Skip Navigation

Permitting Application with Events Details


This data is current as of: Sunday, June 16, 2024


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   ALACHUA
  Permit Type:   Air - Construction Permit
  Permit Processor:   ERIC A DUNKELBERGER
  Application Number:   0010087-084-AC
  Site Name:   ARGOS NEWBERRY CEMENT PLANT
  Applicant Name:   ELKIN RODRIGUEZ BOLANO
  Applicant Company:   ARGOS USA, LLC
  Agency Action:   Issue: Pending Final Action
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/14/2024   05/14/2024
  The permit processor is verifying the permit application fee submitted is correct.   05/14/2024   05/16/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/14/2024   05/14/2024
  The Department is making an outcome determination regarding the permit application.   05/14/2024   06/05/2024
  The Department is mailing the permit applicant and other affected or interested parties a certified copy of the Department's intended actions.   06/05/2024   06/05/2024
  The Department's intent regarding the permit application was published.   06/05/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   ALACHUA
  Permit Type:   Air - Construction Permit
  Permit Processor:   DAVID L READ
  Application Number:   0010087-085-AC
  Site Name:   ARGOS NEWBERRY CEMENT PLANT
  Applicant Name:   ELKIN BOLANO
  Applicant Company:   ARGOS USA, LLC
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/24/2024   05/24/2024
  The permit processor is verifying the permit application fee submitted is correct.   05/24/2024   05/26/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/24/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   BREVARD
  Permit Type:   Air - Construction Permit
  Permit Processor:   MARTY COSTELLO
  Application Number:   0090286-001-AC
  Site Name:   ROBERTS ROAD COMPLEX
  Applicant Name:   BRITTANY ROWE
  Applicant Company:   SPACEX
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/29/2024   03/29/2024
  The permit processor is verifying the permit application fee submitted is correct.   03/29/2024   03/31/2024
  The Department is waiting for the applicant to submit the requested additional fees.   03/31/2024   04/02/2024
  The permit processor is verifying the permit application fee submitted is correct.   04/02/2024   04/04/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/02/2024   05/03/2024
  The Department is making an outcome determination regarding the permit application.   04/02/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   CHARLOTTE
  Permit Type:   Air - Construction Permit
  Permit Processor:   MARTY COSTELLO
  Application Number:   0150093-017-AC
  Site Name:   THE QUIKRETE COMPANIES - PUNTA GORDA
  Applicant Name:   HAYES KERN
  Applicant Company:   QUIKRETE
  Agency Action:   Issue: Pending Final Action
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/15/2024   03/15/2024
  The permit processor is verifying the permit application fee submitted is correct.   03/15/2024   03/17/2024
  The Department is waiting for the applicant to submit the requested additional fees.   03/17/2024   03/25/2024
  The permit processor is verifying the permit application fee submitted is correct.   03/25/2024   03/27/2024
  The Department is reviewing the permit application to determine if it contains all required information.   03/25/2024   04/20/2024
  The Department is making an outcome determination regarding the permit application.   03/25/2024   06/06/2024
  The Department is mailing the permit applicant and other affected or interested parties a certified copy of the Department's intended actions.   06/06/2024   06/06/2024
  The Department's intent regarding the permit application was published.   06/06/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   MIAMI-DADE
  Permit Type:   Air - Construction Permit
  Permit Processor:   PAWAN SUBRAMANIAM
  Application Number:   0250014-074-AC
  Site Name:   MIAMI CEMENT PLANT
  Applicant Name:   JACKELIN SIMMONS
  Applicant Company:   CEMEX CONSTRUCTION MATERIALS FLORIDA, LLC
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/21/2024   05/21/2024
  The permit processor is verifying the permit application fee submitted is correct.   05/21/2024   05/22/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/21/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   DESOTO
  Permit Type:   Air - Construction Permit
  Permit Processor:   JOEL WHARTON
  Application Number:   0270021-007-AC
  Site Name:   ALLIED RECYCLING ARCADIA, INC
  Applicant Name:   TODD ADAMSON
  Applicant Company:   ALLIED RECYCLING, INC.
