/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   PALM BEACH
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0270531-003-EI
  Site Name:   PORT O CALL CONDO ASSOCIATION
  Applicant Name:   CARMINE ANTONELLI
  Applicant Company:   PORTS O'CALL CONDOMINIUM ASSOCIATION, INC.
  Agency Action:   Pending
  Link to Department’s Application File:   PORT O CALL CONDO ASSOCIATION
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   09/21/2022   09/21/2022
  The Department is reviewing the permit application to determine if it contains all required information.   09/21/2022   10/06/2022
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   09/21/2022  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   09/21/2022  
  The Department is determining if the activity affects State Lands.   09/21/2022  
  The Department is conducting a site investigation, if required   09/21/2022  
  The Department is waiting for additional information from the permit applicant.   10/06/2022   03/06/2023
  The Department is reviewing the permit application to determine if it contains all required information.   03/06/2023   04/05/2023
  The Department is waiting for additional information from the permit applicant.   04/05/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MARTIN
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   ANTONELLA ROCCO
  Application Number:   0273658-002-EI
  Site Name:   JOHNSON, TERRY
  Applicant Name:   TERRY JOHNSON
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   JOHNSON, TERRY
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/15/2024   03/15/2024
  The Department is reviewing the permit application to determine if it contains all required information.   03/15/2024   04/12/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   03/15/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   03/15/2024  
  The Department is determining if the activity affects State Lands.   03/15/2024   03/17/2024
  The Department is providing notice of application to commenting agencies for review.   03/15/2024  
  The Department is conducting a site investigation, if required   03/15/2024  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   03/17/2024   03/22/2024
  The Department is waiting for additional information from the permit applicant.   04/12/2024   04/17/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/17/2024   05/16/2024
  The Department is waiting for additional information from the permit applicant.   05/16/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   GENEVA ALPERT
  Application Number:   0278790-006-EI
  Site Name:   2401 LAGUNA DRIVE/MASI, ALBERT
  Applicant Name:   EDWARD CHALUPA
  Applicant Company:   ARROWHEAD HILCOUNTRY INVESTMENTS, LLC
  Agency Action:   Pending
  Link to Department’s Application File:   2401 LAGUNA DRIVE/MASI, ALBERT
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   02/12/2024   02/12/2024
  The Department is reviewing the permit application to determine if it contains all required information.   02/12/2024   03/13/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   02/12/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   02/12/2024  
  The Department is determining if the activity affects State Lands.   02/12/2024  
  The Department is conducting a site investigation, if required   02/12/2024  
  The Department is waiting for additional information from the permit applicant.   03/13/2024   05/16/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/16/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   ANTONELLA ROCCO
  Application Number:   0286924-007-EI
  Site Name:   PARADISE POINT MARINA CONDO ASSOCIATION, INC.
  Applicant Name:   DAYNE TOMASETTI
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   PARADISE POINT MARINA CONDO ASSOCIATION, INC.
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/12/2024   04/12/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/12/2024   05/10/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/12/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/12/2024  
  The Department is determining if the activity affects State Lands.   04/12/2024   04/14/2024
  The Department is providing notice of application to commenting agencies for review.   04/12/2024  
  The Department is conducting a site investigation, if required   04/12/2024  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   04/14/2024  
  The Department is waiting for additional information from the permit applicant.   05/10/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   PALM BEACH
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0287555-006-EI
  Site Name:   MURRAY, SCOTT/1525 NORTH FLAGLER DR, LLC
  Applicant Name:   SCOTT MURRAY
  Applicant Company:   1525 NORTH FLAGLER DR, LLC
  Agency Action:   Pending
  Link to Department’s Application File:   MURRAY, SCOTT/1525 NORTH FLAGLER DR, LLC
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   09/21/2023   09/21/2023
  The Department is reviewing the permit application to determine if it contains all required information.   09/21/2023   10/19/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   09/21/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   09/21/2023  
  The Department is determining if the activity affects State Lands.   09/21/2023  
  The Department is conducting a site investigation, if required   09/21/2023  
  The Department is waiting for additional information from the permit applicant.   10/19/2023   12/08/2023
  The Department is reviewing the permit application to determine if it contains all required information.   12/08/2023   01/05/2024
  The Department is waiting for additional information from the permit applicant.   01/05/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MARTIN
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   EVA DOMAS
  Application Number:   0289153-005-EI
  Site Name:   MARTIN COUNTY BOARD OF COMMISIONERS-LEIGHTON PARK
  Applicant Name:   JENNIFER BRUNTY
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   MARTIN COUNTY BOARD OF COMMISIONERS-LEIGHTON PARK
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   10/27/2023   10/27/2023
  The Department is reviewing the permit application to determine if it contains all required information.   10/27/2023   11/21/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   10/27/2023   10/29/2023
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   10/27/2023   11/13/2023
  The Department is determining if the activity affects State Lands.   10/27/2023   12/22/2023
  The Department is conducting a site investigation, if required   10/27/2023   11/21/2023
  The Department is waiting for additional information from the permit applicant.   11/21/2023   04/16/2024
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   12/22/2023   01/04/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/16/2024   04/16/2024
  The Department is making an outcome determination regarding the permit application.   04/16/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   ST. LUCIE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0289724-006-EI
  Site Name:   ST LUCIE CO - KING MARITIME / INDIAN RIVER TERMINAL
  Applicant Name:   WILL CORNELIUS
  Applicant Company:   DERECKTOR FORT PIERCE
  Agency Action:   Pending
  Link to Department’s Application File:   ST LUCIE CO - KING MARITIME / INDIAN RIVER TERMINAL
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/09/2023   03/09/2023
  The Department is reviewing the permit application to determine if it contains all required information.   03/09/2023   04/03/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   03/09/2023  
  The Department is conducting a site investigation, if required   03/09/2023   03/30/2023
  The Department is determining if the activity affects State Lands.   03/09/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   03/09/2023  
  The Department is waiting for additional information from the permit applicant.   04/03/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   PALM BEACH
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   DAVID WHITE
  Application Number:   0291412-010-EI
  Site Name:   310 MEDITERRANEAN RD LLC / MICHEL, GEORGE
  Applicant Name:   JAY SHAW
  Applicant Company:   310 MEDITERRANEAN RD LLC
  Agency Action:   Pending
  Link to Department’s Application File:   310 MEDITERRANEAN RD LLC / MICHEL, GEORGE
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/18/2024   04/18/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/18/2024   05/17/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/18/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/18/2024  
  The Department is determining if the activity affects State Lands.   04/18/2024  
  The Department is providing notice of application to commenting agencies for review.   04/18/2024  
  The Department is conducting a site investigation, if required   04/18/2024  
  The Department is waiting for additional information from the permit applicant.   05/17/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MONROE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   BAILEY HARDING
  Application Number:   0292597-002-EI
  Site Name:   DEPT OF INTERIOR /JOHNSON KEY EVERGLADES NATIONAL PARK / BAY
  Applicant Name:   MICHAEL MACHUPA
  Applicant Company:   EVERGLADES NATIONAL PARK
  Agency Action:   Pending
  Link to Department’s Application File:   DEPT OF INTERIOR /JOHNSON KEY EVERGLADES NATIONAL PARK / BAY
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/25/2024   04/25/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/25/2024   05/08/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/25/2024   04/27/2024
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/25/2024  
  The Department is determining if the activity affects State Lands.   04/25/2024   04/27/2024
  The Department is providing notice of application to commenting agencies for review.   04/25/2024   04/27/2024
  The Department is conducting a site investigation, if required   04/25/2024  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   04/27/2024   05/01/2024
  The Department is waiting for additional information from the permit applicant.   05/08/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MONROE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   BAILEY HARDING
  Application Number:   0292599-002-EI
  Site Name:   DEPT OF INTERIOR /SHARK POINT EVERGLADES NATIONAL PARK /BAY
  Applicant Name:   MICHAEL MACHUPA
  Applicant Company:   EVERGLADES NATIONAL PARK
  Agency Action:   Pending
  Link to Department’s Application File:   DEPT OF INTERIOR /SHARK POINT EVERGLADES NATIONAL PARK /BAY
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/26/2024   04/26/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/26/2024   05/08/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/26/2024   04/28/2024
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/26/2024  
  The Department is determining if the activity affects State Lands.   04/26/2024   04/28/2024
  The Department is providing notice of application to commenting agencies for review.   04/26/2024   04/28/2024
  The Department is conducting a site investigation, if required   04/26/2024  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   04/28/2024   05/01/2024
  The Department is waiting for additional information from the permit applicant.   05/08/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MONROE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   BAILEY HARDING
  Application Number:   0296496-006-EI
  Site Name:   NUNEZ, ANGEL / TRUE INVESTOR LLC / 00514520 000000 / CNL
  Applicant Name:   ANGEL NUNEZ
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   NUNEZ, ANGEL / TRUE INVESTOR LLC / 00514520 000000 / CNL
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   12/01/2023   12/01/2023
  The Department is reviewing the permit application to determine if it contains all required information.   12/01/2023   12/18/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   12/01/2023   12/03/2023
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   12/01/2023   12/11/2023
  The Department is determining if the activity affects State Lands.   12/01/2023   12/03/2023
  The Department is conducting a site investigation, if required   12/01/2023   03/28/2024
  The Department is waiting for additional information from the permit applicant.   12/18/2023   03/15/2024
  The Department is reviewing the permit application to determine if it contains all required information.   03/15/2024   04/25/2024
  The Department is making an outcome determination regarding the permit application.   03/15/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0296967-006-EI
  Site Name:   SCHINDLER, ROGER
  Applicant Name:   JARRETT POSNER
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   SCHINDLER, ROGER
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   10/13/2021   10/13/2021
  The Department is reviewing the permit application to determine if it contains all required information.   10/13/2021   11/09/2021
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   10/13/2021  
  The Department is determining if the activity affects State Lands.   10/13/2021  
  The Department is waiting for additional information from the permit applicant.   11/09/2021  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MONROE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   BAILEY HARDING
  Application Number:   0299295-002-EI
  Site Name:   BAGLIONI, MARTIN / HERFORT / 00333641 008200 / BAY
  Applicant Name:   MARTIN BAGLIONI
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   BAGLIONI, MARTIN / HERFORT / 00333641 008200 / BAY
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   11/15/2023   11/15/2023
  The Department is reviewing the permit application to determine if it contains all required information.   11/15/2023   12/11/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   11/15/2023   11/17/2023
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   11/15/2023   11/29/2023
  The Department is determining if the activity affects State Lands.   11/15/2023   11/17/2023
  The Department is conducting a site investigation, if required   11/15/2023   03/07/2024
  The Department is waiting for additional information from the permit applicant.   12/11/2023   03/28/2024
  The Department is reviewing the permit application to determine if it contains all required information.   03/28/2024   04/26/2024
  The Department is waiting for additional information from the permit applicant.   04/26/2024   05/10/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/10/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JULIA P STAHL
  Application Number:   0299682-005-EI
  Site Name:   LAKE VIEW WEST APTS., INC.
  Applicant Name:   CHARLES COMPAGNUCCI
  Applicant Company:   LAKE VIEW WEST APTS. INC
  Agency Action:   Pending
  Link to Department’s Application File:   LAKE VIEW WEST APTS., INC.