  Agency Action:   Issue: Pending Final Action
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   01/10/2024   01/10/2024
  The permit processor is verifying the permit application fee submitted is correct.   01/10/2024   01/11/2024
  The Department is waiting for the applicant to submit the requested additional fees.   01/11/2024   02/26/2024
  The permit processor is verifying the permit application fee submitted is correct.   02/26/2024   02/26/2024
  The Department is reviewing the permit application to determine if it contains all required information.   02/26/2024   03/27/2024
  The Department is making an outcome determination regarding the permit application.   02/26/2024   03/27/2024
  The Department is mailing the permit applicant and other affected or interested parties a certified copy of the Department's intended actions.   03/27/2024   03/27/2024
  The Department's intent regarding the permit application was published.   03/27/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   DUVAL
  Permit Type:   Air - Construction Permit
  Permit Processor:   DAVID L READ
  Application Number:   0310045-064-AC
  Site Name:   NORTHSIDE GENERATING STATION
  Applicant Name:   KEVIN HOLBROOKS
  Applicant Company:   JEA
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/20/2024   05/20/2024
  The permit processor is verifying the permit application fee submitted is correct.   05/20/2024   05/22/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/20/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   ESCAMBIA
  Permit Type:   Air - Construction Permit
  Permit Processor:   TAMMY MCWADE
  Application Number:   0330042-030-AC
  Site Name:   INTERNATIONAL PAPER PENSACOLA MILL
  Applicant Name:   SCOTT TAYLOR
  Applicant Company:   INTERNATIONAL PAPER COMPANY PENSACOLA MILL
  Agency Action:   Issue: Pending Final Action
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/01/2022   04/01/2022
  The permit processor is verifying the permit application fee submitted is correct.   04/01/2022   04/03/2022
  The Department is reviewing the permit application to determine if it contains all required information.   04/01/2022   05/04/2022
  The Department is waiting for additional information from the permit applicant.   05/04/2022   05/26/2023
  The Department is reviewing the permit application to determine if it contains all required information.   05/26/2023   06/26/2023
  The Department is making an outcome determination regarding the permit application.   05/26/2023   06/28/2023
  The Department is mailing the permit applicant and other affected or interested parties a certified copy of the Department's intended actions.   06/28/2023   06/28/2023
  The Department's intent regarding the permit application was published.   06/28/2023  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   HERNANDO
  Permit Type:   Air - Construction Permit
  Permit Processor:   SCOTT LAUDER
  Application Number:   0530021-100-AC
  Site Name:   CEMEX BROOKSVILLE SOUTH CEMENT PLANT
  Applicant Name:   PATRICK MONTGOMERY
  Applicant Company:   CEMEX CONSTRUCTION MATERIALS FLORIDA, LLC
  Agency Action:   Issue: Pending Final Action
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   10/27/2023   10/27/2023
  The permit processor is verifying the permit application fee submitted is correct.   10/27/2023   10/27/2023
  The Department is reviewing the permit application to determine if it contains all required information.   10/27/2023   12/22/2023
  The Department is waiting for additional information from the permit applicant.   12/22/2023   04/08/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/08/2024   04/08/2024
  The Department is making an outcome determination regarding the permit application.   04/08/2024   05/03/2024
  The Department is mailing the permit applicant and other affected or interested parties a certified copy of the Department's intended actions.   05/03/2024   05/03/2024
  The Department's intent regarding the permit application was published.   05/03/2024   05/17/2024
  The Department is waiting to see if there is a request for an administrative hearing received from the applicant, the general public or an affected third party.   05/17/2024   05/31/2024
  The permit was issued.   05/31/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   LEE
  Permit Type:   Air - Construction Permit
  Permit Processor:   PAWAN SUBRAMANIAM
  Application Number:   0710133-021-AC
  Site Name:   GULF COAST SANITARY LANDFILL
  Applicant Name:   DAVID PHILLIPS
  Applicant Company:   WASTE MANAGEMENT INC. OF FLORIDA
  Agency Action:   Issue: Pending Final Action
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   01/31/2023   01/31/2023
  The permit processor is verifying the permit application fee submitted is correct.   01/31/2023   01/31/2023
  The Department is reviewing the permit application to determine if it contains all required information.   01/31/2023   02/02/2023
  The Department is waiting for additional information from the permit applicant.   02/02/2023   01/17/2024
  The Department is reviewing the permit application to determine if it contains all required information.   01/17/2024   03/18/2024
  The Department is making an outcome determination regarding the permit application.   01/17/2024   04/16/2024
  The Department is mailing the permit applicant and other affected or interested parties a certified copy of the Department's intended actions.   04/16/2024   04/16/2024
  The Department's intent regarding the permit application was published.   04/16/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   LEVY
  Permit Type:   Air - Construction Permit
  Permit Processor:   TAMMY MCWADE
  Application Number:   0750082-025-AC
  Site Name:   WILLISTON AIRPORT PLANT
  Applicant Name:   ROBERT PITA
  Applicant Company:   SEABRING MARINE INDUSTRIES, INC.