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/22/2024   03/22/2024
  The Department is reviewing the permit application to determine if it contains all required information.   03/22/2024   04/11/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   03/22/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   03/22/2024  
  The Department is determining if the activity affects State Lands.   03/22/2024   03/24/2024
  The Department is providing notice of application to commenting agencies for review.   03/22/2024  
  The Department is conducting a site investigation, if required   03/22/2024  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   03/24/2024   04/04/2024
  The Department is waiting for additional information from the permit applicant.   04/11/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   DAVID WHITE
  Application Number:   0301061-004-EI
  Site Name:   CITY OF POMPANO BEACH - HILLSBORO INLET PARK
  Applicant Name:   ANTHONY ALHASHEMI
  Applicant Company:   CITY OF POMPANO BEACH
  Agency Action:   Pending
  Link to Department’s Application File:   CITY OF POMPANO BEACH - HILLSBORO INLET PARK
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/14/2024   05/14/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/14/2024  
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   05/14/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   05/14/2024  
  The Department is determining if the activity affects State Lands.   05/14/2024   05/21/2024
  The Department is providing notice of application to commenting agencies for review.   05/14/2024   05/21/2024
  The Department is conducting a site investigation, if required   05/14/2024  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   05/21/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   ANTONELLA ROCCO
  Application Number:   0302963-004-EI
  Site Name:   SANTA BARBARA RESORT & YACHT CLUB OWNERS
  Applicant Name:   DANIELLA URIBE
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   SANTA BARBARA RESORT & YACHT CLUB OWNERS
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/22/2024   03/22/2024
  The Department is reviewing the permit application to determine if it contains all required information.   03/22/2024   04/18/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   03/22/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   03/22/2024  
  The Department is determining if the activity affects State Lands.   03/22/2024   03/24/2024
  The Department is providing notice of application to commenting agencies for review.   03/22/2024  
  The Department is conducting a site investigation, if required   03/22/2024  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   03/24/2024   04/04/2024
  The Department is waiting for additional information from the permit applicant.   04/18/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0307061-003-EI
  Site Name:   HERD, CINDY
  Applicant Name:  
  Applicant Company:   1300 BRICKELL, LLC
  Agency Action:   Pending
  Link to Department’s Application File:   HERD, CINDY
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   06/29/2023   06/29/2023
  The Department is reviewing the permit application to determine if it contains all required information.   06/29/2023   07/21/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   06/29/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   06/29/2023  
  The Department is determining if the activity affects State Lands.   06/29/2023  
  The Department is conducting a site investigation, if required   06/29/2023  
  The Department is waiting for additional information from the permit applicant.   07/21/2023   01/05/2024
  The Department is reviewing the permit application to determine if it contains all required information.   01/05/2024   02/02/2024
  The Department is waiting for additional information from the permit applicant.   02/02/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   HALEY E OSBORNE
  Application Number:   0307783-007-EI
  Site Name:   LIME ISLAND 30, LLC
  Applicant Name:   IBRAHIM AL RASHID
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   LIME ISLAND 30, LLC
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   01/29/2024   01/29/2024
  The Department is reviewing the permit application to determine if it contains all required information.   01/29/2024   02/28/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   01/29/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   01/29/2024  
  The Department is determining if the activity affects State Lands.   01/29/2024  
  The Department is conducting a site investigation, if required   01/29/2024  
  The Department is waiting for additional information from the permit applicant.   02/28/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   GENEVA ALPERT
  Application Number:   0308148-006-EI
  Site Name:   WHIRLWAY INVESTMENT INC.
  Applicant Name:   DOV STARK
  Applicant Company:   555 MIDDLE RIVER DR LLC
  Agency Action:   Pending
  Link to Department’s Application File:   WHIRLWAY INVESTMENT INC.
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   06/21/2023   06/21/2023
  The Department is reviewing the permit application to determine if it contains all required information.   06/21/2023   07/14/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   06/21/2023  
  The Department is conducting a site investigation, if required   06/21/2023  
  The Department is determining if the activity affects State Lands.   06/21/2023   06/26/2023
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   06/21/2023  
  The Department is waiting for additional information from the permit applicant.   07/14/2023  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   06/26/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   MATTHEW S FIELD
  Application Number:   0309020-003-EI
  Site Name:   NASSER, JACQUES
  Applicant Name:   MORTEZA KHATIB
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   NASSER, JACQUES
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/27/2024   03/27/2024
  The Department is reviewing the permit application to determine if it contains all required information.   03/27/2024   04/22/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   03/27/2024   03/29/2024
  The Department is conducting a site investigation, if required   03/27/2024  
  The Department is determining if the activity affects State Lands.   03/27/2024  
  The Department is providing notice of application to commenting agencies for review.   03/27/2024   04/26/2024
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   03/27/2024  
  The Department is waiting for additional information from the permit applicant.   04/22/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   DAVID WHITE
  Application Number:   0310343-011-EI
  Site Name:   GLASER/STILES, TERRY / TWS INVESTMENTS
  Applicant Name:   DAVID PAIN
  Applicant Company:   1622 BRICKELL DRIVE INC
  Agency Action:   Pending
  Link to Department’s Application File:   GLASER/STILES, TERRY / TWS INVESTMENTS
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   08/10/2022   08/10/2022
  The Department is reviewing the permit application to determine if it contains all required information.   08/10/2022   08/18/2022
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   08/10/2022  
  The Department is conducting a site investigation, if required   08/10/2022  
  The Department is determining if the activity affects State Lands.   08/10/2022  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   08/10/2022  
  The Department is waiting for additional information from the permit applicant.   08/18/2022  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MONROE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   HALEY KILGOUR
  Application Number:   0310828-006-EI
  Site Name:   PINE RIVER HOME LLC / MILLER / 00551000 003900 / CANAL
  Applicant Name:   JOSE DOMINGUEZ
  Applicant Company:   PINE RIVER HOME LLC
  Agency Action:   Pending
  Link to Department’s Application File:   PINE RIVER HOME LLC / MILLER / 00551000 003900 / CANAL
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   02/27/2024   02/27/2024
  The Department is reviewing the permit application to determine if it contains all required information.   02/27/2024   03/08/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   02/27/2024   02/28/2024
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   02/27/2024   03/12/2024
  The Department is determining if the activity affects State Lands.   02/27/2024   02/28/2024
  The Department is conducting a site investigation, if required   02/27/2024   05/14/2024
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   02/28/2024   03/07/2024
  The Department is waiting for additional information from the permit applicant.   03/08/2024   05/01/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/01/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   INDIAN RIVER
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0322107-004-EI
  Site Name:   73 CACHE CAY
  Applicant Name:   MARTIN GONZALEZ
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   73 CACHE CAY
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   08/31/2023   08/31/2023
  The Department is reviewing the permit application to determine if it contains all required information.   08/31/2023   09/21/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   08/31/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   08/31/2023  
  The Department is determining if the activity affects State Lands.   08/31/2023   09/01/2023
  The Department is conducting a site investigation, if required   08/31/2023  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   09/01/2023   09/07/2023
  The Department is waiting for additional information from the permit applicant.   09/21/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   PALM BEACH
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0323351-002-EI
  Site Name:   TOWN OF PALM BEACH
  Applicant Name:   LESTER KNISPEL
  Applicant Company:   SOUTHPAW TRUST
  Agency Action:   Pending
  Link to Department’s Application File:   TOWN OF PALM BEACH
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   01/23/2023   01/23/2023
  The Department is reviewing the permit application to determine if it contains all required information.   01/23/2023   02/14/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   01/23/2023   01/25/2023
  The Department is conducting a site investigation, if required   01/23/2023  
  The Department is determining if the activity affects State Lands.   01/23/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   01/23/2023  
  The Department is waiting for additional information from the permit applicant.   02/14/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   ALEXANDER BROCKETT
  Application Number:   0323577-003-EI
  Site Name:   THE CHARTER CLUB, INC
  Applicant Name:   MATHEW DAVEY
  Applicant Company:   THE CHARTER CLUB, INC.
  Agency Action:   Pending
  Link to Department’s Application File:   THE CHARTER CLUB, INC
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   11/03/2022   11/03/2022
  The Department is reviewing the permit application to determine if it contains all required information.   11/03/2022   11/29/2022
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   11/03/2022  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   11/03/2022  
  The Department is determining if the activity affects State Lands.   11/03/2022  
  The Department is conducting a site investigation, if required   11/03/2022  
  The Department is waiting for additional information from the permit applicant.   11/29/2022   09/07/2023
  The Department is reviewing the permit application to determine if it contains all required information.   09/07/2023   10/03/2023
  The Department is waiting for additional information from the permit applicant.   10/03/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   PALM BEACH
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   GABRIELA MUNOZ
  Application Number:   0324181-006-EI
  Site Name:   LAGO MAR ASSOCIATION
  Applicant Name:   JOSEPH RAUENHORST
  Applicant Company:   LAGO MAR CROSSINGS LLC
  Agency Action:   Pending
  Link to Department’s Application File:   LAGO MAR ASSOCIATION
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   01/27/2023   01/27/2023
  The Department is reviewing the permit application to determine if it contains all required information.   01/27/2023   02/16/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   01/27/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   01/27/2023  
  The Department is determining if the activity affects State Lands.   01/27/2023  
  The Department is conducting a site investigation, if required   01/27/2023  
  The Department is waiting for additional information from the permit applicant.   02/16/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MARTIN
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0330221-005-EI
  Site Name:   MULLIGANS BEACH HOUSE /SPOTOS OYSTER BAR
  Applicant Name:   MILTON LEGGETT
  Applicant Company:   CITY OF STUART PUBLIC WORKS
  Agency Action:   Pending
  Link to Department’s Application File:   MULLIGANS BEACH HOUSE /SPOTOS OYSTER BAR
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   10/20/2023   10/20/2023
  The Department is reviewing the permit application to determine if it contains all required information.   10/20/2023   11/15/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   10/20/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   10/20/2023  
  The Department is determining if the activity affects State Lands.   10/20/2023  
  The Department is conducting a site investigation, if required   10/20/2023  
  The Department is waiting for additional information from the permit applicant.   11/15/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   PALM BEACH
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   ALEXANDER BROCKETT
  Application Number:   0335965-002-EI
  Site Name:   VIP REAL ESTATE BROKERS INC
  Applicant Name:   JACK CORBETT
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   VIP REAL ESTATE BROKERS INC
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/30/2023   05/30/2023
  The Department is reviewing the permit application to determine if it contains all required information.   05/30/2023   06/28/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   05/30/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   05/30/2023  
  The Department is determining if the activity affects State Lands.   05/30/2023  
  The Department is conducting a site investigation, if required   05/30/2023  
  The Department is waiting for additional information from the permit applicant.   06/28/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0338813-004-EI
  Site Name:   ALTA BAYSHORE LLC
  Applicant Name:   JUAN LABAVCA
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   ALTA BAYSHORE LLC
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/29/2023   03/29/2023
  The Department is reviewing the permit application to determine if it contains all required information.   03/29/2023   04/25/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   03/29/2023  
  The Department is conducting a site investigation, if required   03/29/2023  
  The Department is determining if the activity affects State Lands.   03/29/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   03/29/2023  
  The Department is waiting for additional information from the permit applicant.   04/25/2023   10/03/2023