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   06/29/2023   06/29/2023
  The permit processor is verifying the permit application fee submitted is correct.   06/29/2023   06/29/2023
  The Department is waiting for the applicant to submit the requested additional fees.   06/29/2023   06/30/2023
  The permit processor is verifying the permit application fee submitted is correct.   06/30/2023   07/02/2023
  The Department is reviewing the permit application to determine if it contains all required information.   06/30/2023   07/20/2023
  The Department is waiting for additional information from the permit applicant.   07/20/2023   04/04/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/04/2024   05/05/2024
  The Department is making an outcome determination regarding the permit application.   04/04/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   LEVY
  Permit Type:   Air - Construction Permit
  Permit Processor:   ERIC A DUNKELBERGER
  Application Number:   0750093-006-AC
  Site Name:   PGS ALLIANCE RNG UPGRADING FACILITY
  Applicant Name:   ROBERT VELASCO
  Applicant Company:   TAMPA ELECTRIC COMPANY
  Agency Action:   Issue: Pending Final Action
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/19/2024   04/19/2024
  The permit processor is verifying the permit application fee submitted is correct.   04/19/2024   04/21/2024
  The Department is waiting for the applicant to submit the requested additional fees.   04/21/2024   04/23/2024
  The permit processor is verifying the permit application fee submitted is correct.   04/23/2024   04/23/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/23/2024   05/24/2024
  The Department is making an outcome determination regarding the permit application.   04/23/2024   06/05/2024
  The Department is mailing the permit applicant and other affected or interested parties a certified copy of the Department's intended actions.   06/05/2024   06/05/2024
  The Department's intent regarding the permit application was published.   06/05/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   MANATEE
  Permit Type:   Air - Construction Permit
  Permit Processor:   ERIC A DUNKELBERGER
  Application Number:   0810271-001-AC
  Site Name:   LENA ROAD RNG FACILITY
  Applicant Name:   MARK MCCLENAGHAN
  Applicant Company:   JOHNSON CONTROLS, INC.
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/21/2024   05/21/2024
  The permit processor is verifying the permit application fee submitted is correct.   05/21/2024   05/22/2024
  The Department is waiting for the applicant to submit the requested additional fees.   05/22/2024   05/23/2024
  The permit processor is verifying the permit application fee submitted is correct.   05/23/2024   05/23/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/23/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   MARION
  Permit Type:   Air - Construction Permit
  Permit Processor:   HANNA BRASSEUR
  Application Number:   0830052-017-AC
  Site Name:   CLOSETMAID
  Applicant Name:   GREG SWEARINGEN
  Applicant Company:   CLOSETMAID, INC.