  The Department is reviewing the permit application to determine if it contains all required information.   10/03/2023   11/03/2023
  The Department is waiting for additional information from the permit applicant.   11/03/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   DAVID WHITE
  Application Number:   0342805-003-EI
  Site Name:   WESTMOUNTS REALTY HOLDINGS
  Applicant Name:   MICHAEL AIXALA
  Applicant Company:   WESTMOUNTS PROPERTY HOLDINGS
  Agency Action:   Pending
  Link to Department’s Application File:   WESTMOUNTS REALTY HOLDINGS
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   02/02/2021   02/02/2021
  The Department is reviewing the permit application to determine if it contains all required information.   02/02/2021   03/04/2021
  The Department is determining if the activity affects State Lands.   02/02/2021  
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   02/02/2021  
  The Department is waiting for additional information from the permit applicant.   03/04/2021   01/18/2022
  The Department is reviewing the permit application to determine if it contains all required information.   01/18/2022   02/17/2022
  The Department is waiting for additional information from the permit applicant.   02/17/2022  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   HALEY E OSBORNE
  Application Number:   0344940-006-EI
  Site Name:   8 WEST RIVO ALTO LLC
  Applicant Name:  
  Applicant Company:   8 RIVO, LLC
  Agency Action:   Pending
  Link to Department’s Application File:   8 WEST RIVO ALTO LLC
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   02/01/2024   02/01/2024
  The Department is reviewing the permit application to determine if it contains all required information.   02/01/2024   03/01/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   02/01/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   02/01/2024  
  The Department is determining if the activity affects State Lands.   02/01/2024  
  The Department is conducting a site investigation, if required   02/01/2024  
  The Department is waiting for additional information from the permit applicant.   03/01/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JULIA P STAHL
  Application Number:   0348261-006-EI
  Site Name:   1755 JFK OWNER LLC / 23 3209 000 0110 / BAY (R)
  Applicant Name:  
  Applicant Company:   1755 JFK OWNER, LLC
  Agency Action:   Pending
  Link to Department’s Application File:   1755 JFK OWNER LLC / 23 3209 000 0110 / BAY (R)
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   01/29/2024   01/29/2024
  The Department is reviewing the permit application to determine if it contains all required information.   01/29/2024   02/27/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   01/29/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   01/29/2024  
  The Department is determining if the activity affects State Lands.   01/29/2024  
  The Department is conducting a site investigation, if required   01/29/2024  
  The Department is waiting for additional information from the permit applicant.   02/27/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   HALEY E OSBORNE
  Application Number:   0348724-002-EI
  Site Name:   FKAA / C-11 CANAL XING
  Applicant Name:   FDOT
  Applicant Company:   OCCULUS
  Agency Action:   Pending
  Link to Department’s Application File:   FKAA / C-11 CANAL XING
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   01/23/2024   01/23/2024
  The Department is reviewing the permit application to determine if it contains all required information.   01/23/2024   02/13/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   01/23/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   01/23/2024  
  The Department is determining if the activity affects State Lands.   01/23/2024  
  The Department is conducting a site investigation, if required   01/23/2024  
  The Department is waiting for additional information from the permit applicant.   02/13/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MARTIN
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JILLIAN KENNEDY
  Application Number:   0348796-003-EI
  Site Name:   ANIMAL HOUSE
  Applicant Name:   MIKE BURY
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   ANIMAL HOUSE
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   09/13/2023   09/13/2023
  The Department is reviewing the permit application to determine if it contains all required information.   09/13/2023   10/11/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   09/13/2023  
  The Department is conducting a site investigation, if required   09/13/2023  
  The Department is determining if the activity affects State Lands.   09/13/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   09/13/2023  
  The Department is waiting for additional information from the permit applicant.   10/11/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MARTIN
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JILLIAN KENNEDY
  Application Number:   0348800-006-EI
  Site Name:   ROBERT GLUCKMAN /GORMAN, MICHAEL
  Applicant Name:   ROBERT GLUCKMAN
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   ROBERT GLUCKMAN /GORMAN, MICHAEL
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   08/14/2023   08/14/2023
  The Department is reviewing the permit application to determine if it contains all required information.   08/14/2023   09/13/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   08/14/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   08/14/2023  
  The Department is determining if the activity affects State Lands.   08/14/2023  
  The Department is conducting a site investigation, if required   08/14/2023  
  The Department is waiting for additional information from the permit applicant.   09/13/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MONROE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   BAILEY HARDING
  Application Number:   0350979-005-EI
  Site Name:   126 PORT ANTIGUA LLC / LOZANO, B / 00394488 002900 /
  Applicant Name:   ANIBAL VILLAR
  Applicant Company:   126 PORT ANTIGUA LLC
  Agency Action:   Pending
  Link to Department’s Application File:   126 PORT ANTIGUA LLC / LOZANO, B / 00394488 002900 /
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   10/26/2023   10/26/2023
  The Department is reviewing the permit application to determine if it contains all required information.   10/26/2023   11/13/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   10/26/2023   10/28/2023
  The Department is conducting a site investigation, if required   10/26/2023   02/08/2024
  The Department is determining if the activity affects State Lands.   10/26/2023   10/28/2023
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   10/26/2023   11/09/2023
  The Department is waiting for additional information from the permit applicant.   11/13/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   MELANIE B NAUMANN
  Application Number:   0351084-002-EI
  Site Name:   FISHER ISLAND BOAT SLIP
  Applicant Name:   PATRICK DOVIGI
  Applicant Company:   FISHER ISLAND BOAT BASIN LP
  Agency Action:   Pending
  Link to Department’s Application File:   FISHER ISLAND BOAT SLIP
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/29/2024   04/29/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/29/2024  
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/29/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/29/2024  
  The Department is determining if the activity affects State Lands.   04/29/2024  
  The Department is conducting a site investigation, if required   04/29/2024  
  The Department is providing notice of application to commenting agencies for review.   04/29/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   HALEY E OSBORNE
  Application Number:   0355261-006-EI
  Site Name:   2511 N RIVERSIDE DR
  Applicant Name:   SUSAN PRINCE
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   2511 N RIVERSIDE DR
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/09/2024   04/09/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/09/2024   05/08/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/09/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/09/2024  
  The Department is determining if the activity affects State Lands.   04/09/2024  
  The Department is providing notice of application to commenting agencies for review.   04/09/2024  
  The Department is conducting a site investigation, if required   04/09/2024  
  The Department is waiting for additional information from the permit applicant.   05/08/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   ANTONELLA ROCCO
  Application Number:   0356849-007-EI
  Site Name:   CONGRESS BHN SEAWALL
  Applicant Name:  
  Applicant Company:   10301 BAY HARBOR DEVELOPMENT, LLC
  Agency Action:   Pending
  Link to Department’s Application File:   CONGRESS BHN SEAWALL
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   12/14/2023   12/14/2023
  The Department is reviewing the permit application to determine if it contains all required information.   12/14/2023   01/11/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   12/14/2023   12/16/2023
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   12/14/2023   12/28/2023
  The Department is determining if the activity affects State Lands.   12/14/2023   12/16/2023
  The Department is conducting a site investigation, if required   12/14/2023  
  The Department is waiting for additional information from the permit applicant.   01/11/2024   05/07/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/07/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MONROE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   HALEY KILGOUR
  Application Number:   0360653-001-EI
  Site Name:   CITY OF KEY WEST / MUSTIN ST / FLEMING KEY BRIDGE/ 440355785
  Applicant Name:   ALBERT CHILDRESS
  Applicant Company:   CITY OF KEY WEST
  Agency Action:   Pending
  Link to Department’s Application File:   CITY OF KEY WEST / MUSTIN ST / FLEMING KEY BRIDGE/ 440355785
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/19/2024   04/19/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/19/2024   05/09/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/19/2024   04/21/2024
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/19/2024  
  The Department is determining if the activity affects State Lands.   04/19/2024   04/21/2024
  The Department is providing notice of application to commenting agencies for review.   04/19/2024   04/21/2024
  The Department is conducting a site investigation, if required   04/19/2024  
  The Department is waiting for additional information from the permit applicant.   05/09/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   PALM BEACH
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0360880-005-EI
  Site Name:   O'NEILL
  Applicant Name:   RICHARD GRACIANO
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   O'NEILL
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   11/11/2021   11/11/2021
  The Department is reviewing the permit application to determine if it contains all required information.   11/11/2021   12/09/2021
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   11/11/2021  
  The Department is determining if the activity affects State Lands.   11/11/2021  
  The Department is waiting for additional information from the permit applicant.   12/09/2021   04/06/2022
  The Department is reviewing the permit application to determine if it contains all required information.   04/06/2022   05/04/2022
  The Department is waiting for additional information from the permit applicant.   05/04/2022   04/19/2023
  The Department is reviewing the permit application to determine if it contains all required information.   04/19/2023   05/17/2023
  The Department is waiting for additional information from the permit applicant.   05/17/2023   04/16/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/16/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MARTIN
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0361290-004-EI
  Site Name:   37 & 41 WEST SEMINOLE ST
  Applicant Name:   GEORGE HART
  Applicant Company:   SAILFISH COVE STUART LLC
  Agency Action:   Pending
  Link to Department’s Application File:   37 & 41 WEST SEMINOLE ST
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   11/16/2021   11/16/2021
  The Department is reviewing the permit application to determine if it contains all required information.   11/16/2021   12/29/2021
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   11/16/2021   11/18/2021
  The Department is conducting a site investigation, if required   11/16/2021  
  The Department is determining if the activity affects State Lands.   11/16/2021   11/18/2021
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   11/16/2021   11/30/2021
  The Department is waiting for additional information from the permit applicant.   12/29/2021   04/07/2022
  The Department is reviewing the permit application to determine if it contains all required information.   04/07/2022   05/05/2022
  The Department is waiting for additional information from the permit applicant.   05/05/2022   10/26/2022
  The Department is reviewing the permit application to determine if it contains all required information.   10/26/2022   11/22/2022
  The Department is waiting for additional information from the permit applicant.   11/22/2022  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MONROE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   BAILEY HARDING
  Application Number:   0362022-001-EI
  Site Name:   2264 OVERSEAS HWY LLC / 440354395
  Applicant Name:   JACK SKRELJA
  Applicant Company:   2264 OVERSEAS HWY LLC
  Agency Action:   Pending
  Link to Department’s Application File:   2264 OVERSEAS HWY LLC / 440354395
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   09/08/2023   09/08/2023
  The Department is reviewing the permit application to determine if it contains all required information.   09/08/2023   09/29/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   09/08/2023   09/10/2023
  The Department is conducting a site investigation, if required   09/08/2023   11/07/2023
  The Department is determining if the activity affects State Lands.   09/08/2023   09/10/2023
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   09/08/2023   09/18/2023
  The Department is waiting for additional information from the permit applicant.   09/29/2023   12/04/2023
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   09/10/2023   09/18/2023
  The Department is reviewing the permit application to determine if it contains all required information.   12/04/2023   01/03/2024
  The Department is waiting for additional information from the permit applicant.   01/03/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MONROE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   BAILEY HARDING
  Application Number:   0362979-003-EI
  Site Name:   WARNER & BEAVERSON / SEABREEZE COVE LLC / 440357635
  Applicant Name:   THOMAS WARNER JR
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   WARNER & BEAVERSON / SEABREEZE COVE LLC / 440357635
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   08/10/2023   08/10/2023
  The Department is reviewing the permit application to determine if it contains all required information.   08/10/2023   09/05/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   08/10/2023   08/12/2023
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   08/10/2023   08/21/2023
  The Department is determining if the activity affects State Lands.   08/10/2023   08/12/2023