  Agency Action:   Issue: Pending Final Action
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/22/2024   04/22/2024
  The permit processor is verifying the permit application fee submitted is correct.   04/22/2024   04/24/2024
  The Department is waiting for the applicant to submit the requested additional fees.   04/24/2024   04/25/2024
  The permit processor is verifying the permit application fee submitted is correct.   04/25/2024   04/25/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/25/2024   05/23/2024
  The Department is making an outcome determination regarding the permit application.   04/25/2024   05/23/2024
  The Department is mailing the permit applicant and other affected or interested parties a certified copy of the Department's intended actions.   05/23/2024   05/23/2024
  The Department's intent regarding the permit application was published.   05/23/2024   05/31/2024
  The Department is waiting to see if there is a request for an administrative hearing received from the applicant, the general public or an affected third party.   05/31/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   MARION
  Permit Type:   Air - Construction Permit
  Permit Processor:   SCOTT LAUDER
  Application Number:   0830191-001-AC
  Site Name:   ECO-VERDE LLC
  Applicant Name:   REX FARRIOR
  Applicant Company:   FARRIOR INVESTMENTS LTD.
  Agency Action:   Issue: Pending Final Action
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   03/20/2024   03/20/2024
  The permit processor is verifying the permit application fee submitted is correct.   03/20/2024   03/21/2024
  The Department is waiting for the applicant to submit the requested additional fees.   03/21/2024   03/21/2024
  The permit processor is verifying the permit application fee submitted is correct.   03/21/2024   03/21/2024
  The Department is reviewing the permit application to determine if it contains all required information.   03/21/2024   04/21/2024
  Applicant must publish a Notice of Application (per Rule 17-104.150(1) F.A.C. ) during the dates provided by the Department.   03/21/2024   04/18/2024
  The Department is making an outcome determination regarding the permit application.   03/21/2024   05/29/2024
  The Department is waiting for the applicant to return of the original affidavit of proof of publication of the Notice of Application.   04/18/2024   04/25/2024
  The Department is mailing the permit applicant and other affected or interested parties a certified copy of the Department's intended actions.   05/29/2024   05/29/2024
  The Department's intent regarding the permit application was published.   05/29/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   MARTIN
  Permit Type:   Air - Construction Permit
  Permit Processor:   SCOTT LAUDER
  Application Number:   0850168-001-AC
  Site Name:   INDIANTOWN FACILITY
  Applicant Name:   LUCAS REID
  Applicant Company:   INDIANTOWN MVR WWT, LLC
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   01/17/2024   01/17/2024
  The permit processor is verifying the permit application fee submitted is correct.   01/17/2024   01/18/2024
  The Department is waiting for the applicant to submit the requested additional fees.   01/18/2024   01/18/2024
  The permit processor is verifying the permit application fee submitted is correct.   01/18/2024   01/18/2024
  The Department is reviewing the permit application to determine if it contains all required information.   01/18/2024   02/02/2024
  The Department is waiting for additional information from the permit applicant.   02/02/2024   04/04/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/04/2024   04/25/2024
  The Department is making an outcome determination regarding the permit application.   04/04/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   NASSAU
  Permit Type:   Air - Construction Permit
  Permit Processor:   IRINA V TSVETKOVA
  Application Number:   0890004-070-AC
  Site Name:   RAYONIER FERNANDINA SULFITE PLANT
  Applicant Name:   MARK HOMANS
  Applicant Company:   RAYONIER PERFORMANCE FIBERS, LLC
  Agency Action:   Issue: Pending Final Action
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   11/14/2023   11/14/2023
  The permit processor is verifying the permit application fee submitted is correct.   11/14/2023   11/14/2023
  The Department is reviewing the permit application to determine if it contains all required information.   11/14/2023   12/14/2023
  The Department is making an outcome determination regarding the permit application.   11/14/2023   03/13/2024
  The Department is mailing the permit applicant and other affected or interested parties a certified copy of the Department's intended actions.   03/13/2024   03/13/2024
  The Department's intent regarding the permit application was published.   03/13/2024   03/27/2024