  The Department is conducting a site investigation, if required   08/10/2023  
  The Department is waiting for additional information from the permit applicant.   09/05/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0363664-002-EI
  Site Name:   CITY OF FT. LAUDERDALE SEAWALL REPAIRS
  Applicant Name:   JENNI MOREJON
  Applicant Company:   FORT LAUDERDALE DOWNTOWN DEVELOPMENT AUTHORITY
  Agency Action:   Pending
  Link to Department’s Application File:   CITY OF FT. LAUDERDALE SEAWALL REPAIRS
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/21/2023   04/21/2023
  The Department is reviewing the permit application to determine if it contains all required information.   04/21/2023   05/15/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/21/2023  
  The Department is conducting a site investigation, if required   04/21/2023  
  The Department is determining if the activity affects State Lands.   04/21/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/21/2023  
  The Department is waiting for additional information from the permit applicant.   05/15/2023   07/26/2023
  The Department is reviewing the permit application to determine if it contains all required information.   07/26/2023   08/21/2023
  The Department is waiting for additional information from the permit applicant.   08/21/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MONROE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   HALEY KILGOUR
  Application Number:   0365656-002-EI
  Site Name:   OCYPODE LLC / SEAVIEW COMMONS II LLC / 00363551 000300
  Applicant Name:   DENISE HOLLAND
  Applicant Company:   OCYPODE LLC
  Agency Action:   Pending
  Link to Department’s Application File:   OCYPODE LLC / SEAVIEW COMMONS II LLC / 00363551 000300
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   07/07/2023   07/07/2023
  The Department is reviewing the permit application to determine if it contains all required information.   07/07/2023   07/25/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   07/07/2023   07/09/2023
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   07/07/2023   07/18/2023
  The Department is determining if the activity affects State Lands.   07/07/2023   07/09/2023
  The Department is conducting a site investigation, if required   07/07/2023   10/10/2023
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   07/09/2023   07/26/2023
  The Department is waiting for additional information from the permit applicant.   07/25/2023   09/22/2023
  The Department is reviewing the permit application to determine if it contains all required information.   09/22/2023   10/20/2023
  The Department is waiting for additional information from the permit applicant.   10/20/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   ALEXANDER BROCKETT
  Application Number:   0369664-008-EI
  Site Name:   1809 BRICKELL
  Applicant Name:  
  Applicant Company:   1809 BRICKELL, LP
  Agency Action:   Pending
  Link to Department’s Application File:   1809 BRICKELL
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   11/11/2022   11/11/2022
  The Department is reviewing the permit application to determine if it contains all required information.   11/11/2022   12/05/2022
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   11/11/2022  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   11/11/2022  
  The Department is determining if the activity affects State Lands.   11/11/2022  
  The Department is conducting a site investigation, if required   11/11/2022  
  The Department is waiting for additional information from the permit applicant.   12/05/2022  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MARTIN
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   STEFANEY N POVER
  Application Number:   0376279-002-EI
  Site Name:   MARTIN COUNTY MANATEE POCKET
  Applicant Name:   JESSICA GARLAND
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   MARTIN COUNTY MANATEE POCKET
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   12/12/2023   12/12/2023
  The Department is reviewing the permit application to determine if it contains all required information.   12/12/2023   01/05/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   12/12/2023   12/14/2023
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   12/12/2023   12/18/2023
  The Department is determining if the activity affects State Lands.   12/12/2023   12/14/2023
  The Department is conducting a site investigation, if required   12/12/2023  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   12/14/2023   12/19/2023
  The Department is waiting for additional information from the permit applicant.   01/05/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   PALM BEACH
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   EVA DOMAS
  Application Number:   0378358-003-EI
  Site Name:   REYES
  Applicant Name:   JENNIFER & JAMES REYES
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   REYES
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   11/14/2023   11/14/2023
  The Department is reviewing the permit application to determine if it contains all required information.   11/14/2023   12/14/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   11/14/2023   11/16/2023
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   11/14/2023   11/20/2023
  The Department is determining if the activity affects State Lands.   11/14/2023   11/16/2023
  The Department is conducting a site investigation, if required   11/14/2023  
  The Department is waiting for additional information from the permit applicant.   12/14/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   GENEVA ALPERT
  Application Number:   0384921-004-EI
  Site Name:   ROBERT KING HIGH,LLC
  Applicant Name:  
  Applicant Company:   RIVER PARC RIVERWALK, LLC
  Agency Action:   Pending
  Link to Department’s Application File:   ROBERT KING HIGH,LLC
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/19/2024   03/19/2024
  The Department is reviewing the permit application to determine if it contains all required information.   03/19/2024   04/18/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   03/19/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   03/19/2024  
  The Department is determining if the activity affects State Lands.   03/19/2024  
  The Department is providing notice of application to commenting agencies for review.   03/19/2024   03/22/2024
  The Department is conducting a site investigation, if required   03/19/2024  
  The Department is waiting for additional information from the permit applicant.   04/18/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   ST. LUCIE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   DAVID WHITE
  Application Number:   0387619-002-EI
  Site Name:   WHITE CITY PARK
  Applicant Name:   MATT BAUM
  Applicant Company:   ST. LUCIE COUNTY PARKS & RECREATION
  Agency Action:   Pending
  Link to Department’s Application File:   WHITE CITY PARK
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   01/20/2023   01/20/2023
  The Department is reviewing the permit application to determine if it contains all required information.   01/20/2023   02/14/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   01/20/2023   01/22/2023
  The Department is conducting a site investigation, if required   01/20/2023  
  The Department is determining if the activity affects State Lands.   01/20/2023  
  The Department is providing notice of application to commenting agencies for review.   01/20/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   01/20/2023  
  The Department is waiting for additional information from the permit applicant.   02/14/2023   08/14/2023
  The Department is reviewing the permit application to determine if it contains all required information.   08/14/2023   09/11/2023
  The Department is waiting for additional information from the permit applicant.   09/11/2023   04/24/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/24/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   DAVID WHITE
  Application Number:   0388301-003-EI
  Site Name:   ALFRED HENDRICKSON
  Applicant Name:   ALFRED HENDRICKSON
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   ALFRED HENDRICKSON
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   08/25/2022   08/25/2022
  The Department is reviewing the permit application to determine if it contains all required information.   08/25/2022   09/09/2022
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   08/25/2022   08/27/2022
  The Department is conducting a site investigation, if required   08/25/2022   09/24/2022
  The Department is determining if the activity affects State Lands.   08/25/2022   08/27/2022
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   08/25/2022   01/04/2024
  The Department is waiting for additional information from the permit applicant.   09/09/2022   12/06/2022
  The Department is reviewing the permit application to determine if it contains all required information.   12/06/2022   01/05/2023
  The Department is waiting for additional information from the permit applicant.   01/05/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   MATTHEW GUINAZU
  Application Number:   0394079-006-EI
  Site Name:   RONI JACOBSON
  Applicant Name:  
  Applicant Company:   JLSA STAR LLC
  Agency Action:   Pending
  Link to Department’s Application File:   RONI JACOBSON
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/22/2024   03/22/2024
  The Department is reviewing the permit application to determine if it contains all required information.   03/22/2024   04/19/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   03/22/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   03/22/2024  
  The Department is determining if the activity affects State Lands.   03/22/2024  
  The Department is providing notice of application to commenting agencies for review.   03/22/2024  
  The Department is conducting a site investigation, if required   03/22/2024  
  The Department is waiting for additional information from the permit applicant.   04/19/2024  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   ST. LUCIE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0396199-002-EI
  Site Name:   OCEAN PROPERTY HOLDINGS LLC
  Applicant Name:   LEE HEATON
  Applicant Company:   SEASIDE 20 LLC
  Agency Action:   Pending
  Link to Department’s Application File:   OCEAN PROPERTY HOLDINGS LLC
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   11/19/2021   11/19/2021
  The Department is reviewing the permit application to determine if it contains all required information.   11/19/2021   12/10/2021
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   11/19/2021   11/21/2021
  The Department is determining if the activity affects State Lands.   11/19/2021   11/21/2021
  The Department is waiting for additional information from the permit applicant.   12/10/2021   03/23/2022
  The Department is reviewing the permit application to determine if it contains all required information.   03/23/2022   04/20/2022
  The Department is waiting for additional information from the permit applicant.   04/20/2022   09/01/2022
  The Department is reviewing the permit application to determine if it contains all required information.   09/01/2022   09/28/2022
  The Department is waiting for additional information from the permit applicant.   09/28/2022  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   PALM BEACH
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JULIA P STAHL
  Application Number:   0399993-003-EI
  Site Name:   JEFFREY QUEEN
  Applicant Name:   JEFFREY QUEEN
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   JEFFREY QUEEN
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/25/2024   03/25/2024
  The Department is reviewing the permit application to determine if it contains all required information.   03/25/2024   04/18/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   03/25/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   03/25/2024  
  The Department is determining if the activity affects State Lands.   03/25/2024   03/27/2024
  The Department is providing notice of application to commenting agencies for review.   03/25/2024  
  The Department is conducting a site investigation, if required   03/25/2024  
  The Department is waiting for additional information from the permit applicant.   04/18/2024  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   03/27/2024   05/09/2024
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   BROWARD
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   ALEXANDER BROCKETT
  Application Number:   0403527-001-EI
  Site Name:   DANIA RESIDENCE
  Applicant Name:   ISMAIL DANIA
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   DANIA RESIDENCE
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/07/2021   05/07/2021
  The Department is reviewing the permit application to determine if it contains all required information.   05/07/2021   06/04/2021
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   05/07/2021  
  The Department is determining if the activity affects State Lands.   05/07/2021  
  The Department is waiting for additional information from the permit applicant.   06/04/2021  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MIAMI-DADE
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   JOHN TRACEY
  Application Number:   0403963-004-EI
  Site Name:   GREEN GLADES EAST
  Applicant Name:   RONALD BERGERON
  Applicant Company:   GREEN GLADES EAST, LLC
  Agency Action:   Pending
  Link to Department’s Application File:   GREEN GLADES EAST
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/10/2023   04/10/2023
  The Department is reviewing the permit application to determine if it contains all required information.   04/10/2023   05/08/2023
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/10/2023  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/10/2023  
  The Department is determining if the activity affects State Lands.   04/10/2023  
  The Department is conducting a site investigation, if required   04/10/2023  
  The Department is waiting for additional information from the permit applicant.   05/08/2023  
If you would like to comment on the pending application, please go here: Public Comment | DEP Business Portal (fldepportal.com)


Permitting Application Under Review
  FDEP Office:   SOUTHEAST DISTRICT
  Florida County:   MARTIN
  Permit Type:   Water - Individual With No Conceptual Approval Permit
  Permit Processor:   HANNAH E BLUM
  Application Number:   0405984-001-EI
  Site Name:   5950 SE TAYLOR DRIVE
  Applicant Name:   MARTHA MIJARES
  Applicant Company:  
  Agency Action:   Pending
  Link to Department’s Application File:   5950 SE TAYLOR DRIVE
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/09/2024   04/09/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/09/2024   05/09/2024
  The Department is determining if the application is eligible for the State Programmatic General Permit (SPGP).   04/09/2024  
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   04/09/2024  
  The Department is determining if the activity affects State Lands.   04/09/2024   04/11/2024
  The Department is conducting a site investigation, if required   04/09/2024  
  The Department is providing notice of application to commenting agencies for review.   04/09/2024  
  The Division of State Lands is conducting a Title determination to determine if the activity affects State Lands.   04/11/2024  
  The Department is waiting for additional information from the permit applicant.   05/09/2024