  The Department is waiting to see if there is a request for an administrative hearing received from the applicant, the general public or an affected third party.   03/27/2024   04/24/2024
  The Office of General Counsel is reviewing the Petition for an Administrative Hearing.   04/24/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   PALM BEACH
  Permit Type:   Air - Construction Permit
  Permit Processor:   SCOTT LAUDER
  Application Number:   0990332-027-AC
  Site Name:   OKEELANTA COGENERATION PLANT
  Applicant Name:   JOSE GONZALEZ
  Applicant Company:   NEW HOPE POWER COMPANY
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/17/2024   05/17/2024
  The permit processor is verifying the permit application fee submitted is correct.   05/17/2024   05/19/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/17/2024   06/17/2024
  The Department is making an outcome determination regarding the permit application.   05/17/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   POLK
  Permit Type:   Air - Construction Permit
  Permit Processor:   SCOTT SHEPLAK
  Application Number:   1050004-060-AC
  Site Name:   C.D. MCINTOSH, JR. POWER PLANT
  Applicant Name:   MILES DENTLER
  Applicant Company:   CITY OF LAKELAND--LAKELAND ELECTRIC
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/24/2024   05/24/2024
  The permit processor is verifying the permit application fee submitted is correct.   05/24/2024   05/26/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/24/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   SEMINOLE
  Permit Type:   Air - Construction Permit
  Permit Processor:   PAWAN SUBRAMANIAM
  Application Number:   1170084-013-AC
  Site Name:   SEMINOLE CO/OSCEOLA RD LANDFILL
  Applicant Name:   OLIVER BOND
  Applicant Company:   SEMINOLE COUNTY SOLID WASTE MANAGEMENT DIVISION
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/10/2024   05/10/2024
  The permit processor is verifying the permit application fee submitted is correct.   05/10/2024   05/12/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/10/2024   06/10/2024
  The Department is making an outcome determination regarding the permit application.   05/10/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   SEMINOLE
  Permit Type:   Air - Construction Permit
  Permit Processor:   PAWAN SUBRAMANIAM
  Application Number:   1170084-014-AC
  Site Name:   SEMINOLE CO/OSCEOLA RD LANDFILL
  Applicant Name:   OLIVER BOND
  Applicant Company:   SEMINOLE COUNTY SOLID WASTE MANAGEMENT DIVISION
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   06/06/2024   06/06/2024
  The permit processor is verifying the permit application fee submitted is correct.   06/06/2024   06/06/2024
  The Department is reviewing the permit application to determine if it contains all required information.   06/06/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   SUMTER
  Permit Type:   Air - Construction Permit
  Permit Processor:   DAVID L READ
  Application Number:   1190042-026-AC
  Site Name:   SUMTERVILLE CEMENT PLANT
  Applicant Name:   DIRK COX
  Applicant Company:   SUWANNEE AMERICAN CEMENT COMPANY, LLC
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/01/2024   05/01/2024
  The permit processor is verifying the permit application fee submitted is correct.   05/01/2024   05/02/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/01/2024   06/01/2024
  The Department is making an outcome determination regarding the permit application.   05/01/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   SUWANNEE
  Permit Type:   Air - Construction Permit
  Permit Processor:   PAWAN SUBRAMANIAM
  Application Number:   1210465-063-AC
  Site Name:   BRANFORD CEMENT PLANT
  Applicant Name:   JOHN RALPH
  Applicant Company:   SUWANNEE AMERICAN CEMENT COMPANY, LLC
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   04/29/2024   04/29/2024
  The permit processor is verifying the permit application fee submitted is correct.   04/29/2024   04/29/2024
  The Department is reviewing the permit application to determine if it contains all required information.   04/29/2024   05/30/2024
  The Department is making an outcome determination regarding the permit application.   04/29/2024  


Permitting Application Under Review
  FDEP Office:   TALLAHASSEE HEADQUARTERS
  Florida County:   TAYLOR
  Permit Type:   Air - Construction Permit
  Permit Processor:   IRINA V TSVETKOVA
  Application Number:   1230001-128-AC
  Site Name:   FOLEY MILL
  Applicant Name:   CHRISTOPHER READ
  Applicant Company:   FOLEY CELLULOSE, LLC
  Agency Action:   Pending
Permitting Application Events to Date
  Permitting Event Description   Started   Completed
  Permit application was received by the Department.   05/22/2024   05/22/2024
  The permit processor is verifying the permit application fee submitted is correct.   05/22/2024   05/22/2024
  The Department is reviewing the permit application to determine if it contains all required information.   05/22/2024